Marks Sess13 102309

SAME 2009 California Water Conference
SAME 2009 California Water ConferenceSAME 2009 California Water Conference
Construction Methods for Folsom Lake Dike Modification,[object Object],Presented by,[object Object],Matthew D. Marks,[object Object],Magnus Pacific Corporation,[object Object],Roseville, California,[object Object]
Overview,[object Object],Project Name - Dike 5 Embankment Modifications,[object Object],Engineer/Designer - Bureau of Reclamation’s Safety of Dams (SOD) Program,[object Object],Prime Contractor – DD-M Crane and Rigging,[object Object],Contract Value - $3,204,790,[object Object],Project Location - Located on the north shore of Folsom Reservoir near the intersection of Auburn-Folsom Boulevard and Eureka Road in Granite Bay,[object Object],Construction Schedule - Construction performed between September 2008 and February 2009,[object Object]
Area Map,[object Object],FOLSOM,[object Object], DAM,[object Object],FOLSOM,[object Object], LAKE,[object Object],DIKE 5,[object Object],SACRAMENTO,[object Object],AREA,[object Object]
Project Summary,[object Object],Scope of Work,[object Object],Project involved the partial removal of the downstream face of the existing dike to construct new sand and gravel drains to control internal erosion,[object Object],Change Orders,[object Object],No major change orders; several quantity variations (overruns and underruns),[object Object],By the Numbers,[object Object],40,000 CY excavation for existing downstream face,[object Object],3,500 CY excavation for new toe drain and out fall trench,[object Object],Installed 1,500 LF of 15” HDPE toe drain pipe,[object Object],Installed 18,000 CY (28,000 TN) of fine filter (sand) and 2,500 CY (4,000 TN) of coarse filter (gravel),[object Object],85,000 CY replacement of stockpiled and onsite borrow  soils,[object Object]
Scope of Work,[object Object],Site preparations including recreation trail detour,[object Object],Stripping top soil and excavation of downstream face from 2.25H:1V to 2H:1V slope,[object Object],Excavation of toe drain and outfall trench,[object Object],Installation of toe drain and outfall piping and manhole,[object Object],Toe drain backfill using coarse filter (gravel) and chimney drain using fine filter (sand),[object Object],Reconstruct downstream face to 2.5H:1V slope using stockpiled and onsite borrow materials,[object Object],Replace topsoil and site restoration,[object Object]
Schedule,[object Object],Began site preparations in mid August 2008,[object Object],Restricted to no heavy construction work until after Labor Day 2008,[object Object],Excavation work approximately 4 weeks at average rate of 3,000 CY per day,[object Object],Concurrent placement of backfill materials including toe drain pipe, fine filter, coarse filter, and shell fill (average 100 TN coarse filter, 500 TN fine filter and 2,000 CY shell fill per day) over 3 to 4 month period,[object Object],Performed backfill and restoration work through first half of rainy season,[object Object],Completed work in February 2009 (Contractual Completion Date in March 2009),[object Object]
Embankment Fill Diagram,[object Object],~ EL. 480,[object Object],2.5 h,[object Object],1 v,[object Object],1 v,[object Object],2 h,[object Object],~ EL. 380,[object Object],Typical Embankment Fill Detail with Toe Drain,[object Object]
Toe Drain Diagram,[object Object],Typical Toe Drain Detail with Pipe,[object Object]
Conventional Equipment,[object Object],Excavation & Hauling Equipment,[object Object],PC 400 Excavator,[object Object],PC 300 Excavator,[object Object],CAT D9 Dozer (rock ripping),[object Object],35 TN Articulated Haul Trucks (3 EA),[object Object],Komatsu 450 Front End Loader,[object Object],Backfill & Grading Equipment,[object Object],CAT D6 Dozer (2 EA – GPS),[object Object],CAT 815 Compactor,[object Object],CAT 140 Motor Grader,[object Object],48” Smooth Drum Roller (2 EA),[object Object]
Specialized Equipment,[object Object],Material Delivery System,[object Object],Drive Over End Dump Truck Unloader,[object Object],30 TN Surge Hopper/Conveyor,[object Object],Total 70 TN Onsite Storage Capacity,[object Object],Direct Load Conveyor Trucks,[object Object]
Specialized Equipment,[object Object],Conveyor Trucks,[object Object],CAD (Conveyored Aggregate Delivery),[object Object],Ability to place materials with accuracy and reduced waste,[object Object],Output approximately 250 to 500 TN / DY,[object Object]
Construction Materials,[object Object],Shell Fill,[object Object],Onsite Material (Decomposed Granite),[object Object],Existing Dike Embankment,[object Object],Borrow Site within Folsom Reservoir,[object Object],3” Minus,[object Object],Fine Filter,[object Object],Imported Material,[object Object],Clean Washed Sand,[object Object],3/8” Minus,[object Object],0 – 3% Passing No. 200 Sieve,[object Object],Coarse Filter,[object Object],Imported Material,[object Object],Clean Washed Gravel,[object Object],1” Minus,[object Object],0 – 5% Passing No. 8 Sieve,[object Object]
