Flooding Due to Wave Overtopping of Coastal
Defence Structures using the MIKE 21 Suite
Suzie Clarke and Matt Easton
© DHI
1. Concept Introduction
2. Project Example
3. Step-by-Step Guide Walkthrough
1) Planning and Data Analysis
2) MIKE 21 FMHD and SW Model Construction
3) MIKE 21 BW 1DH Model Construction
4) MIKE 21 BW 1DH Application Runs
5) MIKE 21 FMHD Flooding due to Wave Overtopping Runs
4. Questions?
Agenda
01.
Concept Introduction
© DHI
01. Concept Introduction
© DHI
Aim of Study
• Screening
− Indicator of extent of flooding from
wave overtopping
− Use Overtopping Table approach
with mean overtopping rates for a
selection of water levels and wave
characteristics
• Individual Storm
− Instantaneous overtopping volumes
from phase-resolved wave
environment providing a refined hazard
assessment
− Use Instantaneous Overtopping
Time Series approach using
instantaneous overtopping rates from
MIKE 21 BW 1DH runs
01. Concept Introduction
© DHI
How:
Incident
Environmental
Conditions
MIKE 21 FM HD
MIKE 21 SW
Wave
Transformation and
Overtopping
Overland Flows
MIKE 21 BW 1DH MIKE 21 FM HD
01. Concept Introduction
© DHI
Why use BW?
• Allows you to maintain the spectral characteristics of your wave climate – you can use
a user-defined spectrum (output from SW) to generate your water level input to BW
• You can use your actual structure!
• You do not need to know the location of the toe of the structure for identifying relevant
water depth and wave height, waves are transformed from offshore
02.
Project Example
© DHI
© DHI
• Site of a proposed new infrastructure development thought to be
susceptible to flooding
• Potential for waves to overtop natural defences and contribute to
inundation of low-lying areas
• Develop a series of conceptual pathway mechanisms to determine
overtopping volumes and inform inundation modelling
Problem definition and overview
Problem definition and overview
© DHI
Problem definition and overview
© DHI
General approach
© DHI
Source Pathway Receptor
• Storm waves
• Storm surge
• Tidal water level
• Overtopping of
defences
• Breach of natural
defences
• Proposed new
infrastructure &
personnel
• Coastal morphology
MIKE21 FM HD
MIKE21 FM SW
MIKE 21 BW MIKE21 FM HD
The Source
© DHI
• Wave conditions
− From MIKE21 FM SW model
− Storm events at various return periods (1, 10, 50, 100 years)
• Storm surge
− From MIKE21 FM HD model
− Water level rise (surge) (1, 10, 50, 100 years)
• Tidal water level
− From MIKE21 FM HD model
− Local tide gauge
Source – transformation of wave boundaries
© DHI
100 year storm event
Input boundary from regional SW model
• D > 20 m
• Hm0 = 6.4 m
• Tp = 10.9 s
• MWD = 79°
Output point A from local SW model
• D = 6 m
• Hm0 = 2.3 m
• Tp = 6.6 s
• MWD = 95°
A
1. Ratio of max. water depth to deep
water wavelength: Hmax/L0 < 0.5
𝐿0 =
𝑔𝑇 𝑚𝑖𝑛
2
2𝜋
 𝑇 𝑚𝑖𝑛 =
4𝜋𝐻 𝑚𝑎𝑥
𝑔
for Hmax = 6.0m, Tmin ≈ 2.8 s
Tmin << TP  Criterion met 
Pathway: check MIKE21 BW criteria
© DHI
2. Resolve ~10 characteristic wave-
lengths in BW model
𝐿 = 𝑇𝑃
𝑔𝐿 tanh(2𝜋𝐻 𝑚𝑎𝑥/𝐿)
2𝜋
Iterative solution gives Lmax ≈ 46m
10Lmax<< profile length
 Criterion met 
Pathway: 1D profile
© DHI
1. Extract profile from MIKE21 SW mesh 2. Adjust profile for water level condition
(note sign conventions!)
e.g. SWL = MSL – HAT correction - surge level
SWL = MSL – 1.1 – 0.6
Pathway: 1D profile
© DHI
3. Create unstructured mesh (MIKE21 toolbox)
− Fixed resolution of 40 nodes per wavelength
− Dependent on characteristic wave period (peak wave period)
Defining the pathway – wave boundary
© DHI
• The model is forced by waves generated inside the model domain.
• The internal wave generation of waves allows you to absorb all waves leaving the
model domain (radiation type boundaries).
• Time series’ of water elevations synthesised from random wave generator
(MIKE21 toolbox)
− Input derived from MIKE21 FM SW model
Defining the pathway – running BW
