SlideShare ist ein Scribd-Unternehmen logo
1 von 15
TRELLEBORG OFFSHORE INTEGRATED
MOORING PRESENTATION
TRELLEBORG MARINE SYSTEMS INTRODUCTION



             Trelleborg Marine Systems provides safe berthing and
              mooring solutions for demanding marine environments
             History
                    Harbour Marine Engineering was established in 1971
                    Focus on onshore and offshore mooring equipment (since 1980)
                    Incorporated into Trelleborg in 2006
             Technical capabilities
                    Proven ability to integrate complex solutions -70% of LNG jetties
                     worldwide
                    World leader in the supply of quick release hooks
             Complete Design Control
                    Mechanical, electrical, instrumentation and software in-house design,
                     procurement, manufacturing, QA, project management and after sale
                     service


TRELLEBORG GROUP

2
FPSO Systems
            Agenda

             FPSO Tandem Mooring and Offloading Systems

             Spread Mooring and Chain Tensioning Systems

             Trelleborg Marine Systems: Offshore Integrated Mooring
              Offshore Mooring and Docking System




TRELLEBORG GROUP

3   October 2, 2008
FPSO TANDEM MOORING & OFFLOADING


            Hawser hook with load
             monitoring and remote
             release
            Hawser reeler (vertical or
             horizontal) with hawser
            Trelleborg hose and hose
             reeler
            Certified by world
             classification trade bodies:
                   (ie. DNV, ABS, Rina, Lloyds,
                   BV)


TRELLEBORG GROUP

4
VERTICAL HAWSER REEL

           Never disconnect the
            chafe chain from the
            hawser hook
           Store entire hawser
            assembly onto drum
           Compact layout
           Load monitoring
           Remote release




TRELLEBORG GROUP
HORIZONTAL HAWSER REEL
                              Three section drum
                                 Transfer of chafe chain from
                                   hawser hook to drum
                                 Entire hawser assembly is
                                   stored on drum
                                 Remote release and load
                                   monitoring

                              Single section drum
                                 Never disconnect chafe chain
                                    from hawser hook
                                 Chafe chain stored outboard
                                 Remote release and load
                                    monitoring




TRELLEBORG GROUP
OFFLOADING HOSE REELER
                                 16 inch or 20 inch hose
                                 Up to 1,115 feet/ 340 meter hose
                                 Compact layout
                                 Optimized weight
                                 Shared HPU with hawser reel
                                 Emergency reel handling winch




TRELLEBORG GROUP

7
Agenda


            FPSO Tandem Mooring

            Spread Mooring and Chain Tensioning System

            Trelleborg Marine Systems: Offshore Integrated Mooring
             Offshore Mooring and Docking System




TRELLEBORG GROUP

8
Spread Mooring and Tensioning Systems


            Vertical chain stopper for spread
             mooring
                      Designed to the MBL of the chain or design load
                      Proof load to SWL
                      Optional load monitoring
                      Optional fairlead in front of chain stopper
                      To suit up to 114mm R4 chain

            Local and remote control unit in
             CCR
            150T chain tensioning winch with
             load monitoring
                      1 winch on the bow and 1 winch on the stern
            Suitable for hazardous area
            Certified by Marine Classification
             Societies (DnV, ABS, RINA and BV)




TRELLEBORG GROUP

9
Spread Mooring and Tensioning Systems
                                   (left) Chain stopper with load
                                    monitoring, remote release, chain
                                    tensioning
                                   (bottom left) Horizontal chain
                                    stoppers with integrated fairlead
                                    with no remote release and load
                                    monitoring
                                   (bottom centre) Chain tensioning
                                    jack
                                   (bottom right) Load monitoring
                                    display




TRELLEBORG GROUP

10
Agenda

              FPSO Tandem Mooring

              Spread Mooring and Chain Tensioning Systems

              Trelleborg Marine Systems: Offshore Mooring and Docking
               System




TRELLEBORG GROUP

11   October 2, 2008
INTEGRATION OF MONITORING SYSTEMS
             Integration of sub-systems is
              common in modern FPSO
              (Load Monitoring Systems,
              Remote Release, Mooring
              and Docking, Environmental
              and Reporting)
             Integrated system design
              implemented by Trelleborg is
              based on proven techniques
              and interface methodologies




TRELLEBORG GROUP

12
INTEGRATION OF MONITORING SYSTEMS


            Main advantages of
             integrated systems are:
                      Common operator workstation to display,
                       monitor and report
                      Common portable display units for all sub-
                       systems
                      Efficient sharing of information between
                       sub-systems
                      Information can be easily shared with third
                       party systems i.e. DCS
                      Substantial cost / performance benefits

            Single point responsibility for
             complete system design,
             manufacturing,
             commissioning, warranty and
             training

