Project Location
    Limits
Sarasota County
   MP 39.344
      to
                           I-75 Corridor:
   MP 42.615
                             From north of Fruitville Road to
Manatee County
  MP 0.000                   north of University Parkway
      to
  MP 0.324
                             Approximately 3.5 mi
                           University Parkway Corridor:
                             From Cooper Creek Boulevard/
      Scope                  Cattleman Road to Market Street/
   Interim I-75
    Widening                 Lake Osprey Drive
       and
     Ultimate                Approximately 1.0 mi
  Interchange




                                                                2
Project Timeline
 Public Hearing
   June 2009
                                                              Step 3      Step 4
                           Step 1             Step 2       Right-of-Way Construction
                                                           Right-of-
Location Design
                           PD&E              Preliminary    Acquisition
    Concept
  Acceptance                                 Engineering    (if required)
                                                                required
 (LDCA) for the
 recommended
Build Alternative
on December 8,
      2011
                       Alternatives
                          Public
   Notice to            Workshop
   Proceed
 April 16, 2012
                                               Public
Public Meeting
                               Public          Meeting
  May, 2014                    Hearing




                    Sep               Apr                  Apr      TBD         TBD
                    2007              2012                 2016
                                                                                   3
Need for Project
                                                  Provide relief from existing and projected traffic congestion
                                                  Improve the safety of the highway
I-75 Improvements
Consistent with:                                  Provide a hurricane / emergency evacuation route
I-75 Engineering /
Multi-Modal Master
Plan
                                                  Increase regional connectivity
Sarasota-Manatee                                            200,000                                               10 Lane Capacity
County Long Range
Transportation Plan
(LRTP)                                                      180,000
                                                                                             8 Lane Capacity
                      Annual Average Daily Traffic (AADT)




                                                            160,000

                                                            140,000

                                                            120,000
                                                                      6 Lane Capacity

                                                            100,000

                                                             80,000

                                                             60,000

                                                             40,000

                                                             20,000

                                                                 0
                                                                       2011                  2015     Year         2025                   2035
                                                                              I-75 S. of University Pkwy     I-75 N. of University Pkwy          4
PD&E Interchange Alternatives
All PD&E
Alternatives
Reanalyzed during
the Design Pursuit
                     Preliminary Alternatives – Advanced



                       Existing – Add Lanes          Add NB-WB Loop          Diverging Diamond Interchange



                     Preliminary Alternatives – Not Advanced *



                         EB-NB Flyover          EB-NB Flyover & NB-WB Loop

                     * Other alternatives produced acceptable levels of service without increased
                     construction and right-of-way costs associated with the flyover structure
                                                                                                             5
Interchange Traffic Analysis
  Reduced
  Delay and
   Annual                           I-75                                         University Parkway
   Savings             Ultimate 10-Lane Four Lane
                                                  Existing Add         Add NB-WB                        Add EB-NB Add Loop and
DDI provides more          System Interchange                                                DDI
left turn green time                                 Lanes                Loop                           Flyover    Flyover
 which minimizing             Configuration
     potential for     Mainline LOS                   C/D                  C/D               C/D             C/D                C/D
    backups and
  reduces density      Ramp LOS                        B/C                 B/C               B/C             B/C                B/C
    entering I-75
                       Ramp Termini LOS                D/E                 C/D               C/D             B/D                B/D


 Loop and Flyover                                              Overall Interchange Delay
    Alternatives
   improve one                                                    Vehicle Hours of Delay
movement with little                                                                                                  Annual Cost
 consideration to                                                                             Reduction in Vehicle-
 other movements                    Alternative                 AM        PM         Total                              Savings   Rank
                                                                                                 Hours of Delay
                                                                                                                         ($M)
                       No-Build                                660.2     628.6      1288.8             0                   0       0
                       Add Lanes to Existing Diamond
                                                               292.6     307.0       599.6           689.2               8.8          5
                       Interchange
                       Northbound to Westbound Loop            245.3     205.0       450.3           838.5               10.7         4
                       Diverging Diamond Interchange (DDI)     177.9     157.1       335.0           953.8               12.2         1
                       Eastbound to Northbound Flyover         209.1     152.2       361.3           927.5               11.9         3
                       Northbound to Westbound Loop and
                                                               188.5     163.1       351.6           937.2               12.0         2
                       Eastbound to Northbound Flyover