© DHI
− Sponge Layer (included)
− Wave breaking (included, default parameters)
− Filter (included)
− Moving shoreline (included, increased slot width)
− Porosity layer (not included)
Pathway – model results
© DHI
Pathway – model results (breach case)
© DHI
Scenario modelling
© DHI
• Storm wave return periods (1, 10, 50, 100 years)
• Storm surge return periods (1, 10, 50, 100 years)
• Tidal water level variations over semidiurnal tidal cycle
• Climate change scenarios (projected sea level rise)
• Modification to existing natural defences (breach scenarios)
Each combination of scenarios requires modification of model
inputs (bathymetry profile, mesh, waves, etc.) and a review of the
BW model criteria.
Scenario modelling: varying water level
© DHI
Time Water level (mMSL) Mean OT flux
[m3/s/m]
Mean OT flux (breach
scenario [m3/s/m]
00:00 1.58 0.00199 0.00215
01:00 1.66 0.00249 0.00443
02:00 1.72 0.00419 0.01120
03:00 1.66 0.00249 0.00443
04:00 1.59 0.00199 0.00215
03.
Step-by-Step Guide Walkthrough
© DHI
03_1a. Planning and Data Analysis
© DHI
Example:
• Penzance Promenade
• Wave and Bathymetry Data
from Channel Coastal
Observatory
• Tide Data from DHI Global Tide
Model
03_1b. Planning and Data Analysis
© DHI
• 27 December 2010
• Hs = 4m
• Tp = 9.5s
• Surge = 2.2m
03_2a. MIKE 21 FMHD and SW Model Construction
© DHI
Points to Consider:
• Include arcs in the mesh to define where the defence structures are and add
breaklines on top of these to ensure any sharp changes in bathymetry / ground level
due to the presence of the defence structures is preserved
• You should output the defence arcs as xyz files so you can load them in later as the
defence locations in the dike structure in the HD model
• Cut your buildings out of the mesh or elevate them sufficiently to avoid rapid depth
changes if you don’t have building outlines
03_2a. MIKE 21 FMHD and SW Model Construction
© DHI
Example mesh:
03_2b. MIKE 21 FMHD and SW Model Construction
© DHI
Undertake preliminary HD and SW runs:
• To determine the tidal water levels and wave conditions in the region where the BW
profiles are expected to be…
03_3a. MIKE 21 BW 1DH Model Construction
© DHI
Profiles – how to define them:
Calculate dominant wavelength L with
Dispersion Equation using Tp
10xL is first guess at the
profile length
Find approximate offshore total water
depth from preliminary HD runs
Use BW Set Up Planner
to calc Tmin
Is Tmin acceptable in
comparison to Tp?
Reduce profile length to
reduce offshore depth
Use original profile length but set
depths along it that are greater
than acceptable offshore depth to
acceptable offshore depth
No
Yes
L =
𝑔
2𝜋
𝑇2
𝑡𝑎𝑛ℎ
2𝜋ℎ
𝐿
03_3a. MIKE 21 BW 1DH Model Construction
© DHI
Example
profiles’
locations:
03_3a. MIKE 21 BW 1DH Model Construction
© DHI
Profile development process:
• Create baseline regular profile (to
vertical datum 0mODN)
• Create adjusted regular profile for
each water level (do not forget to
add surge to tidal level to create
total water level)
• Create unstructured (u/s) profile
from adjusted regular profile
• Repeat for all your profile / water
level combinations
03_3b. MIKE 21 BW 1DH Model Construction
© DHI
Create offshore boundary conditions using:
• Total water depth at the Wave Generation Line (WGL) location (from profile – located
just inshore of the outer sponge layer)
• Tmin for each wave condition (from BW Set Up Planner)
• Hs & Tp for each wave condition (from the preliminary SW runs)
03_4a. MIKE 21 BW 1DH Application Runs
© DHI
Important parameters for a successful run completion:
• Moving Shoreline
− DO: try increasing the slot friction coefficient and/or decreasing slot smoothing
parameter to help the model remain stable
− DO: increase your slot depth if you want to get away with larger “errors” before
crashing!
− DO NOT: change the slot width as this represents the porosity of the artificially
