Introduction
 Airport Engineering encompasses the
planning, design, and construction of
terminals, runways, and navigation aids to
provide for passenger and freight service.
 An airport is a facility where passengers
connect from ground transportation to air
transportation
 AIRFIELD is an area where an aircraft can
land and take off, which may or may not be
equipped with any navigational aids or
markings
Air transportation
 One system of transportation which tries to
improve the accessibility to inaccessible areas
 Provides continuous connectivity over water
and land
 Provide relief during emergencies and better
compared to others some times
 Saves productive time, spent in journey
 Increases the demand of specialized skill work
force
Air transportation
 Helps tourism, generates foreign reserves
 Requires heavy funds during provision and
maintenance
 Highly dependent on weather conditions
compared to other modes
 Requires highly sophisticated machinery
 Adds to outward flow of foreign exchange
 Purchase of equipment, airbuses etc.
 Safety provisions are not adequate.
 Providing a support system during the flight is
complicate
 Specific demarcation of flight paths and territories
Development of Air Transport
 1903 – first successful flight by Wilbur and
Orville Wright at Kitty Hawk, North Carolina
 1909 – Louis Bleriot crossed English channel
to England
 1911 – Post was carried by air in India from
Allahabad to Naini (pilot: Henri Pequet)
crossing Ganga
 1912 – Flight between Delhi and Karachi
 1914 – Air passenger transport began in
Germany
Development of Air Transport
 1918 – first international service between
France and Spain
 1919 – London – Paris flight
 1919 – International Commission on Air
Navigation (ICAN) was established
 1919 – 6 European airlines formed in Hague
the International Air Traffic Association (IATA)
to control the movement of air traffic and have
a coordinated approach
 1928 – Havana Convention on civil aviation
 1929 – Warsaw convention on civil aviation
 1944 – international civil aviation convention
 1944 – Chicago convention, establishing
provisional ICAO (international civil aviation
organization)
 1945 – International Air Transport Association
(IATA) established in meeting at Havana, Cuba
 1947 – ICAO was established as a body of
United Nations
 27, July 1949 – worlds first jet airliner made its
journey from hatfield airport
 1954 – Boeing Dash 80 type prototype, B707
first flight
 1969 – concorde first flight
 2006 – Airbus A328 made first flight (one of the
biggest passenger air craft i.e., 800 persons)
Air Transport in India
 1911 – post was carried by air in India from
Allahabad to Naini
 1912 – flight between Delhi and Karachi
 1927 – Civil Aviation Department was
established
 1929 – Regular air service between Delhi and
Karachi
 1932 – Tata airways ltd was setup
 1933 – Indian trans-continental airways ltd
was formed
 1938 – 153 aircrafts were registered
 1946 – Air transport licensing board was
established
 1947 – Tata changed its name to Air India Ltd
 1948 – Air India International ltd was
established by government
 1953 – Air Transport Corporation bill was
made, provision for establishing two
corporations, one for the domestic services
and other for the international services.
 1972 - The International Airport Authority of
India (IAAI) was setup
 to coordinate the international aviation from
different locations of the country
 1981 -Vayudoot service was started. It merged
into Indian Airlines in 1993
 1985 - Air taxi policy
 1994 -Airport Authority of India (AAI) was
formed by merging International Airport
Authority of India (IAAI) and National Airports
Authority (NAA).
Airport Authority of India
 Controls overall air navigation in india
 Constituted by an act of parliament and it came
into being on 1st April, 1995
 Formed by merging NAA (National Airport
Authority) and IAAI (International Airport Authority
of India)
 Functions of AAI
 Control and management of the Indian airspace
extending beyond the territory limits
 Design, development and operation of domestic and
international airports
 Construction and management of facilities
Functions of AAI
 Development of cargo ports and facilities
 Provision of passenger facilities and information
systems
 Expansion and strengthening of operating area
 Provision of visual aids
 Provision of communication and navigational aids
(ex: Radar systems)
Aircraft components
Reference: http://www.grc.nasa.gov/WWW/k-12/airplane/airplane.html
Aircraft components
Aircraft components
Aircraft components
Aircraft characteristics
 Engine Type and Propulsion
 Atmospheric propulsion and trans-atmospheric
propulsion
 Propulsion may be through any type of engine
 Piston engine, jet engine (turbo jet, turbo propulsion or ram jet)
or rocket engine etc.
 Piston – most conventional form, fuel is converted to
mechanical or electrical energy
 Jet – these have a capacity to provide a jet with a height thrust,
which is used for movement.
 Different types of jet engines exist. In case of turbo, jet known
as turbo propulsion is used. Here not simple thrust is used,
instead huge amount of air is sucked, and is transformed into
jet.
 Rocket engines used in trans-atmospheric propulsion systems
 Speed, power increases from piston to rockets
Type of propulsion
Engine Speed limit kmph
Piston 250 to 750
Ram jet 1280 to 2400
Rocket 4600
 Operative altitude of aircraft depends up on