                                                       Least Delay Time and Highest Annual Savings
                                                                                                                                          6
Interchange Analysis – Other Factors
Reduced                               I-75                                              University Parkway
Impacts                        Ultimate 10-Lane                  Existing        Add
                                                                                                            Add EB-NB Add Loop
                              Four Lane System                     Add          NB-WB              DDI
                                                                                                             Flyover  and Flyover
  DDI provides            Interchange Configuration               Lanes          Loop
Comparable LOS                               Wetlands             Low            Low            Low           Low            Low
   with Less
                                             Habitat             Medium          High          Medium        Medium          High
 Environmental     Environmental
    Impacts                                  Species              Low            Low            Low           Low            Low
                                          Contamination           Low            Low            Low           Low            Low
 DDI provides
Comparable LOS
                                            Residential           None           None           None          None           None
 with No ROW             ROW               Commercial             None          Medium          None         Medium         Medium
     Costs                                    Other               None           None           None         Medium         Medium
                                          Roadway Costs          Medium          High           Low           High           High
 DDI provides a
Comparable LOS       Construction        Structures Costs         Low            Low            Low           High           High
   with Less                           Maintenance of Traffic    Medium         Medium         Medium         High           High
  Construction
      Cost
                                                Other Factors – Quantitative Evaluation Criteria
                  Factors                                  Low                        Medium                           High
                  Wetlands                               0-5 Acres                   5-10 Acres                     10+ Acres
                  Habitat                               0-10 Acres                   10-20 Acres                    20+ Acres
                                                                                                            Mitigation is Difficult and
                  Protected Species             Mitigation not Anticipated     Mitigation is Expected
                                                                                                                      Costly
                  Contamination                                  Based on Contamination Risk Potential Rating (CRPR)
                  ROW Impacts                           0-5 Parcels                 5-10 Parcels               10+ Parcels and Size
                  Roadway Costs                       $100-$125 M                  $125-$150 M                      > $150 M
                  Structure Costs                        < $20 M                    $20-$30 M                        > $30 M
                                                                             Temporary Pavement and
                  Maintenance of Traffic           Limited/No Detours                                     Major Detours and Closures
                                                                               Minor Short Detouring
                                                                                                                                          7
Interchange Analysis – Other Factors
  Safety           DDI Enhances Vehicular, Pedestrian, and
 I-44 & Route 13
                   Bicyclist Safety
DDI Performance
    Evaluation     • Traffic Conflict Points - DDI – 14 points; Diamond 26 points
  Completed by
       HDR               Reduces crash rate and severity – 68% crash reduction
   Highlighted
Results from the
                         97% of Drivers feel safer
 I-44 & Route 13
DDI Performance
      Study
                   • Reduces Vehicular Delay – DDI - Two Phase; Diamond Four
                     Phase
                         Reduces Interchange Delay by 15%-60%
                   • Improves freeway flow by reducing density of entrance
                     ramp traffic
                   • Provides Capacity for High Volumes of Left-Turn Movements
                         Increases Overall Capacity by 10% -30%
                   • Improves Pedestrian Safety – Shorter Crossings with Signal
                     Protection
                         80% of Users say Pedestrian and Bicycle Movement is Safer
                                                                                     8
Interchange Analysis
FDOT Approved
   Diverging
   Diamond        RECOMMENDATION – The Diverging Diamond Interchange
Interchange at
1-11-12 Scoping
    Meeting
                    •   Comparable level of service
                    •   Improved delay times
                    •   Reduced right-of-way costs
                    •   Reduced construction costs
                    •   Reduced environmental impacts
                    •   Safest interchange for vehicles, pedestrians and bicyclists

                                                                                      N
                          University
                          Parkway




                                                                                          9
Project Timeline
 Public Hearing
   June 2009
                                                              Step 3      Step 4
                           Step 1                          Right-of-Way Construction
                                                           Right-of-
                           PD&E
                                              Step 2
Location Design                              Preliminary    Acquisition
    Concept
  Acceptance
                                             Engineering    (if required)
                                                                required
 (LDCA) for the
 recommended
Build Alternative
on December 8,
      2011
                       Alternatives
                          Public
   Notice to
   Proceed
                        Workshop               Public
 April 16, 2012

Public Meeting
                               Public          Meeting
  May, 2014                    Hearing




                     Sep              Apr                  Apr      TBD         TBD
                    2007              2012                 2016
                                                                                   10
Design Schedule
  Notice to
  Proceed
April 16, 2012   2012                      2013                    2014                   2015                   2016
                 NTP April 16, 2012
Public Meeting
  May, 2014            Design Survey