permeable structure and needs to be small in order to keep flows through the
structure as small as possible
03_4a. MIKE 21 BW 1DH Application Runs
© DHI
Important parameters for a successful
run completion:
• Filter
− Choose a suitable depth to apply the filter
from and increase the value of the filter
rather than taking the filter layer further
offshore
• Porosity
− Try including a low porosity (for example,
0.98) for steep structures – apply the layer
to roughly one quarter of your most
energetic wavelength (L, calculated earlier)
offshore from the crest of your structure
03_4b. MIKE 21 BW 1DH Application Runs
© DHI
And remember:
• Adjust Cell Locations
− The unstructured mesh location of the WGL (edge of the outer sponge layer) and
structure crest changes with each new water level and profile so update your cell
locations in WGL and Outputs
• Output Interval
− Output fluxes at a very small time step to ensure all instantaneous overtopping is
identified and captured (for example, 100x per Tp)
• Timing
− Add a few extra minutes to the start of the run to give the first waves time to reach the
structure
03_4b. MIKE 21 BW 1DH Application Runs
© DHI
• Profile 01, TS 03 Movie
03_5a. MIKE 21 FMHD Application Runs
© DHI
Wave overtopping rates are applied to dike structures:
• Table (for Screening Studies)
− Take average overtopping rates from the BW model outputs (or use EuroTop)
and create a table for each profile that considers the range of freeboards (crest
height – SWL) and wave conditions
− Create a time series for wave conditions or
use output from the preliminary SW run
03_5a. MIKE 21 FMHD Application Runs
© DHI
Wave overtopping rates are applied to dike structures:
• Time Series (for Storm or Enhanced Studies)
− Remember to remove the overtopping rates calculated for the extra minutes added
at the start of each BW run to allow the waves to reach the structure
− Create one concatenated time series of instantaneous overtopping rates from the
various BW runs for each profile
− Add extra steps at the start of the overtopping time series with zero values to
account for spin up of the HD model
− Make sure the overtopping rates have the correct sign – positive fluxes are from
right to left when looking from the start of the dike structure to the end
03_5a. MIKE 21 FMHD Application Runs
© DHI
Wave overtopping rates are applied to dike structures:
• Time Series (for Storm or Enhanced Studies)
− In order to avoid losing overtopping volume due to time step
difference between HD run and BW output frequency, use an HD
time step that is close to the output frequency of the BW results
and is less than Tp
− For larger HD time steps, take a moving average of the BW data
over a period equal to the time step of the HD model. For
example, output from BW is every 0.1s, HD time step is 10s so
take moving average of BW data over 100 BW time steps
(=10s). Use the Time Series Interpolation tool in the MZ Toolbox
to convert from 0.1s to 10s time steps in the dfs0 input file
03_5b. MIKE 21 FMHD Application Runs
© DHI
Final Instantaneous Overtopping Rate Time Series:
03_5b. MIKE 21 FMHD Application Runs
© DHI
Movie with buildings cut out - TS
03_5b. MIKE 21 FMHD Application Runs
© DHI
Movie with buildings cut out - Table
03_5b. MIKE 21 FMHD Application Runs
© DHI
• Instantaneous
• Table
04.
Questions?
© DHI
DHI are the first people you should call when you have a tough
challenge to solve in a water environment.
In the world of water, our knowledge is second-to-none, and we strive
to make it globally accessible to clients and partners.
So whether you need to save water, share it fairly, improve its quality,
quantify its impact or manage its flow, we can help. Our knowledge,
combined with our team’s expertise and the power of our technology,
hold the key to unlocking the right solution.
© DHI
About DHI
Thank you
© DHI

