Plug & Play Quick Connect Installation
Source: Legrand
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
The conventional method of installation with conduit, wires, cables, junction boxes
and screw connectors is increasingly giving way to a more modern form of installation
that makes use of quick connectors. However, this installation method can only be
applied when free space is available in the form of a suspended ceiling, a floating
floor or hollow walls. In a standard home with stone walls, which has no suspended
ceilings or floating floors, we cannot use this modern form of installation. In many
other places such as shops, offices, industrial areas, hotels, hospitals, schools and
so on, the use of quick connectors can occupy an important place in the installation
process.
In this article, we will endeavour to give an overview of what kinds of product are
available and what benefits the quick connectors offer over conventional installation
methods.
The conventional connection method (above) in comparison with quick connectors. (Illustration source:
Wieland)
Centralised versus decentralised installation
Installations in homes are generally centralised. The cables and wiring go to the
distribution board where connections are made to the various circuits. Other
connections are also made if it is an installation with remote control switches, or an
integrated home system.
In larger buildings, such as offices, schools and hospitals, the decentralised
installation method is used. A supply cable is provided for every room (office,
classroom, etc). A distribution box is placed above the suspended ceiling. From here,
the separate cables go to the wall sockets, the light fittings and switches. With the
conventional method of connection, all connections are done by hand. The cables
and wires have to be stripped, after which the connections to light fittings, wall
sockets and switches generally have to be made with screw connectors. For an
installation with a building management system, such as KNX or LON, a bus cable is
also provided for each room, to which the actuators and sensors are connected. With
conventional connection methods, this means a lot of additional work.
1
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
One of the benefits of a decentralised installation is that a well-organised installation
is obtained for each room. Furthermore the distribution boards are smaller because
the actuators of the building management system are also decentralised and often
even built into the light fittings. When changes and modifications have to be made,
people can carry on working in the same room while the work is carried out, and the
cabling does not have to pass through any other rooms. As a result, staff are not
disturbed as much in their work. A decentralised installation is also more flexible than
a centralised installation.
Working with quick connectors
A supply cable, and possibly also a bus cable, are fitted in a room. They are
connected to one or more distribution boxes that have quick plug connectors. From
there, connections are made to the wall sockets and light fittings using prefabricated,
flexible cables with quick plug connectors. These cables are available in different
lengths. Depending on the type of equipment that has to be connected, there are
larger and smaller quick plug connectors and different types of cables. Certain wall
sockets have quick plug connectors. These sockets – in a plastic or metal installation
duct, for example – are then connected using the quick connectors. There are also
fluorescent light fittings and sensors (for example presence detectors) that are
equipped with a quick plug connector.
Less material is required to make connections with quick connectors (photo on the left). (Illustration
source: Isolectra)
Example of an installation with quick connectors (Illustration source: Wieland)
In the illustration above, we see that a purple ribbon cable has been fitted above the
windows. This acts as a supply cable for a number of rooms. In every room, one or
more distribution boxes are connected to the ribbon cable. The distribution boxes are
pre-cabled internally and have plug connections. From there, cables with quick plug
2
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
connectors lead towards the various fittings and wall sockets. In the drawing, we can
also see the green KNX cables, which are also connected to the ribbon cable. The
ribbon cable contains both supply wires and bus wires. The KNX switches and
sensors can thus be quickly and easily connected to the bus.
In the installation duct (just below the windows), we see the connections to the wall
sockets, for which quick connectors are used. There is also a supply cable on the
floor. This is tapped off with quick connectors to the various floor boxes in which wall
sockets have been fitted. The floor boxes are fitted into the floating office floor.
Benefits of using quick connectors
They are a great time saver. Depending on the source, time savings of 70 to 80%
compared to the traditional installation method have been reported. This is also why
an installation with quick connectors equates to an initial cost saving of 30 to 40%. In
addition, the failure costs fall by around 90%. The failure costs are the costs incurred
when certain items – such as light fittings, wall sockets, sensors or switches – are
installed in the wrong place and subsequently have to be installed in another place.
Wrong connections can also be made that must be repaired later on, resulting in
wasted money. The drop in failure costs is due to the great flexibility of a quick
connector installation. The modification of an existing installation only takes a minute,
which is convenient and saves on renovation costs, or costs incurred when
rearranging an open plan office or shop.
Connecting a light fitting the conventional way takes 111 seconds. With quick connectors, it can be
done in 24 seconds with far fewer tools. (Illustration source: Isolectra)
3
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
A 70% time saving can be made. (Illustration source: Wieland)