                                           R/W Survey & Mapping

                     Phase I Design

                                             Phase II Design
 Final Plans
March 21, 2016                                                        Phase III Design
                       Value Engineering
                                                  Public Meeting                                                 Final Plans
                                                       May 2014                  Phase IV Design & Final Plans   March 21, 2016

                                           Noise Walls

                                      Geotechnical

                                               Permitting

                                                                   Utilities and ITS



                                                                                                                              11
I-75 Existing Typical
     LOS D
is acceptable for
  the Interstate    Three 12-ft lanes in each direction
                    12-ft inside and outside shoulders (10-ft paved)
                    88-ft median
                    Open drainage
                    Acceptable LOS through 2014




                                                                       12
I-75 Ultimate Typical Section
     LOS D
is acceptable for
  the Interstate    Two Special Use Lanes in each direction
                    (potential managed lanes)
                    Three General Use Lanes in each direction
                    64-ft Median (Multi-Modal Envelope)
                    Northbound Auxiliary Lane
                    Acceptable LOS through 2035




                                                                13
I-75 Interim Typical Section
  FHWA Median
  Crossovers on
 Florida Interstate
                      Widen One Lane to the Inside
Highways – 9/14/07
    M.P. 40.312       Advantages
                      • Initial Roadway Cost Savings compared to the Ultimate - $28.9M
                      • New lane aligns with the ultimate typical section inside lane –
                        minimizes “throw-away” – Future Savings
                      • Minimizes impacts to ITS Design Build Project – Savings TBD
                      • Minimizes impacts to existing signs - $243K
                      • Acceptable LOS through 2025




                                                                                          14
I-75 Interim Improvements
     8-Lanes (Interim)
     Potential Noise Barrier
     Emergency Crossover
     Wildlife Crossing – Errie Canal Bridges




                                               15
I-75 Interim Improvements
     No Right-of-Way for Stormwater Management Facilities
     I-75 Lanes Transition - Ultimate General Use Location
     I-75 Bridges over University Parkway – Ultimate General Use
     Location
     Ultimate Interchange – Minus Special Use Lanes and Bridges




                                                                   16
University Parkway Interchange Typical
                     Widen/Reconstruct University Parkway
FDOT PPM - 50 mph
 minimum for SIS
                     University Strategic Intermodal System
  urban arterials

AASHTO – 30 mph
on urban arterials
                     (SIS) criteria
                     Variation for design speed
                     • Existing Posted Speed Limit = 45 mph
                     • Existing Variation for 35 mph for DDI




                                                               17
University Parkway Improvements

     Diverging Diamond Interchange - Ultimate Interchange
     Additional through lane on University Parkway
     between Cattlemen Road/Cooper Creek Boulevard and
     Lake Osprey Drive/Market Street
     No R/W Anticipated
     No Modification to Existing Access Anticipated




                                                            18
DDI Traffic Operations – EB University and NB I-75
     Traffic on
     University
  Parkway crosses
    paths twice

                                                         N
   DDI crossings
eliminate all turning
  movements from
   the signalized
    intersections

    All left turn
 movements occur
 without crossing
 oncoming traffic
                        University
                                                     University
   Results in fewer     Parkway
                                                     Parkway
traffic signal phases
  and greater traffic
       capacity

Results in far fewer
  conflict points,
 reducing number
  and severity of
     crashes




                                                                  19
DDI Traffic Operations – WB University & SB I-75
     Traffic on
     University
  Parkway crosses
    paths twice

                                                        N
   DDI crossings
eliminate all turning
  movements from
   the signalized
    intersections

    All left turn
 movements occur
 without crossing
 oncoming traffic
                        University
                                                    University
   Results in fewer     Parkway
                                                    Parkway
traffic signal phases
  and greater traffic
       capacity

Results in far fewer
  conflict points,
 reducing number
  and severity of
     crashes




                                                                 20
Video – SR 92 & I-15




                       21
Bicycle Accommodation
      Bike Lane to right of outer lane
      Key Holes provided at right turn lane and on-ramps
      Off-Ramp Crossing protected by signal control
             University                                        N
             Parkway




   Key Hole at Right Turn
                                       Key Hole at On-Ramp
                                   Signal Protection at Off-Ramp
                                                                   22
Pedestrians Treatment
 Safety
Concern
             Common Practice to keep pedestrians to
             outside
               Conflicts with left turn onto on-ramp
               Unsafe condition with limited sight distance due to
               bridge abutment