More Related Content

What's hot

Diversion of headwork
Diversion of headwork Diversion of headwork
Diversion of headwork Jay Khoradiya
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationPramoda Raj
 
Hec ras flood modeling little river newburyport
Hec ras flood modeling little river newburyportHec ras flood modeling little river newburyport
Hec ras flood modeling little river newburyportWilliam Mullen
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresGAURAV. H .TANDON
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control HNurton
 
Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)lesliehome
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysisvivek gami
 
Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...HydrologyWebsite
 
Chapter 3 2
Chapter 3 2Chapter 3 2
Chapter 3 2shita43
 
Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesMohammed Salahat
 
Impact of Large Dams on Climate
Impact of Large Dams on ClimateImpact of Large Dams on Climate
Impact of Large Dams on ClimatePrasad Mukherjee
 
Reservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationReservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationPramoda Raj
 
Modelling of Seawater Intrusion
Modelling of Seawater IntrusionModelling of Seawater Intrusion
Modelling of Seawater IntrusionC. P. Kumar
 
Presentation Hydrology
Presentation HydrologyPresentation Hydrology
Presentation HydrologyMalia Damit
 

What's hot (20)

Flood Management
Flood ManagementFlood Management
Flood Management
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
Diversion of headwork
Diversion of headwork Diversion of headwork
Diversion of headwork
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
 
Dams
DamsDams
Dams
 
Hec ras flood modeling little river newburyport
Hec ras flood modeling little river newburyportHec ras flood modeling little river newburyport
Hec ras flood modeling little river newburyport
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control
 
Flood routing
Flood routingFlood routing
Flood routing
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)Lesson 6 factors affecting discharge (hydrographs)
Lesson 6 factors affecting discharge (hydrographs)
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysis
 
Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...
 
Chapter 3 2
Chapter 3 2Chapter 3 2
Chapter 3 2
 
Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resources
 
Impact of Large Dams on Climate
Impact of Large Dams on ClimateImpact of Large Dams on Climate
Impact of Large Dams on Climate
 
Ch4 surface runoff
Ch4 surface runoffCh4 surface runoff
Ch4 surface runoff
 
Reservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationReservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigation
 
Modelling of Seawater Intrusion
Modelling of Seawater IntrusionModelling of Seawater Intrusion
Modelling of Seawater Intrusion
 
Presentation Hydrology
Presentation HydrologyPresentation Hydrology
Presentation Hydrology
 

Viewers also liked

Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Stephen Flood
 
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...Stephen Flood
 
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...Stephen Flood
 
ICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackStephen Flood
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Stephen Flood
 
Do tin cay cac cong trinh tren bien_Nguyen Vi
Do tin cay cac cong trinh tren bien_Nguyen ViDo tin cay cac cong trinh tren bien_Nguyen Vi
Do tin cay cac cong trinh tren bien_Nguyen ViNguyen Thanh Luan
 
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelHydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelSumant Diwakar
 
十八真象Ppt 序(18 Life stories-preface)
十八真象Ppt 序(18 Life stories-preface)十八真象Ppt 序(18 Life stories-preface)
十八真象Ppt 序(18 Life stories-preface)Rebecca Chen
 
員工觀點_生產與作業管理
員工觀點_生產與作業管理員工觀點_生產與作業管理
員工觀點_生產與作業管理Ching Chuang 羅
 
9 marketing pessoal
9   marketing pessoal9   marketing pessoal
9 marketing pessoalluzberto
 
0 cum dorm alpinistii
0  cum dorm alpinistii0  cum dorm alpinistii
0 cum dorm alpinistiiluzberto
 
Writing Institute Day 7 Log
Writing Institute Day 7 LogWriting Institute Day 7 Log
Writing Institute Day 7 LogLesley Roessing
 
New microsoft office power point presentation
New microsoft office power point presentationNew microsoft office power point presentation
New microsoft office power point presentationYogesh Garg
 

Viewers also liked (20)

Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21
 
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
 
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...
From Hazard to Impact: The CORFU flood damage assessment tool - Albert S. Che...
 
ICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate Pack
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 
Current trends of disasters in the asia pacific region
Current trends of disasters in the asia pacific regionCurrent trends of disasters in the asia pacific region
Current trends of disasters in the asia pacific region
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Dinh vu
Dinh vuDinh vu
Dinh vu
 
Do tin cay cac cong trinh tren bien_Nguyen Vi
Do tin cay cac cong trinh tren bien_Nguyen ViDo tin cay cac cong trinh tren bien_Nguyen Vi
Do tin cay cac cong trinh tren bien_Nguyen Vi
 
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelHydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
 
Erosion modeling in the Upper Blue Nile Basin: The case for Mizewa Watershed
Erosion modeling in the Upper Blue Nile Basin: The case for Mizewa WatershedErosion modeling in the Upper Blue Nile Basin: The case for Mizewa Watershed
Erosion modeling in the Upper Blue Nile Basin: The case for Mizewa Watershed
 
Swat & modflow
Swat & modflowSwat & modflow
Swat & modflow
 
State of Education
State of EducationState of Education
State of Education
 
十八真象Ppt 序(18 Life stories-preface)
十八真象Ppt 序(18 Life stories-preface)十八真象Ppt 序(18 Life stories-preface)
十八真象Ppt 序(18 Life stories-preface)
 
