SlideShare a Scribd company logo
1 of 42
TRELLEBORG MARINE SYSTEMSOFFSHORE INTEGRATED MOORING PRESENTATION
TRELLEBORG AB – Corporate Overview Sales by Region Asia ,[object Object]
Employing ~ 20,000 people*
Present in 40           countries worldwide
Manufacturing in                 ~100 plants
Globally, among largest non-tire rubber playersAmericas Europe * Incl recent acquisitions, proforma 2
Our Trelleborg Marine Systems offices are located  at            Sao Paulo  & Rio de Janeiro  Trelleborg Offshore (a different business unit) have gained vendor qualification with Petrobras for their range of subsea equipment. 3
TRELLEBORG AB – Business Areas Trelleborg  Engineered Systems Trelleborg  Sealing Solutions Trelleborg  Automotive Trelleborg  Wheel Systems Trelleborg MarineSystems (Business Unit) Trelleborg Marine Systems –Mooring, Trellex, Fentek, Seaward 4
5        OFFSHORE INTEGRATED MOORING                                Company History ,[object Object]
Acquired by Trelleborg in 2006 name changed toTrelleborg Marine Systems
Focus on design & manufacture of  mooring monitoring & berthing systems for fixed as well as floating terminals. ,[object Object]
HISTORY – SUPPLY TO PETROBRAS Onshore Terminals  BR Salvador Terminal  Scope of Supply : Complete mooring load monitoring & remote release systems.  Supplied via representatives  Laser Tech  Brazil (Formerly GHF)  Guanabarra NG  & Pecem  LNG  Terminals Scope of Supply : Complete mooring load monitoring & remote release systems.  Supplied via representatives  Laser Tech  Brazil (Formerly GHF)  7
                  OUR  KEY STRENGTHS In-house mechanical and instrumentation design capabilities to provide standard as well as custom mooring, berthing and offloading solutions. ISO 9001 & ISO 14001 with Lloyds Register Accreditations  Over 60 FPSO ship sets of tandem mooring equipment supplied since 1980 Largest supplier of integrated mooring berthing systems for on shore LNG facilities First to develop the integrated STS solution now installed on the first of the FSRU vessels such as Golar Freeze & Golar Frost. Dedicated in house Maintenance & Services Group offering routine contract and break down maintenance services worldwide.    8
9 October 2, 2008                  PRESENTATION FOCUS Ship to Ship Integrated Mooring & Berthing        Transfer of crude FPSO & LNG for FSRU applications Tandem Mooring & Offloading        Conventional stern Tandem Offloading for FPSO       Mooring Systems with integrated Hose & Reel package Spread Mooring     Shallow water, long chain, multi leg mooring systems for FPSO              OFFSHORE APPLICATIONS
       Ship to Ship Mooring       for Oil & Gas Transfer 10
       SHIP TO SHIP MOORING & BERTHING ,[object Object]
RTK GPS Approach & Berthing
 Portable Workstations - Carry On Board
Environmental - Met Ocean
Fenders & deployment systems
Fairleads & Chocks
Rope reelers augmentation to LNGC mooring
 Class Approval DNV, ABS, RINA  & Lloyds11
STS - GOLAR FREEZE & GOLAR FROST 12 Golar Freeze for Dubai LNG Golar Frost for Livorno LNG GolarKhannur West Java LNG  FSRU of 287m long volume  125,000 cubic meters of LNG ,[object Object]
Load Monitoring
Remote Release
RTK Berthing Aid
RINA Class Approval – FSRU Frost
DNV Class Approval -  FSRU Freeze,[object Object]
Load Monitoring
Remote Release
RTK Berthing Aid
Fender Deployment System
 Tandem Mooring
 Lloyds Register Class  approval TI ASIA
STS Mooring Hooks during commissioning 2009 14 Golar Freeze Commissioning  – Ti Africa
Instrumentation & Integration  15
INTEGRATED  CCR  SERVER & WORKSTATIONS ,[object Object]
Mooring set up & alarm level configuration
Mooring tension warnings
Approach & Berthing speed, distance & position display
Met Ocean Wind Wave Current

More Related Content

What's hot

Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]Gerald Patrick Soriano
 
Project Dashboard_03-Oct-13
Project Dashboard_03-Oct-13Project Dashboard_03-Oct-13
Project Dashboard_03-Oct-13Upendra Shukla
 