University                                                       N
Parkway




                                                                     23
Pedestrians Treatment
Improved
 Safety      Pedestrian Accommodations in Median
               Barrier Protected Median
               Six of Eight Crossing Signal Protected
               80-90% public approval




University                                              N
Parkway




                                                            24
Public Involvement

      Community Awareness Plan
      Project Website – Not Yet Rolled Out
      • www.I-75_Sarasota-Manatee.com
      Public Meetings
      • Meeting #1 (60% Design)
         • May 2014




                                             25
Comments



       Kevin S. Ingle, P.E.
       FDOT Project Manager, FDOT District One
       801 North Broadway Avenue
       P.O. Box 1249
       Bartow , Florida 33831
       (863) 519-2740
       Kevin.Ingle@dot.state.fl.us




                                                 26

More Related Content

What's hot

Thomas Kim - LG CNS - Smart Transportation in Seoul
Thomas Kim - LG CNS - Smart Transportation in SeoulThomas Kim - LG CNS - Smart Transportation in Seoul
Thomas Kim - LG CNS - Smart Transportation in Seoul
Shane Mitchell
 
PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509
fregoneseassociates
 
Session 42 Hans Boysen
Session 42 Hans BoysenSession 42 Hans Boysen
Session 42 Hans Boysen
hansboysen
 
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
Eamon Keane
 
Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
Keith Nolan
 
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Keith Nolan
 
Southern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid ImpactsSouthern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid Impacts
Center for Sustainable Energy
 
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overviewOtm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
jucaab
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive Summary
Transport Planning
 

What's hot (20)

Thomas Kim - LG CNS - Smart Transportation in Seoul
Thomas Kim - LG CNS - Smart Transportation in SeoulThomas Kim - LG CNS - Smart Transportation in Seoul
Thomas Kim - LG CNS - Smart Transportation in Seoul
 
PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentation
 
Session 42 Hans Boysen
Session 42 Hans BoysenSession 42 Hans Boysen
Session 42 Hans Boysen
 
BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)
 
Meet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line ExtensionMeet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line Extension
 
Lunsford Group E. Africa Railway Project 01 2010
Lunsford Group E. Africa Railway Project 01 2010Lunsford Group E. Africa Railway Project 01 2010
Lunsford Group E. Africa Railway Project 01 2010
 
Mercedes-Benz "E-Mobility - The Way into the Future"
Mercedes-Benz "E-Mobility - The Way into the Future"Mercedes-Benz "E-Mobility - The Way into the Future"
Mercedes-Benz "E-Mobility - The Way into the Future"
 
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
B. McBeth, "e-Mobility @ Daimler," in Electric Vehicle Integration Into Moder...
 
Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
 
Station Redevelopment Communicaiton
Station Redevelopment CommunicaitonStation Redevelopment Communicaiton
Station Redevelopment Communicaiton
 
Overview of Community Points of Distribution
Overview of Community Points of Distribution Overview of Community Points of Distribution
Overview of Community Points of Distribution
 
BusKaroPlus - Review of Activities - Amit Bhatt
BusKaroPlus - Review of Activities - Amit BhattBusKaroPlus - Review of Activities - Amit Bhatt
BusKaroPlus - Review of Activities - Amit Bhatt
 
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
 
Matthew Horsman, Mediatique, Carriage consent in the UK
Matthew Horsman, Mediatique, Carriage consent in the UKMatthew Horsman, Mediatique, Carriage consent in the UK
Matthew Horsman, Mediatique, Carriage consent in the UK
 
Southern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid ImpactsSouthern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid Impacts
 
The Sustainability Approach of Deutsche Bahn
The Sustainability Approach of Deutsche BahnThe Sustainability Approach of Deutsche Bahn
The Sustainability Approach of Deutsche Bahn
 
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overviewOtm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
Otm 2013 c13_e-12-gittoes-derek-otm-release-6-3-overview
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive Summary
 
PtB of IEEP The CO2 Challenge For Passenger Cars In Europe Lecture at the IES...
PtB of IEEP The CO2 Challenge For Passenger Cars In Europe Lecture at the IES...PtB of IEEP The CO2 Challenge For Passenger Cars In Europe Lecture at the IES...
PtB of IEEP The CO2 Challenge For Passenger Cars In Europe Lecture at the IES...
 

