Ma’aden
Ma’aden Mine and Refinery Project


ENGINEERING AND DESIGN SYSTEMS TECHNICAL NOTE DATA
Project Name                          MA’ADEN MINE AND REFINERY PROJECT
Technical Note No.                    201001-00168-JN-SPEL2
Technical Note Created By             Rick Briggs                                                         Date             2012-02-06

Subject                               Ma'aden SmartPlant Electrical - Create Power Distribution Boards
Rev           Date                                                            Description                                               Originator      Checked
    A            2010-02-06           ISSUED FOR INTERNAL REVIEW                                                                           RTB                JKP



TO DISCIPLINE

    Piping                                               Electrical                                              Process
    Equipment                                            Instrumentation                                         Civil
    Structural                                           HVAC                                                    Design Systems Support




Contents
Introduction ............................................................................................................................................ 2
General for all Power Distribution Boards (PDB) .................................................................................... 2
   Facility Workspace .............................................................................................................................. 2
   Equipment Numbering........................................................................................................................ 2
   Creating a Power Distribution Board (PDB) ........................................................................................ 3
   Creating a Bus ..................................................................................................................................... 4
   Creating Circuits (Incomer, Bus Coupler and Bus Riser) ..................................................................... 5
   PDB Properties .................................................................................................................................... 7
   Bus Properties ..................................................................................................................................... 9
Motor Control Centre & Switchboards ................................................................................................... 9
   MCC & SB Typical Circuits ................................................................................................................... 9
   Circuit Items (Incomer, Bus Tie etc.) for MCC’s & SB’s ..................................................................... 11
Distribution Board................................................................................................................................. 12
   Distribution Board Typical Circuits.................................................................................................... 13
   Distribution Board Properties ........................................................................................................... 15




                                                                    Page 1 of 15
Ma’aden
Ma’aden Mine and Refinery Project


Introduction
This is a job note for creating Power Distribution Boards for the Ma’aden Mine and Refinery Project.
This is a simple guide and is not intended to be used in lieu of the Intergraph & Project SmartPlant
Electrical User Guide. For problems and issues always consult the SmartPlant Electrical User Guide for
a solution before contacting EDS support.

The Reference Data in always the first point of call for creating equipment. A duplicate can be made
in the Electrical Index but make sure the original item was previously created from the Reference
Data.

The following items are referred to as a Power Distribution Board in SmartPlant Electrical:

        a. Motor Control Centre (MCC)
        b. Switchboard (SB)
        c. Distribution Board (DB)


General for all Power Distribution Boards (PDB)

    Facility Workspace
    Make sure you are in the correct plant area. This can be easily checked by looking up the top of
    the screen:




    Equipment Numbering
    The equipment numbering is based on the Equipment Identification and Tag Numbering
    Procedure (MD-402-1999-EG-GE-PRO-00001).

    1. When numbering equipment, make sure in the properties window, the Comply with Naming
       Convention is flagged as True. This is the default and shouldn’t be modified.




        If the Comply with Naming Convention is flagged as False, the following dialog box will
        appear when changing an Item Tag (equipment number).




    2. Modifying the item tag can be achieved via the following ways when the equipment is
       selected:
           a. Press F2
           b. Right click the item and select Rename from the drop down menu:

                                            Page 2 of 15
Ma’aden
Ma’aden Mine and Refinery Project



    3. Any of the three methods will result in the following dialog box appearing:




                                    A      B      C

A – This number is based on the plant area that the PDB was created in and cannot be changed.

B – This field displays the PDB type. It’s filled in by selecting the correct PDB type from the Electrical
Equipment Type property field.

C - This field can be manually entered here in the Item Tag dialog box or manually entered into the
Tag Sequence No property field. This sequence number is as per the equipment number from the
project equipment list.