41 Atg&Ctm Fope06
41 Atg&Ctm Fope0641 Atg&Ctm Fope06
41 Atg&Ctm Fope06jubin
 
238 men AWB DP2_2_
238 men AWB DP2_2_238 men AWB DP2_2_
238 men AWB DP2_2_Jimmy James
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Gerald Patrick Soriano
 
Responsibilities of the oow lrg
Responsibilities of the oow  lrgResponsibilities of the oow  lrg
Responsibilities of the oow lrgLance Grindley
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Anatolijs Krjucenkovs
 
Landing Overruns
Landing OverrunsLanding Overruns
Landing Overrunsszentgyuri
 
Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Lance Grindley
 
radar tank gauging and dcs
radar tank gauging and dcsradar tank gauging and dcs
radar tank gauging and dcsSaravana Kumar
 
Restricted visibility lrg
Restricted visibility lrgRestricted visibility lrg
Restricted visibility lrgLance Grindley
 
The use of Remotely Operated Vehicles for Hydrographic Survey
The use of Remotely Operated Vehicles for Hydrographic SurveyThe use of Remotely Operated Vehicles for Hydrographic Survey
The use of Remotely Operated Vehicles for Hydrographic SurveyHydrographic Society Benelux
 

What's hot (20)

Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
Specification Sheet_H924 - 65.5m OSV [Harkand Harmony]
 
Project Dashboard_03-Oct-13
Project Dashboard_03-Oct-13Project Dashboard_03-Oct-13
Project Dashboard_03-Oct-13
 
41 Atg&Ctm Fope06
41 Atg&Ctm Fope0641 Atg&Ctm Fope06
41 Atg&Ctm Fope06
 
238 men AWB DP2_2_
238 men AWB DP2_2_238 men AWB DP2_2_
238 men AWB DP2_2_
 
H1102 Technical Specification Summary
H1102 Technical Specification SummaryH1102 Technical Specification Summary
H1102 Technical Specification Summary
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
 
Responsibilities of the oow lrg
Responsibilities of the oow  lrgResponsibilities of the oow  lrg
Responsibilities of the oow lrg
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
 
Landing Overruns
Landing OverrunsLanding Overruns
Landing Overruns
 
Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg
 
Resume 08-13-2015s
Resume 08-13-2015sResume 08-13-2015s
Resume 08-13-2015s
 
wellservicer_wbb
wellservicer_wbbwellservicer_wbb
wellservicer_wbb
 
radar tank gauging and dcs
radar tank gauging and dcsradar tank gauging and dcs
radar tank gauging and dcs
 
Restricted visibility lrg
Restricted visibility lrgRestricted visibility lrg
Restricted visibility lrg
 
Descripcion del sistema LVT
Descripcion del sistema LVTDescripcion del sistema LVT
Descripcion del sistema LVT
 
OFFSHORE INDUSTRY SERVICE 2014
OFFSHORE INDUSTRY SERVICE 2014OFFSHORE INDUSTRY SERVICE 2014
OFFSHORE INDUSTRY SERVICE 2014
 
Fastnet Puffin
Fastnet PuffinFastnet Puffin
Fastnet Puffin
 
The use of Remotely Operated Vehicles for Hydrographic Survey
The use of Remotely Operated Vehicles for Hydrographic SurveyThe use of Remotely Operated Vehicles for Hydrographic Survey
The use of Remotely Operated Vehicles for Hydrographic Survey
 
5 safety rules and regulations
5 safety rules and regulations5 safety rules and regulations
5 safety rules and regulations
 
RADAR X band
RADAR X bandRADAR X band
RADAR X band
 

Viewers also liked

Star chart power point
Star chart power pointStar chart power point
Star chart power pointprios12
 
Evaluation question2
Evaluation question2Evaluation question2
Evaluation question2leeyameghani
 
Presentation11 111017084500-phpapp01
Presentation11 111017084500-phpapp01Presentation11 111017084500-phpapp01
Presentation11 111017084500-phpapp01leeyameghani
 
Путешествие в прошлое России
Путешествие в прошлое РоссииПутешествие в прошлое России
Путешествие в прошлое РоссииIren Zielinski
 