Laboratorium Badań Materiału Geologicznego
Laboratorium Badań Materiału GeologicznegoLaboratorium Badań Materiału Geologicznego
Laboratorium Badań Materiału Geologicznego
 
員工觀點_生產與作業管理
員工觀點_生產與作業管理員工觀點_生產與作業管理
員工觀點_生產與作業管理
 
9 marketing pessoal
9   marketing pessoal9   marketing pessoal
9 marketing pessoal
 
0 cum dorm alpinistii
0  cum dorm alpinistii0  cum dorm alpinistii
0 cum dorm alpinistii
 
Writing Institute Day 7 Log
Writing Institute Day 7 LogWriting Institute Day 7 Log
Writing Institute Day 7 Log
 
New microsoft office power point presentation
New microsoft office power point presentationNew microsoft office power point presentation
New microsoft office power point presentation
 

Similar to Undertaking Modelling of Flooding due to Wave Overtopping using the MIKE by DHI Software Suite - Dr Suzie Clarke (DHI)

NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOOD
NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOODNUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOOD
NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOODAmaljit Bharali
 
offshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formoffshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formkhalidsiddig8
 
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...Deltares
 
201959 1CoastalOcean ModellingNumerical Mod.docx
201959 1CoastalOcean ModellingNumerical Mod.docx201959 1CoastalOcean ModellingNumerical Mod.docx
201959 1CoastalOcean ModellingNumerical Mod.docxvickeryr87
 
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODReservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODStephen Flood
 
Modelling wave climate for Aquaculture Parks in the Philippines
Modelling wave climate for Aquaculture Parks in the PhilippinesModelling wave climate for Aquaculture Parks in the Philippines
Modelling wave climate for Aquaculture Parks in the PhilippinesPatrick White
 
CFD for Floating Systems.pdf
CFD for Floating Systems.pdfCFD for Floating Systems.pdf
CFD for Floating Systems.pdfmesin upnvj
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDeltares
 
23-2009 Pre-piling for wind farms.pdf
23-2009 Pre-piling for wind farms.pdf23-2009 Pre-piling for wind farms.pdf
23-2009 Pre-piling for wind farms.pdframadhitaerdina1
 
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)glennmcgillivray
 
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Stephen Flood
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfssuserca460e
 
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...Rakibul Hasan,MEng,EIT
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field developmentHamid S
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesignSiam Kak
 
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...Deltares
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 

Similar to Undertaking Modelling of Flooding due to Wave Overtopping using the MIKE by DHI Software Suite - Dr Suzie Clarke (DHI) (20)

NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOOD
NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOODNUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOOD
NUMERICAL MODELS AS MITIGATION MEASURES FOR RIVERINE AND URBAN FLOOD
 
offshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formoffshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate form
 
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...
DSD-INT 2014 - Delft3D Users Meeting - Delft3D-FLOW and CORMIX near-field mod...
 
201959 1CoastalOcean ModellingNumerical Mod.docx
201959 1CoastalOcean ModellingNumerical Mod.docx201959 1CoastalOcean ModellingNumerical Mod.docx
201959 1CoastalOcean ModellingNumerical Mod.docx
 
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODReservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
 
Modelling wave climate for Aquaculture Parks in the Philippines
Modelling wave climate for Aquaculture Parks in the PhilippinesModelling wave climate for Aquaculture Parks in the Philippines
Modelling wave climate for Aquaculture Parks in the Philippines
 
CFD for Floating Systems.pdf
CFD for Floating Systems.pdfCFD for Floating Systems.pdf
CFD for Floating Systems.pdf
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
23-2009 Pre-piling for wind farms.pdf
23-2009 Pre-piling for wind farms.pdf23-2009 Pre-piling for wind farms.pdf
23-2009 Pre-piling for wind farms.pdf
 
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)
ICLR Friday Forum: Reducing the risk of extreme wind damage (Sept. 20, 2019)
 
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdf
 
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field development
 
Lecture 0 design of spilways an overview
Lecture 0 design of spilways an overviewLecture 0 design of spilways an overview
Lecture 0 design of spilways an overview
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesign
 
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...
DSD-INT 2022 Storm Surge Model for Singapore Strait and South China Sea using...
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 

More from Stephen Flood

Models Done Better... - UDG2018 - Intertek and DHI
Models Done Better... - UDG2018 - Intertek and DHIModels Done Better... - UDG2018 - Intertek and DHI
Models Done Better... - UDG2018 - Intertek and DHIStephen Flood
 