 Type of engine
 Propulsive power available to aircraft
 Piston engines – low altitudes
 Turbo jet or turbo propulsions – low to high
altitudes
 Ram jets – used in missiles at middle altitudes
 Where other type of movements are less
 Rocket jets – outside atmosphere
 Size of air craft:
 One of the important aspect
 Here not just the size of main body, but the size of
overall wing space is considered important
 By ICAO, FAA guidelines, air craft wing space is
considered but not main body for classifying the
airport.
 It is important to look at different aspects of size.
Size of Aircraft
 Size of Aircraft involves
 Fuselage length
 From nose of the aircraft to the tail of the aircraft
 Fuselage is the area which compasses the fuel which is to
be transported along the aircraft, which is used along the
path, at the same time it also encompasses the payload and
that is the passengers and the freight that will also be
placed within the fuselage length.
 Height and width (at tail)
 Since additional wings are provided at tail in lateral, vertical
directions
 Gear tread (distance between main gears)
 Wheel base
 Distance between nose gear (pilots location) and main
gear(at wings connection)
 Wing span
 Measured at the location of wings to the furthest ends
of wings
 Wing span decides
 Width of taxi way
 Clearance between two parallel traffic ways
 Size of apron and hanger
 Width of hanger gate
Aircraft characteristics
 Length of aircraft decides
 Widening of taxi way on curves
 Sizes of apron and hanger
 Height of aircraft or empennage height
 It decides the height of hanger gate
 The gear tread and wheel base
 Min turning radius of the aircraft.
Aircraft characteristics – weight
&wheel configuration
 Pavement thickness, design, materials etc.,
depend on the weight and wheel distribution of
aircraft.
 Different types of weights
 Maximum gross take-off weight
 Total amount of weight when it is taking off from
runway
 Maximum standard landing weight
 Fuel consumed during transport will be deducted from
take-off weight
 Operating empty weight
 Operating at zero pay load
Weight and wheel distribution
 Pay load
 Load for which revenues are generated (passengers +
freight)
 Zero-fuel weight
 Air craft reaching destination and fuel is getting empty
Note: (maximum is taken considering biggest aircraft allowed at
airport
 Wheel configuration defines how the weight
will be transferred to the bottom
 More the no of wheels, lesser the stress, hence
less thickness enough.
 Different wheel combinations available based on
size of aircraft.
 Single tandem, duel tandem and multi axle
tandems are used based on the size and weight
of air craft.
 Some wheel configurations are shown in the next
slide.
Minimum turning radius
 While making a turn, the nose gear is steered and
hence it makes an angle with the axis of main
gear called angle of rotation.
 The point of intersection of axis of main gear and
line through axis of steered nose gear is called
point of rotation.
 Max angle varies between 50 to 60 degrees
 The line joining the centre of rotation and the tip of
farthest wing of aircraft is known as minimum
turning radius.
 The amount depends on size of aircraft
Minimum circling radius
 Related to movement of aircraft with in the air
 Radius in space required for the aircraft to take
a smooth turn
 It depends on
 Type of aircraft (size, power propulsion system
etc.,)
 Air traffic volume
 Weather condition
 It is the total radius which is provided at the top
of the air port in which the aircraft will be
circling if it is not allowed to land.
Speed
 Air speed
 Speed of air craft in air relative to medium.
 Indicated speed
 Indicated by the instrument onboard
 2% lower than actual true speed
 The reason is it is relative speed what is true, to
get the correct value of speed 2% is reduced for
resistance in air.
Capacity of air craft
 No of passengers and amount of cargo it can
handle
 Dependant on
 Size
 Propulsive power of aircraft
 Speed of air craft
Noise
 Big problem if nearer to developed areas
 Major sources of noises are
 Engine
 Machinery (more during landing)
 Primary jet (more during take-off)
 Disturbances are more during take off
 Since the inception of jet engines the noise
has been reduced to a great extent
Vortices at tail end
 Vortices form at tail when moving at high
speed
 Have a tendency to break tail if they are heavy
and eddies are formed
 Vortices are made of 2 counter rotating
cylindrical masses of air extending along the
path
 These are formed near tail ends of wings or
tail end of aircraft
 The velocity of wind in these vortices will be
very high
Jet blast
 This aspect belongs to aircrafts having jet engines
 This is the blast that comes out of jet engine at the
rear of air craft to provide a force for movement
 If we consider the case where air craft is standing
and jet blast is coming from back side, it is so hot
and creates severe conditions
 The severity depends on
 Height of tail pipe
 Angle of tail pipe
 Hence, blast fences are needed to control the
damage to the pavements
Fuel spillage
 Spilling of fuel occurs when the engine is
shutdown or loosing speed
 It is spilled fuel from the engine or other
locations into the aircraft. This may cost the
speed when it is moving on runways or
taxiways or apron.
Influencing characteristics of
aircraft on design of airport
 Engine type and propulsion
 Size
 Aircraft weight and wheel configuration