Cоздание библиотечных фотоальбомов и Google+
Cоздание библиотечных фотоальбомов и Google+Cоздание библиотечных фотоальбомов и Google+
Cоздание библиотечных фотоальбомов и Google+Iren Zielinski
 
Pre questionnaire graphs
Pre questionnaire graphsPre questionnaire graphs
Pre questionnaire graphsleeyameghani
 
Chibyke Global Systems Limited Profile
Chibyke Global Systems Limited ProfileChibyke Global Systems Limited Profile
Chibyke Global Systems Limited ProfileChibuike Ogbuanu
 
Jennifer's class presentation
Jennifer's class presentationJennifer's class presentation
Jennifer's class presentationjennifercombs371
 
Jennifer's class presentation
Jennifer's class presentationJennifer's class presentation
Jennifer's class presentationjennifercombs371
 
DESAFIO
DESAFIODESAFIO
DESAFIOcmam11
 
устный журнал
устный журналустный журнал
устный журналIren Zielinski
 
военные деятели россии
военные деятели россиивоенные деятели россии
военные деятели россииIren Zielinski
 
сервисы для представления библиотечных материалов
сервисы для представления библиотечных материаловсервисы для представления библиотечных материалов
сервисы для представления библиотечных материаловIren Zielinski
 
создание единого приложения Abs роли и функции
создание единого приложения Abs роли и функциисоздание единого приложения Abs роли и функции
создание единого приложения Abs роли и функцииAnna Odintsova
 
Star chart power point
Star chart power pointStar chart power point
Star chart power pointprios12
 

Viewers also liked (20)

Star chart power point
Star chart power pointStar chart power point
Star chart power point
 
Evaluation question2
Evaluation question2Evaluation question2
Evaluation question2
 
Presentation11 111017084500-phpapp01
Presentation11 111017084500-phpapp01Presentation11 111017084500-phpapp01
Presentation11 111017084500-phpapp01
 
Путешествие в прошлое России
Путешествие в прошлое РоссииПутешествие в прошлое России
Путешествие в прошлое России
 
Cоздание библиотечных фотоальбомов и Google+
Cоздание библиотечных фотоальбомов и Google+Cоздание библиотечных фотоальбомов и Google+
Cоздание библиотечных фотоальбомов и Google+
 
Pre questionnaire graphs
Pre questionnaire graphsPre questionnaire graphs
Pre questionnaire graphs
 
carbon credit
carbon creditcarbon credit
carbon credit
 
Chibyke Global Systems Limited Profile
Chibyke Global Systems Limited ProfileChibyke Global Systems Limited Profile
Chibyke Global Systems Limited Profile
 
Conduccion politica
Conduccion politicaConduccion politica
Conduccion politica
 
Deber
DeberDeber
Deber
 
Jennifer's class presentation
Jennifer's class presentationJennifer's class presentation
Jennifer's class presentation
 
Jennifer's class presentation
Jennifer's class presentationJennifer's class presentation
Jennifer's class presentation
 
DESAFIO
DESAFIODESAFIO
DESAFIO
 
устный журнал
устный журналустный журнал
устный журнал
 
военные деятели россии
военные деятели россиивоенные деятели россии
военные деятели россии
 
Bab iv
Bab ivBab iv
Bab iv
 
сервисы для представления библиотечных материалов
сервисы для представления библиотечных материаловсервисы для представления библиотечных материалов
сервисы для представления библиотечных материалов
 
создание единого приложения Abs роли и функции
создание единого приложения Abs роли и функциисоздание единого приложения Abs роли и функции
создание единого приложения Abs роли и функции
 
Cookstream
CookstreamCookstream
Cookstream
 
Star chart power point
Star chart power pointStar chart power point
Star chart power point
 

Similar to Petrobras oim presentation rev tt nov 2010 vsersion

Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12swoolway
 
FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioningSevilay Can
 
We are TSC-Rev1-small
We are TSC-Rev1-smallWe are TSC-Rev1-small
We are TSC-Rev1-smallSophia Wang
 
Future Production Products and Solutions 2015
Future Production Products and Solutions 2015Future Production Products and Solutions 2015
Future Production Products and Solutions 2015Richard Loland
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU PresentationThomas Jeannin
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
Offshore Vessels Equipment New
Offshore Vessels Equipment NewOffshore Vessels Equipment New
Offshore Vessels Equipment Newluca1963
 
