18. Structural Comparison Emulsion FDR Typical Reconstruction Design SN = 4.35 6” HMA 18” Type II Aggregate Base 5.5” HMA 6” FDR Total SN = 4.73 (from FWD) $925,685 Total SN = 4.50 $1,248,346 7-12” existing Aggregate Base
19. FWD Results – Before and After FDR AASHTO Layer Coefficient 0.28 per FWD testing. (HMA is typically 0.35 to 0.42)
20.
21. Chris Finberg (City of Las Vegas) – 702-236-4759 Dan Quire (SemMaterials, L.P.) – 303-915-2851 Todd Thomas (SemMaterials, L.P.) – 918-960-3828 Questions?