Creating a Power Distribution Board (PDB)
In the Reference Data Explorer window, select the appropriate PDB, then drag and drop it into the
Power Distribution Boards folder in the Electrical Index:




                                               Page 3 of 15
Ma’aden
Ma’aden Mine and Refinery Project




    Creating a Bus
   1. When creating a bus, expand the PDB and right click on the Buses folder and select New Bus.
      In the Item Tag dialog box complete the equipment tag for the bus. The bus should be
      numbered the same as its parent PDB with a “BU” suffix and a sequential number:




                          A       B       C      D E

       A – This is based on the Facility the PDB was created in

       B – This is the project equipment code for an MCC. SB (switchboard) and DB (distribution
       board) can be selected via the WPEquip Type property field select list.

       C – This is a unique number and is stored in the Tag Sequence Number property field. Refer
       to the individual single line diagram for the MCC numbers.

                                            Page 4 of 15
Ma’aden
Ma’aden Mine and Refinery Project


       D – “BU” is the suffix applied to a bus bar and cannot be changed.

       E – This is the sequential number given to each bus bar in a PDB, and is stored in the Tag
       Suffix property.

   2. Create as many buses as is required for each PDB. Motor Control Centres and Switch Boards
      will typically have 2 Buses with 1 Incomer per Bus and Distribution Boards will typically have
      1 Bus with 2 incomers.

   Creating Circuits (Incomer, Bus Coupler and Bus Riser)
       1. Each PDB will require an Incomer circuit where the supply feed is connected to. To
          create an Incomer right click on the Bus and select New Incomer Circuit:




       2. The Item Tag dialog box will appear:




                               A       B        C       D      E F


           A, B & E – these fields are fixed and cannot be changed.

           C – This field contains the equipment code for the PDB cannot be changed in the Item
           Tag dialog box. This value needs to be set via the Electrical Equipment Type select list.

           D – This field contains the PDB sequential number and is stored in the Tag Sequence
           Number property field. This is a manually entered field and should match exactly the
           parent PDB sequential number.

           F – This number is the incomer sequential number and is set by the second digit of the
           Sequence in Group property. The first incomer on the PDB would be number 1, with the
           second incomer being 2.

       3. Each MCC and SB will require a Bustie and this consists of 2 components, a Coupler and
          a Bus Riser




                                            Page 5 of 15
Ma’aden
Ma’aden Mine and Refinery Project


           A Coupler must be created on the Bus with the lowest bus number, ie. When you have a
           BU1 and a BU2, the coupler should be created on BU1. To create a Coupler right click on
           the Bus and select New Coupler Circuit:




           A Bus Riser must be created on the Bus with the highest bus number ie. When you have
           a BU2 and a BU3, the bus riser should be created on BU3. To create a Bus Riser right
           click on the Bus and select New Bus Riser Circuit:




       4. When a coupler circuit is created, the following Item Tag dialog box will appear:




                               A       B        C       D      E F

           A, B & E – these fields are fixed and cannot be changed.

           C – This field contains the equipment code for the PDB cannot be changed in the Item
           Tag dialog box. This value needs to be set via the Electrical Equipment Type select list.

           D – This field contains the PDB sequential number and is stored in the Tag Sequence
           Number property field. This is a manually entered field and should match exactly the
           parent PDB sequential number.

           F – This number is the coupler sequential number and is set by the second digit of the
           Sequence in Group property. The coupler sequential number should follow on from the
           last incomer to the PDB.

       5. When a bus riser circuit is created, the following Item Tag dialog box will appear:

                                            Page 6 of 15
Ma’aden
Ma’aden Mine and Refinery Project




                                                                   F

                             A        B        C       D       E       G

           A, B, E & G – these fields are fixed and cannot be changed.

           C – This field contains the equipment code for the PDB cannot be changed in the Item
           Tag dialog box. This value needs to be set via the Electrical Equipment Type select list.

           D – This field contains the PDB sequential number and is stored in the Tag Sequence
           Number property field. This is a manually entered field and should match exactly the
           parent PDB sequential number.

           F – This number is the bus riser sequential number and is set by the second digit of the
           Sequence in Group property. The bus riser sequential number must be the same as its
           corresponding coupler.

