LM-715-1
LM-715
Supportability Analyses
Given a scenario, choose the appropriate supportability analyses
tools and techniques.
• Illustrate the need for supportability analyses and their role as integral part of the
systems engineering process.
• Discuss supportability analyses methods throughout the system life cycle.
• Identify the applicable tools and techniques of supportability analyses in the
systems engineering process.
• Relate the appropriate supportability analyses tools and techniques.
LM-715-2
Supportability Analyses
• SUPPORTABILITY ANALYSES:
Tailored application of engineering efforts during
acquisition, to identify/solve logistics issues through
an iterative SE process of definition, synthesis,
tradeoff, T&E. (Mil Handbook 502)
• LOGISTICS MANAGEMENT INFORMATION (LMI):
Documentation associated with supportability
analyses.
[See MIL-PRF-49506]
Logistics
Supportability
Analyses
LMI
?
Anything analytical that has something
to do with support
LM-715-3
Policy
“Supportability factors are integral elements of
program performance specification. However,
support requirements are not to be stated as
distinct logistic elements, but instead as
performance requirements that relate to a
system’s operational effectiveness,
operational suitability, and life-cycle cost
reduction.”
DoD 5000.2-R
LM-715-4
• Supportability analyses are integral parts of Systems
Engineering.
• Supportability analyses form the basis for related design
requirements in system specifications.
• .Supportability analyses form the basis for decisions:
how to most cost-effectively support a system over its
life cycle.
• Programs shall allow contractors maximum flexibility to
propose most appropriate supportability analyses.
DoD 5000.2-R
Policy
LM-715-5
Integrated Supportability Analyses
Can Include:
– Maintenance Planning
– Manpower, Personnel and Training
– Facilities
– Failure Modes, Effects and
Criticality Analysis (FMECA)
– PHS&T
– Supply Support
– Repair Level Analysis
– Life Cycle Cost (LCC) Analysis.
– Support & Test Equipment
– etc. ....
LM-715-6
Spares Training PHS&T Personnel
Technical
Data
Tools &
Support
Equip
Facilities
LORA
Common
Source
Engineering
Data Base
Work
Breakdown
Structure
Candidate
Reliability
Prediction
RCM FMECA
Supportability Analyses Process
O & S COST
Computer
Resources
Support
Maint.
Planning
LM-715-7
BEST PRACTICE:
Supportability Analyses
 Tailored !
 Part of iterative SE process
 Assists in:
 Defining support
 Influencing design
 Uses (not duplicates) other data & analyses
 Documented and communicated
LM-715-8
Supportability Analyses in Practice
Supportability
Analyses Results
Logistics IPT
Maintenance Concept A
Maintenance Concept B
Maintenance Concept C
Support Plan Specification
LM-715-9
Supportability Is a Design
Requirement - Not the Result of
the Design
• Early focus results in:
– support parameters stated in
operational terms
– readiness objectives
– support costs
• Achieving & sustaining affordable
system supportability [AKA - Affordable
Readiness] is the result of sound
systems engineering
LM-715-10
Supportability Analyses Provide Input
to the Systems Engineering Strategy
• Strategy should address all supportability
analyses needed to:
– analyze, define and verify supportability
threshold & objectives
• assess the risk in meeting
the thresholds & objectives
LM-715-11
Supportability Analysis Provides
Input into the TEMP
• Methods & techniques encompass:
– technical reviews
– modeling & simulation
– demonstration
– testing
• All support performance requirements
should be tested & verified.
LM-715-12
