Case Study – How an Unchecked Capacitor can cause loss of revenue
oss of Revenue is one of the biggest headaches for all the industries across world. And losses
may come from Failure of Equipments, Accidents, Less production, Production at higher costs, N
number of things. Everyday we come to know about some new breakdowns happening in
industries due to various issues in our Electrical system. And our Motto is one problem must not
be repeated in other plants. And sometime few problems help us to provide the best solution to
other plants where such problem may arrive. Presenting you all the case now.
Background
Power Factor, one of the important parameters that grid connected industries continuously
measured. As the rise and fall of the same has impact on the penalty or less rebate in electricity
bills.
We received an emergency call
from a grid connected process
industries for tripping of 6.6 kV
1500 KVAR capacitor bank in Earth
fault, which resulted into low PF.
This 1500 KVAR was a part of 7900
KVAR capacitor bank. To support
the costumer, System Protection is
always ready on their feet. So,
within 24 hours, we sent our expert
engineer to check and resolve the
issue. Below is the diagram of the
cap bank.
Findings – at Site
Before calling, Maintenance team did the check-up like Visual Inspection, cleaning of capacitor
bank and Insulation resistance measurement, but all the checks were found to be ok. They
decided to normalise the system by charging complete capacitor bank again. So, they charged
the capacitor bank and started closing individual bank one by one. Again, the Bank-5 tripped in
E/F.
Now our engineer took over and checked the capacitor bank, following were the findings
L
Page | 2
Authorised Channel Partners
1. 2500 KVAR Bank was in isolate
condition as the fuse were removed.
We inquired about the same and found
that this is the condition since
commissioning.
2. 1500 KVAR Bank was already out due to
E/F tripping, which was to be checked
thoroughly.
3. Out of 5 Banks, now 2 banks were in
isolate condition, causing Low PF.
Troubleshooting and Root Cause analysis
Our expert team reached the site and in consultation with process team 6.6 kV outgoing feeder
of APFC was made off and isolated. We were given only 2 to 3 hours of time frame (due to
operation related issue) by O&M team to diagnose the exact reason of E/F and suggest
recommended actions.
We repeated the IR test with our Calibrated instruments of individual capacitor and series
reactor after isolating, done through visual check of capacitor, reactor, support insulator,
busbar, cleaning, tightness and Capacitance / Reactance measurement by instrument and test
set.
After doing above test we got something, which is mentioned in below tabular form.
Capacitance value as measured by Calibrated Multimeter.
Phase
Qn
(KVAR)
IN
(A)
Un
(KV)
Cn
(µF)
Capacitance value
(µF)
R1 250.0 56.05 4.46 40.02 42.01
R2 250.0 56.05 4.46 40.02 31.0
Y1 250.0 56.05 4.46 40.02 42.3
Y2 250.0 56.05 4.46 40.02 42.3
B1 250.0 56.05 4.46 40.02 41.7
B2 250.0 56.05 4.46 40.02 42.2
We found capacitance value of one the capacitor different. To make sure we checked the same by
Voltage source method and below were the readings.
Page | 3
Authorised Channel Partners
Name Plate of one of the capacitors
DOUBLE STAR CONNECTION SCHEME OF CAPACITORS
- In this scheme capacitors
are connected in double star
formation with neutrals
interconnected through a neutral
CT as shown in figure above. In
balance condition there is no
current flowing through the
neutral CT.
- Measured capacitance of
R2 capacitor by both the method
was around 31.0 µF.
- In the event of R2 capacitor failure or unbalance, it will create unbalance system condition. This
was causing flow of current in neutral CT 20/1 which was giving tripping in Earth Fault. So, the
recommendation was to replace R2 Capacitor with healthy one for 1500 KVAR cap bank to work
healthily.
- The 1500 KVAR E/F root cause was found, but problem of the plant remains in as it is condition
i.e. Low PF
- So, we went one step further to check the 2500 KVAR bank with all the routine tests. And to our
astonishment that Cap bank was healthy, but why fuse was removed earlier were not known to
the current team.
- The reason which we thought could be, that at the time of commissioning, plant must be on NO
Load, so during charging this 2500 KVAR capacitor would have come directly in line, which could
have been causing leading PF, Hence the fuse must have been removed at that time to avoid
Leading PF and its impact.
Phase
Capacitor Value @
name plate (µF)
Capacitance value (µF)
by Voltage source
method
R1 40.02 42.53
R2 40.02 31.62
Y1 40.02 42.62
Y2 40.02 42.55
B1 40.02 42.00
B2 40.02 42.48
Page | 4
Authorised Channel Partners
- So, we installed the fuse and
charge the system successfully
and the power factor was
maintained.
- And at last, we were delighted
to ’WOW’ the costumer again,
who learnt at last, the difference
between symptom solving
agents and Proper doctors.
Conclusion – How routine / diagnostic testing of all the electrical equipment can prevent loss
of Revenue / Profit.
- In industries, testing is always prioritized as per priority of Equipments, like Relays and / or
Release are given High priority in Panels, after that come Circuit breakers and if time, budget,
and management permits time come for CT / PT testing, and for other equipment no body ask
what to do. So, we normally see that in a panel, CT / PT, Panel Schemes, Power Cables, Capacitor
bank, Series reactor, etc are not given priority and are rarely tested.
- We recommend that industry should do testing and maintenance of such untouched electrical
Equipments like CT, PT, Cap bank, Power cables, Schemes, etc with latest and advanced testing,
so that time to time healthiness of those can also be monitored.
We, as an Electrical asset consultant and service provider always suggest what is best to run your
industries smoothly and without hiccups of maloperation and breakdown.
And if you are looking for a dedicated agency that understands the direct link between your assets and
your revenue, call/write to us, we will be happy to assist you.
SYSTEM PROTECTION
E-Mail : bdm@systemprotection.in
Web : www.systemprotection.in
Tele : +91-265-2225137
(Servicing & Testing of Circuit Breaker,
Relay, CT, PT, Transformer, Other
Switchyard Equipment’s, Relay Co-
ordination Studies, Cable, etc.)