   PDB Properties
    The following properties window shows the fields that must be filled in for a PDB as the project
    progresses. They should all be filled in upon completion of the project. Some of the fields are
    automatically filled in when the PDB is created. The list of fields to be filled in can be displayed
    by clicking the Brief Properties button shown below:

             -   This represents the manually Input cells at creation stage.

             -   These must be updated when vendor data is received.




                                             Page 7 of 15
Ma’aden
Ma’aden Mine and Refinery Project




                                    Page 8 of 15
Ma’aden
Ma’aden Mine and Refinery Project


   Bus Properties
    The following properties window shows the fields that must be filled in for a Bus as the project
    progresses. They should all be filled in upon completion of the project. Some of the fields are
    automatically filled in when the Bus is created. The list of fields to be filled in can be displayed
    by clicking the Brief Properties button shown below:

            -      This represents the manually Input cells at creation stage.




Motor Control Centre & Switchboards
The Motor Control Centres (MCC) and Switchboards (SB) typically have 2 feed supplies as per
drawing MD-402-7400-EG-EL-SLD-00001. This is represented in SPEL as a Power Distribution Board
(PDB) with 2 Bus’, 2 Incomers, a Bus Coupler and a Bus Riser.

Refer to the Overall Single Line Diagram and Load List for the respective MCC and SB numbers.

   MCC & SB Typical Circuits
   For a Power Distribution Board, there are no profiles to run but there are typical circuits that
   must be run on the incomer, coupler and bus riser circuits. Follow the steps below for all the
   Incomers, Bus Couplers & Bus Riser circuits.

       1.       Find the circuit in the Electrical Engineer window, right click and select Apply Options.

       2.       Tick the enable typical circuit box and select Find to search for the relevant circuit.




                                                Page 9 of 15
Ma’aden
Ma’aden Mine and Refinery Project




       3.   Click on the Find Now button, select the correct circuit from the list and click OK.




       4.   Verify you have the correct typical circuit and click Apply or OK.

       5.   When you are back at the Apply Options dialog box ensure that the “All Item” button is
            ticked. Then click Apply, then OK. This will place the correct circuit breaker and various
            items for the Circuit.




                                           Page 10 of 15
Ma’aden
Ma’aden Mine and Refinery Project




       6.    It will also change the status of some of the properties such that it appears on the
             single line diagram correctly.

        The following properties window shows the fields that must be filled in for a circuit as the
        project progresses. They should all be filled in upon completion of the project. Some of the
        fields are automatically filled in when the typical circuit is applied. The list of fields to be
        filled in can be displayed by clicking the Brief Properties button shown below:

               -    This represents the manually Input cells at creation stage.




   Circuit Items (Incomer, Bus Tie etc.) for MCC’s & SB’s
       1. Now that the circuit items have been created we need to check them all. Locate the
          circuit that relates to the Incomer/Bus Tie item and work from the top of the list to the
          bottom so that no items are missed.

       2. Each of the items in the circuit has a number in their Sequence in Group property field.
          The first digit of this number gives the item its location in the circuit and the second digit

                                            Page 11 of 15
Ma’aden
Ma’aden Mine and Refinery Project


           of this number, for the circuit breaker and current transformers, give the items its
           number value in the item tag. For the main circuit breaker in the above example, the
           Sequence in Group number should be 31 for a circuit breaker labelled Q1 at the top of
           the circuit:




           If it is incorrect as above update it to the correct one.

       3. The protection CT that follows the main circuit breaker in this circuit is called B2. I is in
          position 4 and uses a 2 for its Tag, therefore its Sequence in Group number would be 42.

       4. Each circuit item needs to be also checked for the correct Electrical Equipment Type
          property. If it is incorrect then update accordingly. For example, the current
          transformers, B1 and B2 in this case need to have their Electrical Equipment Type
          checked so that they appear correctly in the SLD’s.




           There are three options to choose from in the drop down menu. Choose the appropriate
           current transformer for the application.

       5. The fuses F1 and F2 should also be checked as per the above.

       6. The last item in the circuit is the protection relay. This item needs to have its Sequence in
          Group property and Electrical Equipment Type checked also. This will ensure that the
          correct item tag is displayed and the correct symbol used in the SLDs.