 Minimum turning radius
 Minimum circling radius
 speed capacity
 Noise
 Vortices at tail ends
 Jet blast
 Fuel spillage
Engine type and propulsion
decides
 Size of the aircraft
 Speed
 length of the runway (more speed ->longer runway)
 Weight (more if bigger propulsion system)
 Carrying capacity (depends on size)
 Noise (depends on propulsion system)
 Circling radius (high power, and speed crafts have
high radius)
 Range (distance it can move without refueling)
 Maintenance facilities
 Ballast pads (required for jet propulsion)
 Size of aircraft influences
 Load carrying capacity
 Other facilities like apron, terminal area etc.
 Bigger the size larger are facilities to be provided at airport
terminal building
 Wing span will increase with size
 It has effect on taxiway width
 Separation between traffic lanes
 Size of gate, apron size, width of hanger etc.
 Length
 Widening of taxiway on curves, apron, hangers, width of exit
way
 Height : further influences height of hanger gate
 Wheel base, gear tread also changes
 Aircraft wheel configuration
 Thickness of runway, taxiway, apron
 Distribution of load to ground
 Turning (difficult for more weight in case of sharp
curves)
 Stability (depends on the support system
provided and also depends on wheel
configuration)
 Minimum turning radius
 Radius of taxiways
 Taxiway is the connecting pavement which is provided
between the runways and aprons
 Minimum circling radius:
 Defines the minimum distance between 2 near by
airports
 For larger aircrafts it will be in kms hence more
distance is required between 2 airports
 Adjustments of timings of landing and takeoff
 Airport capacity(decrease with increased air circle
time)
 Zoning laws related to height of obstruction
 Speed
 Reduces journey time
 Increase in frequency of operations
 Improving and broadening the air network system
 Capacity
 Processing terminals
 Passenger and baggage handling facilities
 Cargo processing
 Size of apron, special equipments etc.
 Vortices at tail ends
 Hazardous to aircraft
 Stresses at fuselage and other joints
 Pressure under wings producing lifts and drags
 Jet blast
 Inconvenience to passengers
 May do harm to airport runways and other
components of airport
 Fuel slippage
 Badly effects bitumen pavements
 Causes slip of wheels
Selection of site for airport
 Air traffic potential
 Magnitude of passenger and freight traffic expected
 Adequate access
 Sufficient airspace
 Circling radius should be taken care
 Sufficient land
 Various facilities, terminal buildings, security systems
 Atmospheric and meteorological conditions
 Availability of land for expansion
 Availability of utilities
 Development of surrounding area
 Ground accessibility
 Presence of other airports
 Regional plan
 Soil characteristics
 Surrounding obstructions
 Use of air port
 Atmospheric and meteorological conditions
 Visibility
 Fog, smoke, haze
 Affected by wind
 Development of area (industrial)
 Causes reduction in frequency and hence in capacity
handling
 Wind
 Direction and intensity
 Associated topographical features (hills, valley)
 Windward/leeward side
 Locating development w.r.t site of airport
 Availability of land for expansion
 Future prediction of air traffic
 Land for parking vehicles, providing facilities
 Land cost at later stage
 Availability of land at later stage
 Availability of utilities
 Water, power etc.,
 Sewerage, communication etc.
 Development of surrounding area
 Residential or sensitive area
 Industrial development
 Height of development
 Zoning laws
 Noise pollution
 Movement of air pollution
 Birds and hits at engines
 Economy of construction
 Alternate sites to be examined
 Availability of local construction material
 Terrain even or not
 Problematic areas
 Water logging areas
 Reclaimed areas
 Ground accessibility
 Travel time in air vs on ground
 Easily approachable using all modes
 Proximity to areas of trip generation
 Facilities for private vehicle users
 Efficient transport system
 Presence of other airport
 Traffic volume
 circling radius
 Types of air crafts in different airports
 Type of operating facility
 Instrumental flight rules, design flight rules
 Separation distance between radii
 May cause
 Accidents, reduction in capacity
 Characteristics of soil
 Strength of soil sub grade
 Drainage of soil
 Level of water table and its impact
 Sub-soil drainage effects
 Valley side may have flooding
 Soil with good amount of pervious material like
sand or gravel is considered good
 Use of airport
 Civil or for military
 Adaptability for other usage during emergencies
 Surrounding area obstructions
 Clear air space for take off and landing
 High rise buildings not allowed
 High trees are cleared off
 Zoning laws are made to take care
Factors affecting the size of
airport
 Size of airport
 Defined by the space for operators, controlling systems,
facilities, manpower etc.
 Controlled by peak aircraft traffic, aircraft characteristics
 Elevation of airport size above MSL
 density and air pressure reduces
 Effects runway requirements, lift, drag etc.
 Aircraft performance varies altitude, air density, pressure ,
temperature
 Meteorological conditions
 Wind, temperature
 Effects runway orientation, length and no of runways reqd.
 Performance characteristics of aircraft
 Volume of air traffic (peak hour volume, size of aircraft,
nature of air traffic, runways, taxiways etc.,)

