SlideShare ist ein Scribd-Unternehmen logo
1 von 16
LEED (Leadership in Energy Environmental Design)
by United States Green Building Council.
Certification
Prepared by
SYED DANISH GHANI
Leadership in Energy & Environmental
Design
®
A leading-edge system for designing,
constructing, operating and certifying the
world’s
greenest buildings.
2
INTRODUCTION:
3
Artistic Milliner , Pvt , Ltd Will be the first LEED facility in
Pakistan Design for LEED Gold,
It is a leading multinational apparel manufacturer in
Karachi, in which we employing over 10,000 peoples since
many years.
The company has initiated an Energy & Water Efficiency
Improvement program with the intention of increasing
energy and water efficiency leading to M&S Plan A
certification and thereafter, LEED GOLD certification.
Main features
 Reduction of water use with efficient fixtures and use of treated water for
flushing.
 Efficient lighting and controls (mostly use natural light or LED).
 Efficient HVAC (heating ventilation and air condition ) systems.
 Improve erosion and sedimentation control to reduce negative impacts on
water and air quality.
 Additional Energy and water flow metering for measurement and verification.
 Earmarked areas for parking fuel efficient and pool vehicles.
 Better waste management - storage and collection program for waste
generated .
 Indoor air quality (IAQ) improvements.
 High performance glass to reduce heat gain.
 Heat recovery from generators to generate steam using heat recovery
boilers.
 Use of generator jacket water for running an absorption chiller to air
condition cooling in merchandising and office spaces.
EnergySolve International (Pvt) Ltd 4
Benefits & Impacts
 Tangible benefits:
 Over 25% reductions in energy consumption.
 Over 45% reductions in water consumption.
 Intangible benefits:
 Green image for the facility and group
 Health and safety of the building occupants
 Enhanced occupant comfort
 Higher productivity of occupants
 Best operating practices
 Incorporate latest techniques / technologies
EnergySolve International (Pvt) Ltd 5
Energy Monitoring Meters
Electricity
Production
Lighting
Office
Air
Conditioning
Compressed
air system
Boiler
RO Plant
EnergySolve International (Pvt) Ltd 6
Natural Gas
Canteen
Boiler
Production
load
Chiller
Water
Canteen
Main Block
Cooling
Tower
Boiler
Workers
Toilets
Water Management
 Efficient water fixtures installed
 Rain water harvesting used for flushing
 Water sub meters installed
 Daily water usage monitoring implemented to
reduce its usage
 Awareness program on water conservation
conducted
EnergySolve International (Pvt) Ltd 7
Low flow self-closing taps in wash basins,
canteen
EnergySolve International (Pvt) Ltd 8
Installed manual flush
valves in worker toilets
ECO Factory Policy &
Management
 ECO factory policy established
 Environmental sustainability plan developed and
practicing
 ECO factory delivery manager & team appointed
 Waste control, reduction & recycling plan implemented
 Preventive maintenance schedule implemented
EnergySolve International (Pvt) Ltd 9
Waste Reduction &
Recycling Waste control, reduction and recycling plan
implemented
 Waste bins are clearly marked and located
 Segregation completed at the central waste
recycling storage area
 A Bulb eater installed for safe disposing of
mercury in florescent lamps
 Contracts signed with recyclers
 Awareness program is conducted to reduce
waste
 Waste is 100% recycled and zero to landfill!
EnergySolve International (Pvt) Ltd 10
Way forward….
 Regular monitoring of performance to sustain
benefits
 Further improvements to HVAC, compressed air and
boiler/steam distribution system
 Further reduction of waste
 Annual energy and water audits from a third party
 Certification
EnergySolve International (Pvt) Ltd 11
EnergySolve International (Pvt) Ltd 12
EnergySolve International (Pvt) Ltd 13
EnergySolve International (Pvt) Ltd 14
Conclusions
 When completed, Artistic Milliners a
new facility in Karachi, Pakistan will be
a LEED “GREEN” installation and it will
stand out as a proud Achievement.
 The LEED rating will result in a high
performance building with substantial
reduction in operating costs to Artistic
Milliners, owner of the facility.
 Energy Solve will facilitate and hand
hold Artistic Milliners project team right
from LEED registration.
EnergySolve International (Pvt) Ltd 15
16
THANKYOU
Prepared by
SYED DANISH GHANI

Weitere ähnliche Inhalte

Was ist angesagt?

Green Factory
Green FactoryGreen Factory
Green FactoryAydinN
 
Comparing griha with breeam for new construction
Comparing griha with breeam for new constructionComparing griha with breeam for new construction
Comparing griha with breeam for new constructionkhushal tadas
 
How to Create a Lighting Sustainability Program in Your Building
How to Create a Lighting Sustainability Program in Your BuildingHow to Create a Lighting Sustainability Program in Your Building
How to Create a Lighting Sustainability Program in Your BuildingEverLights
 
IRJET-Model House of Green Building
IRJET-Model House of Green BuildingIRJET-Model House of Green Building
IRJET-Model House of Green BuildingIRJET Journal
 
Innovations in green buildings
 Innovations in green buildings  Innovations in green buildings
Innovations in green buildings arica123
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workgatti Teja
 
Presentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemPresentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemIGBC Green Building Congress
 
VegetativeGreenRoofChicago-PGM
VegetativeGreenRoofChicago-PGMVegetativeGreenRoofChicago-PGM
VegetativeGreenRoofChicago-PGMAmy Zmecek
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT vk78512
 
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...IoEnergy, Inc.
 