Pre-Construction,[object Object],Existing Downstream Face,[object Object]
Pre-Construction,[object Object],Existing Top of Slope,[object Object]
Downstream Face Excavation,[object Object],Excavated Face and Toe Drain (and view of Blanket Drain),[object Object]
Toe Drain Excavation,[object Object],Toe Drain Excavation and Dewatering,[object Object]
Borrow Site Excavation,[object Object],Stockpiled Shell Fill in Folsom Reservoir,[object Object]
Toe Drain,[object Object],Compaction Testing Fine Filter Material,[object Object]
Toe Drain,[object Object],Toe Drain Backfill with Fine and Coarse Filter Material,[object Object]
Shell Fill,[object Object],Shell Fill Placement on New Downstream Face,[object Object]
Shell Fill,[object Object],Shell Fill Placement and Compaction,[object Object]
Shell Fill,[object Object],Fine Filter and Shell Fill Placement,[object Object]
Shell Fill,[object Object],Shell Fill Grading (and Material Delivery System),[object Object]
“The Big Picture”,[object Object],Fine Filter and Shell Fill Placement,[object Object]
Chimney Drain,[object Object],Fine Filter Placement with Conveyor Truck,[object Object]
Chimney Drain,[object Object],Fine Filter Placement (Non-compacted Loose Lift),[object Object]
Chimney Drain,[object Object],Fine Filter Placement Near Top of Downstream Face,[object Object]
Chimney Drain,[object Object],New Blanket Drain on Upper Slope,[object Object]
Finishing,[object Object],Excavator Pulling Up Slope Near Top of Dike,[object Object]
Finishing,[object Object],Top of Chimney Drain and Shell Fill Placement,[object Object]
Finishing,[object Object],Final Gravel Road on Crest of Dike,[object Object]
Finishing,[object Object],Finish Slope Grading and Topsoil (Dredge Tailings) Placement,[object Object]
Finishing ,[object Object],Finished Slope (In Progress),[object Object]
Finishing,[object Object],Finished Grade and Hydroseeding,[object Object]
Project Highlights,[object Object],Excavation on face of dike and rock ripping,[object Object],Excavated with CAT D6 GPS Dozers pushing down slope; load out with Komatsu PC400 Excavator and Articulated Haul Trucks,[object Object],Rock ripping in Borrow Site and Toe Drain using CAT D9 Dozer with rippers; intensely weathered granitic rock with uniaxial compressive strength ranging from about 330 to 850 psi  ,[object Object],Placement of coarse and fine filter material without cross blending or waste,[object Object],Material Delivery System replaced managing stockpiles and waste on ground,[object Object],Conveyor Trucks allowed precise placement of coarse and fine filter with less than 1% waste,[object Object],Achieved placement of 28,000 TN of fine filter without any failing tests for No. 200 sieve; material tested in place after compaction,[object Object],Determination of proper compaction equipment and methods,[object Object],Test sections on fine filter to determine proper equipment to minimize break down of material,[object Object],Moisture conditioning fine filter and shell fill,[object Object]
Project Highlights (cont.),[object Object],Managing site logistics, equipment access and coordination,[object Object],Heavy equipment traffic patterns; one way traffic through work areas,[object Object],Working in limited work space; steep slopes,[object Object],Weather related impacts and site storm water control,[object Object],Most backfill work performed during rainy season,[object Object],Installation and maintenance of site SWPPP controls,[object Object],Effects of rain on site conditions,[object Object],Construction survey control for asbuilt and payment,[object Object],Utilized GPS machine control on CAT D6 Dozer for excavation and backfill; achieved specified tolerances,[object Object],Maintained full time surveyor onsite to survey asbuilt conditions,[object Object],Organization of data and volume calculations,[object Object],Health and Safety,[object Object],Completed the project with no injury or accidents,[object Object],Minor incident involving propane powered fence post pounder; caught fire due to a manufacturer defect; product was recalled,[object Object]
Questions,[object Object],Any questions?,[object Object],DD-M Crane & Rigging,[object Object],2900 Main St., Suite 103,[object Object],Alameda, CA 94501,[object Object],(510) 769-8707,[object Object],(510) 769-8711 fax,[object Object],P.O. Box 520/160 River Rd,[object Object],Rio Vista, CA 94571,[object Object],(707) 374-2000,[object Object],(707) 374-2728 fax,[object Object],Denise Maurer - President,[object Object],Magnus Pacific Corporation,[object Object],3001 Lava Ridge Court, Suite 240,[object Object],Roseville, CA 95661,[object Object],(916) 233-1139,[object Object],(916) 783-0215 fax,[object Object],Louay Owaidat - President,[object Object]
1 von 37

