© 2015 Eaton. All Rights Reserved..
Five ways to increase power system availability
© 2015 Eaton. All Rights Reserved.. 2
Data centers are a cornerstone of
our always-connected lives and a
strategic asset, making reliability and
uptime more important than ever.
However, businesses are vulnerable
to a variety of threats, some out of
their control.
© 2015 Eaton. All Rights Reserved.. 3
A power system design flaw or failure
in the electric grid can bring down
even the most sophisticated data
center.
Here are five best practices to help
mitigate your exposure to power-
related downtime.
© 2015 Eaton. All Rights Reserved.. 4
1. Focus on long-term value
Challenge: Short- and long-term priorities are often in
conflict during data center construction or renovation.
• Those building the facility are asked to hold down
costs and shorten completion times.
• Those operating the facility want quality equipment
that meets operating specifications.
© 2015 Eaton. All Rights Reserved.. 5
Best practice: Decision makers should make sure no one
trades long-term risk for short-term savings. And they should
communicate the importance of adhering to original operating
specifications, even if it means spending a little more.
1. Focus on long-term value
© 2015 Eaton. All Rights Reserved.. 6
2. Consider ease of repair and reliability
Challenge: Availability and reliability are sometimes used
interchangeably—but the two have distinct meanings.
Repair time is a big factor when assessing system
availability. For example, a power supply may rarely
experience downtime (highly reliable), but not be highly
available because it has a high mean time to repair.
© 2015 Eaton. All Rights Reserved.. 7
Best practice: When evaluating power system
components, look for products that are highly reliable
and quickly repairable. In particular, investigate how
swiftly and effectively a given power system
manufacturer can service products.
2. Consider ease of repair and reliability
© 2015 Eaton. All Rights Reserved.. 8
3. Implement monitoring and proactive diagnostics
Challenge: Few systems fail without warning, except in
disasters. It’s just that their warnings often go unheeded
since the monitoring systems in place are reactive in
nature. If facilities managers aren’t monitoring the right
performance indicators, they may know nothing about
an impending breakdown until after it happens.
© 2015 Eaton. All Rights Reserved.. 9
Best practice: The latest enterprise management
products can help with monitoring and proactively
maintaining mission-critical equipment. Facilities
departments need to have work processes in place
for consulting the software and responding swiftly to
signs of danger.
3. Implement monitoring and proactive diagnostics
© 2015 Eaton. All Rights Reserved.. 10
4. Adopt an appropriate power system topology
Challenge: Power system topology has a major
impact on procurement costs, operational
expenses, reliability and average repair times.
The more redundancy you incorporate into a data
center, the more it will cost you to build and run it.
But, it will also recover faster from an outage.
© 2015 Eaton. All Rights Reserved.. 11
Best practice: There is no single
correct answer when it comes to
selecting a power system topology.
Match your power system to your
circumstances and needs, based on
the criticality of the IT applications
the data center houses.
4. Adopt an appropriate power system topology
© 2015 Eaton. All Rights Reserved.. 12
5. Audit your power systems
Challenge: Most data center
managers think they know what
their power systems are capable of
delivering. Far fewer, actually
know. Only by auditing power
systems and the operational
processes that support them on a
regular basis can you establish
your data center’s maximum load
parameters concretely.
© 2015 Eaton. All Rights Reserved.. 13
Best practice: Audit power systems
thoroughly and regularly. Update any
building drawings, schematics,
operating manuals, etc., as facilities
equipment is replaced or upgraded.
5. Audit your power systems
© 2015 Eaton. All Rights Reserved.. 14
Thank you!
Learn more at Eaton.com/PowerQuality

Weitere ähnliche Inhalte

Mehr von SwitchOn to Eaton

10 UPS components that require the most attention
10 UPS components that require the most attention10 UPS components that require the most attention
10 UPS components that require the most attentionSwitchOn to Eaton
 
10 tips to safeguard your server room
10 tips to safeguard your server room10 tips to safeguard your server room
10 tips to safeguard your server roomSwitchOn to Eaton
 
Saving money with smart data center design
Saving money with smart data center designSaving money with smart data center design
Saving money with smart data center designSwitchOn to Eaton
 
Limit data center costs without limiting growth
Limit data center costs without limiting growthLimit data center costs without limiting growth
Limit data center costs without limiting growthSwitchOn to Eaton
 
UPS battery backup health checklist
UPS battery backup health checklistUPS battery backup health checklist
UPS battery backup health checklistSwitchOn to Eaton
 
Spotlight on quality manufacturing in Raleigh, NC
Spotlight on quality manufacturing in Raleigh, NCSpotlight on quality manufacturing in Raleigh, NC
Spotlight on quality manufacturing in Raleigh, NCSwitchOn to Eaton
 
Every second matters in sports and event broadcasting
Every second matters in sports and event broadcastingEvery second matters in sports and event broadcasting
Every second matters in sports and event broadcastingSwitchOn to Eaton
 