           Select the appropriate motor protection relay for the suit the application.

       7. It should be noted that that this is mainly a check as most of the above has been pre-set
          in the Typical Circuit so should have been applied correctly during the Apply Typical
          Circuit function SPEL performed.

Distribution Board
A Distribution Board (DB) typically has 2 feed supplies as per drawing MD-402-0000-EG-EL-SLD-
00101. This is represented in SPEL as a Power Distribution Board with 1 bus and 2 incomers.




                                            Page 12 of 15
Ma’aden
Ma’aden Mine and Refinery Project


Note: All Distribution Boards in the plant, regardless of whether they have cables connected to them
in SPEL or not, need to be created in SPEL with their correct equipment numbers.

Refer to the individual substation DB system single line diagrams for the respective equipment
numbers.

    Distribution Board Typical Circuits
    For a distribution board, a typical circuit should be applied to the DB feeder originating at the
    MCC. There are no profiles for the actual distribution board. Typical circuits need to be applied
    to the individual feeder circuits:

        1.   Find the circuit in the Electrical Engineer window, right click and select Apply Options.

        2.   Tick the Enable typical circuit box and select Find to search for the relevant circuit.




        3.   Click on the Find Now button and select the correct circuit from the list and click OK.




                                            Page 13 of 15
Ma’aden
Ma’aden Mine and Refinery Project




       4.   Verify you have the correct typical circuit and click Apply or OK.

       5.   When you are back at the Apply Options dialog box ensure that the “All Item” button is
            ticked. Then click Apply, then OK. This will place the correct circuit breaker and various
            items for the Circuit.




                                           Page 14 of 15
Ma’aden
Ma’aden Mine and Refinery Project


   Distribution Board Properties
    The following properties window shows the fields that must be filled in for a Distribution Board
    as the project progresses. They should all be filled in upon completion of the project. Some of
    the fields are automatically filled in when PDB is created. The list of fields to be filled in can be
    displayed by clicking the Brief Properties button shown below:

           -    This represents the manually input cells at creation stage.

           -    These must be updated when vendor data is received.




                                             Page 15 of 15

Weitere ähnliche Inhalte

Ähnlich wie Rtb spel job_note_2_-_pd_bs_-_a.pdf

DigSILENT PF - 06 irena additional exercises
DigSILENT PF - 06 irena  additional exercisesDigSILENT PF - 06 irena  additional exercises
DigSILENT PF - 06 irena additional exercisesHimmelstern
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors Sudhanshu Tripathi
 
IRJET- Calibration Techniques for Pipelined ADCs
IRJET-  	  Calibration Techniques for Pipelined ADCsIRJET-  	  Calibration Techniques for Pipelined ADCs
IRJET- Calibration Techniques for Pipelined ADCsIRJET Journal
 
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...IRJET Journal
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoSouvik Dutta
 
Electrical Schematic Open Hardware PowerPC Notebook motherboard
Electrical Schematic Open Hardware PowerPC Notebook motherboard Electrical Schematic Open Hardware PowerPC Notebook motherboard
Electrical Schematic Open Hardware PowerPC Notebook motherboard Roberto Innocenti
 
Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manualJaideep Kulkarni
 
Power Over Fiber_PCBProject
Power Over Fiber_PCBProjectPower Over Fiber_PCBProject
Power Over Fiber_PCBProjectInbar Kinarty
 
Xb5 r batteryless wireless switch
Xb5 r batteryless wireless switchXb5 r batteryless wireless switch
Xb5 r batteryless wireless switchweihong liu
 
Electrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookElectrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookRoberto Innocenti
 
Bmt 2098 c-a-line_scan_camera_user_manual
Bmt 2098 c-a-line_scan_camera_user_manualBmt 2098 c-a-line_scan_camera_user_manual
Bmt 2098 c-a-line_scan_camera_user_manualBalajimicrotechnologies
 
