Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Proven Results - Midland County RecordParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Aim Sets Record Run with Contender 40 Series MotorParker Hooks
• First 100% Successful Curve/Lateral Run in Eagle Ford
• Most Footage Drilled with a Single BHA (11,028’)
• Exceeded ROP Goal for both Curve and Lateral Sections
All of us at Aim Directional Services want to thank our clients and employees for their support over the past ten years.
We greatly appreciate and value everyone’s hard work and dedication.
We look forward to continued growth and success for years to come.
Aim Directional Services is seeking a motivated and reliable shop hand to work in our Corpus MWD shop.
Preferred Requirements:
High school diploma or equivalent
1 year of previous oil field experience
Familiar with Tensor/Tolteq tools
Computer literate
Must be able to comprehend instructions and willing to take direction
Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Proven Results - Midland County RecordParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Aim Sets Record Run with Contender 40 Series MotorParker Hooks
• First 100% Successful Curve/Lateral Run in Eagle Ford
• Most Footage Drilled with a Single BHA (11,028’)
• Exceeded ROP Goal for both Curve and Lateral Sections
All of us at Aim Directional Services want to thank our clients and employees for their support over the past ten years.
We greatly appreciate and value everyone’s hard work and dedication.
We look forward to continued growth and success for years to come.
Aim Directional Services is seeking a motivated and reliable shop hand to work in our Corpus MWD shop.
Preferred Requirements:
High school diploma or equivalent
1 year of previous oil field experience
Familiar with Tensor/Tolteq tools
Computer literate
Must be able to comprehend instructions and willing to take direction
Aim Directional Services is hiring an experienced MWD technician to work in their Midland, Texas shop. The ideal candidate will have at least 2 years of experience as a MWD technician and be familiar with Tolteq tools including pulsers, data modules, and gammas. They should also have experience with Tensor/Tolteq data analysis, basic understanding of APS tools, and experience performing gamma calibrations. Resumes should be emailed to resumes@aimdir.com.
The document summarizes the results of drilling a horizontal well in Kingfisher County, Oklahoma that was drilled from spud to total depth (TD) in only 8.43 days, averaging 1449 ft/day. The well consisted of 4 runs and drilled a total of 12,215 feet over 126.83 hours with an average rate of penetration of 93.07' per hour. The well objectives of drilling from spud to TD in under 10.5 days while maintaining tight geological targets and minimizing sliding and dog legs were achieved, providing value to the client through reduced costs and non-productive time.
RSP Permian drilled two lateral runs over 8,000 feet each in June 2017 using Aim Downhole Motors and Real-Time Monitoring. They maintained consistent performance across rigs, maximizing drill rate while minimizing sliding and doglegs. The laterals stayed on target with 15% slide and 85% rotation. This consistent performance allowed RSP Permian to reduce costs and days on multiple rigs while ensuring optimal wellbore placement.
Aim Directional Services is hiring an experienced MWD technician to work in their Midland, Texas shop. The ideal candidate will have at least 2 years of experience as a MWD technician and be familiar with Tolteq tools including pulsers, data modules, and gammas. They should also have experience with Tensor/Tolteq data analysis, basic understanding of APS tools, and experience performing gamma calibrations. Resumes should be emailed to resumes@aimdir.com.
The document summarizes the results of drilling a horizontal well in Kingfisher County, Oklahoma that was drilled from spud to total depth (TD) in only 8.43 days, averaging 1449 ft/day. The well consisted of 4 runs and drilled a total of 12,215 feet over 126.83 hours with an average rate of penetration of 93.07' per hour. The well objectives of drilling from spud to TD in under 10.5 days while maintaining tight geological targets and minimizing sliding and dog legs were achieved, providing value to the client through reduced costs and non-productive time.
RSP Permian drilled two lateral runs over 8,000 feet each in June 2017 using Aim Downhole Motors and Real-Time Monitoring. They maintained consistent performance across rigs, maximizing drill rate while minimizing sliding and doglegs. The laterals stayed on target with 15% slide and 85% rotation. This consistent performance allowed RSP Permian to reduce costs and days on multiple rigs while ensuring optimal wellbore placement.