KILIFI DISTRICT
            1




 FFA PROJECTS UPDATES


     JUNE 13TH 2011

DISTRCT FFA COORDINATOR
         ALRMP



                          11/12/2011
Current Phase I Projects( August 2010-Sept
    2011) Planned Projects and Outputs
                          Total number of project sites                                           32
Improve pasture and browse Hectares of land developed for              No of Sites                 4
        production           pasture production (e.g semi-                Ha
                                                      2
                            circular bunds, re-seeded range
                                        lands etc)
                                                                                                   20
  Reduce environmental      Number of tree seedlings planted No of sites                           32
      degradation                      in negarims           No                               293,438
Improve access to water for Number of NEW water pans/ponds No of sites                             33
    Human and livestock      Constructed (3,000-15,000 m3) M3                                 189,920
       consumption             Number of water pans/ponds No of sites                               5
                             Rehabilitated 3,000-15,000 m3) m3                                 43,000
                             Number of zai pits constructed) No of sites                           32
                                                             No Ha                                393
                               Number of trapezoidal bunds No of sites                             15
                                       constructed           No Ha                                149
 Increased Crop production
                             No of sunken beds constructed No of sites                              5
                                                             No Ha                                0.8
                              Number of multistorey gardens No of sites                            32
                                       constructed           No. of multistorey gardens         4,510

                                                                                          11/12/2011
3
     Achieved May 31, 2011: Sites outputs
                              Total number of project sites                                                   32
Improve pasture and browse      Hectares of land developed for No of Sites                                     4
        production               pasture production (e.g. semi- Ha
                                circular bunds, re-seeded range
                                            lands etc)
                                                                                                              41
  Reduce environmental        Number of trees seedlings planted No of sites                                   32
      degradation                                               No                                       6230
Improve access to water for    Number of NEW water pans/ponds No of sites                                     29
   Human and livestock          Constructed (3,000-15,000 m3) M3
      consumption                                                                                      132,423
                                 Number of water pans/ponds No of sites                                        4
                                Rehabilitated 3,000-15,000 m3) M3
                                                                                                        11,545
                                Number of zai pits constructed) No of sites                                   32
                                                                No Ha                                     589
                                 Number of trapezoidal bunds    No of sites                                    0
                                        constructed             No Ha                                          0
Increased Crop production
                                No of sunken beds constructed No of sites                                      3
                                                                No Ha                                         0.8
                                Number of multistorey gardens   No of sites                                   32
                                        constructed             No. of multistorey gardens                600
                                                                                                 11/12/2011
ACHIEVED OUTPUT PHOTOS
          4




                         11/12/2011
ACHIEVED OUTPUT PHOTOS
          5




                         11/12/2011
CONTINUED
    6




            11/12/2011
Current partnerships for the FFA Projects:

                             7
 Ministry of Livestock Production
 Ministry of Water and Irrigation
 Ministry of Agriculture
 ALRMP II
 Ministry of Public Works
 Ministry of Forests
 Ministry of Education
 Office of the President
 CBO’s
 Ministry of Public Health and sanitation

                                             11/12/2011
Partnership chart
        8

               Community
               • FFA
                 beneficiaries

               Government
               Line
               Ministries

               NGOS




                                 11/12/2011
Procurement of NFI for first installment funds:
                                    9

No ITEM                  STATUS                            REMARKS
1     Tools (Assorted)   Being delivered by the supplier   Rammers are too
                                                           expensive
2.    Survey equipment   Being delivered by the supplier   -

3.    Water tanks        PRF sent to National Office       Awaiting delivery
4.    Cattle troughs     BoQ developed on 10th June        Tenders to be
                                                           floated
5.    Tree seeds         Procured and distributed to       Payment done
                         farmers
6.    Poly tubes         LPO sent to supplier              Awaiting delivery
7.    SMM Pumps          PRF sent to sub branch office     Awaiting delivery




                                                                     11/12/2011
Comments
                          10

 Support from community
 Support from line ministries and the DSG




                                             11/12/2011
Phase II Projects (expansion of old, New) Planned: sites,
        Beneficiaries, Projects, Outputs(pans, Ha)
                                                           11
                    Total number of project sites /Beneficiaries                                          43(65,100)
 Increase crop production     Hectares of cultivated land treated and No of Sites                                  5
                              conserved with physical soil and water
                              conservation measures/structures (e.g.  Km
                               terraces, stone and soil bunds e.t.c.)
                                                                                                               37.8
Improve pasture and browse     Hectares of land developed for pasture      No of Sites                           10
        production         production (e.g. semi-circular bunds, re-seeded
                                           range lands etc)                Ha
                                                                                                                  65
  Reduce environmental                Number of tree seedlings planted     No of sites                            43
       degradation                                                         No                                404,724
Improve access to water for          Number of NEW water pans/ponds        No of sites                            36
   Human and livestock                Constructed (3,000-15,000 m3)        M
                                                                               3
                                                                                                             484,880
      consumption
                                 Number of water pans/ponds Rehabilitated No of sites                              9
                                                                            3
                                             3,000-15,000 m3)             M                                   71,600
                                     Number of zai pits constructed)      No                                      32
                                                                          No                                     596
                                  Number of trapezoidal bunds constructed No of sites                             33
                                                                          No Ha                                  400
                                      No of sunken beds constructed       No of sites                             16
Others(including fishponds,                                               No Ha                                   13
 trapezoidal bunds, stone            Number of negarims constructed       No of sites                             43
        bunds, etc)                                                       No. of seedlings                   404.724
                                                                                             11/12/2011
High Impact Projects & Mechanization
             Estimated Budget for Phase II projects
                                                  12
                                                Number of
   Project       Beneficiaries     Size                     Estimate Budget   Project Period
                                                 projects