Weitere ähnliche Inhalte

Was ist angesagt?

Runway orientation
Runway orientationRunway orientation
Runway orientationjagadish108
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNNiranjan Varma
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGGovindaRajuluBadana1
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airportHarshit P Jain
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH RAMPRASAD KUMAWAT
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiwayAsok999
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unitT.Naga Anusha
 
Terminal Design
Terminal DesignTerminal Design
Terminal DesignMal Mai
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect pptVijay Reddy
 
Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneNIKHIL PAKWANNE
 
Airport terminal design (lecture note)
Airport terminal design (lecture note)Airport terminal design (lecture note)
Airport terminal design (lecture note)Sarah Shuchi
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructionssrinivas2036
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unitT.Naga Anusha
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport PlanningManoharanM12
 

Was ist angesagt? (20)

Runways
RunwaysRunways
Runways
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGN
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
Airports
AirportsAirports
Airports
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airport
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 
Airport
AirportAirport
Airport
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unit
 
Terminal Design
Terminal DesignTerminal Design
Terminal Design
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect ppt
 
Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil Pakwanne
 
Airport planning and design
Airport planning and designAirport planning and design
Airport planning and design
 
Airport terminal design (lecture note)
Airport terminal design (lecture note)Airport terminal design (lecture note)
Airport terminal design (lecture note)
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructions
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport Planning
 

Andere mochten auch

Pre history of architecture and biskupin
Pre history of architecture and biskupinPre history of architecture and biskupin
Pre history of architecture and biskupinyosepharch ayele
 
Building,types of building and case study about redential building
Building,types of building and case study about redential buildingBuilding,types of building and case study about redential building
Building,types of building and case study about redential buildingyosepharch ayele
 
Minimalism Architecture
Minimalism ArchitectureMinimalism Architecture
Minimalism ArchitectureMayur Waghulde
 
Rationalism Architecture
Rationalism ArchitectureRationalism Architecture
Rationalism ArchitectureMayur Waghulde
 
Minimalism powerpoint full
Minimalism powerpoint fullMinimalism powerpoint full
Minimalism powerpoint full10polarbears
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Hossam Shafiq I
 
Vehicle Dynamics (Transportation Engineering)
Vehicle Dynamics (Transportation Engineering)Vehicle Dynamics (Transportation Engineering)
Vehicle Dynamics (Transportation Engineering)Hossam Shafiq I
 
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربيAnnex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربيHossam Shafiq I
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Pronob Ghosh
 
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...Hossam Shafiq I
 
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Pronob Ghosh
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Pronob Ghosh
 
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 

Andere mochten auch (20)

Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Earthquakes
EarthquakesEarthquakes
Earthquakes
 
Pre history of architecture and biskupin
Pre history of architecture and biskupinPre history of architecture and biskupin
Pre history of architecture and biskupin
 
Building,types of building and case study about redential building
Building,types of building and case study about redential buildingBuilding,types of building and case study about redential building
Building,types of building and case study about redential building
 
Minimalism Architecture
Minimalism ArchitectureMinimalism Architecture
Minimalism Architecture
 
minimalism
minimalismminimalism
minimalism
 
Rationalism Architecture
Rationalism ArchitectureRationalism Architecture
Rationalism Architecture
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
5 Characteristics of Modern Minimalist House Designs
5 Characteristics of Modern Minimalist House Designs5 Characteristics of Modern Minimalist House Designs
5 Characteristics of Modern Minimalist House Designs
 
Minimalism powerpoint full
Minimalism powerpoint fullMinimalism powerpoint full
Minimalism powerpoint full
 
Minimalism ppt
Minimalism pptMinimalism ppt
Minimalism ppt
 
Minimalism
MinimalismMinimalism
Minimalism
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)
 
Vehicle Dynamics (Transportation Engineering)
Vehicle Dynamics (Transportation Engineering)Vehicle Dynamics (Transportation Engineering)
Vehicle Dynamics (Transportation Engineering)
 
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربيAnnex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
 
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...Geometry condition study on panthapath to russel square by pronob ghosh buet ...
Geometry condition study on panthapath to russel square by pronob ghosh buet ...
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
 
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 

Ähnlich wie Airport planning and Design

Airport introduction
Airport introductionAirport introduction
Airport introductionjagadish108
 
AIRPORT PLANNING AND DESIGNING
AIRPORT PLANNING AND DESIGNINGAIRPORT PLANNING AND DESIGNING
AIRPORT PLANNING AND DESIGNINGSteven Wallach
 
5. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 31506115. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptxWhUllahWa
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristicssrinivas2036
 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4AJEETH B
 
Air Traffic Control PPT
Air Traffic Control PPTAir Traffic Control PPT
Air Traffic Control PPTksasidhar007
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport EngineeringAbhishekChavan63
 
Airport planning and design AS PER AAI .pptx
Airport planning and design AS PER AAI .pptxAirport planning and design AS PER AAI .pptx
Airport planning and design AS PER AAI .pptxRishi Nath
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and DesignMohsen, S Ab
 