More Related Content

What's hot

FEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTIONFEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTIONDr. Rohit Babu
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methodsHimmelstern
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)J. FR
 
Safety and order in electrical substations
Safety and order in electrical substationsSafety and order in electrical substations
Safety and order in electrical substationsYunz contracting
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthingDenuka
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecionHimmelstern
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics AnalysisHimmelstern
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfJayWin2
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamleshKamlesh Vala
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
ETAP - Short circuit analysis iec standard
ETAP - Short circuit analysis iec standardETAP - Short circuit analysis iec standard
ETAP - Short circuit analysis iec standardHimmelstern
 

What's hot (20)

FEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTIONFEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTION
 
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
BUS BAR  PROTECTION PPT BY:-R.K.PANDITBUS BAR  PROTECTION PPT BY:-R.K.PANDIT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methods
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Protective relaying
Protective relayingProtective relaying
Protective relaying
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Safety and order in electrical substations
Safety and order in electrical substationsSafety and order in electrical substations
Safety and order in electrical substations
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecion
 
Bus Bar Protection
Bus Bar ProtectionBus Bar Protection
Bus Bar Protection
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics Analysis
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
ETAP - Short circuit analysis iec standard
ETAP - Short circuit analysis iec standardETAP - Short circuit analysis iec standard
ETAP - Short circuit analysis iec standard
 

Similar to Unchecked Capacitor Causes Loss of Revenue

Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalStaco Energy
 
DPE Company Profile - KV Ref 2
DPE Company Profile - KV Ref 2DPE Company Profile - KV Ref 2
DPE Company Profile - KV Ref 2Sarel Meyer
 
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...System Protection
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoringNiraj Agrawal
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-downSystem Protection
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET Journal
 