Viewers also liked (8)

USA interchange modern roundabouts examples
USA interchange modern roundabouts examplesUSA interchange modern roundabouts examples
USA interchange modern roundabouts examples
 
I-95 Corridor
I-95 CorridorI-95 Corridor
I-95 Corridor
 
Diamond interchange
Diamond interchangeDiamond interchange
Diamond interchange
 
Interchange
InterchangeInterchange
Interchange
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
 

Similar to I 75 University Pkwy Interchange FDOT plan

2010 ITE Annual Meeting and Exhibit
2010 ITE Annual Meeting and Exhibit2010 ITE Annual Meeting and Exhibit
2010 ITE Annual Meeting and Exhibit
Franz Loewenherz
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
satish choudhari
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
absnakcac
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
Allan Lewis
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
mecocca5
 
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
xmumiao
 
2003 Washington APA Conference
2003 Washington APA Conference2003 Washington APA Conference
2003 Washington APA Conference
Franz Loewenherz
 

Similar to I 75 University Pkwy Interchange FDOT plan (20)

2010 ITE Annual Meeting and Exhibit
2010 ITE Annual Meeting and Exhibit2010 ITE Annual Meeting and Exhibit
2010 ITE Annual Meeting and Exhibit
 
High Speed Rail - Riverside County
High Speed Rail - Riverside CountyHigh Speed Rail - Riverside County
High Speed Rail - Riverside County
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
 
SR 92 DDI
SR 92 DDISR 92 DDI
SR 92 DDI
 
SCS12-006 ppt
SCS12-006 pptSCS12-006 ppt
SCS12-006 ppt
 
Calstart fuel cell bus review short v3
Calstart fuel cell bus review short v3Calstart fuel cell bus review short v3
Calstart fuel cell bus review short v3
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernization
 
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
 
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
 
16 3239 c
16 3239 c16 3239 c
16 3239 c
 
Tteng 422 s2021 module 2b: Roundabout Capacity Analysis and Level of Service
Tteng 422  s2021 module 2b: Roundabout Capacity Analysis and Level of ServiceTteng 422  s2021 module 2b: Roundabout Capacity Analysis and Level of Service
Tteng 422 s2021 module 2b: Roundabout Capacity Analysis and Level of Service
 
Capacity analysis Of Highways
Capacity analysis Of HighwaysCapacity analysis Of Highways
Capacity analysis Of Highways
 
BNSF 2011 SCLA IM Gen / Converstion
BNSF 2011 SCLA IM Gen / ConverstionBNSF 2011 SCLA IM Gen / Converstion
BNSF 2011 SCLA IM Gen / Converstion
 
L20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging MovementsL20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging Movements
 
2003 Washington APA Conference
2003 Washington APA Conference2003 Washington APA Conference
2003 Washington APA Conference
 
2015 March 16 ASCE TTG - I-405 Improvement Project
2015 March 16   ASCE TTG - I-405 Improvement Project 2015 March 16   ASCE TTG - I-405 Improvement Project
2015 March 16 ASCE TTG - I-405 Improvement Project
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 

More from THECITYALLIANCE

Final sarasota mobility now presentation to city
Final sarasota mobility now presentation to cityFinal sarasota mobility now presentation to city
Final sarasota mobility now presentation to city
THECITYALLIANCE
 
Sarasota context sensitive rbt centers
Sarasota context sensitive rbt centersSarasota context sensitive rbt centers
Sarasota context sensitive rbt centers
THECITYALLIANCE
 

More from THECITYALLIANCE (20)

Sarasota mobility now
Sarasota mobility nowSarasota mobility now
Sarasota mobility now
 
Final sarasota mobility now presentation to city
Final sarasota mobility now presentation to cityFinal sarasota mobility now presentation to city
Final sarasota mobility now presentation to city
 
SarasotaMobilityNOW!
SarasotaMobilityNOW!SarasotaMobilityNOW!
SarasotaMobilityNOW!
 
Roundabout centers as context sensitive icons
Roundabout centers as context sensitive iconsRoundabout centers as context sensitive icons
Roundabout centers as context sensitive icons
 
Roundabouts in series with short separation
Roundabouts in series with short separationRoundabouts in series with short separation
Roundabouts in series with short separation
 
Roundabout centers as context sensitive icons
Roundabout centers as context sensitive iconsRoundabout centers as context sensitive icons
Roundabout centers as context sensitive icons
 
Go Round - it's fun
Go Round - it's funGo Round - it's fun
Go Round - it's fun
 
Roundabout center as context sensitive iconic signature landmark
Roundabout center as context sensitive iconic signature landmarkRoundabout center as context sensitive iconic signature landmark
Roundabout center as context sensitive iconic signature landmark
 
