2. Goals & Objectives of the Project:
The objective of the project is to acquire complete surface knowledge
regarding geology of the KP on scale of 1:50,000.
Moreover, potential areas would be mapped on 1:10000 or 1:5000 scale
To serve as a primary data source to attract investors and for further
detail minerals resource exploration.
To have a geological map that presents carefully and competently
compiled and well organized geological information.
To have a 3D model of the subsurface geology of Khyber Pakhtunkhwa.
3. Outcomes:
Soft & Hard copies of Geological Maps including 3D models and
cross section of the project area (Scale 1:50,000)
Geo-database of the mapped area supported by ArcGIS
Identification of new mineral potential sites.
4. MAPPED SHEETS: 49
MAPPED AREA: 26288
SQ.KMUNMAPPED SHEETS: 117
UNMAPPED AREA: 48144
SQ.KM
TOTAL SHEETS: 166
TOTAL AREA: 74432
SQ.KM
MAPPED AREA: 35 %
UNMAPPED AREA: 65 %
BACK TO FIRST SLIDE
5. MALAKAND
DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
43 15144
Mapped 31 14549
District Minerals
Currently Mining
Mineral Potential
Chitral Marble Metallic Minerals
Copper, Lead, Zinc,
Antimony, Aqua Marine &
Nephrite
Dir Granite Metallic Minerals
Copper, Lead, Zinc,
Antimony
Swat Emerald
Marble & Granite
Emerald
Marble & Granite
Shangla Soapstone Soapstone
Malakand Quartz Chromite
Chitral
Upper
Dir
Swat
Shangla
Lower
DirMalakan
d
Buner
6. HAZARA DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
31 11777
Mapped 15 5545
District Minerals
Currently
Mining
Mineral Potential
Kohistan Chromite Granite, Copper, Lead,
Peridote
Batagram Soapstone Granite, Mica, Peridote
Mansehra Feldspar,
Granite,
Soapstone
Peridote, Emerald, Ruby
Abbottaba
d
Phosphate Coal
Haripure Limestone Coal
Kohistan
Batagram
Mansehra
Abbottabad
Haripur
7. MARDAN DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
5 537
Mapped 10 2553
District Minerals
Currently
Mining
Mineral Potential
Mardan Marble,
Limestone,
Topaz
Topaz
Swabi Limestone,
marble,
Granite
Placer Gold, Barite
Swabi
Mardan
8. PESHAWAR
DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
6 2220
Mapped 7 1776
District Minerals
Currently
Mining
Mineral Potential
Peshawar Limestone
Charsadd
a
Chromite Chromite, Placer
Gold
Nowsher
a
Limestone,
Coal
Coal, Placer Gold
Charsadda
Peshawar
Nowshera
9. KOHAT DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
9 2284
Mapped 11 4688
District Minerals
Currently
Mining
Mineral Potential
Kohat Limestone,
Coal,
Gypsum, Salt
Coal, Placer Gold
Hangu Limestone,
Coal
Coal
Karak Gypsum,
Salt, Coal
Coal, Placer Gold
KohatHangu
Karak
10. BANNU DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
12 4168
Mapped 2 219
District Minerals
Currently
Mining
Mineral Potential
Bannu Limstone Limestone
Lakki
Marwat
Limestone,
Laterite
Laterite, Coal,
Limestone
Lakki Marwat
Bannu
11. D.I. KHAN DIVISION
No. of Topo sheets Area (sq.km)
Unmappe
d
25 8825
Mapped 2 117
District Minerals
Currently
Mining
Mineral Potential
Tank - Barite
D.I. Khan Limestone,
Laterite
Laterite, Limestone
Tank
D.I. Khan
12. MAPPING COST PER DIVISION
Malakand,
121.9
Hazara,
100.2Mardan, 4.1
Peshawar,
17.3
Kohat,
17.0
Bannu, 31.0
D.I. Khan,
66.4
Division
Unmapped Area
(sq.km)
No. of
Sheets
Cost in Million
(approx.)
Malakan
d 16396 45 121.9
Hazara 13480 35 100.2
Mardan 549 7 4.1
Peshawa
r 2331 7 17.3
Kohat 2284 9 17.0
Bannu 4168 12 31.0
D.I.
Khan 8936 26 66.4
Total 48144 117 358.0
13. ACADEMIA EXPERTS IN KP CONTACTED
FOR THE PROJECT, WHO EXPRESSED
WILLINGNESS TOEXCUTE THE
PROJECT1. Department of Geology, University of Peshawar
2. Department of Geology, Bacha Khan University, Charsadda
3. Department of Geology, University of Swabi
4. Department of Earth Science, University of Swat
5. Department of Geology, Shaheed Benazir Bhutto University, Dir
6. Department of Geology, Khushal Khan Khattak University, Karak
7. Department of Earth Science, Abbottabad University of Science and Technology
8. Department of Geology, University of Haripur
9. Department of Geology, University of Malakand
10. Department of Geology, Abdul Wali Khan University Mardan
11. Geological Survey of Pakistan, Peshawar
12. National Center of Excellence in Geology, University of Peshawar
14. MODE OF EXECUTION
• 7 Consultants from government organizations listed above shall be hired
under Section 3(2C) of KPPRA Rule 2014
• Request for proposal (RFP) shall be provided to consultants by MDD
• Comprised of:
• Scope of Project, ToRs, Technical & Financial Bidding Procedure
• Consultants shall submit technical & financial proposals for Divisional
Mapping of their Interest
• Technical & financial proposals shall be scrutinized / evaluated by MDD
on QCBS (Quality and Cost Based Selection)
• Technical Bid: HR Expertise, Equipment & Experience
• Financial Bid: Lowest bid
• Upon successive bidders, Contracts for each Divisions (7) shall be
awarded by MDD
15. WORK PLAN
S.N
o
Nature of Work
1st Year (2017-18) 2nd Year (2018-19)
1st
Qtr
2nd
Qtr
3rd
Qtr
4th Qtr 1st Qtr 2nd
Qtr
3rd
Qtr
4th
Qtr
1 Appointment of
Consultant & Staff
2 Study & Analysis of
existing Data
3 Geological Mapping
(Scale 1:50,000)
4 Generation of 3D
Geological Models in GIS
5 Compilation of Report
along with Geological
Map (Hard & Soft Copy)
16. MODE OF PAYMENT
S.No Mode of Payment %age
1 Submission of work plan & inception report 10 %
2 Submission of first quarter Divisional Geological Map along
with geological report, scale @1:50,000
15%
3 Submission of second quarter Divisional Geological Map along
with geological report, scale @1:50,000
20%
4 Submission of 3rd quarter Divisional Geological Map along
with geological report, scale @1:50,000
20%
5 Submission of Final Geological Map along with Final Report 35%
17. CAPITAL COST ESTIMATES
S/N Items Cost Rs in million
1 Salary 11.244
2 Establishment Charges 8.000
3 Consultancy Charges 358.000
4 Equipment's 21.120
5 Vehicle 4.300
Total 402.664
18. MEETING WITH ACADEMIA EXPERTS
DATED 11.04.2018
Showed keen interest in project
Suggested to extend the duration of project to two years for Northern
parts of KP
Suggested for team up of two institute for submission of proposals
for project