Greenhouse                                                                    July 2011– April
                    19146          STD             15        15,481,950.00
 Projects                                                                           2012



                                            3                                 July 2011– April
Water pan for
                    20000        15,000 M          4         16,000,000.00          2012
 irrigation



NFI Budget for                   Assorted                                     July 2011– April
  Up scaled         24,100        items            31        10,318,176.00          2012
 Beneficiaries


   TOTAL                                                     41,800,126.00


                                                                                     11/12/2011
New Projects Update:
                                  13

NO.   NEW PROJECTS                 STATUS           REMARKS


1.    8 Community farms            Reviewed by DPSC Approved


2.    2 water pan expansion and    Reviewed by DPSC Approved
      rehabilitation



3.    2 water pan excavation       Reviewed by DPSC Approved




                                                               11/12/2011
New Partnerships
                       14

 SMART Logistics
 Chome (aloe Vera)
 AMIRAN
 CBOs – Mwangaza Mudzo, Dzikunze farmers




                                            11/12/2011
Challenges
                           15

 Unstable food pipeline
 Political interference
 Shortage of Government Staff in the Ministry of
  Public Works
 Inadequate NFI




                                                    11/12/2011
Mitigating actions that you took.
                           16

 Information sharing with all stakeholders
  (community, DSG)
 Negotiations for consideration and prioritization of
  FFA activities through related line ministries.




                                                  11/12/2011
Challenges that are still a bother and unresolved
                        17

 Inadequate NFIs




                                            11/12/2011

Weitere ähnliche Inhalte

Mehr von Stephen Musimba

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011Stephen Musimba
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGStephen Musimba
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIStephen Musimba
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationStephen Musimba
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work planStephen Musimba
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingStephen Musimba
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poorStephen Musimba
 
FFA PROCESS MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS MANUALRevised 21-05-2010Stephen Musimba
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2Stephen Musimba
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visitStephen Musimba
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communitiesStephen Musimba
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryStephen Musimba
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresStephen Musimba
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design ManualStephen Musimba
 

Mehr von Stephen Musimba (20)

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSG
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFI
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentation
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work plan
 
viragoni FDP
viragoni FDPviragoni FDP
viragoni FDP
 
Ndugu mnani proposal
Ndugu mnani proposalNdugu mnani proposal
Ndugu mnani proposal
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessing
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poor
 
WFP RWH Planning 3
WFP RWH Planning 3WFP RWH Planning 3
WFP RWH Planning 3
 
FFA PROCESS MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS MANUALRevised 21-05-2010
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2
 
Probability Analysisx
Probability AnalysisxProbability Analysisx
Probability Analysisx
 
Water from small dams
Water from small damsWater from small dams
Water from small dams
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visit
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communities
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itinerary
 
WFP Hydrologic cycle
WFP Hydrologic cycleWFP Hydrologic cycle
WFP Hydrologic cycle
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH Structures
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design Manual
 

Kürzlich hochgeladen

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 

Kürzlich hochgeladen (20)