Roundabout centers as context sensitive icons 6 2014
Roundabout centers as context sensitive icons 6 2014Roundabout centers as context sensitive icons 6 2014
Roundabout centers as context sensitive icons 6 2014
 
Sarasota's US41 Grand Boulevard Concept
Sarasota's US41 Grand Boulevard ConceptSarasota's US41 Grand Boulevard Concept
Sarasota's US41 Grand Boulevard Concept
 
Sarasota's US41 Grand Boulevard Concept
Sarasota's US41 Grand Boulevard ConceptSarasota's US41 Grand Boulevard Concept
Sarasota's US41 Grand Boulevard Concept
 
Sarasot's US41Momentum concept
Sarasot's US41Momentum conceptSarasot's US41Momentum concept
Sarasot's US41Momentum concept
 
Roundabout centers as icon update 7 6 2013 jpeg
Roundabout centers as icon update 7 6 2013 jpegRoundabout centers as icon update 7 6 2013 jpeg
Roundabout centers as icon update 7 6 2013 jpeg
 
Roundabout centers as icon update 7 2013 jpeg
Roundabout centers as icon update 7 2013 jpegRoundabout centers as icon update 7 2013 jpeg
Roundabout centers as icon update 7 2013 jpeg
 
Ddi
DdiDdi
Ddi
 
This or that corridor
This or that corridorThis or that corridor
This or that corridor
 
Roundabout centers as signature icons
Roundabout centers as signature iconsRoundabout centers as signature icons
Roundabout centers as signature icons
 
Roundabout centers as context sensitive icons
Roundabout centers as context sensitive icons Roundabout centers as context sensitive icons
Roundabout centers as context sensitive icons
 
Roundabout centers as context sensitive icons
Roundabout centers as context sensitive icons Roundabout centers as context sensitive icons
Roundabout centers as context sensitive icons
 
Sarasota context sensitive rbt centers
Sarasota context sensitive rbt centersSarasota context sensitive rbt centers
Sarasota context sensitive rbt centers
 

Recently uploaded

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Recently uploaded (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

