1 of 40
© 2013 VMware Inc. All rights reserved
VMware Operational Readiness
for Cloud Computing Service
Kickoff
2
Download
 Student Guide & Internal & Confidential Update Daly - https://goo.gl/VVmVZ0
-- Release Notes http://ouo.io/BWTCno
00 Document Map http://ouo.io/NIZVq
01 Delivery Reference Guide http://ouo.io/y6yXB
02 Pre-Engagement Checklist http://ouo.io/zXIPg
03 Consultant Guide http://ouo.io/GoUlA
A01 Work Breakdown Structure http://ouo.io/YhaJ86
A02 Kickoff http://ouo.io/dJPzG
A03 Pre-Discovery Workshop and Schedule Guide http://ouo.io/vTQ2R
A04 Discovery Workbook http://ouo.io/dteQPJ
A05 Planning Workshop http://ouo.io/bVXtvz
A06 Recommendations http://ouo.io/awNkwH
A07 Conclusion http://ouo.io/NJ8jwf
A08 Assessment Report http://ouo.io/MPkCq
3
Agenda
 Overview
 Delivery Team
 Project Phases, Activities, and Timeline
 Framework
 Deliverables
 Engagement Expectations
 Next Steps
4
Overview
5
Purpose
 Conduct high-level gap analysis on customer’s strategic
organization and operational capabilities. This assessment is
focused on the virtualization and cloud layers
 Review gaps in VMware vCloud® best practice guidelines
 Build recommendations for remediation
 Refine and prioritize recommendations to support transition to
cloud computing
6
Scope
 Review against VMware best practice guidelines
• Customer’s cloud strategy and vision for IT as a Service
• Customer’s organizational structure supporting the virtualization and cloud
layer
• IT business and consumer control, service control, operations control, and
infrastructure control
• Overall IT processes
• IT management and governance tools
 Deliver organizational and operational workshops
• Data gathering
• Operational recommendation prioritization
 Deliver prioritized remediation recommendations
7
Delivery Team
8
Roles
 VMware
• Engagement management – <name>
• Operations consultant – <name>
• Operations SME – <name>
 Customer
• Executive responsible for cloud computing strategy
• Project manager
• IT service, operations, and infrastructure control managers
• Enterprise architect
• VMware vSphere® architect
• Technical staff as required
9
VMware Management Plan
 Engagement management
• Responsible for overall customer relationship and project management of
VMware tasks and deliverables, as specified in the SOW
• Manages coordination with customer project manager
• Tracks VMware progress and deliverables
• Provides escalation triage
• Obtains project sign-off
10
Other VMware Responsibilities
 Operations consultants or operations SMEs
• Lead discovery workshops
• Strategy
• Organization
• IT business and consumer control
• Service control
• Operations control
• Infrastructure control
• Conduct gap analysis and create remediation recommendations
• Lead forward-planning workshops
• Refine and prioritize recommendations to support transition to vCloud
11
Project Phases, Activities, and Timeline
12
Project Phases
 Planning and pre-engagement preparation
 Engagement kickoff
 Discovery workshops and analysis
 Planning workshops
 Recommendations presentation
13
Project Phases
Phase 5
Recommendation
Presentation
Phase 4
Planning
Workshops
Phase 3
Discovery Workshops
and Analysis
Week 1
Phase 2
Engagement
Kickoff
Phase 1
Planning and
Pre-Engagement
Week 0 Week 1 - 3 Week 3 - 4
Key
Events
SOW
Sign-off
Recommendation
Presentation
Agreement on
Work Breakdown Structure
Engagement
Kickoff
Planning
Call
Pre-Engagement
Discovery
Workshop Scheduling
Discovery Workshop
Kickoff
Data Collection Key
Recommendations
Recommendation
Prioritization
Gap Analysis
Document
Review
Project Conclusion
Today
Week 4
14
Planning and Pre-Engagement Preparation and Kickoff
 Validate completion
• Confirm that all required discovery workshops are scheduled in accordance
with the pre-discovery workshop and schedule guide
• Confirm workshop participation
• Confirm agreement on Work Breakdown Structure (WBS) activities
15
Discovery Workshops and Analysis
 High-level information about customer’s current state of readiness
for deploying and operating a vCloud environment
 Use multiple discovery workshops to collect and analyze data
16
Discovery Workshop Objectives
 Focus on high-level understanding
• Strategy for using vCloud environment as a basis for IT as a Service
• IT organizational structure in the current virtualization or cloud environment
• How the virtualization or cloud environment is governed
• How consumer experience is enhanced
• How services offered in the current virtualization or cloud environment are
managed
• How the organization manages the virtualization or cloud environment
operationally to support the services
• How the infrastructure that supports the virtualization or cloud environment is
managed
• Virtualization, or cloud infrastructure architectures with a focus on the areas
most important to deploying a vCloud environment
17
Analysis Objectives
 Identify gaps between the current state and VMware best practice
guidelines for vCloud
 Develop recommendations for closing the gaps
18
Planning Workshops
 VMware works with the customer’s team to prioritize and present
the recommendations developed in discovery workshops and
analysis
• Prioritize recommendations
• Develop and deliver a presentation
• Deliver to the customer’s executive sponsor and project stakeholders
19
Project Conclusion
 Deliverables
• Final version of the VMware Operational Readiness for Cloud Computing
Service Discovery Workbook
• Final version of the VMware Operational Readiness for Cloud Computing
Service Recommendations presentation
• Final version of the VMware Operational Readiness for Cloud Computing
Service Assessment Report
• Project conclusion presentation to the customer’s project sponsor and
designated customer stakeholders
20
Framework
21
VMware Cloud IT Service Management Framework
End User Computing
Service Portfolio
Management
Provisioning Management
Service Level Management Service Showback and
Metering
Service Development
Management
Service Control
Operations Control
Infrastructure Control
IT Business and Consumer Control
Consumer Management
and Reporting
Accounting and Billing
Risk Mgmt Demand Management
BusinessAlignmentITEfficiency
IT Financial Management
IT Vendor Management
Configuration and
Compliance Management
ITBM
DemandSupply
Infrastructure Architecture
Services
Infrastructure Engineering
Services
Availability and Continuity
Management
Integration and Automation Management
Consumer Self-Service
Catalog Management
Access and Security
Management
Change Management
Capacity Management
Performance Management
Analytics, Trending, and
Metrics
Monitoring, Event, Incident,
and Problem Management