TRELLEBORG GROUP

13
Conclusion


            Trelleborg Marine Systems provides safe berthing and mooring
             solutions for demanding marine environments
               Over 40 years of experience in developing customized
                 berthing and mooring solutions
               In-house technical expertise with a proven track record in
                 complex system integration
               Bringing our expertise for onshore LNG terminal berthing
                 solutions together with our offshore FPSO/FSO mooring
                 know-how to provide the safest berthing and mooring
                 solutions




TRELLEBORG GROUP

14
www.trelleborg.com
TRELLEBORG GROUP

15

Weitere ähnliche Inhalte

Andere mochten auch

FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...IQPC
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOPutu Indra Mahatrisna
 
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsFPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsDavid Seah
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
Fpso forum presentation sept 2011
Fpso forum presentation sept  2011Fpso forum presentation sept  2011
Fpso forum presentation sept 2011Endeavor Management
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls IQPC
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 

Andere mochten auch (10)

FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSO
 
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsFPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
 
SUC Brasil 2012 : The New Sesam Manager
SUC Brasil 2012 : The New Sesam ManagerSUC Brasil 2012 : The New Sesam Manager
SUC Brasil 2012 : The New Sesam Manager
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
FPSO Requirements
FPSO RequirementsFPSO Requirements
FPSO Requirements
 
Fpso forum presentation sept 2011
Fpso forum presentation sept  2011Fpso forum presentation sept  2011
Fpso forum presentation sept 2011
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 

Ähnlich wie Tmsm Oim Fpso Overview June 2012

120421 Oim Presentation Otc Dg 120424
120421 Oim Presentation Otc  Dg 120424120421 Oim Presentation Otc  Dg 120424
120421 Oim Presentation Otc Dg 120424swoolway
 
Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12swoolway
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersiontom_toth
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia
2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia
2012 Jeep Liberty For Sale VA | Jeep Dealer VirginiaManassas Dealership
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly
2012 Jeep Liberty For Sale VA | Jeep Dealer Near ChantillyManassas Dealership
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria
2012 Jeep Liberty For Sale VA | Jeep Dealer Near AlexandriaSafford Jeep of Springfield
 
Lifegear - NFPA Rescue catalogue
Lifegear - NFPA Rescue catalogueLifegear - NFPA Rescue catalogue
Lifegear - NFPA Rescue cataloguelifegear1
 
Rescue kit - Lifegear Safetech
Rescue kit - Lifegear SafetechRescue kit - Lifegear Safetech
Rescue kit - Lifegear Safetechlifegear1
 
2014.04 dubai - metrology and ramses synthetic baseline positioning - final...
2014.04   dubai - metrology and ramses synthetic baseline positioning - final...2014.04   dubai - metrology and ramses synthetic baseline positioning - final...
2014.04 dubai - metrology and ramses synthetic baseline positioning - final...James Titcomb
 
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5Tie-in Analysis Guideline Using ORCAFLEX_DKA_5
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5Dewintha Kania
 
Manuale Sky Tech TS6I 2,4 GHz
Manuale Sky Tech TS6I 2,4 GHzManuale Sky Tech TS6I 2,4 GHz
Manuale Sky Tech TS6I 2,4 GHzSabattinicars
 
LTE air interface overview
LTE air interface overviewLTE air interface overview
LTE air interface overviewNasir Ahmad
 
Precision Processing Equipment Kolkata
Precision Processing Equipment KolkataPrecision Processing Equipment Kolkata
Precision Processing Equipment Kolkataprepec
 

Ähnlich wie Tmsm Oim Fpso Overview June 2012 (13)

120421 Oim Presentation Otc Dg 120424
120421 Oim Presentation Otc  Dg 120424120421 Oim Presentation Otc  Dg 120424
120421 Oim Presentation Otc Dg 120424
 
Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersion
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia
2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia
2012 Jeep Liberty For Sale VA | Jeep Dealer Virginia
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Chantilly
 
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria
2012 Jeep Liberty For Sale VA | Jeep Dealer Near Alexandria
 
Lifegear - NFPA Rescue catalogue
Lifegear - NFPA Rescue catalogueLifegear - NFPA Rescue catalogue
Lifegear - NFPA Rescue catalogue
 
Rescue kit - Lifegear Safetech
Rescue kit - Lifegear SafetechRescue kit - Lifegear Safetech
Rescue kit - Lifegear Safetech
 
2014.04 dubai - metrology and ramses synthetic baseline positioning - final...
2014.04   dubai - metrology and ramses synthetic baseline positioning - final...2014.04   dubai - metrology and ramses synthetic baseline positioning - final...
2014.04 dubai - metrology and ramses synthetic baseline positioning - final...
 