Follow the Eaton ePDU G3 Throne
Follow the Eaton ePDU G3 ThroneFollow the Eaton ePDU G3 Throne
Follow the Eaton ePDU G3 ThroneSwitchOn to Eaton
 
Manufacturing spotlight in Youngsville, North Carolina
Manufacturing spotlight in Youngsville, North CarolinaManufacturing spotlight in Youngsville, North Carolina
Manufacturing spotlight in Youngsville, North CarolinaSwitchOn to Eaton
 
Eaton's Desk Toy Decision results
Eaton's Desk Toy Decision resultsEaton's Desk Toy Decision results
Eaton's Desk Toy Decision resultsSwitchOn to Eaton
 
VMworld 2016 recap from the Eaton booth
VMworld 2016 recap from the Eaton boothVMworld 2016 recap from the Eaton booth
VMworld 2016 recap from the Eaton boothSwitchOn to Eaton
 
Cisco Live show recap - What IT pros may have missed at the Eaton booth
Cisco Live show recap - What IT pros may have missed at the Eaton boothCisco Live show recap - What IT pros may have missed at the Eaton booth
Cisco Live show recap - What IT pros may have missed at the Eaton boothSwitchOn to Eaton
 
Top ten most unusual outages
Top ten most unusual outagesTop ten most unusual outages
Top ten most unusual outagesSwitchOn to Eaton
 
The top 10 most significant U.S. blackouts of 2015
The top 10 most significant U.S. blackouts of 2015The top 10 most significant U.S. blackouts of 2015
The top 10 most significant U.S. blackouts of 2015SwitchOn to Eaton
 
Getting the February 7th big game to your living room
Getting the February 7th big game to your living roomGetting the February 7th big game to your living room
Getting the February 7th big game to your living roomSwitchOn to Eaton
 
Eaton rack power distribution overview
Eaton rack power distribution overviewEaton rack power distribution overview
Eaton rack power distribution overviewSwitchOn to Eaton
 
10 things you should expect from modern rack PDUs
10 things you should expect from modern rack PDUs10 things you should expect from modern rack PDUs
10 things you should expect from modern rack PDUsSwitchOn to Eaton
 
IT pros weigh in on colocation data centers
IT pros weigh in on colocation data centersIT pros weigh in on colocation data centers
IT pros weigh in on colocation data centersSwitchOn to Eaton
 
Eaton Fun Fan Facts: Series 3 of 3
Eaton Fun Fan Facts: Series 3 of 3Eaton Fun Fan Facts: Series 3 of 3
Eaton Fun Fan Facts: Series 3 of 3SwitchOn to Eaton
 

Mehr von SwitchOn to Eaton (20)

10 UPS components that require the most attention
10 UPS components that require the most attention10 UPS components that require the most attention
10 UPS components that require the most attention
 
10 tips to safeguard your server room
10 tips to safeguard your server room10 tips to safeguard your server room
10 tips to safeguard your server room
 
Saving money with smart data center design
Saving money with smart data center designSaving money with smart data center design
Saving money with smart data center design
 
Limit data center costs without limiting growth
Limit data center costs without limiting growthLimit data center costs without limiting growth
Limit data center costs without limiting growth
 
UPS battery backup health checklist
UPS battery backup health checklistUPS battery backup health checklist
UPS battery backup health checklist
 
Spotlight on quality manufacturing in Raleigh, NC
Spotlight on quality manufacturing in Raleigh, NCSpotlight on quality manufacturing in Raleigh, NC
Spotlight on quality manufacturing in Raleigh, NC
 
Top 10 blackouts for 2016
Top 10 blackouts for 2016Top 10 blackouts for 2016
Top 10 blackouts for 2016
 
Every second matters in sports and event broadcasting
Every second matters in sports and event broadcastingEvery second matters in sports and event broadcasting
Every second matters in sports and event broadcasting
 
Follow the Eaton ePDU G3 Throne
Follow the Eaton ePDU G3 ThroneFollow the Eaton ePDU G3 Throne
Follow the Eaton ePDU G3 Throne
 
Manufacturing spotlight in Youngsville, North Carolina
Manufacturing spotlight in Youngsville, North CarolinaManufacturing spotlight in Youngsville, North Carolina
Manufacturing spotlight in Youngsville, North Carolina
 
Eaton's Desk Toy Decision results
Eaton's Desk Toy Decision resultsEaton's Desk Toy Decision results
Eaton's Desk Toy Decision results
 
VMworld 2016 recap from the Eaton booth
VMworld 2016 recap from the Eaton boothVMworld 2016 recap from the Eaton booth
VMworld 2016 recap from the Eaton booth
 
Cisco Live show recap - What IT pros may have missed at the Eaton booth
Cisco Live show recap - What IT pros may have missed at the Eaton boothCisco Live show recap - What IT pros may have missed at the Eaton booth
Cisco Live show recap - What IT pros may have missed at the Eaton booth
 