Bala ji microtechnologies analog line scan camera korea
Bala ji microtechnologies analog line scan camera koreaBala ji microtechnologies analog line scan camera korea
Bala ji microtechnologies analog line scan camera koreabalajibmt02
 
Automatic power factor correction by fine tuning of graded capacitors
Automatic power factor correction by fine tuning of graded capacitorsAutomatic power factor correction by fine tuning of graded capacitors
Automatic power factor correction by fine tuning of graded capacitorsIJARIIT
 

Ähnlich wie Rtb spel job_note_2_-_pd_bs_-_a.pdf (20)

Medium Questions
Medium QuestionsMedium Questions
Medium Questions
 
DigSILENT PF - 06 irena additional exercises
DigSILENT PF - 06 irena  additional exercisesDigSILENT PF - 06 irena  additional exercises
DigSILENT PF - 06 irena additional exercises
 
Electric Motorbike
Electric MotorbikeElectric Motorbike
Electric Motorbike
 
Ee34791794
Ee34791794Ee34791794
Ee34791794
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors
 
Ecbc session 3
Ecbc session 3Ecbc session 3
Ecbc session 3
 
IRJET- Calibration Techniques for Pipelined ADCs
IRJET-  	  Calibration Techniques for Pipelined ADCsIRJET-  	  Calibration Techniques for Pipelined ADCs
IRJET- Calibration Techniques for Pipelined ADCs
 
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
 
11.docx
11.docx11.docx
11.docx
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
 
Ed help
Ed helpEd help
Ed help
 
Electrical Schematic Open Hardware PowerPC Notebook motherboard
Electrical Schematic Open Hardware PowerPC Notebook motherboard Electrical Schematic Open Hardware PowerPC Notebook motherboard
Electrical Schematic Open Hardware PowerPC Notebook motherboard
 
Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manual
 
Power Over Fiber_PCBProject
Power Over Fiber_PCBProjectPower Over Fiber_PCBProject
Power Over Fiber_PCBProject
 
Q gx developer_e
Q gx developer_eQ gx developer_e
Q gx developer_e
 
Xb5 r batteryless wireless switch
Xb5 r batteryless wireless switchXb5 r batteryless wireless switch
Xb5 r batteryless wireless switch
 
Electrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookElectrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux Notebook
 
Bmt 2098 c-a-line_scan_camera_user_manual
Bmt 2098 c-a-line_scan_camera_user_manualBmt 2098 c-a-line_scan_camera_user_manual
Bmt 2098 c-a-line_scan_camera_user_manual
 
Bala ji microtechnologies analog line scan camera korea
Bala ji microtechnologies analog line scan camera koreaBala ji microtechnologies analog line scan camera korea
Bala ji microtechnologies analog line scan camera korea
 
Automatic power factor correction by fine tuning of graded capacitors
Automatic power factor correction by fine tuning of graded capacitorsAutomatic power factor correction by fine tuning of graded capacitors
Automatic power factor correction by fine tuning of graded capacitors
 