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in India
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in IndiaEssae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in India
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in IndiaEssaeDigitronics
 
STG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagSTG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagJarek Wittbrodt
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3Craig Lang
 
MCS Presentation
MCS PresentationMCS Presentation
MCS PresentationArranEwan
 
Introduction of Motion Control and requirements of Navigations systems techno...
Introduction of Motion Control and requirements of Navigations systems techno...Introduction of Motion Control and requirements of Navigations systems techno...
Introduction of Motion Control and requirements of Navigations systems techno...volodymyrgolikov
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 

Similar to Petrobras oim presentation rev tt nov 2010 vsersion (20)

Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12
 
FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioning
 
Bourbon Media
Bourbon MediaBourbon Media
Bourbon Media
 
D mfor lng
D mfor lngD mfor lng
D mfor lng
 
Bureau veritas
Bureau veritasBureau veritas
Bureau veritas
 
We are TSC-Rev1-small
We are TSC-Rev1-smallWe are TSC-Rev1-small
We are TSC-Rev1-small
 
Future Production Products and Solutions 2015
Future Production Products and Solutions 2015Future Production Products and Solutions 2015
Future Production Products and Solutions 2015
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU Presentation
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
Offshore Vessels Equipment New
Offshore Vessels Equipment NewOffshore Vessels Equipment New
Offshore Vessels Equipment New
 
PT Arung karunia sejati company profile
PT Arung karunia sejati company profilePT Arung karunia sejati company profile
PT Arung karunia sejati company profile
 
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in India
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in IndiaEssae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in India
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in India
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
STG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagSTG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4Pag
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
Introduction of Motion Control and requirements of Navigations systems techno...
Introduction of Motion Control and requirements of Navigations systems techno...Introduction of Motion Control and requirements of Navigations systems techno...
Introduction of Motion Control and requirements of Navigations systems techno...
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 

Recently uploaded

How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfSrushith Repakula
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform EngineeringMarcus Vechiato
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...ScyllaDB
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfFIDO Alliance
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessUXDXConf
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?Mark Billinghurst
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGDSC PJATK
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?Paolo Missier
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPTiSEO AI
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Skynet Technologies
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingScyllaDB
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfUK Journal
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftshyamraj55
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandIES VE
 

Recently uploaded (20)