IT Risk Management
Release Management
Infrastructure Deployment
Services
IT Strategy and Policy Dev.
Service Desk
Service Catalog
Management
(vSphere 5 Image Builder and Auto Deploy)
Provisioning Management
IT Governance
Consumer
Management
Service Design and
Development
Service Governance and Lifecycle Management
Proactive Operations Management
24
VMware Operational Readiness for Cloud Computing Framework
StrategyOrganization
25
Deliverables
26
Results
 VMware Operational Readiness for Cloud Computing Service
Discovery Workbook
 VMware Operational Readiness for Cloud Computing Service
Recommendations presentation
 VMware Operational Readiness for Cloud Computing Service
Assessment Report
 VMware Operational Readiness for Cloud Computing Service
Conclusion presentation
27
Workbook Tool – Engagement Framework
28
Service Portfolio Management Effort Impact
Develop & align service offerings strategy to technology and business roadmaps
Guideline Mandatory
Assessed
Level Status
Establish, document, and adopt Service Portfolio Management process for virtualization/cloud computing-
based service offerings No
Service Portfolio function implemented with service offering strategy alignment to technology services to
overall IT cloud computing strategy No 2
Service Owners identified No
Establish chargeback and metering, security, and operational considerations as part of the service definition No
Business demand management impacts the prioritization of the service portfolio No
Define and deploy an integrated tool for Service Portfolio Management No
Establish, report, and review KPIs for Service Portfolio Management process No
Establish and document virtualization/cloud computing Service Portfolio roles and responsibilities with
assignments as part of the COE No
Sample Workbook
29
Findings – Gap Analysis
31
Readiness Framework Heat Map
32
Infrastructure
Control
RecommendationsFindings
– Non-standard
infrastructure architecture
– Non-standard
virtualization provisioning
procedures
Short Term
• Create standard virtualization
provisioning project template
Long Term
• Develop and maintain architectural
blueprints
Outcomes – Recommendations Presentation
34
Organization
Service
Control
Operations
Control
Infrastructure
Control
Top Short-Term Opportunities
 Strategy
 <xyz>
 Organization
 <xyz>
 Business Control
 <xyz>
 Service Control
 <xyz>
 Operations Control
 <xyz>
 Infrastructure Control
 <xyz>
Red Green Red Green Red Green Red Green
Strategy
Red Green
Business
Control
Red Green
Executive Sponsor – Recommendations Presentation
36
1
1.5
2
2.5
3
3.5
4
4.5
5
ITaaS Strategy
Financial Mgmt - IT Organization
Service Mgmt - IT Organization
Operations Mgmt - IT Organization
Infrastructure Mgmt - IT Organization
Consumer Mgmt. & Reporting
Business Requirements Mgmt.
IT Financial Mgmt.
Accounting & Billing
Risk Mgmt.
IT Vendor Mgmt.
Service Catalog Mgmt.
Service Level Mgmt.
Service Portfolio Mgmt.
Service Development and
Implementation Mgmt.
Demand Mgmt.
Chargeback and Metering
Service Desk
Event Mgmt.
Incident and Problem Mgmt.
Change and Configuration Mgmt.
Capacity and Availability Mgmt.
Continuity Mgmt.
Release Mgmt.
Integration & Automation Mgmt.
Provisioning Mgmt.
Performance Mgmt.
Architecture Services
Deployment Services
Infrastructure Provisioning Services
Integration and Automation Services
Infrastructure Capacity Mgmt.
Security and Compliance Mgmt.
Monitoring
Capability Scores Target State Existing State
Executive Sponsor – Summary View
38
Engagement Expectations
39
Out-of-Scope Items for Project
 Designing or implementing any VMware Operational Readiness for
Cloud Computing Service recommendations
 Defining a new organization structure for the customer
 Creation and updates of IT process area documentation or
operation manuals
 Creation and updates to IT process metrics and KPIs
 Development of <Customer> service offerings
 Planning deployment of <Customer>’s VMware cloud or supporting
vSphere environments
 Assessment of any VMware Operational Readiness for Cloud
Computing Service topic areas across more than one datacenter
 Assessment of any VMware Operational Readiness for Cloud
Computing Service topic areas across more than one IT
organization
40
Out-of-Scope Items for Project (cont.)
 Architecting, designing, installing, or configuring a vSphere
environment
 Architecting, designing, installing, or configuring a VMware cloud
environment
 Configuring, tuning, or troubleshooting of customer server,
storage, or network environments resulting from any VMware
Operational Readiness for Cloud Computing Service
recommendations
 Making specific recommendations regarding hardware, storage, or
networking products or vendors
 Hardware procurement, installation, configuration, testing,
validation, or management of a vCloud environment
 Designing or building a production vCloud environment
41
Key Customer Responsibilities
 Provide timely access to required documentation and available IT
process management tools
 Management and leadership team to actively participate and
provide direction, issue resolution, and help mitigating delivery
risks during engagement execution
 Project manager and the VMware engagement manager mutually
agree in writing to the formal project plan governing this project
 Project manager is responsible for identifying the appropriate
participants in, as well as the timely scheduling of, discovery and
planning workshops
42
Key Customer Responsibilities (cont.)
 Staff to actively participate in this engagement, and individuals
with relevant domain, business, operations, or technical expertise
to be available as required
 Access to facilities, computer systems, plans, process and policy
documents, and organizational structure information as required
for VMware team
 Provide a suitable environment for discovery and planning
workshops, including overhead projector and conference facilities
 Customer is responsible for, and assumes any risk associated
with, problems resulting from the content, completeness, accuracy,
and consistency of any supplied data, materials, and information
43
Next Steps
44
Next Steps
 Review and agree to project management plan and WBS
 Finalize workshop participants and workshop schedules
 Begin conducting discovery workshops
 Provide documentation for team review
• Strategy, organizational, process, and architectural documentation
• Management tools strategy and lists
• Completed pre-discovery workshop and schedule guide
• Contact list
45
Questions
46
VMware Operational Readiness for
Cloud Computing Service
VMware, Inc.
3401 Hillview Ave
Palo Alto, CA 94304
Tel: 1-877-486-9273 or 650-427-5000
Fax: 650-427-5001