The use of quick connectors is also better for the environment. The entire system can
be easily and simply reused. When an installation is dismantled, the cables with quick
connectors and the distribution boxes can be used again in a different installation. If,
however, the material is too old or damaged, everything can be recycled, resulting in
less waste. Furthermore, home-work traffic is reduced because installation on site is
much quicker. Finally, energy-saving techniques such as presence detectors,
movement detectors, window detectors and integrated KNX or LON controls can
easily be used with quick connectors. Energy bills fall and CO2 emissions are
reduced.
Overview of the different materials
Let’s begin with the ribbon cable. This is used as a supply cable and for bus
distribution. This cable consists of an outer sheath, in which are placed 5 x 2.5 mm²
conductors insulated from one another. Sometimes there are also a further 2 x 1.5
mm² conductors for bus distribution. Using small junction boxes, screws are screwed
into the cable in order to make the connections. These junction boxes generally have
a connection for a plug to which different items of equipment are connected with a
connecting cable using quick plug connectors, or a supply is sent to a connection
box.
Example of the installation of a connector on a ribbon cable. (Illustration source: Woertz)
4
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
The connecting screws are screwed into the conductors. (Illustration source: Wieland)
There are different types of connectors to suit different requirements. (Illustration source: Wieland)
With such cables, multipole 230V connections can be made between the neutral and
L1, L2 or L3. However, 400V connections can also be made between the phases. A
two-pole connector is also available for the bus.
Different types of flexible connecting cables with quick plug connectors are generally
available, so there are cables with 2.5 mm² or 1.5 mm² of wiring. The pre-mounted
plugs on these cables are respectively larger or smaller. In this way, it is not possible
to wrongly go from a 2.5 mm² cross-section to a 1.5 mm² cross-section without
additional protection. The smaller cross-section is often used for lighting, the larger
for wall sockets.
5
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
Small and large plugs, three-pole, four-pole or five-pole, splashproof or otherwise. (Illustration source:
Wago)
When making a number of branch connections to equipment, distribution blocks can
be used. On the one hand, the supply from a distribution box or black box is
connected to this. On the other hand, connections can also be made to the same
distribution block for several other appliances.
Three plug cables have been connected to this distribution block. On the right, there is still space for
three additional connections. (Illustration source: Wieland)
Various producers offer distribution boxes with plug connections. For example,
Attema has fairly traditional distribution boxes that are supplied with conventional
cables or wire in a conduit. Covered plug connections are another possibility.
Legrand and others have distribution boxes as well. Here, the supply to the
distribution box is made with a plug connection.
6
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
Here we see a distribution box in which the supply is on the left. On the right, the supply cable goes on
to the next distribution box. At the top and bottom, branch connections can be made to the equipment.
(Illustration source: Legrand)
A further step can be taken with the ‘black box’. This is also a distribution box, but
with installation equipment inside (actuators such as relay modules and dimmers, for
example). The black box has a supply and a bus connection, and plug connections
for light fittings are also available. They are not connected directly to the supply, but
via an actuator controlled by bus commands.
This black box from Peha has a three-pole power-in and power-out connector. Six pieces of
equipment can be connected to it that are switched via a PHC relay. There is also a bus-in and two
bus-out connections. Finally, up to eight push buttons can be connected. This is done internally via an
input module on the bus. (Illustration source: Peha)
The costs again
Isolectra calculated the costs per m² for different forms of lighting installations in
offices. The prices below are net prices for the installation material, including labour,
but excluding light fittings and operating points.
7
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
Conventional installation method (conduit, cables, junction boxes, labour) €5.47/m²
Cable boxes with quick plug connectors in the office area €3.99/m²
Black box on the cable duct €2.59/m²
Ribbon cable 5 x 2.5 mm² with the cable duct €2.19/m²
Ribbon cable 5 x 2.5 mm² + bus with the cable duct €2.26/m²
Depending on the form of installation, the price falls to less than half that of a
conventional installation.
Conclusion
For electrical installations in office buildings, schools, hospitals and shops, a quick
connector installation offers many benefits. Working time is reduced, costs fall and
the installation is much more flexible than conventional installations. The same
benefits also apply to renovations and repairs. There are a number of producers
operating in this market. Some have only a limited number of products while others
offer an extensive range of solutions for all types of situation. Plug & Play installation
could well become the standard installation method in the near future, so why not try
it?
An overview of a small section of Wieland’s Gesis quick connector system. (Illustration source:
Wieland)
8
Plug & Play Quick Connect installation
___________________________________________________________________
www.leonardo-energy.org
9
Example of an installation in a small office. (Illustration source: Isolectra)
Links
Attema website: www.attema.nl
Isolectra website: www.isolectra.nl
Legrand website: www.legrand.co.uk
Peha website: www.peha.de
Wago website: www.wago.com
Wieland website: www.wieland-electric.com
Woertz website: www.woertz.ch/ch_en