Supportability Analyses for
Commercial and NDI?
• Questions:
– Commercial and NDI have
sufficient data?
– Commercial and NDI used in the
same “operational” environment?
– Commercial and NDI
supportable with the same
maintenance/logistic concept?
• Results impact choice of
supportability analyses
LM-715-13
Phases
Preconcept Concept
Exploration
Program Def.
and Risk Red.
Engineering
& Manuf. Dev.
Prod., Fielding/
Deployment,
Operational Spt.
Maintenance Planning Summaries
Repair Analysis Summaries
Manpower, Personnel and Training Summaries
Supply Support Summaries
Support & Test Equipment Summaries
Facilities Summaries
PHS&T Summaries
Post Production Support Summaries
These “and other*” reports to be tailored to Program needs.
*not all inclusive nor exclusive Source: Mil-Hdbk-502
Supportability Analyses Reports
Examples
LM-715-14
HOW DO YOU DO
SUPPORTABILITY ANALYSES?
Scientific Method Process
• Observation
• Problem Formulation
• State Research objectives
• Determine Casual
Relationship
• Formulate Hypothesis
• State Research Methodology
• Test Hypothesis
• Formulate conclusions
• Communicate findings
Nine Phase Decision Process
• Monitor Environment
• Define Problem
• Specify objective
• Diagnose the Problem
• Develop alternatives
• Establish Evaluation Criteria
• Appraise alternatives
• Choose Best Alternative[s]
• Implement Decision
When all else fails, use your
Common Sense!
FAILURE MODES, EFFECTS AND
CRITICALITY ANALYSIS (FMECA)
Number
SYSTEM NAME
SPACE SHUTTLE MP SRM
10-00
SUBSYSTEM NAME
SRM CASE
10-06
COMPONENT NAME AND
PART NO.
CASE ASSEMBLY, FORWARD 10-05-01
SEGMENT
1U50147-08
AUTHOR AND
COMPANY
W. L. HANKINE
THIOKOL CORPORATION
DATE
JUNE 1983
REVISION
COMPONENT FUNCTION
MISSION
PHASE
COMPONENT FAILURE MODE
AFFECTED COMPONENT
FAILURE EFFECT ON
A. SUBSYSTEM FUNCTION
B. SYSTEM FUNCTION
C. MISSION
D. VEHICLE AND PERSONNEL
CONTROL METHODS
TO INSURE A
RELIABLE PRODUCT
ASSEMBLY JOINTS LEAK.
PART NO.
1U50131-09
1U51473-01
1U50228-24
1U100269-01
1U50228-15
PART NAME
CASE SEGMENT, CYLINDER
CASE SEGMENT, FORWARD
PACKING (O-RINGS)
TEST PLUG
PACKING (TEST PLUG)
2
1
2/JOINT
1/JOINT
1/PLUG
QUANTITY
PER
COMPONENT
1. TANG-A-DIAMETER EXCEEDS UPPER LIMIT OR SURFACE
FINISH NONCONFORMING, OR IS GOUGEDRFACES.
2. CLEVIS NONCONFORMING (DIAMETER, THICKNESS, FINISH).
3. CLEVIS O-RING GROOVES EXCEED WIDTH AND/OR DEPTH
UPPER LIMITS OR CORRODED.
4. 0-RINGS NONCONFORMING OR DAMAGED DURING ASSEM-
BLY.
5. LEAK CHECK PLUG LOOSE OR WITHOUT O-RING, INNERMOST
SEAL INEFFECTIVE PER 1 ABOVE OR THE CONDITIONS OF O-
RING ARE PER 4 ABOVE.
6. FOREIGN MATERIAL IN O-RING GROOVES.
7. IGNITER FLANGE NONCONFORMING, FLATNESS FINISH.
8. CASE ASSEMBLY JOINT ROTATION CAUSES “LIFT-OFF” FROM
SECONDARY O-RING (PRIMARY O-RING WILL REMAIN IN
COMPRESSION).
9. EXPANSION OF CLEVIS GAP BECAUSE OF RESIDUAL STRAINS
RESULTING FROM MANUFACTURING PROCESSES.
A. HIGH TEMPERATURE GAS FLOW
WILL CAUSE METAL EROSION
AND PROBABLE BURNTHROUGH
AND CASE BURST.
B. CATASTROPHIC FAILURE OF
SRM.
C. MISSION LOSS.
D. VEHICLE AND
PERSONNEL LOSS.
1
(1)
(1R)
(1R)
(1R)
(1)
(1R)
(1R)
(1R)
(1R)
SEE CIL
1. TRAINED, QUALIFIED
MACHINIST TO PERFORM
MACHINING OPERATION.
2. SPECIAL PROFILE TEMPLATE
TO CONTROL LATHE CUTTING
HEAD.
3. 100% INSPECTION OF TANG-
DIAMETER, CLEVIS, DIMEN -
SIONS AND O-RING GROOVES
USING PI TAPE AND STAND-
DARD MEASURING INSTRU-
MENTS . SURFACE FINISH
SAMPLE INSPECTED BY
SURF-INDICATOR.
7. A. TRAINED, QUALIFIED
MACHINIST TO PERFORM
MACHINING OPERATION.
B. 100% INSPECTION OF
IGNITER FLANGE FLATNESS
BY TIR READOUT FINISH IS
SAMPLE INSPECTED USING
SURF-INDICATOR.
PAGE OF
CRITICALITY
CATEGORY