Recomendados

Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ... von
Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...
Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...Onondaga County Save the Rain
2.2K views64 Folien
06 bridge von
06 bridge06 bridge
06 bridgeCida Feitosa
58 views38 Folien
Dam engineering i 3 von
Dam engineering i 3Dam engineering i 3
Dam engineering i 3FeteneBefekadu
27 views8 Folien
Gude Landfill Remediation - June 15, 2017 von
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Recycling and Resource Management Division
1.1K views22 Folien
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012 von
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Recycling and Resource Management Division
2.3K views33 Folien
20140414_FISH_FinalPresentation von
20140414_FISH_FinalPresentation20140414_FISH_FinalPresentation
20140414_FISH_FinalPresentationFunyima Sherpa, Civil EI, LE
315 views31 Folien

Más contenido relacionado

Was ist angesagt?

Gude landfill remediation 161019 von
Gude landfill remediation 161019Gude landfill remediation 161019
Gude landfill remediation 161019Recycling and Resource Management Division
1.1K views18 Folien
2006 AEG Godwin presentation von
2006 AEG Godwin presentation2006 AEG Godwin presentation
2006 AEG Godwin presentationWilliam Godwin
55 views62 Folien
Resume Dwyer 9-16 von
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16Don Dwyer
213 views5 Folien
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti von
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiB2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiIceland Geothermal
119 views11 Folien
Expo Presentation Poster FINAL von
Expo Presentation Poster FINALExpo Presentation Poster FINAL
Expo Presentation Poster FINALBenjamin Kramka
118 views1 Folie
Presentation fot Coal Loading Operation von
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading OperationAdi Sumanto
539 views21 Folien

Was ist angesagt?(20)