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.Climate Control Systems Inc.
 
SUSTAINABLE BUILDING Infosys limited,mysore
SUSTAINABLE BUILDING Infosys limited,mysoreSUSTAINABLE BUILDING Infosys limited,mysore
SUSTAINABLE BUILDING Infosys limited,mysoreApurwa Kumari
 
CII green building
CII green building CII green building
CII green building Deepak Thapa
 
Controlled Environment Agriculture by Busari and Lawal
Controlled Environment Agriculture by Busari and LawalControlled Environment Agriculture by Busari and Lawal
Controlled Environment Agriculture by Busari and LawalABDULMUIZZ LAWAL
 
Abloy Oy environmental review 2016
Abloy Oy environmental review 2016Abloy Oy environmental review 2016
Abloy Oy environmental review 2016Abloy Oy
 

Was ist angesagt? (20)

GreengineersPoster
GreengineersPosterGreengineersPoster
GreengineersPoster
 
Green Factory
Green FactoryGreen Factory
Green Factory
 
Comparing griha with breeam for new construction
Comparing griha with breeam for new constructionComparing griha with breeam for new construction
Comparing griha with breeam for new construction
 
How to Create a Lighting Sustainability Program in Your Building
How to Create a Lighting Sustainability Program in Your BuildingHow to Create a Lighting Sustainability Program in Your Building
How to Create a Lighting Sustainability Program in Your Building
 
leed-case-study_final-reduced
leed-case-study_final-reducedleed-case-study_final-reduced
leed-case-study_final-reduced
 
IRJET-Model House of Green Building
IRJET-Model House of Green BuildingIRJET-Model House of Green Building
IRJET-Model House of Green Building
 
Innovations in green buildings
 Innovations in green buildings  Innovations in green buildings
Innovations in green buildings
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team work
 
Presentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemPresentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating System
 
VegetativeGreenRoofChicago-PGM
VegetativeGreenRoofChicago-PGMVegetativeGreenRoofChicago-PGM
VegetativeGreenRoofChicago-PGM
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
 
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
 
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.
Ozone Water Recycling with Oxygen Benefits for Better Greenhouse Yields.
 
SUSTAINABLE BUILDING Infosys limited,mysore
SUSTAINABLE BUILDING Infosys limited,mysoreSUSTAINABLE BUILDING Infosys limited,mysore
SUSTAINABLE BUILDING Infosys limited,mysore
 
Natural capital
Natural capitalNatural capital
Natural capital
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
CII green building
CII green building CII green building
CII green building
 
Controlled Environment Agriculture by Busari and Lawal
Controlled Environment Agriculture by Busari and LawalControlled Environment Agriculture by Busari and Lawal
Controlled Environment Agriculture by Busari and Lawal
 
Abloy Oy environmental review 2016
Abloy Oy environmental review 2016Abloy Oy environmental review 2016
Abloy Oy environmental review 2016
 

Ähnlich wie Artisitic Millinersssmain

Green Manufacturing
Green ManufacturingGreen Manufacturing
Green Manufacturingananya0122
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria amfacilities
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptxManjeet63
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptxManjeet63
 
Hotelaria sustentável
Hotelaria sustentávelHotelaria sustentável
Hotelaria sustentávelGabriela Otto
 
Memorandum To Daniel D. McLean, Chief Operating Officer .docx
Memorandum To Daniel D. McLean, Chief Operating Officer .docxMemorandum To Daniel D. McLean, Chief Operating Officer .docx
Memorandum To Daniel D. McLean, Chief Operating Officer .docxandreecapon
 
Internal Carbon Fees to the Rescue
Internal Carbon Fees to the RescueInternal Carbon Fees to the Rescue
Internal Carbon Fees to the RescueSustainable Brands
 
Optimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance PracticesOptimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance PracticesGreen Initiatives 绿色倡议
 
ICC - Commitment to Sustainability -- “Go Green”
ICC - Commitment to Sustainability --“Go Green”ICC - Commitment to Sustainability --“Go Green”
ICC - Commitment to Sustainability -- “Go Green”michelle523
 
Leed factories in bangladesh 1
Leed factories in bangladesh 1Leed factories in bangladesh 1
Leed factories in bangladesh 1SharoareAnik
 

Ähnlich wie Artisitic Millinersssmain (20)

Platinum level sample
Platinum level samplePlatinum level sample
Platinum level sample
 
IGBC
IGBCIGBC
IGBC
 
Hero Motocorp
Hero MotocorpHero Motocorp
Hero Motocorp
 
Green Manufacturing
Green ManufacturingGreen Manufacturing
Green Manufacturing
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptx
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptx
 
green building ppt
green building pptgreen building ppt
green building ppt
 
Hotelaria sustentável
Hotelaria sustentávelHotelaria sustentável
Hotelaria sustentável
 