More Related Content

Similar to Plug & Play Quick Connect Installation

Integrated Home Systems - Chapter 5 - Structured Cabling
Integrated Home Systems - Chapter 5 - Structured CablingIntegrated Home Systems - Chapter 5 - Structured Cabling
Integrated Home Systems - Chapter 5 - Structured CablingLeonardo ENERGY
 
Cost comparison fusion splicing versus pre terminated system
Cost comparison fusion splicing versus pre terminated systemCost comparison fusion splicing versus pre terminated system
Cost comparison fusion splicing versus pre terminated systemAngelina Li
 
Fiber Optic Termination Tutorial
Fiber Optic Termination TutorialFiber Optic Termination Tutorial
Fiber Optic Termination TutorialCalvinarnold843
 
Picking the right drop cable for the long run
Picking the right drop cable for the long runPicking the right drop cable for the long run
Picking the right drop cable for the long runAngelina Li
 
24 v trailers 051.812.955.17 folder to Tax Return
24 v trailers   051.812.955.17 folder to Tax Return24 v trailers   051.812.955.17 folder to Tax Return
24 v trailers 051.812.955.17 folder to Tax ReturnSandro Suzart
 
Lapp hardwire - CONNECTORS LOWER WIRING COSTS
Lapp hardwire - CONNECTORS LOWER WIRING COSTSLapp hardwire - CONNECTORS LOWER WIRING COSTS
Lapp hardwire - CONNECTORS LOWER WIRING COSTSSunil Jain
 
Nestor Cables Solutions
Nestor Cables SolutionsNestor Cables Solutions
Nestor Cables SolutionsNestorExports
 
Bus Off DeviceNet June-FINAL
Bus Off DeviceNet June-FINALBus Off DeviceNet June-FINAL
Bus Off DeviceNet June-FINALThomas O Connell
 
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMSElectrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMSMADHUMITHA355894
 
Why Conduit Adaptors Essential in Every Smart Home Setup.doc
Why Conduit Adaptors Essential in Every Smart Home Setup.docWhy Conduit Adaptors Essential in Every Smart Home Setup.doc
Why Conduit Adaptors Essential in Every Smart Home Setup.docCabex India
 
LAN Architecture Over Fiber Optics.pdf
LAN Architecture Over Fiber Optics.pdfLAN Architecture Over Fiber Optics.pdf
LAN Architecture Over Fiber Optics.pdfVERSITRONINC
 
Things You Must Know About Fiber Optic Distribution Box
Things You Must Know About Fiber Optic Distribution BoxThings You Must Know About Fiber Optic Distribution Box
Things You Must Know About Fiber Optic Distribution BoxSun Telecom
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationAIRCC Publishing Corporation
 
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATIONCIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATIONijcsit
 

Similar to Plug & Play Quick Connect Installation (20)

Integrated Home Systems - Chapter 5 - Structured Cabling
Integrated Home Systems - Chapter 5 - Structured CablingIntegrated Home Systems - Chapter 5 - Structured Cabling
Integrated Home Systems - Chapter 5 - Structured Cabling
 