Rtb spel job_note_2_-_pd_bs_-_a.pdf

  • 1. Ma’aden Ma’aden Mine and Refinery Project ENGINEERING AND DESIGN SYSTEMS TECHNICAL NOTE DATA Project Name MA’ADEN MINE AND REFINERY PROJECT Technical Note No. 201001-00168-JN-SPEL2 Technical Note Created By Rick Briggs Date 2012-02-06 Subject Ma'aden SmartPlant Electrical - Create Power Distribution Boards Rev Date Description Originator Checked A 2010-02-06 ISSUED FOR INTERNAL REVIEW RTB JKP TO DISCIPLINE Piping Electrical Process Equipment Instrumentation Civil Structural HVAC Design Systems Support Contents Introduction ............................................................................................................................................ 2 General for all Power Distribution Boards (PDB) .................................................................................... 2 Facility Workspace .............................................................................................................................. 2 Equipment Numbering........................................................................................................................ 2 Creating a Power Distribution Board (PDB) ........................................................................................ 3 Creating a Bus ..................................................................................................................................... 4 Creating Circuits (Incomer, Bus Coupler and Bus Riser) ..................................................................... 5 PDB Properties .................................................................................................................................... 7 Bus Properties ..................................................................................................................................... 9 Motor Control Centre & Switchboards ................................................................................................... 9 MCC & SB Typical Circuits ................................................................................................................... 9 Circuit Items (Incomer, Bus Tie etc.) for MCC’s & SB’s ..................................................................... 11 Distribution Board................................................................................................................................. 12 Distribution Board Typical Circuits.................................................................................................... 13 Distribution Board Properties ........................................................................................................... 15 Page 1 of 15
  • 2. Ma’aden Ma’aden Mine and Refinery Project Introduction This is a job note for creating Power Distribution Boards for the Ma’aden Mine and Refinery Project. This is a simple guide and is not intended to be used in lieu of the Intergraph & Project SmartPlant Electrical User Guide. For problems and issues always consult the SmartPlant Electrical User Guide for a solution before contacting EDS support. The Reference Data in always the first point of call for creating equipment. A duplicate can be made in the Electrical Index but make sure the original item was previously created from the Reference Data. The following items are referred to as a Power Distribution Board in SmartPlant Electrical: a. Motor Control Centre (MCC) b. Switchboard (SB) c. Distribution Board (DB) General for all Power Distribution Boards (PDB) Facility Workspace Make sure you are in the correct plant area. This can be easily checked by looking up the top of the screen: Equipment Numbering The equipment numbering is based on the Equipment Identification and Tag Numbering Procedure (MD-402-1999-EG-GE-PRO-00001). 1. When numbering equipment, make sure in the properties window, the Comply with Naming Convention is flagged as True. This is the default and shouldn’t be modified. If the Comply with Naming Convention is flagged as False, the following dialog box will appear when changing an Item Tag (equipment number). 2. Modifying the item tag can be achieved via the following ways when the equipment is selected: a. Press F2 b. Right click the item and select Rename from the drop down menu: Page 2 of 15
  • 3. Ma’aden Ma’aden Mine and Refinery Project 3. Any of the three methods will result in the following dialog box appearing: A B C A – This number is based on the plant area that the PDB was created in and cannot be changed. B – This field displays the PDB type. It’s filled in by selecting the correct PDB type from the Electrical Equipment Type property field. C - This field can be manually entered here in the Item Tag dialog box or manually entered into the Tag Sequence No property field. This sequence number is as per the equipment number from the project equipment list. Creating a Power Distribution Board (PDB) In the Reference Data Explorer window, select the appropriate PDB, then drag and drop it into the Power Distribution Boards folder in the Electrical Index: Page 3 of 15