Development of a Integrated Air Cushioned Vehicle (Hovercraft)
Development of a Integrated Air Cushioned Vehicle (Hovercraft)Development of a Integrated Air Cushioned Vehicle (Hovercraft)
Development of a Integrated Air Cushioned Vehicle (Hovercraft)IJMER
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristicsAbhishek Kumar
 
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxAIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxRishi Nath
 
AIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxAIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxRishi Nath
 

Ähnlich wie Airport planning and Design (20)

Airport introduction
Airport introductionAirport introduction
Airport introduction
 
AIRPORT PLANNING AND DESIGNING
AIRPORT PLANNING AND DESIGNINGAIRPORT PLANNING AND DESIGNING
AIRPORT PLANNING AND DESIGNING
 
5. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 31506115. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 3150611
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptx
 
UNIT-3.pptx
UNIT-3.pptxUNIT-3.pptx
UNIT-3.pptx
 
1.introduction
1.introduction1.introduction
1.introduction
 
Aviation 1st ppt
Aviation 1st pptAviation 1st ppt
Aviation 1st ppt
 
Acronyms 1
Acronyms 1Acronyms 1
Acronyms 1
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4
 
K@ran sa hu
K@ran sa huK@ran sa hu
K@ran sa hu
 
Air Traffic Control PPT
Air Traffic Control PPTAir Traffic Control PPT
Air Traffic Control PPT
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport Engineering
 
Airport planning and design AS PER AAI .pptx
Airport planning and design AS PER AAI .pptxAirport planning and design AS PER AAI .pptx
Airport planning and design AS PER AAI .pptx
 
Airport Engineering
Airport Engineering Airport Engineering
Airport Engineering
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and Design
 
Development of a Integrated Air Cushioned Vehicle (Hovercraft)
Development of a Integrated Air Cushioned Vehicle (Hovercraft)Development of a Integrated Air Cushioned Vehicle (Hovercraft)
Development of a Integrated Air Cushioned Vehicle (Hovercraft)
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxAIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
 
AIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxAIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptx
 

Mehr von srinivas2036

Fundamental operations
Fundamental operationsFundamental operations
Fundamental operationssrinivas2036
 
Data collection and input overview
Data collection and input overviewData collection and input overview
Data collection and input overviewsrinivas2036
 
Theoretical framework for gis
Theoretical framework for gisTheoretical framework for gis
Theoretical framework for gissrinivas2036
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized constructionsrinivas2036
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Fire protection in construction
Fire protection in constructionFire protection in construction
Fire protection in constructionsrinivas2036
 
Environment at site – construction management
Environment at site – construction managementEnvironment at site – construction management
Environment at site – construction managementsrinivas2036
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in constructionsrinivas2036
 
Personal safety in construction
Personal safety in constructionPersonal safety in construction
Personal safety in constructionsrinivas2036
 
Startup india action plan – who are eligible
Startup india action plan – who are eligibleStartup india action plan – who are eligible
Startup india action plan – who are eligiblesrinivas2036
 
Introduction to aerial photography and photogrammetry.ppt
Introduction to aerial photography and photogrammetry.pptIntroduction to aerial photography and photogrammetry.ppt
Introduction to aerial photography and photogrammetry.pptsrinivas2036
 
Topic stereoscopy, Parallax, Relief displacement
Topic  stereoscopy, Parallax, Relief displacementTopic  stereoscopy, Parallax, Relief displacement
Topic stereoscopy, Parallax, Relief displacementsrinivas2036
 
Principle of aerial photography and types.ppt
Principle of aerial photography and types.pptPrinciple of aerial photography and types.ppt
Principle of aerial photography and types.pptsrinivas2036
 
GATE Syllabus Civil engineering
GATE Syllabus Civil engineeringGATE Syllabus Civil engineering
GATE Syllabus Civil engineeringsrinivas2036
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bayssrinivas2036
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumensrinivas2036
 

Mehr von srinivas2036 (20)

Fundamental operations
Fundamental operationsFundamental operations
Fundamental operations
 
Data collection and input overview
Data collection and input overviewData collection and input overview
Data collection and input overview
 
Theoretical framework for gis
Theoretical framework for gisTheoretical framework for gis
Theoretical framework for gis
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized construction
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Fire protection in construction
Fire protection in constructionFire protection in construction
Fire protection in construction
 
Environment at site – construction management
Environment at site – construction managementEnvironment at site – construction management
Environment at site – construction management
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in construction
 
Personal safety in construction
Personal safety in constructionPersonal safety in construction
Personal safety in construction
 
Startup india action plan – who are eligible
Startup india action plan – who are eligibleStartup india action plan – who are eligible
Startup india action plan – who are eligible
 
Introduction to aerial photography and photogrammetry.ppt
Introduction to aerial photography and photogrammetry.pptIntroduction to aerial photography and photogrammetry.ppt
Introduction to aerial photography and photogrammetry.ppt
 