Cost comparison fusion splicing versus pre terminated system
Cost comparison fusion splicing versus pre terminated systemCost comparison fusion splicing versus pre terminated system
Cost comparison fusion splicing versus pre terminated system
 
Fiber Optic Termination Tutorial
Fiber Optic Termination TutorialFiber Optic Termination Tutorial
Fiber Optic Termination Tutorial
 
Picking the right drop cable for the long run
Picking the right drop cable for the long runPicking the right drop cable for the long run
Picking the right drop cable for the long run
 
Catalog busbar legrand
Catalog busbar legrand Catalog busbar legrand
Catalog busbar legrand
 
24 v trailers 051.812.955.17 folder to Tax Return
24 v trailers   051.812.955.17 folder to Tax Return24 v trailers   051.812.955.17 folder to Tax Return
24 v trailers 051.812.955.17 folder to Tax Return
 
Lapp hardwire - CONNECTORS LOWER WIRING COSTS
Lapp hardwire - CONNECTORS LOWER WIRING COSTSLapp hardwire - CONNECTORS LOWER WIRING COSTS
Lapp hardwire - CONNECTORS LOWER WIRING COSTS
 
LumenCACHE Proposal Print 102916 1332
LumenCACHE Proposal Print 102916 1332LumenCACHE Proposal Print 102916 1332
LumenCACHE Proposal Print 102916 1332
 
Role of MV Cable Accessories.pdf
Role of MV Cable Accessories.pdfRole of MV Cable Accessories.pdf
Role of MV Cable Accessories.pdf
 
Nestor Cables Solutions
Nestor Cables SolutionsNestor Cables Solutions
Nestor Cables Solutions
 
The Elektro Tipp - DK Cable Junction Boxes
The Elektro Tipp - DK Cable Junction BoxesThe Elektro Tipp - DK Cable Junction Boxes
The Elektro Tipp - DK Cable Junction Boxes
 
Catalog busbar Legrand
Catalog busbar LegrandCatalog busbar Legrand
Catalog busbar Legrand
 
Bus Off DeviceNet June-FINAL
Bus Off DeviceNet June-FINALBus Off DeviceNet June-FINAL
Bus Off DeviceNet June-FINAL
 
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMSElectrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
 
Why Conduit Adaptors Essential in Every Smart Home Setup.doc
Why Conduit Adaptors Essential in Every Smart Home Setup.docWhy Conduit Adaptors Essential in Every Smart Home Setup.doc
Why Conduit Adaptors Essential in Every Smart Home Setup.doc
 
Role of Medium Voltage Cable Accessories.pdf
Role of Medium Voltage Cable Accessories.pdfRole of Medium Voltage Cable Accessories.pdf
Role of Medium Voltage Cable Accessories.pdf
 
LAN Architecture Over Fiber Optics.pdf
LAN Architecture Over Fiber Optics.pdfLAN Architecture Over Fiber Optics.pdf
LAN Architecture Over Fiber Optics.pdf
 
Things You Must Know About Fiber Optic Distribution Box
Things You Must Know About Fiber Optic Distribution BoxThings You Must Know About Fiber Optic Distribution Box
Things You Must Know About Fiber Optic Distribution Box
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile Application
 
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATIONCIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
 

More from Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

More from Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Plug & Play Quick Connect Installation