  • 4. Ma’aden Ma’aden Mine and Refinery Project Creating a Bus 1. When creating a bus, expand the PDB and right click on the Buses folder and select New Bus. In the Item Tag dialog box complete the equipment tag for the bus. The bus should be numbered the same as its parent PDB with a “BU” suffix and a sequential number: A B C D E A – This is based on the Facility the PDB was created in B – This is the project equipment code for an MCC. SB (switchboard) and DB (distribution board) can be selected via the WPEquip Type property field select list. C – This is a unique number and is stored in the Tag Sequence Number property field. Refer to the individual single line diagram for the MCC numbers. Page 4 of 15
  • 5. Ma’aden Ma’aden Mine and Refinery Project D – “BU” is the suffix applied to a bus bar and cannot be changed. E – This is the sequential number given to each bus bar in a PDB, and is stored in the Tag Suffix property. 2. Create as many buses as is required for each PDB. Motor Control Centres and Switch Boards will typically have 2 Buses with 1 Incomer per Bus and Distribution Boards will typically have 1 Bus with 2 incomers. Creating Circuits (Incomer, Bus Coupler and Bus Riser) 1. Each PDB will require an Incomer circuit where the supply feed is connected to. To create an Incomer right click on the Bus and select New Incomer Circuit: 2. The Item Tag dialog box will appear: A B C D E F A, B & E – these fields are fixed and cannot be changed. C – This field contains the equipment code for the PDB cannot be changed in the Item Tag dialog box. This value needs to be set via the Electrical Equipment Type select list. D – This field contains the PDB sequential number and is stored in the Tag Sequence Number property field. This is a manually entered field and should match exactly the parent PDB sequential number. F – This number is the incomer sequential number and is set by the second digit of the Sequence in Group property. The first incomer on the PDB would be number 1, with the second incomer being 2. 3. Each MCC and SB will require a Bustie and this consists of 2 components, a Coupler and a Bus Riser Page 5 of 15
  • 6. Ma’aden Ma’aden Mine and Refinery Project A Coupler must be created on the Bus with the lowest bus number, ie. When you have a BU1 and a BU2, the coupler should be created on BU1. To create a Coupler right click on the Bus and select New Coupler Circuit: A Bus Riser must be created on the Bus with the highest bus number ie. When you have a BU2 and a BU3, the bus riser should be created on BU3. To create a Bus Riser right click on the Bus and select New Bus Riser Circuit: 4. When a coupler circuit is created, the following Item Tag dialog box will appear: A B C D E F A, B & E – these fields are fixed and cannot be changed. C – This field contains the equipment code for the PDB cannot be changed in the Item Tag dialog box. This value needs to be set via the Electrical Equipment Type select list. D – This field contains the PDB sequential number and is stored in the Tag Sequence Number property field. This is a manually entered field and should match exactly the parent PDB sequential number. F – This number is the coupler sequential number and is set by the second digit of the Sequence in Group property. The coupler sequential number should follow on from the last incomer to the PDB. 5. When a bus riser circuit is created, the following Item Tag dialog box will appear: Page 6 of 15
  • 7. Ma’aden Ma’aden Mine and Refinery Project F A B C D E G A, B, E & G – these fields are fixed and cannot be changed. C – This field contains the equipment code for the PDB cannot be changed in the Item Tag dialog box. This value needs to be set via the Electrical Equipment Type select list. D – This field contains the PDB sequential number and is stored in the Tag Sequence Number property field. This is a manually entered field and should match exactly the parent PDB sequential number. F – This number is the bus riser sequential number and is set by the second digit of the Sequence in Group property. The bus riser sequential number must be the same as its corresponding coupler. PDB Properties The following properties window shows the fields that must be filled in for a PDB as the project progresses. They should all be filled in upon completion of the project. Some of the fields are automatically filled in when the PDB is created. The list of fields to be filled in can be displayed by clicking the Brief Properties button shown below: - This represents the manually Input cells at creation stage. - These must be updated when vendor data is received. Page 7 of 15
  • 8. Ma’aden Ma’aden Mine and Refinery Project Page 8 of 15
  • 9. Ma’aden Ma’aden Mine and Refinery Project Bus Properties The following properties window shows the fields that must be filled in for a Bus as the project progresses. They should all be filled in upon completion of the project. Some of the fields are automatically filled in when the Bus is created. The list of fields to be filled in can be displayed by clicking the Brief Properties button shown below: - This represents the manually Input cells at creation stage. Motor Control Centre & Switchboards The Motor Control Centres (MCC) and Switchboards (SB) typically have 2 feed supplies as per drawing MD-402-7400-EG-EL-SLD-00001. This is represented in SPEL as a Power Distribution Board (PDB) with 2 Bus’, 2 Incomers, a Bus Coupler and a Bus Riser. Refer to the Overall Single Line Diagram and Load List for the respective MCC and SB numbers. MCC & SB Typical Circuits For a Power Distribution Board, there are no profiles to run but there are typical circuits that must be run on the incomer, coupler and bus riser circuits. Follow the steps below for all the Incomers, Bus Couplers & Bus Riser circuits. 1. Find the circuit in the Electrical Engineer window, right click and select Apply Options. 2. Tick the enable typical circuit box and select Find to search for the relevant circuit. Page 9 of 15