Topic stereoscopy, Parallax, Relief displacement
Topic  stereoscopy, Parallax, Relief displacementTopic  stereoscopy, Parallax, Relief displacement
Topic stereoscopy, Parallax, Relief displacement
 
Principle of aerial photography and types.ppt
Principle of aerial photography and types.pptPrinciple of aerial photography and types.ppt
Principle of aerial photography and types.ppt
 
GATE Syllabus Civil engineering
GATE Syllabus Civil engineeringGATE Syllabus Civil engineering
GATE Syllabus Civil engineering
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Valuation
ValuationValuation
Valuation
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 

Kürzlich hochgeladen

The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 

Kürzlich hochgeladen (20)

The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 

Airport planning and Design

  • 2. Introduction  Airport Engineering encompasses the planning, design, and construction of terminals, runways, and navigation aids to provide for passenger and freight service.  An airport is a facility where passengers connect from ground transportation to air transportation  AIRFIELD is an area where an aircraft can land and take off, which may or may not be equipped with any navigational aids or markings
  • 3. Air transportation  One system of transportation which tries to improve the accessibility to inaccessible areas  Provides continuous connectivity over water and land  Provide relief during emergencies and better compared to others some times  Saves productive time, spent in journey  Increases the demand of specialized skill work force
  • 4. Air transportation  Helps tourism, generates foreign reserves  Requires heavy funds during provision and maintenance  Highly dependent on weather conditions compared to other modes  Requires highly sophisticated machinery  Adds to outward flow of foreign exchange  Purchase of equipment, airbuses etc.  Safety provisions are not adequate.  Providing a support system during the flight is complicate  Specific demarcation of flight paths and territories
  • 5. Development of Air Transport  1903 – first successful flight by Wilbur and Orville Wright at Kitty Hawk, North Carolina  1909 – Louis Bleriot crossed English channel to England  1911 – Post was carried by air in India from Allahabad to Naini (pilot: Henri Pequet) crossing Ganga  1912 – Flight between Delhi and Karachi  1914 – Air passenger transport began in Germany
  • 6. Development of Air Transport  1918 – first international service between France and Spain  1919 – London – Paris flight  1919 – International Commission on Air Navigation (ICAN) was established  1919 – 6 European airlines formed in Hague the International Air Traffic Association (IATA) to control the movement of air traffic and have a coordinated approach
  • 7.  1928 – Havana Convention on civil aviation  1929 – Warsaw convention on civil aviation  1944 – international civil aviation convention  1944 – Chicago convention, establishing provisional ICAO (international civil aviation organization)  1945 – International Air Transport Association (IATA) established in meeting at Havana, Cuba  1947 – ICAO was established as a body of United Nations
  • 8.  27, July 1949 – worlds first jet airliner made its journey from hatfield airport  1954 – Boeing Dash 80 type prototype, B707 first flight  1969 – concorde first flight  2006 – Airbus A328 made first flight (one of the biggest passenger air craft i.e., 800 persons)
  • 9. Air Transport in India  1911 – post was carried by air in India from Allahabad to Naini  1912 – flight between Delhi and Karachi  1927 – Civil Aviation Department was established  1929 – Regular air service between Delhi and Karachi  1932 – Tata airways ltd was setup  1933 – Indian trans-continental airways ltd was formed
  • 10.  1938 – 153 aircrafts were registered  1946 – Air transport licensing board was established  1947 – Tata changed its name to Air India Ltd  1948 – Air India International ltd was established by government  1953 – Air Transport Corporation bill was made, provision for establishing two corporations, one for the domestic services and other for the international services.
  • 11.  1972 - The International Airport Authority of India (IAAI) was setup  to coordinate the international aviation from different locations of the country  1981 -Vayudoot service was started. It merged into Indian Airlines in 1993  1985 - Air taxi policy  1994 -Airport Authority of India (AAI) was formed by merging International Airport Authority of India (IAAI) and National Airports Authority (NAA).
  • 12. Airport Authority of India  Controls overall air navigation in india  Constituted by an act of parliament and it came into being on 1st April, 1995  Formed by merging NAA (National Airport Authority) and IAAI (International Airport Authority of India)  Functions of AAI  Control and management of the Indian airspace extending beyond the territory limits  Design, development and operation of domestic and international airports  Construction and management of facilities
  • 13. Functions of AAI  Development of cargo ports and facilities  Provision of passenger facilities and information systems  Expansion and strengthening of operating area  Provision of visual aids  Provision of communication and navigational aids (ex: Radar systems)
  • 18. Aircraft characteristics  Engine Type and Propulsion  Atmospheric propulsion and trans-atmospheric propulsion  Propulsion may be through any type of engine  Piston engine, jet engine (turbo jet, turbo propulsion or ram jet) or rocket engine etc.  Piston – most conventional form, fuel is converted to mechanical or electrical energy  Jet – these have a capacity to provide a jet with a height thrust, which is used for movement.  Different types of jet engines exist. In case of turbo, jet known as turbo propulsion is used. Here not simple thrust is used, instead huge amount of air is sucked, and is transformed into jet.  Rocket engines used in trans-atmospheric propulsion systems  Speed, power increases from piston to rockets