  • 1. HomeoftheFuture Briefing Paper Guy Kasier E&D Systems Available online September 2010 Plug & Play Quick Connect Installation Source: Legrand
  • 2. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org The conventional method of installation with conduit, wires, cables, junction boxes and screw connectors is increasingly giving way to a more modern form of installation that makes use of quick connectors. However, this installation method can only be applied when free space is available in the form of a suspended ceiling, a floating floor or hollow walls. In a standard home with stone walls, which has no suspended ceilings or floating floors, we cannot use this modern form of installation. In many other places such as shops, offices, industrial areas, hotels, hospitals, schools and so on, the use of quick connectors can occupy an important place in the installation process. In this article, we will endeavour to give an overview of what kinds of product are available and what benefits the quick connectors offer over conventional installation methods. The conventional connection method (above) in comparison with quick connectors. (Illustration source: Wieland) Centralised versus decentralised installation Installations in homes are generally centralised. The cables and wiring go to the distribution board where connections are made to the various circuits. Other connections are also made if it is an installation with remote control switches, or an integrated home system. In larger buildings, such as offices, schools and hospitals, the decentralised installation method is used. A supply cable is provided for every room (office, classroom, etc). A distribution box is placed above the suspended ceiling. From here, the separate cables go to the wall sockets, the light fittings and switches. With the conventional method of connection, all connections are done by hand. The cables and wires have to be stripped, after which the connections to light fittings, wall sockets and switches generally have to be made with screw connectors. For an installation with a building management system, such as KNX or LON, a bus cable is also provided for each room, to which the actuators and sensors are connected. With conventional connection methods, this means a lot of additional work. 1
  • 3. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org One of the benefits of a decentralised installation is that a well-organised installation is obtained for each room. Furthermore the distribution boards are smaller because the actuators of the building management system are also decentralised and often even built into the light fittings. When changes and modifications have to be made, people can carry on working in the same room while the work is carried out, and the cabling does not have to pass through any other rooms. As a result, staff are not disturbed as much in their work. A decentralised installation is also more flexible than a centralised installation. Working with quick connectors A supply cable, and possibly also a bus cable, are fitted in a room. They are connected to one or more distribution boxes that have quick plug connectors. From there, connections are made to the wall sockets and light fittings using prefabricated, flexible cables with quick plug connectors. These cables are available in different lengths. Depending on the type of equipment that has to be connected, there are larger and smaller quick plug connectors and different types of cables. Certain wall sockets have quick plug connectors. These sockets – in a plastic or metal installation duct, for example – are then connected using the quick connectors. There are also fluorescent light fittings and sensors (for example presence detectors) that are equipped with a quick plug connector. Less material is required to make connections with quick connectors (photo on the left). (Illustration source: Isolectra) Example of an installation with quick connectors (Illustration source: Wieland) In the illustration above, we see that a purple ribbon cable has been fitted above the windows. This acts as a supply cable for a number of rooms. In every room, one or more distribution boxes are connected to the ribbon cable. The distribution boxes are pre-cabled internally and have plug connections. From there, cables with quick plug 2
  • 4. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org connectors lead towards the various fittings and wall sockets. In the drawing, we can also see the green KNX cables, which are also connected to the ribbon cable. The ribbon cable contains both supply wires and bus wires. The KNX switches and sensors can thus be quickly and easily connected to the bus. In the installation duct (just below the windows), we see the connections to the wall sockets, for which quick connectors are used. There is also a supply cable on the floor. This is tapped off with quick connectors to the various floor boxes in which wall sockets have been fitted. The floor boxes are fitted into the floating office floor. Benefits of using quick connectors They are a great time saver. Depending on the source, time savings of 70 to 80% compared to the traditional installation method have been reported. This is also why an installation with quick connectors equates to an initial cost saving of 30 to 40%. In addition, the failure costs fall by around 90%. The failure costs are the costs incurred when certain items – such as light fittings, wall sockets, sensors or switches – are installed in the wrong place and subsequently have to be installed in another place. Wrong connections can also be made that must be repaired later on, resulting in wasted money. The drop in failure costs is due to the great flexibility of a quick connector installation. The modification of an existing installation only takes a minute, which is convenient and saves on renovation costs, or costs incurred when rearranging an open plan office or shop. Connecting a light fitting the conventional way takes 111 seconds. With quick connectors, it can be done in 24 seconds with far fewer tools. (Illustration source: Isolectra) 3