How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 

Petrobras oim presentation rev tt nov 2010 vsersion

  • 1. TRELLEBORG MARINE SYSTEMSOFFSHORE INTEGRATED MOORING PRESENTATION
  • 2.
  • 4. Present in 40 countries worldwide
  • 5. Manufacturing in ~100 plants
  • 6. Globally, among largest non-tire rubber playersAmericas Europe * Incl recent acquisitions, proforma 2
  • 7. Our Trelleborg Marine Systems offices are located at Sao Paulo & Rio de Janeiro Trelleborg Offshore (a different business unit) have gained vendor qualification with Petrobras for their range of subsea equipment. 3
  • 8. TRELLEBORG AB – Business Areas Trelleborg Engineered Systems Trelleborg Sealing Solutions Trelleborg Automotive Trelleborg Wheel Systems Trelleborg MarineSystems (Business Unit) Trelleborg Marine Systems –Mooring, Trellex, Fentek, Seaward 4
  • 9.
  • 10. Acquired by Trelleborg in 2006 name changed toTrelleborg Marine Systems
  • 11.
  • 12. HISTORY – SUPPLY TO PETROBRAS Onshore Terminals BR Salvador Terminal Scope of Supply : Complete mooring load monitoring & remote release systems. Supplied via representatives Laser Tech Brazil (Formerly GHF) Guanabarra NG & Pecem LNG Terminals Scope of Supply : Complete mooring load monitoring & remote release systems. Supplied via representatives Laser Tech Brazil (Formerly GHF) 7
  • 13. OUR KEY STRENGTHS In-house mechanical and instrumentation design capabilities to provide standard as well as custom mooring, berthing and offloading solutions. ISO 9001 & ISO 14001 with Lloyds Register Accreditations Over 60 FPSO ship sets of tandem mooring equipment supplied since 1980 Largest supplier of integrated mooring berthing systems for on shore LNG facilities First to develop the integrated STS solution now installed on the first of the FSRU vessels such as Golar Freeze & Golar Frost. Dedicated in house Maintenance & Services Group offering routine contract and break down maintenance services worldwide. 8
  • 14. 9 October 2, 2008 PRESENTATION FOCUS Ship to Ship Integrated Mooring & Berthing Transfer of crude FPSO & LNG for FSRU applications Tandem Mooring & Offloading Conventional stern Tandem Offloading for FPSO Mooring Systems with integrated Hose & Reel package Spread Mooring Shallow water, long chain, multi leg mooring systems for FPSO OFFSHORE APPLICATIONS
  • 15. Ship to Ship Mooring for Oil & Gas Transfer 10
  • 16.
  • 17. RTK GPS Approach & Berthing
  • 18. Portable Workstations - Carry On Board
  • 22. Rope reelers augmentation to LNGC mooring
  • 23. Class Approval DNV, ABS, RINA & Lloyds11
  • 24.
  • 28. RINA Class Approval – FSRU Frost
  • 29.
  • 35. Lloyds Register Class approval TI ASIA
  • 36. STS Mooring Hooks during commissioning 2009 14 Golar Freeze Commissioning – Ti Africa
  • 38.
  • 39. Mooring set up & alarm level configuration
  • 41. Approach & Berthing speed, distance & position display
  • 42. Met Ocean Wind Wave Current
  • 43. Telemetry Communications of Mooring, Berthing & Met Ocean to Secondary Vessel
  • 44. Integrated Data Logging 16
  • 45. 17 Integration concept for STS originated from onshore LNG mooring & berthing
  • 46. Berthing & Approach Systems 18
  • 47.
  • 48. Provides Primary & Secondary vessels with berthing data with integrated feed from Met Ocean sensors.
  • 49. Primary vessel fitted with the fixed system. Secondary vessel is supplied with the portable carry on board unit.19 Bridge Unit STS or tandem Berthing Navigation
  • 50.
  • 51. Fixed workstations integrated with load monitoring emergency release & ship to
  • 52.
  • 53. 22 TANDEM MOORING SOLUTIONS Shuttle tanker Tandem Mooring Winches With Emergency Quick Release Mooring to full load Load Monitoring Local & CCR with Load History recording GPS approach monitoring Load alarm options deck or CCR load alarm stations
  • 54. 23 FPSO TANDEM MOORING Hawser hook with load monitoring and remote release Hawser reeler (vertical or horizontal) with hawser Trelleborg hose and hose reeler Certified by classification society (i.e.. DNV, ABS, Rina, Lloyds)
  • 55.
  • 57.
  • 58. 26 I have called it the “LIMP- D- HOOK” or LDH.
  • 59. 27
  • 60. Vertical Tandem Mooring Winch – Tupi FPSO 21inch 150m integral buoyancy hawser with 76mm dia. chafe chains 400t Quick Release Load Monitoring Remote Release 28
  • 61. 29
  • 62. Offloading Hose & Hose Reel Systems 30
  • 63.
  • 64. API 17K certified
  • 65.
  • 67. 34 Bow Spread Mooring
  • 68. Spread Mooring Equipment List Chain stoppers Dual Pawl Type or Quick Release to suit chain up to 127 mm diameter with optional : Load Monitoring System Load Alarm Stations Local and remote display at CCR Chain Tensioners - Using winch or jack Hazardous Area Compliant Class Approved Fixed or transferable within a stopper group. Chain Fairleads & Chutes Fixed & Sheave type, Swivelling above & below water configurations Chain to 127mm 35
  • 69. Q 36 10 Point Spread Mooring Chain - 1200 metres 105mm U3 Load Monitoring to 800t Releasable 0 to 600t MBL > 1200t Chain Size 89mm Load Monitoring to 250t Releasable 0 to 250t MBL > 580t
  • 70. DUAL PAWL TYPE CHAIN STOPPERS 76 - 120mm Chains 37
  • 71. 38 Fenders – Pneumatic or Foam Fender Deployment Systems for STS
  • 72.
  • 74. API or IEC design
  • 75. High dynamic FOS for open sea deployment applications such as FLNG39 6 Fender Deployment FPSO - Ti Africa ULCC Out board fender storage proposed for Livorno FLNG
  • 76.
  • 77. Complete with Tyre & Chain net
  • 78.
  • 79. Do not require Chain net
  • 81.
  • 82. 42 Questions? www.trelleborg.com

Editor's Notes

  1. Add cross section