Top ten most unusual outages
Top ten most unusual outagesTop ten most unusual outages
Top ten most unusual outages
 
The top 10 most significant U.S. blackouts of 2015
The top 10 most significant U.S. blackouts of 2015The top 10 most significant U.S. blackouts of 2015
The top 10 most significant U.S. blackouts of 2015
 
Getting the February 7th big game to your living room
Getting the February 7th big game to your living roomGetting the February 7th big game to your living room
Getting the February 7th big game to your living room
 
Eaton rack power distribution overview
Eaton rack power distribution overviewEaton rack power distribution overview
Eaton rack power distribution overview
 
10 things you should expect from modern rack PDUs
10 things you should expect from modern rack PDUs10 things you should expect from modern rack PDUs
10 things you should expect from modern rack PDUs
 
IT pros weigh in on colocation data centers
IT pros weigh in on colocation data centersIT pros weigh in on colocation data centers
IT pros weigh in on colocation data centers
 
Eaton Fun Fan Facts: Series 3 of 3
Eaton Fun Fan Facts: Series 3 of 3Eaton Fun Fan Facts: Series 3 of 3
Eaton Fun Fan Facts: Series 3 of 3
 

Kürzlich hochgeladen

Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 

Kürzlich hochgeladen (20)

Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 

5 ways to increase power system availability in data centers

  • 1. © 2015 Eaton. All Rights Reserved.. Five ways to increase power system availability
  • 2. © 2015 Eaton. All Rights Reserved.. 2 Data centers are a cornerstone of our always-connected lives and a strategic asset, making reliability and uptime more important than ever. However, businesses are vulnerable to a variety of threats, some out of their control.
  • 3. © 2015 Eaton. All Rights Reserved.. 3 A power system design flaw or failure in the electric grid can bring down even the most sophisticated data center. Here are five best practices to help mitigate your exposure to power- related downtime.
  • 4. © 2015 Eaton. All Rights Reserved.. 4 1. Focus on long-term value Challenge: Short- and long-term priorities are often in conflict during data center construction or renovation. • Those building the facility are asked to hold down costs and shorten completion times. • Those operating the facility want quality equipment that meets operating specifications.
  • 5. © 2015 Eaton. All Rights Reserved.. 5 Best practice: Decision makers should make sure no one trades long-term risk for short-term savings. And they should communicate the importance of adhering to original operating specifications, even if it means spending a little more. 1. Focus on long-term value
  • 6. © 2015 Eaton. All Rights Reserved.. 6 2. Consider ease of repair and reliability Challenge: Availability and reliability are sometimes used interchangeably—but the two have distinct meanings. Repair time is a big factor when assessing system availability. For example, a power supply may rarely experience downtime (highly reliable), but not be highly available because it has a high mean time to repair.
  • 7. © 2015 Eaton. All Rights Reserved.. 7 Best practice: When evaluating power system components, look for products that are highly reliable and quickly repairable. In particular, investigate how swiftly and effectively a given power system manufacturer can service products. 2. Consider ease of repair and reliability
  • 8. © 2015 Eaton. All Rights Reserved.. 8 3. Implement monitoring and proactive diagnostics Challenge: Few systems fail without warning, except in disasters. It’s just that their warnings often go unheeded since the monitoring systems in place are reactive in nature. If facilities managers aren’t monitoring the right performance indicators, they may know nothing about an impending breakdown until after it happens.
  • 9. © 2015 Eaton. All Rights Reserved.. 9 Best practice: The latest enterprise management products can help with monitoring and proactively maintaining mission-critical equipment. Facilities departments need to have work processes in place for consulting the software and responding swiftly to signs of danger. 3. Implement monitoring and proactive diagnostics
  • 10. © 2015 Eaton. All Rights Reserved.. 10 4. Adopt an appropriate power system topology Challenge: Power system topology has a major impact on procurement costs, operational expenses, reliability and average repair times. The more redundancy you incorporate into a data center, the more it will cost you to build and run it. But, it will also recover faster from an outage.
  • 11. © 2015 Eaton. All Rights Reserved.. 11 Best practice: There is no single correct answer when it comes to selecting a power system topology. Match your power system to your circumstances and needs, based on the criticality of the IT applications the data center houses. 4. Adopt an appropriate power system topology
  • 12. © 2015 Eaton. All Rights Reserved.. 12 5. Audit your power systems Challenge: Most data center managers think they know what their power systems are capable of delivering. Far fewer, actually know. Only by auditing power systems and the operational processes that support them on a regular basis can you establish your data center’s maximum load parameters concretely.
  • 13. © 2015 Eaton. All Rights Reserved.. 13 Best practice: Audit power systems thoroughly and regularly. Update any building drawings, schematics, operating manuals, etc., as facilities equipment is replaced or upgraded. 5. Audit your power systems
  • 14. © 2015 Eaton. All Rights Reserved.. 14 Thank you! Learn more at Eaton.com/PowerQuality