Resume Dwyer 9-16 von Don Dwyer
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16
Don Dwyer213 views
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti von Iceland Geothermal
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiB2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
Iceland Geothermal119 views
Presentation fot Coal Loading Operation von Adi Sumanto
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
Adi Sumanto539 views
BCPC LOADING JETTY AND STOCK PILE Presentation von Adi Sumanto
BCPC  LOADING JETTY AND STOCK PILE  PresentationBCPC  LOADING JETTY AND STOCK PILE  Presentation
BCPC LOADING JETTY AND STOCK PILE Presentation
Adi Sumanto1.1K views
Dr. Malek Smadi, Ph.D. thesis lateral deformation and associated settlement r... von Dr. Malek Smadi
Dr. Malek Smadi, Ph.D. thesis lateral deformation and associated settlement r...Dr. Malek Smadi, Ph.D. thesis lateral deformation and associated settlement r...
Dr. Malek Smadi, Ph.D. thesis lateral deformation and associated settlement r...
Dr. Malek Smadi1.3K views
Stone Edge Consulting Ltd. Corporate Resume von Barry Lunseth
Stone Edge Consulting Ltd. Corporate ResumeStone Edge Consulting Ltd. Corporate Resume
Stone Edge Consulting Ltd. Corporate Resume
Barry Lunseth346 views
The design evolution of replacement motorway bridge approach embankments von Chris Bridges
The design evolution of replacement motorway bridge approach embankmentsThe design evolution of replacement motorway bridge approach embankments
The design evolution of replacement motorway bridge approach embankments
Chris Bridges156 views
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub... von brooksroadenvironmental
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
General Geotechnical Presentation von android9999
General Geotechnical PresentationGeneral Geotechnical Presentation
General Geotechnical Presentation
android99999.6K views
Pavel Samec - Predictions of changes in properties of forest soils von swenney
Pavel Samec - Predictions of changes in properties of forest soilsPavel Samec - Predictions of changes in properties of forest soils
Pavel Samec - Predictions of changes in properties of forest soils
swenney472 views
19-07-06 Scheme Description details von Aonghus Murray
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray386 views
Quay failure in barcelona harbour von FHRahman1
Quay failure in barcelona harbourQuay failure in barcelona harbour
Quay failure in barcelona harbour
FHRahman1119 views

Similar a Marks Sess13 102309

2016-08-18-DCCR Presentation for DOT rev2 von
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2Ismael Vazquez, LSIT
113 views24 Folien
Practical Application of GI Technique Rev 0 HAKI pdf von
Practical Application of GI Technique Rev 0 HAKI pdfPractical Application of GI Technique Rev 0 HAKI pdf
Practical Application of GI Technique Rev 0 HAKI pdfKeat Wei, Gavin Chung
3.8K views63 Folien
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur... von
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...Christian Olele
276 views10 Folien
Navy Presentation on Site 27 to Moffett RAB July 17, 2008 von
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Steve Williams
262 views19 Folien
4P - CAPSTONE FINAL POWERPOINT von
4P - CAPSTONE FINAL POWERPOINT4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINTThomas Bryce
555 views38 Folien
Tremie von
TremieTremie
Tremiesappy2shail
4.3K views85 Folien

Similar a Marks Sess13 102309(20)

The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur... von Christian Olele
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
Christian Olele276 views
Navy Presentation on Site 27 to Moffett RAB July 17, 2008 von Steve Williams
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Steve Williams262 views
4P - CAPSTONE FINAL POWERPOINT von Thomas Bryce
4P - CAPSTONE FINAL POWERPOINT4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINT
Thomas Bryce555 views
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver... von IES / IAQM
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
IES / IAQM398 views
Management & mitigation of groundwater infiltration within underground excava... von Angelo Indelicato
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule von Kook Dean
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
Kook Dean81 views
Cameron Run Tributary At La Vista Drive: Stream Restoration von Fairfax County
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
Fairfax County472 views
20220817 Presentation wapda.pptx von AmirShafiq25
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq2545 views
Sne closure turf presentation combined von MassRecycle .
Sne closure turf presentation combinedSne closure turf presentation combined
Sne closure turf presentation combined
MassRecycle .286 views
Armoured Ford construction calculator v15 von Eric Lestock Kay
Armoured Ford construction calculator v15Armoured Ford construction calculator v15
Armoured Ford construction calculator v15
Eric Lestock Kay1.1K views
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ... von Michael Hewitt, GISP
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Terrett Court Storm Drainage Improvements von Fairfax County
Terrett Court Storm Drainage ImprovementsTerrett Court Storm Drainage Improvements
Terrett Court Storm Drainage Improvements
Fairfax County65 views

Más de SAME 2009 California Water Conference

W Wright Sess8 102709 von
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709SAME 2009 California Water Conference
550 views47 Folien
V Wright Sess2 102109 von
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109SAME 2009 California Water Conference
433 views28 Folien
Travis Tuesdaynoon 102709 von
Travis Tuesdaynoon 102709Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709SAME 2009 California Water Conference
398 views104 Folien
Tibbitts Sess14 102009 von
Tibbitts Sess14 102009Tibbitts Sess14 102009
Tibbitts Sess14 102009SAME 2009 California Water Conference
375 views27 Folien