More Related Content

What's hot

Aberdeen Oil & Gas Event - Cloud Adoption Framework
Aberdeen Oil & Gas Event - Cloud Adoption FrameworkAberdeen Oil & Gas Event - Cloud Adoption Framework
Aberdeen Oil & Gas Event - Cloud Adoption Framework
Amazon Web Services
 
AWS Cloud Center Excellence Quick Start Prescriptive Guidance
AWS Cloud Center Excellence Quick Start Prescriptive GuidanceAWS Cloud Center Excellence Quick Start Prescriptive Guidance
AWS Cloud Center Excellence Quick Start Prescriptive Guidance
Tom Laszewski
 

What's hot (20)

Cloud Workload Suitability
Cloud Workload SuitabilityCloud Workload Suitability
Cloud Workload Suitability
 
Cloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
Cloud Readiness 101: Analyzing and Visualizing Your IT InfrastructureCloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
Cloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
 
Cloud Migration: Cloud Readiness Assessment Case Study
Cloud Migration: Cloud Readiness Assessment Case StudyCloud Migration: Cloud Readiness Assessment Case Study
Cloud Migration: Cloud Readiness Assessment Case Study
 
Application Portfolio Migration
Application Portfolio MigrationApplication Portfolio Migration
Application Portfolio Migration
 
Solution deck capgemini cloud assessment
Solution deck capgemini cloud assessmentSolution deck capgemini cloud assessment
Solution deck capgemini cloud assessment
 
Where are you at on your journey from on-premise SAP HCM to SuccessFactors th...
Where are you at on your journey from on-premise SAP HCM to SuccessFactors th...Where are you at on your journey from on-premise SAP HCM to SuccessFactors th...
Where are you at on your journey from on-premise SAP HCM to SuccessFactors th...
 
An Agile Approach to Accelerate Mass Migration | AWS Public Sector Summit 2016
An Agile Approach to Accelerate Mass Migration | AWS Public Sector Summit 2016An Agile Approach to Accelerate Mass Migration | AWS Public Sector Summit 2016
An Agile Approach to Accelerate Mass Migration | AWS Public Sector Summit 2016
 
What does a successful partnership look like?
What does a successful partnership look like?What does a successful partnership look like?
What does a successful partnership look like?
 
