3. OBJECTIVES:
1. Maximum utilization of man power and
machine.
2. Effective output as per customer’s 100%
satisfaction.
3. Coordination between management,
men and machines.
4. OBJECTIVES:
4. Output goods meet planned
product specifications.
5. Minimizing throughput time.
6. Detecting flaws in production side for
the delay and failure of planning execution.