Más de SAME 2009 California Water Conference(20)

Último

Why are KPIs(key performance indicators) important? von
Why are KPIs(key performance indicators) important? Why are KPIs(key performance indicators) important?
Why are KPIs(key performance indicators) important? Epixel MLM Software
16 views17 Folien
MechMaf Shipping LLC von
MechMaf Shipping LLCMechMaf Shipping LLC
MechMaf Shipping LLCMechMaf Shipping LLC
59 views288 Folien
Accel_Series_2023Autumn_En.pptx von
Accel_Series_2023Autumn_En.pptxAccel_Series_2023Autumn_En.pptx
Accel_Series_2023Autumn_En.pptxNTTDATA INTRAMART
203 views75 Folien
Building Careers at Specialty TRE 2023 von
Building Careers at Specialty TRE 2023Building Careers at Specialty TRE 2023
Building Careers at Specialty TRE 2023Jennifer Sanborn
50 views22 Folien
Tanishq von
Tanishq Tanishq
Tanishq supiriyakithuva
14 views7 Folien
Presentation on proposed acquisition of leading European asset manager Aermon... von
Presentation on proposed acquisition of leading European asset manager Aermon...Presentation on proposed acquisition of leading European asset manager Aermon...
Presentation on proposed acquisition of leading European asset manager Aermon...KeppelCorporation
240 views11 Folien

Último(20)

Why are KPIs(key performance indicators) important? von Epixel MLM Software
Why are KPIs(key performance indicators) important? Why are KPIs(key performance indicators) important?
Why are KPIs(key performance indicators) important?
Presentation on proposed acquisition of leading European asset manager Aermon... von KeppelCorporation
Presentation on proposed acquisition of leading European asset manager Aermon...Presentation on proposed acquisition of leading European asset manager Aermon...
Presentation on proposed acquisition of leading European asset manager Aermon...
KeppelCorporation240 views
Navigating EUDR Compliance within the Coffee Industry von Peter Horsten
Navigating EUDR Compliance within the Coffee IndustryNavigating EUDR Compliance within the Coffee Industry
Navigating EUDR Compliance within the Coffee Industry
Peter Horsten44 views
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf von Bloomerang
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdfBloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf
Bloomerang146 views
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck von HajeJanKamps
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deckPitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
HajeJanKamps597 views
How UiPath’s European Founder Kept Control and Built an Expert Board of Direc... von Christian Dahlen
How UiPath’s European Founder Kept Control and Built an Expert Board of Direc...How UiPath’s European Founder Kept Control and Built an Expert Board of Direc...
How UiPath’s European Founder Kept Control and Built an Expert Board of Direc...
Christian Dahlen51 views
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen... von morshedislam3
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...
morshedislam317 views
Imports Next Level.pdf von Bloomerang
Imports Next Level.pdfImports Next Level.pdf
Imports Next Level.pdf
Bloomerang120 views
PMU Launch - Guaranteed Slides von pmulaunch
PMU Launch - Guaranteed SlidesPMU Launch - Guaranteed Slides
PMU Launch - Guaranteed Slides
pmulaunch16 views
voice logger software aegis.pdf von Nirmal Sharma
voice logger software aegis.pdfvoice logger software aegis.pdf
voice logger software aegis.pdf
Nirmal Sharma44 views
Bloomerang Thank Yous Dec 2023.pdf von Bloomerang
Bloomerang Thank Yous Dec 2023.pdfBloomerang Thank Yous Dec 2023.pdf
Bloomerang Thank Yous Dec 2023.pdf
Bloomerang123 views
Accounts Class 12 project cash flow statement and ratio analysis von JinendraPamecha
Accounts Class 12 project cash flow statement and ratio analysisAccounts Class 12 project cash flow statement and ratio analysis
Accounts Class 12 project cash flow statement and ratio analysis
JinendraPamecha35 views

Marks Sess13 102309

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.