Cloud Strategy
Cloud StrategyCloud Strategy
Cloud Strategy
 
IT Transformation in the Public Sector
IT Transformation in the Public SectorIT Transformation in the Public Sector
IT Transformation in the Public Sector
 
Aberdeen Oil & Gas Event - Cloud Adoption Framework
Aberdeen Oil & Gas Event - Cloud Adoption FrameworkAberdeen Oil & Gas Event - Cloud Adoption Framework
Aberdeen Oil & Gas Event - Cloud Adoption Framework
 
Technical Due Diligence with AWS
Technical Due Diligence with AWSTechnical Due Diligence with AWS
Technical Due Diligence with AWS
 
Application Portfolio Assessment and the 6Rs in Cloud Migrations
Application Portfolio Assessment and the 6Rs in Cloud MigrationsApplication Portfolio Assessment and the 6Rs in Cloud Migrations
Application Portfolio Assessment and the 6Rs in Cloud Migrations
 
Where to Begin? Application Portfolio Migration
Where to Begin? Application Portfolio MigrationWhere to Begin? Application Portfolio Migration
Where to Begin? Application Portfolio Migration
 
Post transaction cloud value creation
Post transaction cloud value creation Post transaction cloud value creation
Post transaction cloud value creation
 
Winning Enterprise Cloud Engagements
Winning Enterprise Cloud EngagementsWinning Enterprise Cloud Engagements
Winning Enterprise Cloud Engagements
 
Building Your Cloud Strategy
Building Your Cloud StrategyBuilding Your Cloud Strategy
Building Your Cloud Strategy
 
Enterprise Transformation through Cognizant’s XaaS fabric on AWS (ENT222) | A...
Enterprise Transformation through Cognizant’s XaaS fabric on AWS (ENT222) | A...Enterprise Transformation through Cognizant’s XaaS fabric on AWS (ENT222) | A...
Enterprise Transformation through Cognizant’s XaaS fabric on AWS (ENT222) | A...
 
Creating an Operating Model to enable a high frequency organization
Creating an Operating Model to enable a high frequency organizationCreating an Operating Model to enable a high frequency organization
Creating an Operating Model to enable a high frequency organization
 
AWS Cloud Center Excellence Quick Start Prescriptive Guidance
AWS Cloud Center Excellence Quick Start Prescriptive GuidanceAWS Cloud Center Excellence Quick Start Prescriptive Guidance
AWS Cloud Center Excellence Quick Start Prescriptive Guidance
 

Viewers also liked

Creating cyber forensic readiness in your organisation
Creating cyber forensic readiness in your organisationCreating cyber forensic readiness in your organisation
Creating cyber forensic readiness in your organisation
Jacqueline Fick
 
Data Center Migration to the AWS Cloud
Data Center Migration to the AWS CloudData Center Migration to the AWS Cloud
Data Center Migration to the AWS Cloud
Tom Laszewski
 
AWS Summit 2011: Building a cloud strategy
AWS Summit 2011: Building a cloud strategyAWS Summit 2011: Building a cloud strategy
AWS Summit 2011: Building a cloud strategy
Amazon Web Services
 

Viewers also liked (14)

A cloud readiness assessment framework
A cloud readiness assessment frameworkA cloud readiness assessment framework
A cloud readiness assessment framework
 
PCAPP Update 26 February 2014
PCAPP Update 26 February 2014PCAPP Update 26 February 2014
PCAPP Update 26 February 2014
 
Creating cyber forensic readiness in your organisation
Creating cyber forensic readiness in your organisationCreating cyber forensic readiness in your organisation
Creating cyber forensic readiness in your organisation
 
Cyber forensic readiness cybercon2012 adv j fick
Cyber forensic readiness cybercon2012 adv j fickCyber forensic readiness cybercon2012 adv j fick
Cyber forensic readiness cybercon2012 adv j fick
 
Enterprise Cloud Operating Model Design
Enterprise Cloud Operating Model DesignEnterprise Cloud Operating Model Design
Enterprise Cloud Operating Model Design
 
NIST Cloud Computing Reference Architecture
NIST Cloud Computing Reference ArchitectureNIST Cloud Computing Reference Architecture
NIST Cloud Computing Reference Architecture
 
Computer forensics powerpoint presentation
Computer forensics powerpoint presentationComputer forensics powerpoint presentation
Computer forensics powerpoint presentation
 
The Cloud Enabled IT Operating Model - Business
The Cloud Enabled IT Operating Model - BusinessThe Cloud Enabled IT Operating Model - Business
The Cloud Enabled IT Operating Model - Business
 
Operating Model
Operating ModelOperating Model
Operating Model
 
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
 
Data Center Migration to the AWS Cloud
Data Center Migration to the AWS CloudData Center Migration to the AWS Cloud
Data Center Migration to the AWS Cloud
 
AWS Summit 2011: Building a cloud strategy
AWS Summit 2011: Building a cloud strategyAWS Summit 2011: Building a cloud strategy
AWS Summit 2011: Building a cloud strategy
 
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud MigrationCapgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
 
AWS Migration Planning Roadmap
AWS Migration Planning RoadmapAWS Migration Planning Roadmap
AWS Migration Planning Roadmap
 