Weitere ähnliche Inhalte

Ähnlich wie 0557 Supportability Analyses 1.ppt

DFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVDFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVKamal Vora
 
Feasibility report
Feasibility reportFeasibility report
Feasibility reportRavi Shekhar
 
Verifying and Validating Requirements
Verifying and Validating RequirementsVerifying and Validating Requirements
Verifying and Validating RequirementsRavikanth-BA
 
Software requirement verification & validation
Software requirement verification & validationSoftware requirement verification & validation
Software requirement verification & validationAbdul Basit
 
Requirement verification & validation
Requirement verification & validationRequirement verification & validation
Requirement verification & validationAbdul Basit
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and ProgramRicky Smith CMRP
 
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...IOSR Journals
 
86One of the fi rst activities of an analyst is to determi.docx
86One of the fi rst activities of an analyst is to determi.docx86One of the fi rst activities of an analyst is to determi.docx
86One of the fi rst activities of an analyst is to determi.docxransayo
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...Verhaert Masters in Innovation
 
Requirements Management Booklet Pages
Requirements Management Booklet PagesRequirements Management Booklet Pages
Requirements Management Booklet PagesTonda MacLeod
 
MULTIMEDIA Cocomo forum version5
MULTIMEDIA Cocomo forum version5 MULTIMEDIA Cocomo forum version5
MULTIMEDIA Cocomo forum version5 philipsinter
 
Dependable Systems - System Dependability Evaluation (8/16)
Dependable Systems - System Dependability Evaluation (8/16)Dependable Systems - System Dependability Evaluation (8/16)
Dependable Systems - System Dependability Evaluation (8/16)Peter Tröger
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsSudhir Reddy
 

Ähnlich wie 0557 Supportability Analyses 1.ppt (20)

DFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVDFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCV
 
Agile testing approach
Agile testing approachAgile testing approach
Agile testing approach
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Verifying and Validating Requirements
Verifying and Validating RequirementsVerifying and Validating Requirements
Verifying and Validating Requirements
 
Software requirement verification & validation
Software requirement verification & validationSoftware requirement verification & validation
Software requirement verification & validation
 
Requirement verification & validation
Requirement verification & validationRequirement verification & validation
Requirement verification & validation
 
Tech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.pptTech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.ppt
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...
Reliability Assessment of Induction Motor Drive using Failure Mode Effects An...
 
ERP 04
ERP 04ERP 04
ERP 04
 
86One of the fi rst activities of an analyst is to determi.docx
86One of the fi rst activities of an analyst is to determi.docx86One of the fi rst activities of an analyst is to determi.docx
86One of the fi rst activities of an analyst is to determi.docx
 
sdlc.pptx
sdlc.pptxsdlc.pptx
sdlc.pptx
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
 
CCPS PERD Project
CCPS PERD ProjectCCPS PERD Project
CCPS PERD Project
 
Requirements Management Booklet Pages
Requirements Management Booklet PagesRequirements Management Booklet Pages
Requirements Management Booklet Pages
 
MULTIMEDIA Cocomo forum version5
MULTIMEDIA Cocomo forum version5 MULTIMEDIA Cocomo forum version5
MULTIMEDIA Cocomo forum version5
 
Dependable Systems - System Dependability Evaluation (8/16)
Dependable Systems - System Dependability Evaluation (8/16)Dependable Systems - System Dependability Evaluation (8/16)
Dependable Systems - System Dependability Evaluation (8/16)
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Hawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 ResumeHawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 Resume
 

Kürzlich hochgeladen

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Kürzlich hochgeladen (20)