I 75 University Pkwy Interchange FDOT plan

  • 1.
  • 2. Project Location Limits Sarasota County MP 39.344 to I-75 Corridor: MP 42.615 From north of Fruitville Road to Manatee County MP 0.000 north of University Parkway to MP 0.324 Approximately 3.5 mi University Parkway Corridor: From Cooper Creek Boulevard/ Scope Cattleman Road to Market Street/ Interim I-75 Widening Lake Osprey Drive and Ultimate Approximately 1.0 mi Interchange 2
  • 3. Project Timeline Public Hearing June 2009 Step 3 Step 4 Step 1 Step 2 Right-of-Way Construction Right-of- Location Design PD&E Preliminary Acquisition Concept Acceptance Engineering (if required) required (LDCA) for the recommended Build Alternative on December 8, 2011 Alternatives Public Notice to Workshop Proceed April 16, 2012 Public Public Meeting Public Meeting May, 2014 Hearing Sep Apr Apr TBD TBD 2007 2012 2016 3
  • 4. Need for Project Provide relief from existing and projected traffic congestion Improve the safety of the highway I-75 Improvements Consistent with: Provide a hurricane / emergency evacuation route I-75 Engineering / Multi-Modal Master Plan Increase regional connectivity Sarasota-Manatee 200,000 10 Lane Capacity County Long Range Transportation Plan (LRTP) 180,000 8 Lane Capacity Annual Average Daily Traffic (AADT) 160,000 140,000 120,000 6 Lane Capacity 100,000 80,000 60,000 40,000 20,000 0 2011 2015 Year 2025 2035 I-75 S. of University Pkwy I-75 N. of University Pkwy 4
  • 5. PD&E Interchange Alternatives All PD&E Alternatives Reanalyzed during the Design Pursuit Preliminary Alternatives – Advanced Existing – Add Lanes Add NB-WB Loop Diverging Diamond Interchange Preliminary Alternatives – Not Advanced * EB-NB Flyover EB-NB Flyover & NB-WB Loop * Other alternatives produced acceptable levels of service without increased construction and right-of-way costs associated with the flyover structure 5
  • 6. Interchange Traffic Analysis Reduced Delay and Annual I-75 University Parkway Savings Ultimate 10-Lane Four Lane Existing Add Add NB-WB Add EB-NB Add Loop and DDI provides more System Interchange DDI left turn green time Lanes Loop Flyover Flyover which minimizing Configuration potential for Mainline LOS C/D C/D C/D C/D C/D backups and reduces density Ramp LOS B/C B/C B/C B/C B/C entering I-75 Ramp Termini LOS D/E C/D C/D B/D B/D Loop and Flyover Overall Interchange Delay Alternatives improve one Vehicle Hours of Delay movement with little Annual Cost consideration to Reduction in Vehicle- other movements Alternative AM PM Total Savings Rank Hours of Delay ($M) No-Build 660.2 628.6 1288.8 0 0 0 Add Lanes to Existing Diamond 292.6 307.0 599.6 689.2 8.8 5 Interchange Northbound to Westbound Loop 245.3 205.0 450.3 838.5 10.7 4 Diverging Diamond Interchange (DDI) 177.9 157.1 335.0 953.8 12.2 1 Eastbound to Northbound Flyover 209.1 152.2 361.3 927.5 11.9 3 Northbound to Westbound Loop and 188.5 163.1 351.6 937.2 12.0 2 Eastbound to Northbound Flyover Least Delay Time and Highest Annual Savings 6
  • 7. Interchange Analysis – Other Factors Reduced I-75 University Parkway Impacts Ultimate 10-Lane Existing Add Add EB-NB Add Loop Four Lane System Add NB-WB DDI Flyover and Flyover DDI provides Interchange Configuration Lanes Loop Comparable LOS Wetlands Low Low Low Low Low with Less Habitat Medium High Medium Medium High Environmental Environmental Impacts Species Low Low Low Low Low Contamination Low Low Low Low Low DDI provides Comparable LOS Residential None None None None None with No ROW ROW Commercial None Medium None Medium Medium Costs Other None None None Medium Medium Roadway Costs Medium High Low High High DDI provides a Comparable LOS Construction Structures Costs Low Low Low High High with Less Maintenance of Traffic Medium Medium Medium High High Construction Cost Other Factors – Quantitative Evaluation Criteria Factors Low Medium High Wetlands 0-5 Acres 5-10 Acres 10+ Acres Habitat 0-10 Acres 10-20 Acres 20+ Acres Mitigation is Difficult and Protected Species Mitigation not Anticipated Mitigation is Expected Costly Contamination Based on Contamination Risk Potential Rating (CRPR) ROW Impacts 0-5 Parcels 5-10 Parcels 10+ Parcels and Size Roadway Costs $100-$125 M $125-$150 M > $150 M Structure Costs < $20 M $20-$30 M > $30 M Temporary Pavement and Maintenance of Traffic Limited/No Detours Major Detours and Closures Minor Short Detouring 7
  • 8. Interchange Analysis – Other Factors Safety DDI Enhances Vehicular, Pedestrian, and I-44 & Route 13 Bicyclist Safety DDI Performance Evaluation • Traffic Conflict Points - DDI – 14 points; Diamond 26 points Completed by HDR Reduces crash rate and severity – 68% crash reduction Highlighted Results from the 97% of Drivers feel safer I-44 & Route 13 DDI Performance Study • Reduces Vehicular Delay – DDI - Two Phase; Diamond Four Phase Reduces Interchange Delay by 15%-60% • Improves freeway flow by reducing density of entrance ramp traffic • Provides Capacity for High Volumes of Left-Turn Movements Increases Overall Capacity by 10% -30% • Improves Pedestrian Safety – Shorter Crossings with Signal Protection 80% of Users say Pedestrian and Bicycle Movement is Safer 8