Similar to V mware operational readiness for cloud computing service

Presentation cim1309 v cat 3.0 operating a v-mware cloud
Presentation   cim1309 v cat 3.0 operating a v-mware cloudPresentation   cim1309 v cat 3.0 operating a v-mware cloud
Presentation cim1309 v cat 3.0 operating a v-mware cloud
solarisyourep
 

Similar to V mware operational readiness for cloud computing service (20)

V mware horizon 6 accelerator service
V mware horizon 6 accelerator serviceV mware horizon 6 accelerator service
V mware horizon 6 accelerator service
 
V mware horizon view™ accelerator service
V mware horizon view™ accelerator serviceV mware horizon view™ accelerator service
V mware horizon view™ accelerator service
 
Presentation cim1309 v cat 3.0 operating a v-mware cloud
Presentation   cim1309 v cat 3.0 operating a v-mware cloudPresentation   cim1309 v cat 3.0 operating a v-mware cloud
Presentation cim1309 v cat 3.0 operating a v-mware cloud
 
Presentation cim1309 v cat 3.0 operating a v-mware cloud
Presentation   cim1309 v cat 3.0 operating a v-mware cloudPresentation   cim1309 v cat 3.0 operating a v-mware cloud
Presentation cim1309 v cat 3.0 operating a v-mware cloud
 
Transition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdfTransition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdf
 
PMP Training Project Scope Management Part 2
PMP Training Project Scope Management Part 2PMP Training Project Scope Management Part 2
PMP Training Project Scope Management Part 2
 
vBrownBagIT-VCDX
vBrownBagIT-VCDXvBrownBagIT-VCDX
vBrownBagIT-VCDX
 
Start With The End In Mind
Start With The End In MindStart With The End In Mind
Start With The End In Mind
 
V mware business continuity and disaster recovery accelerator service
V mware business continuity and disaster recovery accelerator serviceV mware business continuity and disaster recovery accelerator service
V mware business continuity and disaster recovery accelerator service
 
The role of commissioning in closing the gap
The role of commissioning in closing the gap The role of commissioning in closing the gap
The role of commissioning in closing the gap
 
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons LearnedVMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptx
 
Shared Services Canada - Architect Framework Advisory Committee WTD Session 5...
Shared Services Canada - Architect Framework Advisory Committee WTD Session 5...Shared Services Canada - Architect Framework Advisory Committee WTD Session 5...
Shared Services Canada - Architect Framework Advisory Committee WTD Session 5...
 
CAF intro Hosters modern
CAF intro Hosters modernCAF intro Hosters modern
CAF intro Hosters modern
 
Develop an Enterprise-wide Cloud Adoption Strategy – Chris Merrigan
Develop an Enterprise-wide Cloud Adoption Strategy – Chris MerriganDevelop an Enterprise-wide Cloud Adoption Strategy – Chris Merrigan
Develop an Enterprise-wide Cloud Adoption Strategy – Chris Merrigan
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementation
 
Project life cycle and scope management
Project life cycle and scope management Project life cycle and scope management
Project life cycle and scope management
 
VMworld 2013: View Planner 3.0 as a VDI Benchmark
VMworld 2013: View Planner 3.0 as a VDI Benchmark VMworld 2013: View Planner 3.0 as a VDI Benchmark
VMworld 2013: View Planner 3.0 as a VDI Benchmark
 
AWS Perú Meetup - Cloud Adoption Framework by Pathros Manay
AWS Perú Meetup - Cloud Adoption Framework by Pathros ManayAWS Perú Meetup - Cloud Adoption Framework by Pathros Manay
AWS Perú Meetup - Cloud Adoption Framework by Pathros Manay
 
V mware business continuity and disaster recovery design and deploy service
V mware business continuity and disaster recovery design and deploy serviceV mware business continuity and disaster recovery design and deploy service
V mware business continuity and disaster recovery design and deploy service
 

More from solarisyougood

More from solarisyougood (20)

Emc vipr srm workshop
Emc vipr srm workshopEmc vipr srm workshop
Emc vipr srm workshop
 
Emc recoverpoint technical
Emc recoverpoint technicalEmc recoverpoint technical
Emc recoverpoint technical
 
Emc vmax3 technical deep workshop
Emc vmax3 technical deep workshopEmc vmax3 technical deep workshop
Emc vmax3 technical deep workshop
 
EMC Atmos for service providers
EMC Atmos for service providersEMC Atmos for service providers
EMC Atmos for service providers
 
Cisco prime network 4.1 technical overview
Cisco prime network 4.1 technical overviewCisco prime network 4.1 technical overview
Cisco prime network 4.1 technical overview
 
Designing your xen desktop 7.5 environment with training guide
Designing your xen desktop 7.5 environment with training guideDesigning your xen desktop 7.5 environment with training guide
Designing your xen desktop 7.5 environment with training guide
 
Ibm aix technical deep dive workshop advanced administration and problem dete...
Ibm aix technical deep dive workshop advanced administration and problem dete...Ibm aix technical deep dive workshop advanced administration and problem dete...
Ibm aix technical deep dive workshop advanced administration and problem dete...
 