A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenanceAmadeo Antonio
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin ResumeVipin Das
 
1660034363151685.pptx
1660034363151685.pptx1660034363151685.pptx
1660034363151685.pptxPradip khatri
 
Submersible Pump Capacitors
Submersible Pump CapacitorsSubmersible Pump Capacitors
Submersible Pump CapacitorsBinoAlexander
 

Similar to Unchecked Capacitor Causes Loss of Revenue (20)

Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
DPE Company Profile - KV Ref 2
DPE Company Profile - KV Ref 2DPE Company Profile - KV Ref 2
DPE Company Profile - KV Ref 2
 
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoring
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-down
 
APFC AMTL 30.01.2015
APFC  AMTL  30.01.2015APFC  AMTL  30.01.2015
APFC AMTL 30.01.2015
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Sme apfc panel catalogue
Sme apfc panel catalogueSme apfc panel catalogue
Sme apfc panel catalogue
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonic
 
A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenance
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
bala.1
bala.1bala.1
bala.1
 
PD_Presentation_1.pdf
PD_Presentation_1.pdfPD_Presentation_1.pdf
PD_Presentation_1.pdf
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 
WHO final
WHO  finalWHO  final
WHO final
 
1660034363151685.pptx
1660034363151685.pptx1660034363151685.pptx
1660034363151685.pptx
 
Submersible Pump Capacitors
Submersible Pump CapacitorsSubmersible Pump Capacitors
Submersible Pump Capacitors
 

More from System Protection

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54System Protection
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsSystem Protection
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionSystem Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionSystem Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionSystem Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711System Protection
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingSystem Protection
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016System Protection
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)System Protection
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatSystem Protection
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSystem Protection
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSystem Protection
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionSystem Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionSystem Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionSystem Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...System Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!System Protection
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuSystem Protection
 

More from System Protection (20)

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Recently uploaded (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Unchecked Capacitor Causes Loss of Revenue