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5Tie-in Analysis Guideline Using ORCAFLEX_DKA_5
Tie-in Analysis Guideline Using ORCAFLEX_DKA_5
 
Manuale Sky Tech TS6I 2,4 GHz
Manuale Sky Tech TS6I 2,4 GHzManuale Sky Tech TS6I 2,4 GHz
Manuale Sky Tech TS6I 2,4 GHz
 
LTE air interface overview
LTE air interface overviewLTE air interface overview
LTE air interface overview
 
Precision Processing Equipment Kolkata
Precision Processing Equipment KolkataPrecision Processing Equipment Kolkata
Precision Processing Equipment Kolkata
 

Tmsm Oim Fpso Overview June 2012

  • 2. TRELLEBORG MARINE SYSTEMS INTRODUCTION  Trelleborg Marine Systems provides safe berthing and mooring solutions for demanding marine environments  History  Harbour Marine Engineering was established in 1971  Focus on onshore and offshore mooring equipment (since 1980)  Incorporated into Trelleborg in 2006  Technical capabilities  Proven ability to integrate complex solutions -70% of LNG jetties worldwide  World leader in the supply of quick release hooks  Complete Design Control  Mechanical, electrical, instrumentation and software in-house design, procurement, manufacturing, QA, project management and after sale service TRELLEBORG GROUP 2
  • 3. FPSO Systems Agenda  FPSO Tandem Mooring and Offloading Systems  Spread Mooring and Chain Tensioning Systems  Trelleborg Marine Systems: Offshore Integrated Mooring Offshore Mooring and Docking System TRELLEBORG GROUP 3 October 2, 2008
  • 4. FPSO TANDEM MOORING & OFFLOADING  Hawser hook with load monitoring and remote release  Hawser reeler (vertical or horizontal) with hawser  Trelleborg hose and hose reeler  Certified by world classification trade bodies: (ie. DNV, ABS, Rina, Lloyds, BV) TRELLEBORG GROUP 4
  • 5. VERTICAL HAWSER REEL  Never disconnect the chafe chain from the hawser hook  Store entire hawser assembly onto drum  Compact layout  Load monitoring  Remote release TRELLEBORG GROUP
  • 6. HORIZONTAL HAWSER REEL  Three section drum  Transfer of chafe chain from hawser hook to drum  Entire hawser assembly is stored on drum  Remote release and load monitoring  Single section drum  Never disconnect chafe chain from hawser hook  Chafe chain stored outboard  Remote release and load monitoring TRELLEBORG GROUP
  • 7. OFFLOADING HOSE REELER  16 inch or 20 inch hose  Up to 1,115 feet/ 340 meter hose  Compact layout  Optimized weight  Shared HPU with hawser reel  Emergency reel handling winch TRELLEBORG GROUP 7
  • 8. Agenda  FPSO Tandem Mooring  Spread Mooring and Chain Tensioning System  Trelleborg Marine Systems: Offshore Integrated Mooring Offshore Mooring and Docking System TRELLEBORG GROUP 8
  • 9. Spread Mooring and Tensioning Systems  Vertical chain stopper for spread mooring  Designed to the MBL of the chain or design load  Proof load to SWL  Optional load monitoring  Optional fairlead in front of chain stopper  To suit up to 114mm R4 chain  Local and remote control unit in CCR  150T chain tensioning winch with load monitoring  1 winch on the bow and 1 winch on the stern  Suitable for hazardous area  Certified by Marine Classification Societies (DnV, ABS, RINA and BV) TRELLEBORG GROUP 9
  • 10. Spread Mooring and Tensioning Systems  (left) Chain stopper with load monitoring, remote release, chain tensioning  (bottom left) Horizontal chain stoppers with integrated fairlead with no remote release and load monitoring  (bottom centre) Chain tensioning jack  (bottom right) Load monitoring display TRELLEBORG GROUP 10
  • 11. Agenda  FPSO Tandem Mooring  Spread Mooring and Chain Tensioning Systems  Trelleborg Marine Systems: Offshore Mooring and Docking System TRELLEBORG GROUP 11 October 2, 2008
  • 12. INTEGRATION OF MONITORING SYSTEMS  Integration of sub-systems is common in modern FPSO (Load Monitoring Systems, Remote Release, Mooring and Docking, Environmental and Reporting)  Integrated system design implemented by Trelleborg is based on proven techniques and interface methodologies TRELLEBORG GROUP 12
  • 13. INTEGRATION OF MONITORING SYSTEMS  Main advantages of integrated systems are:  Common operator workstation to display, monitor and report  Common portable display units for all sub- systems  Efficient sharing of information between sub-systems  Information can be easily shared with third party systems i.e. DCS  Substantial cost / performance benefits  Single point responsibility for complete system design, manufacturing, commissioning, warranty and training TRELLEBORG GROUP 13
  • 14. Conclusion  Trelleborg Marine Systems provides safe berthing and mooring solutions for demanding marine environments  Over 40 years of experience in developing customized berthing and mooring solutions  In-house technical expertise with a proven track record in complex system integration  Bringing our expertise for onshore LNG terminal berthing solutions together with our offshore FPSO/FSO mooring know-how to provide the safest berthing and mooring solutions TRELLEBORG GROUP 14