Ibm power ha v7 technical deep dive workshop
Ibm power ha v7 technical deep dive workshopIbm power ha v7 technical deep dive workshop
Ibm power ha v7 technical deep dive workshop
 
Power8 hardware technical deep dive workshop
Power8 hardware technical deep dive workshopPower8 hardware technical deep dive workshop
Power8 hardware technical deep dive workshop
 
Power systems virtualization with power kvm
Power systems virtualization with power kvmPower systems virtualization with power kvm
Power systems virtualization with power kvm
 
Power vc for powervm deep dive tips &amp; tricks
Power vc for powervm deep dive tips &amp; tricksPower vc for powervm deep dive tips &amp; tricks
Power vc for powervm deep dive tips &amp; tricks
 
Emc data domain technical deep dive workshop
Emc data domain  technical deep dive workshopEmc data domain  technical deep dive workshop
Emc data domain technical deep dive workshop
 
Ibm flash system v9000 technical deep dive workshop
Ibm flash system v9000 technical deep dive workshopIbm flash system v9000 technical deep dive workshop
Ibm flash system v9000 technical deep dive workshop
 
Emc vnx2 technical deep dive workshop
Emc vnx2 technical deep dive workshopEmc vnx2 technical deep dive workshop
Emc vnx2 technical deep dive workshop
 
Emc isilon technical deep dive workshop
Emc isilon technical deep dive workshopEmc isilon technical deep dive workshop
Emc isilon technical deep dive workshop
 
Emc ecs 2 technical deep dive workshop
Emc ecs 2 technical deep dive workshopEmc ecs 2 technical deep dive workshop
Emc ecs 2 technical deep dive workshop
 
Emc vplex deep dive
Emc vplex deep diveEmc vplex deep dive
Emc vplex deep dive
 
Cisco mds 9148 s training workshop
Cisco mds 9148 s training workshopCisco mds 9148 s training workshop
Cisco mds 9148 s training workshop
 
Cisco cloud computing deploying openstack
Cisco cloud computing deploying openstackCisco cloud computing deploying openstack
Cisco cloud computing deploying openstack
 
Se training storage grid webscale technical overview
Se training   storage grid webscale technical overviewSe training   storage grid webscale technical overview
Se training storage grid webscale technical overview
 