  • 10. Ma’aden Ma’aden Mine and Refinery Project 3. Click on the Find Now button, select the correct circuit from the list and click OK. 4. Verify you have the correct typical circuit and click Apply or OK. 5. When you are back at the Apply Options dialog box ensure that the “All Item” button is ticked. Then click Apply, then OK. This will place the correct circuit breaker and various items for the Circuit. Page 10 of 15
  • 11. Ma’aden Ma’aden Mine and Refinery Project 6. It will also change the status of some of the properties such that it appears on the single line diagram correctly. The following properties window shows the fields that must be filled in for a circuit as the project progresses. They should all be filled in upon completion of the project. Some of the fields are automatically filled in when the typical circuit is applied. The list of fields to be filled in can be displayed by clicking the Brief Properties button shown below: - This represents the manually Input cells at creation stage. Circuit Items (Incomer, Bus Tie etc.) for MCC’s & SB’s 1. Now that the circuit items have been created we need to check them all. Locate the circuit that relates to the Incomer/Bus Tie item and work from the top of the list to the bottom so that no items are missed. 2. Each of the items in the circuit has a number in their Sequence in Group property field. The first digit of this number gives the item its location in the circuit and the second digit Page 11 of 15
  • 12. Ma’aden Ma’aden Mine and Refinery Project of this number, for the circuit breaker and current transformers, give the items its number value in the item tag. For the main circuit breaker in the above example, the Sequence in Group number should be 31 for a circuit breaker labelled Q1 at the top of the circuit: If it is incorrect as above update it to the correct one. 3. The protection CT that follows the main circuit breaker in this circuit is called B2. I is in position 4 and uses a 2 for its Tag, therefore its Sequence in Group number would be 42. 4. Each circuit item needs to be also checked for the correct Electrical Equipment Type property. If it is incorrect then update accordingly. For example, the current transformers, B1 and B2 in this case need to have their Electrical Equipment Type checked so that they appear correctly in the SLD’s. There are three options to choose from in the drop down menu. Choose the appropriate current transformer for the application. 5. The fuses F1 and F2 should also be checked as per the above. 6. The last item in the circuit is the protection relay. This item needs to have its Sequence in Group property and Electrical Equipment Type checked also. This will ensure that the correct item tag is displayed and the correct symbol used in the SLDs. Select the appropriate motor protection relay for the suit the application. 7. It should be noted that that this is mainly a check as most of the above has been pre-set in the Typical Circuit so should have been applied correctly during the Apply Typical Circuit function SPEL performed. Distribution Board A Distribution Board (DB) typically has 2 feed supplies as per drawing MD-402-0000-EG-EL-SLD- 00101. This is represented in SPEL as a Power Distribution Board with 1 bus and 2 incomers. Page 12 of 15
  • 13. Ma’aden Ma’aden Mine and Refinery Project Note: All Distribution Boards in the plant, regardless of whether they have cables connected to them in SPEL or not, need to be created in SPEL with their correct equipment numbers. Refer to the individual substation DB system single line diagrams for the respective equipment numbers. Distribution Board Typical Circuits For a distribution board, a typical circuit should be applied to the DB feeder originating at the MCC. There are no profiles for the actual distribution board. Typical circuits need to be applied to the individual feeder circuits: 1. Find the circuit in the Electrical Engineer window, right click and select Apply Options. 2. Tick the Enable typical circuit box and select Find to search for the relevant circuit. 3. Click on the Find Now button and select the correct circuit from the list and click OK. Page 13 of 15
  • 14. Ma’aden Ma’aden Mine and Refinery Project 4. Verify you have the correct typical circuit and click Apply or OK. 5. When you are back at the Apply Options dialog box ensure that the “All Item” button is ticked. Then click Apply, then OK. This will place the correct circuit breaker and various items for the Circuit. Page 14 of 15
  • 15. Ma’aden Ma’aden Mine and Refinery Project Distribution Board Properties The following properties window shows the fields that must be filled in for a Distribution Board as the project progresses. They should all be filled in upon completion of the project. Some of the fields are automatically filled in when PDB is created. The list of fields to be filled in can be displayed by clicking the Brief Properties button shown below: - This represents the manually input cells at creation stage. - These must be updated when vendor data is received. Page 15 of 15