  • 5. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org A 70% time saving can be made. (Illustration source: Wieland) The use of quick connectors is also better for the environment. The entire system can be easily and simply reused. When an installation is dismantled, the cables with quick connectors and the distribution boxes can be used again in a different installation. If, however, the material is too old or damaged, everything can be recycled, resulting in less waste. Furthermore, home-work traffic is reduced because installation on site is much quicker. Finally, energy-saving techniques such as presence detectors, movement detectors, window detectors and integrated KNX or LON controls can easily be used with quick connectors. Energy bills fall and CO2 emissions are reduced. Overview of the different materials Let’s begin with the ribbon cable. This is used as a supply cable and for bus distribution. This cable consists of an outer sheath, in which are placed 5 x 2.5 mm² conductors insulated from one another. Sometimes there are also a further 2 x 1.5 mm² conductors for bus distribution. Using small junction boxes, screws are screwed into the cable in order to make the connections. These junction boxes generally have a connection for a plug to which different items of equipment are connected with a connecting cable using quick plug connectors, or a supply is sent to a connection box. Example of the installation of a connector on a ribbon cable. (Illustration source: Woertz) 4
  • 6. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org The connecting screws are screwed into the conductors. (Illustration source: Wieland) There are different types of connectors to suit different requirements. (Illustration source: Wieland) With such cables, multipole 230V connections can be made between the neutral and L1, L2 or L3. However, 400V connections can also be made between the phases. A two-pole connector is also available for the bus. Different types of flexible connecting cables with quick plug connectors are generally available, so there are cables with 2.5 mm² or 1.5 mm² of wiring. The pre-mounted plugs on these cables are respectively larger or smaller. In this way, it is not possible to wrongly go from a 2.5 mm² cross-section to a 1.5 mm² cross-section without additional protection. The smaller cross-section is often used for lighting, the larger for wall sockets. 5
  • 7. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org Small and large plugs, three-pole, four-pole or five-pole, splashproof or otherwise. (Illustration source: Wago) When making a number of branch connections to equipment, distribution blocks can be used. On the one hand, the supply from a distribution box or black box is connected to this. On the other hand, connections can also be made to the same distribution block for several other appliances. Three plug cables have been connected to this distribution block. On the right, there is still space for three additional connections. (Illustration source: Wieland) Various producers offer distribution boxes with plug connections. For example, Attema has fairly traditional distribution boxes that are supplied with conventional cables or wire in a conduit. Covered plug connections are another possibility. Legrand and others have distribution boxes as well. Here, the supply to the distribution box is made with a plug connection. 6
  • 8. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org Here we see a distribution box in which the supply is on the left. On the right, the supply cable goes on to the next distribution box. At the top and bottom, branch connections can be made to the equipment. (Illustration source: Legrand) A further step can be taken with the ‘black box’. This is also a distribution box, but with installation equipment inside (actuators such as relay modules and dimmers, for example). The black box has a supply and a bus connection, and plug connections for light fittings are also available. They are not connected directly to the supply, but via an actuator controlled by bus commands. This black box from Peha has a three-pole power-in and power-out connector. Six pieces of equipment can be connected to it that are switched via a PHC relay. There is also a bus-in and two bus-out connections. Finally, up to eight push buttons can be connected. This is done internally via an input module on the bus. (Illustration source: Peha) The costs again Isolectra calculated the costs per m² for different forms of lighting installations in offices. The prices below are net prices for the installation material, including labour, but excluding light fittings and operating points. 7
  • 9. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org Conventional installation method (conduit, cables, junction boxes, labour) €5.47/m² Cable boxes with quick plug connectors in the office area €3.99/m² Black box on the cable duct €2.59/m² Ribbon cable 5 x 2.5 mm² with the cable duct €2.19/m² Ribbon cable 5 x 2.5 mm² + bus with the cable duct €2.26/m² Depending on the form of installation, the price falls to less than half that of a conventional installation. Conclusion For electrical installations in office buildings, schools, hospitals and shops, a quick connector installation offers many benefits. Working time is reduced, costs fall and the installation is much more flexible than conventional installations. The same benefits also apply to renovations and repairs. There are a number of producers operating in this market. Some have only a limited number of products while others offer an extensive range of solutions for all types of situation. Plug & Play installation could well become the standard installation method in the near future, so why not try it? An overview of a small section of Wieland’s Gesis quick connector system. (Illustration source: Wieland) 8
  • 10. Plug & Play Quick Connect installation ___________________________________________________________________ www.leonardo-energy.org 9 Example of an installation in a small office. (Illustration source: Isolectra) Links Attema website: www.attema.nl Isolectra website: www.isolectra.nl Legrand website: www.legrand.co.uk Peha website: www.peha.de Wago website: www.wago.com Wieland website: www.wieland-electric.com Woertz website: www.woertz.ch/ch_en