Recently uploaded

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

V mware operational readiness for cloud computing service

  • 1. © 2013 VMware Inc. All rights reserved VMware Operational Readiness for Cloud Computing Service Kickoff
  • 2. 2 Download  Student Guide & Internal & Confidential Update Daly - https://goo.gl/VVmVZ0 -- Release Notes http://ouo.io/BWTCno 00 Document Map http://ouo.io/NIZVq 01 Delivery Reference Guide http://ouo.io/y6yXB 02 Pre-Engagement Checklist http://ouo.io/zXIPg 03 Consultant Guide http://ouo.io/GoUlA A01 Work Breakdown Structure http://ouo.io/YhaJ86 A02 Kickoff http://ouo.io/dJPzG A03 Pre-Discovery Workshop and Schedule Guide http://ouo.io/vTQ2R A04 Discovery Workbook http://ouo.io/dteQPJ A05 Planning Workshop http://ouo.io/bVXtvz A06 Recommendations http://ouo.io/awNkwH A07 Conclusion http://ouo.io/NJ8jwf A08 Assessment Report http://ouo.io/MPkCq
  • 3. 3 Agenda  Overview  Delivery Team  Project Phases, Activities, and Timeline  Framework  Deliverables  Engagement Expectations  Next Steps
  • 5. 5 Purpose  Conduct high-level gap analysis on customer’s strategic organization and operational capabilities. This assessment is focused on the virtualization and cloud layers  Review gaps in VMware vCloud® best practice guidelines  Build recommendations for remediation  Refine and prioritize recommendations to support transition to cloud computing
  • 6. 6 Scope  Review against VMware best practice guidelines • Customer’s cloud strategy and vision for IT as a Service • Customer’s organizational structure supporting the virtualization and cloud layer • IT business and consumer control, service control, operations control, and infrastructure control • Overall IT processes • IT management and governance tools  Deliver organizational and operational workshops • Data gathering • Operational recommendation prioritization  Deliver prioritized remediation recommendations
  • 8. 8 Roles  VMware • Engagement management – <name> • Operations consultant – <name> • Operations SME – <name>  Customer • Executive responsible for cloud computing strategy • Project manager • IT service, operations, and infrastructure control managers • Enterprise architect • VMware vSphere® architect • Technical staff as required
  • 9. 9 VMware Management Plan  Engagement management • Responsible for overall customer relationship and project management of VMware tasks and deliverables, as specified in the SOW • Manages coordination with customer project manager • Tracks VMware progress and deliverables • Provides escalation triage • Obtains project sign-off
  • 10. 10 Other VMware Responsibilities  Operations consultants or operations SMEs • Lead discovery workshops • Strategy • Organization • IT business and consumer control • Service control • Operations control • Infrastructure control • Conduct gap analysis and create remediation recommendations • Lead forward-planning workshops • Refine and prioritize recommendations to support transition to vCloud
  • 12. 12 Project Phases  Planning and pre-engagement preparation  Engagement kickoff  Discovery workshops and analysis  Planning workshops  Recommendations presentation
  • 13. 13 Project Phases Phase 5 Recommendation Presentation Phase 4 Planning Workshops Phase 3 Discovery Workshops and Analysis Week 1 Phase 2 Engagement Kickoff Phase 1 Planning and Pre-Engagement Week 0 Week 1 - 3 Week 3 - 4 Key Events SOW Sign-off Recommendation Presentation Agreement on Work Breakdown Structure Engagement Kickoff Planning Call Pre-Engagement Discovery Workshop Scheduling Discovery Workshop Kickoff Data Collection Key Recommendations Recommendation Prioritization Gap Analysis Document Review Project Conclusion Today Week 4
  • 14. 14 Planning and Pre-Engagement Preparation and Kickoff  Validate completion • Confirm that all required discovery workshops are scheduled in accordance with the pre-discovery workshop and schedule guide • Confirm workshop participation • Confirm agreement on Work Breakdown Structure (WBS) activities
  • 15. 15 Discovery Workshops and Analysis  High-level information about customer’s current state of readiness for deploying and operating a vCloud environment  Use multiple discovery workshops to collect and analyze data
  • 16. 16 Discovery Workshop Objectives  Focus on high-level understanding • Strategy for using vCloud environment as a basis for IT as a Service • IT organizational structure in the current virtualization or cloud environment • How the virtualization or cloud environment is governed • How consumer experience is enhanced • How services offered in the current virtualization or cloud environment are managed • How the organization manages the virtualization or cloud environment operationally to support the services • How the infrastructure that supports the virtualization or cloud environment is managed • Virtualization, or cloud infrastructure architectures with a focus on the areas most important to deploying a vCloud environment
  • 17. 17 Analysis Objectives  Identify gaps between the current state and VMware best practice guidelines for vCloud  Develop recommendations for closing the gaps
  • 18. 18 Planning Workshops  VMware works with the customer’s team to prioritize and present the recommendations developed in discovery workshops and analysis • Prioritize recommendations • Develop and deliver a presentation • Deliver to the customer’s executive sponsor and project stakeholders
  • 19. 19 Project Conclusion  Deliverables • Final version of the VMware Operational Readiness for Cloud Computing Service Discovery Workbook • Final version of the VMware Operational Readiness for Cloud Computing Service Recommendations presentation • Final version of the VMware Operational Readiness for Cloud Computing Service Assessment Report • Project conclusion presentation to the customer’s project sponsor and designated customer stakeholders
  • 21. 21 VMware Cloud IT Service Management Framework End User Computing Service Portfolio Management Provisioning Management Service Level Management Service Showback and Metering Service Development Management Service Control Operations Control Infrastructure Control IT Business and Consumer Control Consumer Management and Reporting Accounting and Billing Risk Mgmt Demand Management BusinessAlignmentITEfficiency IT Financial Management IT Vendor Management Configuration and Compliance Management ITBM DemandSupply Infrastructure Architecture Services Infrastructure Engineering Services Availability and Continuity Management Integration and Automation Management Consumer Self-Service Catalog Management Access and Security Management Change Management Capacity Management Performance Management Analytics, Trending, and Metrics Monitoring, Event, Incident, and Problem Management IT Risk Management Release Management Infrastructure Deployment Services IT Strategy and Policy Dev. Service Desk Service Catalog Management (vSphere 5 Image Builder and Auto Deploy) Provisioning Management IT Governance Consumer Management Service Design and Development Service Governance and Lifecycle Management Proactive Operations Management
  • 22. 24 VMware Operational Readiness for Cloud Computing Framework StrategyOrganization