  • 9. Interchange Analysis FDOT Approved Diverging Diamond RECOMMENDATION – The Diverging Diamond Interchange Interchange at 1-11-12 Scoping Meeting • Comparable level of service • Improved delay times • Reduced right-of-way costs • Reduced construction costs • Reduced environmental impacts • Safest interchange for vehicles, pedestrians and bicyclists N University Parkway 9
  • 10. Project Timeline Public Hearing June 2009 Step 3 Step 4 Step 1 Right-of-Way Construction Right-of- PD&E Step 2 Location Design Preliminary Acquisition Concept Acceptance Engineering (if required) required (LDCA) for the recommended Build Alternative on December 8, 2011 Alternatives Public Notice to Proceed Workshop Public April 16, 2012 Public Meeting Public Meeting May, 2014 Hearing Sep Apr Apr TBD TBD 2007 2012 2016 10
  • 11. Design Schedule Notice to Proceed April 16, 2012 2012 2013 2014 2015 2016 NTP April 16, 2012 Public Meeting May, 2014 Design Survey R/W Survey & Mapping Phase I Design Phase II Design Final Plans March 21, 2016 Phase III Design Value Engineering Public Meeting Final Plans May 2014 Phase IV Design & Final Plans March 21, 2016 Noise Walls Geotechnical Permitting Utilities and ITS 11
  • 12. I-75 Existing Typical LOS D is acceptable for the Interstate Three 12-ft lanes in each direction 12-ft inside and outside shoulders (10-ft paved) 88-ft median Open drainage Acceptable LOS through 2014 12
  • 13. I-75 Ultimate Typical Section LOS D is acceptable for the Interstate Two Special Use Lanes in each direction (potential managed lanes) Three General Use Lanes in each direction 64-ft Median (Multi-Modal Envelope) Northbound Auxiliary Lane Acceptable LOS through 2035 13
  • 14. I-75 Interim Typical Section FHWA Median Crossovers on Florida Interstate Widen One Lane to the Inside Highways – 9/14/07 M.P. 40.312 Advantages • Initial Roadway Cost Savings compared to the Ultimate - $28.9M • New lane aligns with the ultimate typical section inside lane – minimizes “throw-away” – Future Savings • Minimizes impacts to ITS Design Build Project – Savings TBD • Minimizes impacts to existing signs - $243K • Acceptable LOS through 2025 14
  • 15. I-75 Interim Improvements 8-Lanes (Interim) Potential Noise Barrier Emergency Crossover Wildlife Crossing – Errie Canal Bridges 15
  • 16. I-75 Interim Improvements No Right-of-Way for Stormwater Management Facilities I-75 Lanes Transition - Ultimate General Use Location I-75 Bridges over University Parkway – Ultimate General Use Location Ultimate Interchange – Minus Special Use Lanes and Bridges 16
  • 17. University Parkway Interchange Typical Widen/Reconstruct University Parkway FDOT PPM - 50 mph minimum for SIS University Strategic Intermodal System urban arterials AASHTO – 30 mph on urban arterials (SIS) criteria Variation for design speed • Existing Posted Speed Limit = 45 mph • Existing Variation for 35 mph for DDI 17
  • 18. University Parkway Improvements Diverging Diamond Interchange - Ultimate Interchange Additional through lane on University Parkway between Cattlemen Road/Cooper Creek Boulevard and Lake Osprey Drive/Market Street No R/W Anticipated No Modification to Existing Access Anticipated 18
  • 19. DDI Traffic Operations – EB University and NB I-75 Traffic on University Parkway crosses paths twice N DDI crossings eliminate all turning movements from the signalized intersections All left turn movements occur without crossing oncoming traffic University University Results in fewer Parkway Parkway traffic signal phases and greater traffic capacity Results in far fewer conflict points, reducing number and severity of crashes 19
  • 20. DDI Traffic Operations – WB University & SB I-75 Traffic on University Parkway crosses paths twice N DDI crossings eliminate all turning movements from the signalized intersections All left turn movements occur without crossing oncoming traffic University University Results in fewer Parkway Parkway traffic signal phases and greater traffic capacity Results in far fewer conflict points, reducing number and severity of crashes 20
  • 21. Video – SR 92 & I-15 21
  • 22. Bicycle Accommodation Bike Lane to right of outer lane Key Holes provided at right turn lane and on-ramps Off-Ramp Crossing protected by signal control University N Parkway Key Hole at Right Turn Key Hole at On-Ramp Signal Protection at Off-Ramp 22
  • 23. Pedestrians Treatment Safety Concern Common Practice to keep pedestrians to outside Conflicts with left turn onto on-ramp Unsafe condition with limited sight distance due to bridge abutment University N Parkway 23
  • 24. Pedestrians Treatment Improved Safety Pedestrian Accommodations in Median Barrier Protected Median Six of Eight Crossing Signal Protected 80-90% public approval University N Parkway 24
  • 25. Public Involvement Community Awareness Plan Project Website – Not Yet Rolled Out • www.I-75_Sarasota-Manatee.com Public Meetings • Meeting #1 (60% Design) • May 2014 25
  • 26. Comments Kevin S. Ingle, P.E. FDOT Project Manager, FDOT District One 801 North Broadway Avenue P.O. Box 1249 Bartow , Florida 33831 (863) 519-2740 Kevin.Ingle@dot.state.fl.us 26