  • 1. Page | 1 Authorised Channel Partners Case Study – How an Unchecked Capacitor can cause loss of revenue oss of Revenue is one of the biggest headaches for all the industries across world. And losses may come from Failure of Equipments, Accidents, Less production, Production at higher costs, N number of things. Everyday we come to know about some new breakdowns happening in industries due to various issues in our Electrical system. And our Motto is one problem must not be repeated in other plants. And sometime few problems help us to provide the best solution to other plants where such problem may arrive. Presenting you all the case now. Background Power Factor, one of the important parameters that grid connected industries continuously measured. As the rise and fall of the same has impact on the penalty or less rebate in electricity bills. We received an emergency call from a grid connected process industries for tripping of 6.6 kV 1500 KVAR capacitor bank in Earth fault, which resulted into low PF. This 1500 KVAR was a part of 7900 KVAR capacitor bank. To support the costumer, System Protection is always ready on their feet. So, within 24 hours, we sent our expert engineer to check and resolve the issue. Below is the diagram of the cap bank. Findings – at Site Before calling, Maintenance team did the check-up like Visual Inspection, cleaning of capacitor bank and Insulation resistance measurement, but all the checks were found to be ok. They decided to normalise the system by charging complete capacitor bank again. So, they charged the capacitor bank and started closing individual bank one by one. Again, the Bank-5 tripped in E/F. Now our engineer took over and checked the capacitor bank, following were the findings L
  • 2. Page | 2 Authorised Channel Partners 1. 2500 KVAR Bank was in isolate condition as the fuse were removed. We inquired about the same and found that this is the condition since commissioning. 2. 1500 KVAR Bank was already out due to E/F tripping, which was to be checked thoroughly. 3. Out of 5 Banks, now 2 banks were in isolate condition, causing Low PF. Troubleshooting and Root Cause analysis Our expert team reached the site and in consultation with process team 6.6 kV outgoing feeder of APFC was made off and isolated. We were given only 2 to 3 hours of time frame (due to operation related issue) by O&M team to diagnose the exact reason of E/F and suggest recommended actions. We repeated the IR test with our Calibrated instruments of individual capacitor and series reactor after isolating, done through visual check of capacitor, reactor, support insulator, busbar, cleaning, tightness and Capacitance / Reactance measurement by instrument and test set. After doing above test we got something, which is mentioned in below tabular form. Capacitance value as measured by Calibrated Multimeter. Phase Qn (KVAR) IN (A) Un (KV) Cn (µF) Capacitance value (µF) R1 250.0 56.05 4.46 40.02 42.01 R2 250.0 56.05 4.46 40.02 31.0 Y1 250.0 56.05 4.46 40.02 42.3 Y2 250.0 56.05 4.46 40.02 42.3 B1 250.0 56.05 4.46 40.02 41.7 B2 250.0 56.05 4.46 40.02 42.2 We found capacitance value of one the capacitor different. To make sure we checked the same by Voltage source method and below were the readings.
  • 3. Page | 3 Authorised Channel Partners Name Plate of one of the capacitors DOUBLE STAR CONNECTION SCHEME OF CAPACITORS - In this scheme capacitors are connected in double star formation with neutrals interconnected through a neutral CT as shown in figure above. In balance condition there is no current flowing through the neutral CT. - Measured capacitance of R2 capacitor by both the method was around 31.0 µF. - In the event of R2 capacitor failure or unbalance, it will create unbalance system condition. This was causing flow of current in neutral CT 20/1 which was giving tripping in Earth Fault. So, the recommendation was to replace R2 Capacitor with healthy one for 1500 KVAR cap bank to work healthily. - The 1500 KVAR E/F root cause was found, but problem of the plant remains in as it is condition i.e. Low PF - So, we went one step further to check the 2500 KVAR bank with all the routine tests. And to our astonishment that Cap bank was healthy, but why fuse was removed earlier were not known to the current team. - The reason which we thought could be, that at the time of commissioning, plant must be on NO Load, so during charging this 2500 KVAR capacitor would have come directly in line, which could have been causing leading PF, Hence the fuse must have been removed at that time to avoid Leading PF and its impact. Phase Capacitor Value @ name plate (µF) Capacitance value (µF) by Voltage source method R1 40.02 42.53 R2 40.02 31.62 Y1 40.02 42.62 Y2 40.02 42.55 B1 40.02 42.00 B2 40.02 42.48
  • 4. Page | 4 Authorised Channel Partners - So, we installed the fuse and charge the system successfully and the power factor was maintained. - And at last, we were delighted to ’WOW’ the costumer again, who learnt at last, the difference between symptom solving agents and Proper doctors. Conclusion – How routine / diagnostic testing of all the electrical equipment can prevent loss of Revenue / Profit. - In industries, testing is always prioritized as per priority of Equipments, like Relays and / or Release are given High priority in Panels, after that come Circuit breakers and if time, budget, and management permits time come for CT / PT testing, and for other equipment no body ask what to do. So, we normally see that in a panel, CT / PT, Panel Schemes, Power Cables, Capacitor bank, Series reactor, etc are not given priority and are rarely tested. - We recommend that industry should do testing and maintenance of such untouched electrical Equipments like CT, PT, Cap bank, Power cables, Schemes, etc with latest and advanced testing, so that time to time healthiness of those can also be monitored. We, as an Electrical asset consultant and service provider always suggest what is best to run your industries smoothly and without hiccups of maloperation and breakdown. And if you are looking for a dedicated agency that understands the direct link between your assets and your revenue, call/write to us, we will be happy to assist you. SYSTEM PROTECTION E-Mail : bdm@systemprotection.in Web : www.systemprotection.in Tele : +91-265-2225137 (Servicing & Testing of Circuit Breaker, Relay, CT, PT, Transformer, Other Switchyard Equipment’s, Relay Co- ordination Studies, Cable, etc.)