  • 24. 26 Results  VMware Operational Readiness for Cloud Computing Service Discovery Workbook  VMware Operational Readiness for Cloud Computing Service Recommendations presentation  VMware Operational Readiness for Cloud Computing Service Assessment Report  VMware Operational Readiness for Cloud Computing Service Conclusion presentation
  • 25. 27 Workbook Tool – Engagement Framework
  • 26. 28 Service Portfolio Management Effort Impact Develop & align service offerings strategy to technology and business roadmaps Guideline Mandatory Assessed Level Status Establish, document, and adopt Service Portfolio Management process for virtualization/cloud computing- based service offerings No Service Portfolio function implemented with service offering strategy alignment to technology services to overall IT cloud computing strategy No 2 Service Owners identified No Establish chargeback and metering, security, and operational considerations as part of the service definition No Business demand management impacts the prioritization of the service portfolio No Define and deploy an integrated tool for Service Portfolio Management No Establish, report, and review KPIs for Service Portfolio Management process No Establish and document virtualization/cloud computing Service Portfolio roles and responsibilities with assignments as part of the COE No Sample Workbook
  • 29. 32 Infrastructure Control RecommendationsFindings – Non-standard infrastructure architecture – Non-standard virtualization provisioning procedures Short Term • Create standard virtualization provisioning project template Long Term • Develop and maintain architectural blueprints Outcomes – Recommendations Presentation
  • 30. 34 Organization Service Control Operations Control Infrastructure Control Top Short-Term Opportunities  Strategy  <xyz>  Organization  <xyz>  Business Control  <xyz>  Service Control  <xyz>  Operations Control  <xyz>  Infrastructure Control  <xyz> Red Green Red Green Red Green Red Green Strategy Red Green Business Control Red Green Executive Sponsor – Recommendations Presentation
  • 31. 36 1 1.5 2 2.5 3 3.5 4 4.5 5 ITaaS Strategy Financial Mgmt - IT Organization Service Mgmt - IT Organization Operations Mgmt - IT Organization Infrastructure Mgmt - IT Organization Consumer Mgmt. & Reporting Business Requirements Mgmt. IT Financial Mgmt. Accounting & Billing Risk Mgmt. IT Vendor Mgmt. Service Catalog Mgmt. Service Level Mgmt. Service Portfolio Mgmt. Service Development and Implementation Mgmt. Demand Mgmt. Chargeback and Metering Service Desk Event Mgmt. Incident and Problem Mgmt. Change and Configuration Mgmt. Capacity and Availability Mgmt. Continuity Mgmt. Release Mgmt. Integration & Automation Mgmt. Provisioning Mgmt. Performance Mgmt. Architecture Services Deployment Services Infrastructure Provisioning Services Integration and Automation Services Infrastructure Capacity Mgmt. Security and Compliance Mgmt. Monitoring Capability Scores Target State Existing State Executive Sponsor – Summary View
  • 33. 39 Out-of-Scope Items for Project  Designing or implementing any VMware Operational Readiness for Cloud Computing Service recommendations  Defining a new organization structure for the customer  Creation and updates of IT process area documentation or operation manuals  Creation and updates to IT process metrics and KPIs  Development of <Customer> service offerings  Planning deployment of <Customer>’s VMware cloud or supporting vSphere environments  Assessment of any VMware Operational Readiness for Cloud Computing Service topic areas across more than one datacenter  Assessment of any VMware Operational Readiness for Cloud Computing Service topic areas across more than one IT organization
  • 34. 40 Out-of-Scope Items for Project (cont.)  Architecting, designing, installing, or configuring a vSphere environment  Architecting, designing, installing, or configuring a VMware cloud environment  Configuring, tuning, or troubleshooting of customer server, storage, or network environments resulting from any VMware Operational Readiness for Cloud Computing Service recommendations  Making specific recommendations regarding hardware, storage, or networking products or vendors  Hardware procurement, installation, configuration, testing, validation, or management of a vCloud environment  Designing or building a production vCloud environment
  • 35. 41 Key Customer Responsibilities  Provide timely access to required documentation and available IT process management tools  Management and leadership team to actively participate and provide direction, issue resolution, and help mitigating delivery risks during engagement execution  Project manager and the VMware engagement manager mutually agree in writing to the formal project plan governing this project  Project manager is responsible for identifying the appropriate participants in, as well as the timely scheduling of, discovery and planning workshops
  • 36. 42 Key Customer Responsibilities (cont.)  Staff to actively participate in this engagement, and individuals with relevant domain, business, operations, or technical expertise to be available as required  Access to facilities, computer systems, plans, process and policy documents, and organizational structure information as required for VMware team  Provide a suitable environment for discovery and planning workshops, including overhead projector and conference facilities  Customer is responsible for, and assumes any risk associated with, problems resulting from the content, completeness, accuracy, and consistency of any supplied data, materials, and information
  • 38. 44 Next Steps  Review and agree to project management plan and WBS  Finalize workshop participants and workshop schedules  Begin conducting discovery workshops  Provide documentation for team review • Strategy, organizational, process, and architectural documentation • Management tools strategy and lists • Completed pre-discovery workshop and schedule guide • Contact list
  • 40. 46 VMware Operational Readiness for Cloud Computing Service VMware, Inc. 3401 Hillview Ave Palo Alto, CA 94304 Tel: 1-877-486-9273 or 650-427-5000 Fax: 650-427-5001

Editor's Notes

  1. This slide further delineates each layer by the specific processes/functional areas contained in each. The processes/functional areas VMware defines as necessary for effectively and efficiently operating a VMware cloud environment go beyond those described by traditional ITIL to include orchestration and integration, as well as a set of underlying vSphere/VMware cloud infrastructure services.
  2. This slide further delineates each layer by the specific processes/functional areas contained in each. The processes/functional areas VMware defines as necessary for effectively and efficiently operating a VMware cloud environment go beyond those described by traditional ITIL to include orchestration and integration, as well as a set of underlying vSphere/VMware cloud infrastructure services.
  3. This slide further delineates each layer by the specific processes/functional areas contained in each. The processes/functional areas VMware defines as necessary for effectively and efficiently operating a VMware cloud environment go beyond those described by traditional ITIL to include orchestration and integration, as well as a set of underlying vSphere/VMware cloud infrastructure services.