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

0557 Supportability Analyses 1.ppt

  • 1. LM-715-1 LM-715 Supportability Analyses Given a scenario, choose the appropriate supportability analyses tools and techniques. • Illustrate the need for supportability analyses and their role as integral part of the systems engineering process. • Discuss supportability analyses methods throughout the system life cycle. • Identify the applicable tools and techniques of supportability analyses in the systems engineering process. • Relate the appropriate supportability analyses tools and techniques.
  • 2. LM-715-2 Supportability Analyses • SUPPORTABILITY ANALYSES: Tailored application of engineering efforts during acquisition, to identify/solve logistics issues through an iterative SE process of definition, synthesis, tradeoff, T&E. (Mil Handbook 502) • LOGISTICS MANAGEMENT INFORMATION (LMI): Documentation associated with supportability analyses. [See MIL-PRF-49506] Logistics Supportability Analyses LMI ? Anything analytical that has something to do with support
  • 3. LM-715-3 Policy “Supportability factors are integral elements of program performance specification. However, support requirements are not to be stated as distinct logistic elements, but instead as performance requirements that relate to a system’s operational effectiveness, operational suitability, and life-cycle cost reduction.” DoD 5000.2-R
  • 4. LM-715-4 • Supportability analyses are integral parts of Systems Engineering. • Supportability analyses form the basis for related design requirements in system specifications. • .Supportability analyses form the basis for decisions: how to most cost-effectively support a system over its life cycle. • Programs shall allow contractors maximum flexibility to propose most appropriate supportability analyses. DoD 5000.2-R Policy
  • 5. LM-715-5 Integrated Supportability Analyses Can Include: – Maintenance Planning – Manpower, Personnel and Training – Facilities – Failure Modes, Effects and Criticality Analysis (FMECA) – PHS&T – Supply Support – Repair Level Analysis – Life Cycle Cost (LCC) Analysis. – Support & Test Equipment – etc. ....
  • 6. LM-715-6 Spares Training PHS&T Personnel Technical Data Tools & Support Equip Facilities LORA Common Source Engineering Data Base Work Breakdown Structure Candidate Reliability Prediction RCM FMECA Supportability Analyses Process O & S COST Computer Resources Support Maint. Planning
  • 7. LM-715-7 BEST PRACTICE: Supportability Analyses  Tailored !  Part of iterative SE process  Assists in:  Defining support  Influencing design  Uses (not duplicates) other data & analyses  Documented and communicated
  • 8. LM-715-8 Supportability Analyses in Practice Supportability Analyses Results Logistics IPT Maintenance Concept A Maintenance Concept B Maintenance Concept C Support Plan Specification
  • 9. LM-715-9 Supportability Is a Design Requirement - Not the Result of the Design • Early focus results in: – support parameters stated in operational terms – readiness objectives – support costs • Achieving & sustaining affordable system supportability [AKA - Affordable Readiness] is the result of sound systems engineering
  • 10. LM-715-10 Supportability Analyses Provide Input to the Systems Engineering Strategy • Strategy should address all supportability analyses needed to: – analyze, define and verify supportability threshold & objectives • assess the risk in meeting the thresholds & objectives
  • 11. LM-715-11 Supportability Analysis Provides Input into the TEMP • Methods & techniques encompass: – technical reviews – modeling & simulation – demonstration – testing • All support performance requirements should be tested & verified.