Memorandum To Daniel D. McLean, Chief Operating Officer .docx
Memorandum To Daniel D. McLean, Chief Operating Officer .docxMemorandum To Daniel D. McLean, Chief Operating Officer .docx
Memorandum To Daniel D. McLean, Chief Operating Officer .docx
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
Internal Carbon Fees to the Rescue
Internal Carbon Fees to the RescueInternal Carbon Fees to the Rescue
Internal Carbon Fees to the Rescue
 
Optimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance PracticesOptimizing Building Operations and Maintenance Practices
Optimizing Building Operations and Maintenance Practices
 
ICC - Commitment to Sustainability -- “Go Green”
ICC - Commitment to Sustainability --“Go Green”ICC - Commitment to Sustainability --“Go Green”
ICC - Commitment to Sustainability -- “Go Green”
 
Green Presentation
Green PresentationGreen Presentation
Green Presentation
 
Leed factories in bangladesh 1
Leed factories in bangladesh 1Leed factories in bangladesh 1
Leed factories in bangladesh 1
 
SERVICES
SERVICESSERVICES
SERVICES
 
Green Building
Green BuildingGreen Building
Green Building
 
Green
GreenGreen
Green
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 

Artisitic Millinersssmain

  • 1. LEED (Leadership in Energy Environmental Design) by United States Green Building Council. Certification Prepared by SYED DANISH GHANI
  • 2. Leadership in Energy & Environmental Design ® A leading-edge system for designing, constructing, operating and certifying the world’s greenest buildings. 2
  • 3. INTRODUCTION: 3 Artistic Milliner , Pvt , Ltd Will be the first LEED facility in Pakistan Design for LEED Gold, It is a leading multinational apparel manufacturer in Karachi, in which we employing over 10,000 peoples since many years. The company has initiated an Energy & Water Efficiency Improvement program with the intention of increasing energy and water efficiency leading to M&S Plan A certification and thereafter, LEED GOLD certification.
  • 4. Main features  Reduction of water use with efficient fixtures and use of treated water for flushing.  Efficient lighting and controls (mostly use natural light or LED).  Efficient HVAC (heating ventilation and air condition ) systems.  Improve erosion and sedimentation control to reduce negative impacts on water and air quality.  Additional Energy and water flow metering for measurement and verification.  Earmarked areas for parking fuel efficient and pool vehicles.  Better waste management - storage and collection program for waste generated .  Indoor air quality (IAQ) improvements.  High performance glass to reduce heat gain.  Heat recovery from generators to generate steam using heat recovery boilers.  Use of generator jacket water for running an absorption chiller to air condition cooling in merchandising and office spaces. EnergySolve International (Pvt) Ltd 4
  • 5. Benefits & Impacts  Tangible benefits:  Over 25% reductions in energy consumption.  Over 45% reductions in water consumption.  Intangible benefits:  Green image for the facility and group  Health and safety of the building occupants  Enhanced occupant comfort  Higher productivity of occupants  Best operating practices  Incorporate latest techniques / technologies EnergySolve International (Pvt) Ltd 5
  • 6. Energy Monitoring Meters Electricity Production Lighting Office Air Conditioning Compressed air system Boiler RO Plant EnergySolve International (Pvt) Ltd 6 Natural Gas Canteen Boiler Production load Chiller Water Canteen Main Block Cooling Tower Boiler Workers Toilets
  • 7. Water Management  Efficient water fixtures installed  Rain water harvesting used for flushing  Water sub meters installed  Daily water usage monitoring implemented to reduce its usage  Awareness program on water conservation conducted EnergySolve International (Pvt) Ltd 7
  • 8. Low flow self-closing taps in wash basins, canteen EnergySolve International (Pvt) Ltd 8 Installed manual flush valves in worker toilets
  • 9. ECO Factory Policy & Management  ECO factory policy established  Environmental sustainability plan developed and practicing  ECO factory delivery manager & team appointed  Waste control, reduction & recycling plan implemented  Preventive maintenance schedule implemented EnergySolve International (Pvt) Ltd 9
  • 10. Waste Reduction & Recycling Waste control, reduction and recycling plan implemented  Waste bins are clearly marked and located  Segregation completed at the central waste recycling storage area  A Bulb eater installed for safe disposing of mercury in florescent lamps  Contracts signed with recyclers  Awareness program is conducted to reduce waste  Waste is 100% recycled and zero to landfill! EnergySolve International (Pvt) Ltd 10
  • 11. Way forward….  Regular monitoring of performance to sustain benefits  Further improvements to HVAC, compressed air and boiler/steam distribution system  Further reduction of waste  Annual energy and water audits from a third party  Certification EnergySolve International (Pvt) Ltd 11
  • 15. Conclusions  When completed, Artistic Milliners a new facility in Karachi, Pakistan will be a LEED “GREEN” installation and it will stand out as a proud Achievement.  The LEED rating will result in a high performance building with substantial reduction in operating costs to Artistic Milliners, owner of the facility.  Energy Solve will facilitate and hand hold Artistic Milliners project team right from LEED registration. EnergySolve International (Pvt) Ltd 15