GOVERNMENT OF INDIA (Bharat Sadmlo)
                          MINISTRY OF RAILWAYS (Rail Mantralaya)
                                    RAILWAY BOARD


N o.2008/Chg- IJl26/24jMaintenance    spares
The General Managers,
All Indian Railways
           Sub: Provision of traffic and maintenance spares for coaching stock.
       At present Railways are following the percentages for maintenance spares as per
the instructions contained in Board's letter of number 98JM(C)jl40/10 dated 03-05-2006.
The question      of revising  the percentage     of maintenance    spares (except for
RajdhaniJShatabdi    type coaches) was under consideration following the increase in
periodicity of overhauling period of BG coaches from the existing 12 months to 18
months under Board's letter number 2007JM(C)141jl dated 0~-05-08.
        The position in regard to maintenance spare percentagro has been reviewed jointly
by Coaching and Mechanical Directorates in Board's office and it has been decided that
the requirements of spares as a percentage of bare requirements should be worked out
in accordance with the details tabulated below. These provisions should be followed
with effect from 01-01-2010 and the requirement of coaches should be reworked by the
Zonal Railways. These instructions are in supercession of all previous instructions on
the subject issued either by Coaching Directorate or Mechanical directorate of Board's
Office.

                                        Provision of spares as a % of bare   requirements
 Gauge     Coach Type            Permitted            Permitted Traffic      Total      Permitteq.
                                 Maintenance          spares                 spares Percentage
                                 spares Percentage percenta~ e
                                 Existing Revised Existing Revised           Existing   Revised

 BG        Non-AC                10            8.5   5          5            15         12.5
           AC (Other than        12            10    6          6            18         15.5
           Rajdhani/Shatabdi)
           AC                    12            12    5          5,           17         17
           (Raidhani/Shatabdi)
 MG        Non-AC                10            10    5          5            15         15
           AC                    12            12    3          3.           15         15
       The provision of maintenance spares should be worked out on Divisional basis
and traffic spares on Zonal Railway basis and such spare coaches should be based at
Depots/Stations to be decided by the concerned CMF/COM.


           1omPIi~nce
                  of these instructions may be ensured by all the Zonal Railways.



  (P. L  A)
Executive Dir./ (Coaching)
Railway Board
                                                                        ~-~-----
                                                                       (A.K.SINGH)
                                                     Executive Dir.JMech. Engg. (Coaching)
                                                                       Railway Board
                                                                                             - "-,
                                                                                             --

More Related Content

What's hot

Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway SignallingSandeep Patalay
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGbhavin_pindoriya
 
Northern railway
Northern railwayNorthern railway
Northern railwaysometech
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsSrinivasaRao Guduru
 
Jagadhri workshop ppt
Jagadhri workshop pptJagadhri workshop ppt
Jagadhri workshop pptJasdeep Singh
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systembabu yadav
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian RailwaysJogendra Yadvendu
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayGALGOTIAS UNIVERSITY
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot reportAshutosh Khaitan
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco ShedAarti Ojha
 

What's hot (20)

Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trains
 
Jagadhri workshop ppt
Jagadhri workshop pptJagadhri workshop ppt
Jagadhri workshop ppt
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian Railways
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Presentation on universal axel counter by cel
Presentation on universal axel counter by celPresentation on universal axel counter by cel
Presentation on universal axel counter by cel
 
Fork Lift Truck
Fork Lift TruckFork Lift Truck
Fork Lift Truck
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railway
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
BLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORTBLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORT
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
Loco bogies clw
Loco bogies clwLoco bogies clw
Loco bogies clw
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 

More from SrinivasaRao Guduru

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing deviceSrinivasaRao Guduru
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugsSrinivasaRao Guduru
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coachesSrinivasaRao Guduru
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01SrinivasaRao Guduru
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogieSrinivasaRao Guduru
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockSrinivasaRao Guduru
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)SrinivasaRao Guduru
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen managementSrinivasaRao Guduru
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)SrinivasaRao Guduru
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesSrinivasaRao Guduru
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...SrinivasaRao Guduru
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterSrinivasaRao Guduru
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilitiesSrinivasaRao Guduru
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan SrinivasaRao Guduru
 

More from SrinivasaRao Guduru (20)

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing device
 
Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugs
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coaches
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogie
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stock
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering system
 
Bio toilets presentation
Bio toilets presentation Bio toilets presentation
Bio toilets presentation
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen management
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coaches
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering system
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counter
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilities
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 

Traffic and maintenance spares for coaching stock

  • 1. GOVERNMENT OF INDIA (Bharat Sadmlo) MINISTRY OF RAILWAYS (Rail Mantralaya) RAILWAY BOARD N o.2008/Chg- IJl26/24jMaintenance spares The General Managers, All Indian Railways Sub: Provision of traffic and maintenance spares for coaching stock. At present Railways are following the percentages for maintenance spares as per the instructions contained in Board's letter of number 98JM(C)jl40/10 dated 03-05-2006. The question of revising the percentage of maintenance spares (except for RajdhaniJShatabdi type coaches) was under consideration following the increase in periodicity of overhauling period of BG coaches from the existing 12 months to 18 months under Board's letter number 2007JM(C)141jl dated 0~-05-08. The position in regard to maintenance spare percentagro has been reviewed jointly by Coaching and Mechanical Directorates in Board's office and it has been decided that the requirements of spares as a percentage of bare requirements should be worked out in accordance with the details tabulated below. These provisions should be followed with effect from 01-01-2010 and the requirement of coaches should be reworked by the Zonal Railways. These instructions are in supercession of all previous instructions on the subject issued either by Coaching Directorate or Mechanical directorate of Board's Office. Provision of spares as a % of bare requirements Gauge Coach Type Permitted Permitted Traffic Total Permitteq. Maintenance spares spares Percentage spares Percentage percenta~ e Existing Revised Existing Revised Existing Revised BG Non-AC 10 8.5 5 5 15 12.5 AC (Other than 12 10 6 6 18 15.5 Rajdhani/Shatabdi) AC 12 12 5 5, 17 17 (Raidhani/Shatabdi) MG Non-AC 10 10 5 5 15 15 AC 12 12 3 3. 15 15 The provision of maintenance spares should be worked out on Divisional basis and traffic spares on Zonal Railway basis and such spare coaches should be based at Depots/Stations to be decided by the concerned CMF/COM. 1omPIi~nce of these instructions may be ensured by all the Zonal Railways. (P. L A) Executive Dir./ (Coaching) Railway Board ~-~----- (A.K.SINGH) Executive Dir.JMech. Engg. (Coaching) Railway Board - "-, --