4. Quality and TQM Definition
Quality:
It is define as the degree to which a set of inherent characteristics fulfills
requirement
TQM:
(Total Quality Management) is the art of managing the whole to achieve
excellence
We are going to apply the Total Quality Management standards on “Asia
Ghee Mill LTD”
6. Introduction
Asia ghee mill was established in 1997 via company ordinance, 1984.
The Private company was founded by Ch.Abdul Majeed (Late), Now the
owner of this company is Ch.Masood Majeed
It is situated at Ahmadpur road Near Khanqah Sharif , Bahawalpur
Its plant was imported from United Kingdom
Employees working in asia ghee mills are 350 on different post
Total production capacity is 150 ton per day
Plant utilize 70 % of capacity in summer and 90% in winter
7. Vision and Mission of Asia Ghee Mill
Vision of Asia Ghee Mill:
“Superior quality products at affordable price for our customers, is our
commitment.”
Mission of Asia Ghee Mill:
“We want to become a company which will have customer satisfaction,
innovation and continuous improvement in all fields in safe environment.”
8. Major Products Of Asia Ghee Mill
Two Major products of asia ghee mills are:
Asia Cooking oil
Asia Banaspati
Soap and CO2 are the bi products of asia ghee mill
10. Competitors Of Asia Ghee Mill
Sr.no. Ghee Name Company Name
1 Dalda Dalda Foods
2 Nasir Nasir Ghee mills Pvt Ltd Bahawalpur
3 Seasons Wali oil mills
4 Tallo Wazir Ali Industries Hyderabad
5 Kisan Madina Enterprises
6 Sufi Hamza Vegetables
7 Lives Shamim Group of companies
8 Sultan Al-Hilal vegetables ghee mills Multan
9 Shahbaz Shahbaz Banaspati Rahim Yar Khan
14. Supplier and Customer Of Asia Ghee
Supplier:
Asia ghee import Raw oil from Singapur and Malasia
Asia ghee mill also buy Raw oil from Karachi, Lahore and Attock.
Customer:
Customer of Asia ghee mill are divided into 9 circles to provide its product all over the
city
15. Supplier and customer of Asia ghee
Circle A Circles B Circle C
Mian Traders. Hafiz Ibraheem Jail Road Yaqub Ghur Mandi
Saleem Multan Road. Malik bradars Jail Road Yousaf Ghur Mandi
Afzal Puldivan. Riaz Machli Bazar.
Hafiz Baqa Multani Gate.
Circle D Circle E Circle F
Hamza Ghalla Mandi. Saleem Railway Road. Shoaib Bhatta Number
Aik.
Habib Sabzi Mandi. Ishaq Shadra. Abdul Rashid Katal Mara
Mur.
Circle G Circle H Circle I
Owais Foji Basti. Asghar Hamaitian. Aashiq Asfaq Ghalla
Mandi.
New Rafeeq Dilawar Naibi General Store. Haji Abid Ghalla Mandi.
Kaluni.
Rashid and Sons Fuji Master Sadiq Master Sadiq Bilal Bradars Ghalla
Basti. Road. Mandi.
16. Quality Standard
Asia ghee mill use the following standards:
ISO 9000 (for Quality standard)
ISO 14000 (for Environmental Friendly standard)
18. Supplier and Customer Relationship
To Registering costumer complaints.
Inform the upper subordinates about any major complaints as soon as possible.
They resolve all the minor problems as quickly as possible.
They develop user friendly environment.
They apply humble behavior.
They try to satisfy the costumer at any cost.
By providing proper product information.
19. Supplier and Customer Relationship
Provide product use information.
Identify product’s salient features.
Provide fast mechanism for managing and scheduling follow up sales calls,
repurchase times and repurchase frequencies.
Identify potential problems quickly before they occur.
21. Improvement Strategies
Refinement:
Refinement improves efficiency and effectiveness of cooking oil and Asia ghee
Renovation:
Automatic packaging system and imported latest machinery from UK
Reinvention:
Introduce asia soap at lowest cost for the middle class customers.
29. Employee Involvement
Employee Suggestion System:
Suggestion boxes are installed on entrance
Suggestion boxes are also installed on exit gate
Boxes open on monthly basis
Changes according to the employees suggestion
Always employees rights keeps in mind.
30. Methods of Performance Measure
Quality:
Percent reduction in cost of poor quality
Percent reduction in nonconformities
Percent of certified Suppliers
Percent reduction in supplier base
Percent reduction in corrective action cycle time
31. Methods of Performance Measure
Cost:
Percent increase in inventory turnover
Percent reduction in data transactions
Percent increase in materials shipped direct to work in process by the supplier.
Percent increase in output dollars per employee
Percent reduction in floor space utilization
33. Methods of Performance Measure
Flexibility:
Percent reduction cycle time
Percent Reduction in setup time.
Percent Reduction in lot/batch size.
Percent Increase in number of jobs mastered per employee
Percent increase in common materials used per product.
34. Methods of Performance Measure
Reliability:
Percent of processes capable of cp2.0
Percent reduction in down time.
Percent reduction in warranty costs.
Percent reduction in design changes
Percent increase in one time delivery.
35. Methods of Performance Measure
Innovation:
Percent reduction in new product introduction time
Percent increase in new product sales revenue as a Percent of total sales
revenue.
Percent increase in new patents granted.
Customer perception as a leader in innovation.
Percent of management time spent on or leading innovation.
Motivation: Friendly Work Environment, pleasant atmosphere, Take advantages, Use food as incentive (asia do it 3 time),, Reward 4 hard work, Create social events.,
Employee Teamwork's:: mil kr kam krna as a team and team leader.
Employe Rewards:: Employees ko rewards dye jaty hen bonus nd inam dea jata h
Employee suggestion system: is me employee sy segesion li jati hen and complains du ki jati hyn