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 

Kilifi District Food For Asset brief

  • 1. KILIFI DISTRICT 1 FFA PROJECTS UPDATES JUNE 13TH 2011 DISTRCT FFA COORDINATOR ALRMP 11/12/2011
  • 2. Current Phase I Projects( August 2010-Sept 2011) Planned Projects and Outputs Total number of project sites 32 Improve pasture and browse Hectares of land developed for No of Sites 4 production pasture production (e.g semi- Ha 2 circular bunds, re-seeded range lands etc) 20 Reduce environmental Number of tree seedlings planted No of sites 32 degradation in negarims No 293,438 Improve access to water for Number of NEW water pans/ponds No of sites 33 Human and livestock Constructed (3,000-15,000 m3) M3 189,920 consumption Number of water pans/ponds No of sites 5 Rehabilitated 3,000-15,000 m3) m3 43,000 Number of zai pits constructed) No of sites 32 No Ha 393 Number of trapezoidal bunds No of sites 15 constructed No Ha 149 Increased Crop production No of sunken beds constructed No of sites 5 No Ha 0.8 Number of multistorey gardens No of sites 32 constructed No. of multistorey gardens 4,510 11/12/2011
  • 3. 3 Achieved May 31, 2011: Sites outputs Total number of project sites 32 Improve pasture and browse Hectares of land developed for No of Sites 4 production pasture production (e.g. semi- Ha circular bunds, re-seeded range lands etc) 41 Reduce environmental Number of trees seedlings planted No of sites 32 degradation No 6230 Improve access to water for Number of NEW water pans/ponds No of sites 29 Human and livestock Constructed (3,000-15,000 m3) M3 consumption 132,423 Number of water pans/ponds No of sites 4 Rehabilitated 3,000-15,000 m3) M3 11,545 Number of zai pits constructed) No of sites 32 No Ha 589 Number of trapezoidal bunds No of sites 0 constructed No Ha 0 Increased Crop production No of sunken beds constructed No of sites 3 No Ha 0.8 Number of multistorey gardens No of sites 32 constructed No. of multistorey gardens 600 11/12/2011
  • 4. ACHIEVED OUTPUT PHOTOS 4 11/12/2011
  • 5. ACHIEVED OUTPUT PHOTOS 5 11/12/2011
  • 6. CONTINUED 6 11/12/2011
  • 7. Current partnerships for the FFA Projects: 7  Ministry of Livestock Production  Ministry of Water and Irrigation  Ministry of Agriculture  ALRMP II  Ministry of Public Works  Ministry of Forests  Ministry of Education  Office of the President  CBO’s  Ministry of Public Health and sanitation 11/12/2011
  • 8. Partnership chart 8 Community • FFA beneficiaries Government Line Ministries NGOS 11/12/2011
  • 9. Procurement of NFI for first installment funds: 9 No ITEM STATUS REMARKS 1 Tools (Assorted) Being delivered by the supplier Rammers are too expensive 2. Survey equipment Being delivered by the supplier - 3. Water tanks PRF sent to National Office Awaiting delivery 4. Cattle troughs BoQ developed on 10th June Tenders to be floated 5. Tree seeds Procured and distributed to Payment done farmers 6. Poly tubes LPO sent to supplier Awaiting delivery 7. SMM Pumps PRF sent to sub branch office Awaiting delivery 11/12/2011
  • 10. Comments 10  Support from community  Support from line ministries and the DSG 11/12/2011
  • 11. Phase II Projects (expansion of old, New) Planned: sites, Beneficiaries, Projects, Outputs(pans, Ha) 11 Total number of project sites /Beneficiaries 43(65,100) Increase crop production Hectares of cultivated land treated and No of Sites 5 conserved with physical soil and water conservation measures/structures (e.g. Km terraces, stone and soil bunds e.t.c.) 37.8 Improve pasture and browse Hectares of land developed for pasture No of Sites 10 production production (e.g. semi-circular bunds, re-seeded range lands etc) Ha 65 Reduce environmental Number of tree seedlings planted No of sites 43 degradation No 404,724 Improve access to water for Number of NEW water pans/ponds No of sites 36 Human and livestock Constructed (3,000-15,000 m3) M 3 484,880 consumption Number of water pans/ponds Rehabilitated No of sites 9 3 3,000-15,000 m3) M 71,600 Number of zai pits constructed) No 32 No 596 Number of trapezoidal bunds constructed No of sites 33 No Ha 400 No of sunken beds constructed No of sites 16 Others(including fishponds, No Ha 13 trapezoidal bunds, stone Number of negarims constructed No of sites 43 bunds, etc) No. of seedlings 404.724 11/12/2011
  • 12. High Impact Projects & Mechanization Estimated Budget for Phase II projects 12 Number of Project Beneficiaries Size Estimate Budget Project Period projects Greenhouse July 2011– April 19146 STD 15 15,481,950.00 Projects 2012 3 July 2011– April Water pan for 20000 15,000 M 4 16,000,000.00 2012 irrigation NFI Budget for Assorted July 2011– April Up scaled 24,100 items 31 10,318,176.00 2012 Beneficiaries TOTAL 41,800,126.00 11/12/2011
  • 13. New Projects Update: 13 NO. NEW PROJECTS STATUS REMARKS 1. 8 Community farms Reviewed by DPSC Approved 2. 2 water pan expansion and Reviewed by DPSC Approved rehabilitation 3. 2 water pan excavation Reviewed by DPSC Approved 11/12/2011
  • 14. New Partnerships 14  SMART Logistics  Chome (aloe Vera)  AMIRAN  CBOs – Mwangaza Mudzo, Dzikunze farmers 11/12/2011
  • 15. Challenges 15  Unstable food pipeline  Political interference  Shortage of Government Staff in the Ministry of Public Works  Inadequate NFI 11/12/2011
  • 16. Mitigating actions that you took. 16  Information sharing with all stakeholders (community, DSG)  Negotiations for consideration and prioritization of FFA activities through related line ministries. 11/12/2011
  • 17. Challenges that are still a bother and unresolved 17  Inadequate NFIs 11/12/2011