  • 12. LM-715-12 Supportability Analyses for Commercial and NDI? • Questions: – Commercial and NDI have sufficient data? – Commercial and NDI used in the same “operational” environment? – Commercial and NDI supportable with the same maintenance/logistic concept? • Results impact choice of supportability analyses
  • 13. LM-715-13 Phases Preconcept Concept Exploration Program Def. and Risk Red. Engineering & Manuf. Dev. Prod., Fielding/ Deployment, Operational Spt. Maintenance Planning Summaries Repair Analysis Summaries Manpower, Personnel and Training Summaries Supply Support Summaries Support & Test Equipment Summaries Facilities Summaries PHS&T Summaries Post Production Support Summaries These “and other*” reports to be tailored to Program needs. *not all inclusive nor exclusive Source: Mil-Hdbk-502 Supportability Analyses Reports Examples
  • 14. LM-715-14 HOW DO YOU DO SUPPORTABILITY ANALYSES? Scientific Method Process • Observation • Problem Formulation • State Research objectives • Determine Casual Relationship • Formulate Hypothesis • State Research Methodology • Test Hypothesis • Formulate conclusions • Communicate findings Nine Phase Decision Process • Monitor Environment • Define Problem • Specify objective • Diagnose the Problem • Develop alternatives • Establish Evaluation Criteria • Appraise alternatives • Choose Best Alternative[s] • Implement Decision When all else fails, use your Common Sense!
  • 15. FAILURE MODES, EFFECTS AND CRITICALITY ANALYSIS (FMECA) Number SYSTEM NAME SPACE SHUTTLE MP SRM 10-00 SUBSYSTEM NAME SRM CASE 10-06 COMPONENT NAME AND PART NO. CASE ASSEMBLY, FORWARD 10-05-01 SEGMENT 1U50147-08 AUTHOR AND COMPANY W. L. HANKINE THIOKOL CORPORATION DATE JUNE 1983 REVISION COMPONENT FUNCTION MISSION PHASE COMPONENT FAILURE MODE AFFECTED COMPONENT FAILURE EFFECT ON A. SUBSYSTEM FUNCTION B. SYSTEM FUNCTION C. MISSION D. VEHICLE AND PERSONNEL CONTROL METHODS TO INSURE A RELIABLE PRODUCT ASSEMBLY JOINTS LEAK. PART NO. 1U50131-09 1U51473-01 1U50228-24 1U100269-01 1U50228-15 PART NAME CASE SEGMENT, CYLINDER CASE SEGMENT, FORWARD PACKING (O-RINGS) TEST PLUG PACKING (TEST PLUG) 2 1 2/JOINT 1/JOINT 1/PLUG QUANTITY PER COMPONENT 1. TANG-A-DIAMETER EXCEEDS UPPER LIMIT OR SURFACE FINISH NONCONFORMING, OR IS GOUGEDRFACES. 2. CLEVIS NONCONFORMING (DIAMETER, THICKNESS, FINISH). 3. CLEVIS O-RING GROOVES EXCEED WIDTH AND/OR DEPTH UPPER LIMITS OR CORRODED. 4. 0-RINGS NONCONFORMING OR DAMAGED DURING ASSEM- BLY. 5. LEAK CHECK PLUG LOOSE OR WITHOUT O-RING, INNERMOST SEAL INEFFECTIVE PER 1 ABOVE OR THE CONDITIONS OF O- RING ARE PER 4 ABOVE. 6. FOREIGN MATERIAL IN O-RING GROOVES. 7. IGNITER FLANGE NONCONFORMING, FLATNESS FINISH. 8. CASE ASSEMBLY JOINT ROTATION CAUSES “LIFT-OFF” FROM SECONDARY O-RING (PRIMARY O-RING WILL REMAIN IN COMPRESSION). 9. EXPANSION OF CLEVIS GAP BECAUSE OF RESIDUAL STRAINS RESULTING FROM MANUFACTURING PROCESSES. A. HIGH TEMPERATURE GAS FLOW WILL CAUSE METAL EROSION AND PROBABLE BURNTHROUGH AND CASE BURST. B. CATASTROPHIC FAILURE OF SRM. C. MISSION LOSS. D. VEHICLE AND PERSONNEL LOSS. 1 (1) (1R) (1R) (1R) (1) (1R) (1R) (1R) (1R) SEE CIL 1. TRAINED, QUALIFIED MACHINIST TO PERFORM MACHINING OPERATION. 2. SPECIAL PROFILE TEMPLATE TO CONTROL LATHE CUTTING HEAD. 3. 100% INSPECTION OF TANG- DIAMETER, CLEVIS, DIMEN - SIONS AND O-RING GROOVES USING PI TAPE AND STAND- DARD MEASURING INSTRU- MENTS . SURFACE FINISH SAMPLE INSPECTED BY SURF-INDICATOR. 7. A. TRAINED, QUALIFIED MACHINIST TO PERFORM MACHINING OPERATION. B. 100% INSPECTION OF IGNITER FLANGE FLATNESS BY TIR READOUT FINISH IS SAMPLE INSPECTED USING SURF-INDICATOR. PAGE OF CRITICALITY CATEGORY