  • 19. Type of propulsion Engine Speed limit kmph Piston 250 to 750 Ram jet 1280 to 2400 Rocket 4600
  • 20.  Operative altitude of aircraft depends up on  Type of engine  Propulsive power available to aircraft  Piston engines – low altitudes  Turbo jet or turbo propulsions – low to high altitudes  Ram jets – used in missiles at middle altitudes  Where other type of movements are less  Rocket jets – outside atmosphere
  • 21.  Size of air craft:  One of the important aspect  Here not just the size of main body, but the size of overall wing space is considered important  By ICAO, FAA guidelines, air craft wing space is considered but not main body for classifying the airport.  It is important to look at different aspects of size.
  • 22. Size of Aircraft  Size of Aircraft involves  Fuselage length  From nose of the aircraft to the tail of the aircraft  Fuselage is the area which compasses the fuel which is to be transported along the aircraft, which is used along the path, at the same time it also encompasses the payload and that is the passengers and the freight that will also be placed within the fuselage length.  Height and width (at tail)  Since additional wings are provided at tail in lateral, vertical directions  Gear tread (distance between main gears)  Wheel base  Distance between nose gear (pilots location) and main gear(at wings connection)
  • 23.  Wing span  Measured at the location of wings to the furthest ends of wings  Wing span decides  Width of taxi way  Clearance between two parallel traffic ways  Size of apron and hanger  Width of hanger gate
  • 24. Aircraft characteristics  Length of aircraft decides  Widening of taxi way on curves  Sizes of apron and hanger  Height of aircraft or empennage height  It decides the height of hanger gate  The gear tread and wheel base  Min turning radius of the aircraft.
  • 25. Aircraft characteristics – weight &wheel configuration  Pavement thickness, design, materials etc., depend on the weight and wheel distribution of aircraft.  Different types of weights  Maximum gross take-off weight  Total amount of weight when it is taking off from runway  Maximum standard landing weight  Fuel consumed during transport will be deducted from take-off weight  Operating empty weight  Operating at zero pay load
  • 26. Weight and wheel distribution  Pay load  Load for which revenues are generated (passengers + freight)  Zero-fuel weight  Air craft reaching destination and fuel is getting empty Note: (maximum is taken considering biggest aircraft allowed at airport
  • 27.  Wheel configuration defines how the weight will be transferred to the bottom  More the no of wheels, lesser the stress, hence less thickness enough.  Different wheel combinations available based on size of aircraft.  Single tandem, duel tandem and multi axle tandems are used based on the size and weight of air craft.  Some wheel configurations are shown in the next slide.
  • 28.
  • 29. Minimum turning radius  While making a turn, the nose gear is steered and hence it makes an angle with the axis of main gear called angle of rotation.  The point of intersection of axis of main gear and line through axis of steered nose gear is called point of rotation.  Max angle varies between 50 to 60 degrees  The line joining the centre of rotation and the tip of farthest wing of aircraft is known as minimum turning radius.  The amount depends on size of aircraft
  • 30.
  • 31. Minimum circling radius  Related to movement of aircraft with in the air  Radius in space required for the aircraft to take a smooth turn  It depends on  Type of aircraft (size, power propulsion system etc.,)  Air traffic volume  Weather condition  It is the total radius which is provided at the top of the air port in which the aircraft will be circling if it is not allowed to land.
  • 32. Speed  Air speed  Speed of air craft in air relative to medium.  Indicated speed  Indicated by the instrument onboard  2% lower than actual true speed  The reason is it is relative speed what is true, to get the correct value of speed 2% is reduced for resistance in air.
  • 33. Capacity of air craft  No of passengers and amount of cargo it can handle  Dependant on  Size  Propulsive power of aircraft  Speed of air craft
  • 34. Noise  Big problem if nearer to developed areas  Major sources of noises are  Engine  Machinery (more during landing)  Primary jet (more during take-off)  Disturbances are more during take off  Since the inception of jet engines the noise has been reduced to a great extent
  • 35. Vortices at tail end  Vortices form at tail when moving at high speed  Have a tendency to break tail if they are heavy and eddies are formed  Vortices are made of 2 counter rotating cylindrical masses of air extending along the path  These are formed near tail ends of wings or tail end of aircraft  The velocity of wind in these vortices will be very high
  • 36. Jet blast  This aspect belongs to aircrafts having jet engines  This is the blast that comes out of jet engine at the rear of air craft to provide a force for movement  If we consider the case where air craft is standing and jet blast is coming from back side, it is so hot and creates severe conditions  The severity depends on  Height of tail pipe  Angle of tail pipe  Hence, blast fences are needed to control the damage to the pavements
  • 37. Fuel spillage  Spilling of fuel occurs when the engine is shutdown or loosing speed  It is spilled fuel from the engine or other locations into the aircraft. This may cost the speed when it is moving on runways or taxiways or apron.
  • 38. Influencing characteristics of aircraft on design of airport  Engine type and propulsion  Size  Aircraft weight and wheel configuration  Minimum turning radius  Minimum circling radius  speed capacity  Noise  Vortices at tail ends  Jet blast  Fuel spillage
  • 39. Engine type and propulsion decides  Size of the aircraft  Speed  length of the runway (more speed ->longer runway)  Weight (more if bigger propulsion system)  Carrying capacity (depends on size)  Noise (depends on propulsion system)  Circling radius (high power, and speed crafts have high radius)  Range (distance it can move without refueling)  Maintenance facilities  Ballast pads (required for jet propulsion)
  • 40.  Size of aircraft influences  Load carrying capacity  Other facilities like apron, terminal area etc.  Bigger the size larger are facilities to be provided at airport terminal building  Wing span will increase with size  It has effect on taxiway width  Separation between traffic lanes  Size of gate, apron size, width of hanger etc.  Length  Widening of taxiway on curves, apron, hangers, width of exit way  Height : further influences height of hanger gate  Wheel base, gear tread also changes
  • 41.  Aircraft wheel configuration  Thickness of runway, taxiway, apron  Distribution of load to ground  Turning (difficult for more weight in case of sharp curves)  Stability (depends on the support system provided and also depends on wheel configuration)
  • 42.  Minimum turning radius  Radius of taxiways  Taxiway is the connecting pavement which is provided between the runways and aprons  Minimum circling radius:  Defines the minimum distance between 2 near by airports  For larger aircrafts it will be in kms hence more distance is required between 2 airports  Adjustments of timings of landing and takeoff  Airport capacity(decrease with increased air circle time)  Zoning laws related to height of obstruction
  • 43.  Speed  Reduces journey time  Increase in frequency of operations  Improving and broadening the air network system  Capacity  Processing terminals  Passenger and baggage handling facilities  Cargo processing  Size of apron, special equipments etc.
  • 44.  Vortices at tail ends  Hazardous to aircraft  Stresses at fuselage and other joints  Pressure under wings producing lifts and drags  Jet blast  Inconvenience to passengers  May do harm to airport runways and other components of airport  Fuel slippage  Badly effects bitumen pavements  Causes slip of wheels
  • 45. Selection of site for airport  Air traffic potential  Magnitude of passenger and freight traffic expected  Adequate access  Sufficient airspace  Circling radius should be taken care  Sufficient land  Various facilities, terminal buildings, security systems  Atmospheric and meteorological conditions  Availability of land for expansion  Availability of utilities
  • 46.  Development of surrounding area  Ground accessibility  Presence of other airports  Regional plan  Soil characteristics  Surrounding obstructions  Use of air port
  • 47.  Atmospheric and meteorological conditions  Visibility  Fog, smoke, haze  Affected by wind  Development of area (industrial)  Causes reduction in frequency and hence in capacity handling  Wind  Direction and intensity  Associated topographical features (hills, valley)  Windward/leeward side  Locating development w.r.t site of airport
  • 48.  Availability of land for expansion  Future prediction of air traffic  Land for parking vehicles, providing facilities  Land cost at later stage  Availability of land at later stage  Availability of utilities  Water, power etc.,  Sewerage, communication etc.
  • 49.  Development of surrounding area  Residential or sensitive area  Industrial development  Height of development  Zoning laws  Noise pollution  Movement of air pollution  Birds and hits at engines
  • 50.  Economy of construction  Alternate sites to be examined  Availability of local construction material  Terrain even or not  Problematic areas  Water logging areas  Reclaimed areas
  • 51.  Ground accessibility  Travel time in air vs on ground  Easily approachable using all modes  Proximity to areas of trip generation  Facilities for private vehicle users  Efficient transport system
  • 52.  Presence of other airport  Traffic volume  circling radius  Types of air crafts in different airports  Type of operating facility  Instrumental flight rules, design flight rules  Separation distance between radii  May cause  Accidents, reduction in capacity
  • 53.  Characteristics of soil  Strength of soil sub grade  Drainage of soil  Level of water table and its impact  Sub-soil drainage effects  Valley side may have flooding  Soil with good amount of pervious material like sand or gravel is considered good
  • 54.  Use of airport  Civil or for military  Adaptability for other usage during emergencies  Surrounding area obstructions  Clear air space for take off and landing  High rise buildings not allowed  High trees are cleared off  Zoning laws are made to take care
  • 55. Factors affecting the size of airport  Size of airport  Defined by the space for operators, controlling systems, facilities, manpower etc.  Controlled by peak aircraft traffic, aircraft characteristics  Elevation of airport size above MSL  density and air pressure reduces  Effects runway requirements, lift, drag etc.  Aircraft performance varies altitude, air density, pressure , temperature  Meteorological conditions  Wind, temperature  Effects runway orientation, length and no of runways reqd.  Performance characteristics of aircraft  Volume of air traffic (peak hour volume, size of aircraft, nature of air traffic, runways, taxiways etc.,)