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.Stephen Flood
 
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...Stephen Flood
 
Effects of time-series data resolution on modelling shoreline change. Avidesh...
Effects of time-series data resolution on modelling shoreline change. Avidesh...Effects of time-series data resolution on modelling shoreline change. Avidesh...
Effects of time-series data resolution on modelling shoreline change. Avidesh...Stephen Flood
 
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...Stephen Flood
 
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...Stephen Flood
 
Some of our recent applications of the MIKE software. Oliver Way, WSP.
Some of our recent applications of the MIKE software. Oliver Way, WSP.Some of our recent applications of the MIKE software. Oliver Way, WSP.
Some of our recent applications of the MIKE software. Oliver Way, WSP.Stephen Flood
 
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.Stephen Flood
 
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...Stephen Flood
 
Developments in pollution risk forecasting at the Environment Agency. Deborah...
Developments in pollution risk forecasting at the Environment Agency. Deborah...Developments in pollution risk forecasting at the Environment Agency. Deborah...
Developments in pollution risk forecasting at the Environment Agency. Deborah...Stephen Flood
 
An Introduction to the Environment Agency extreme offshore wave, water level ...
An Introduction to the Environment Agency extreme offshore wave, water level ...An Introduction to the Environment Agency extreme offshore wave, water level ...
An Introduction to the Environment Agency extreme offshore wave, water level ...Stephen Flood
 
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...Stephen Flood
 
DHI Ireland Symposium 2018
DHI Ireland Symposium 2018DHI Ireland Symposium 2018
DHI Ireland Symposium 2018Stephen Flood
 
DHI UK Symposium 2018
DHI UK Symposium 2018DHI UK Symposium 2018
DHI UK Symposium 2018Stephen Flood
 
DHI UK & Ireland Symposium 2017 Programme
DHI UK & Ireland Symposium 2017 ProgrammeDHI UK & Ireland Symposium 2017 Programme
DHI UK & Ireland Symposium 2017 ProgrammeStephen Flood
 
DHI UK & Ireland Symposium 2017 Announcement Flyer
DHI UK & Ireland Symposium 2017 Announcement FlyerDHI UK & Ireland Symposium 2017 Announcement Flyer
DHI UK & Ireland Symposium 2017 Announcement FlyerStephen Flood
 
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...Stephen Flood
 
Smart Real-time Control of Water Systems
Smart Real-time Control of Water SystemsSmart Real-time Control of Water Systems
Smart Real-time Control of Water SystemsStephen Flood
 
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...Stephen Flood
 
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016Stephen Flood
 

More from Stephen Flood (20)

Models Done Better... - UDG2018 - Intertek and DHI
Models Done Better... - UDG2018 - Intertek and DHIModels Done Better... - UDG2018 - Intertek and DHI
Models Done Better... - UDG2018 - Intertek and DHI
 
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
 
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
 
Effects of time-series data resolution on modelling shoreline change. Avidesh...
Effects of time-series data resolution on modelling shoreline change. Avidesh...Effects of time-series data resolution on modelling shoreline change. Avidesh...
Effects of time-series data resolution on modelling shoreline change. Avidesh...
 
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
 
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
 
Some of our recent applications of the MIKE software. Oliver Way, WSP.
Some of our recent applications of the MIKE software. Oliver Way, WSP.Some of our recent applications of the MIKE software. Oliver Way, WSP.
Some of our recent applications of the MIKE software. Oliver Way, WSP.
 
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
 
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
 
Developments in pollution risk forecasting at the Environment Agency. Deborah...
Developments in pollution risk forecasting at the Environment Agency. Deborah...Developments in pollution risk forecasting at the Environment Agency. Deborah...
Developments in pollution risk forecasting at the Environment Agency. Deborah...
 
An Introduction to the Environment Agency extreme offshore wave, water level ...
An Introduction to the Environment Agency extreme offshore wave, water level ...An Introduction to the Environment Agency extreme offshore wave, water level ...
An Introduction to the Environment Agency extreme offshore wave, water level ...
 
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
 
DHI Ireland Symposium 2018
DHI Ireland Symposium 2018DHI Ireland Symposium 2018
DHI Ireland Symposium 2018
 
DHI UK Symposium 2018
DHI UK Symposium 2018DHI UK Symposium 2018
DHI UK Symposium 2018
 
DHI UK & Ireland Symposium 2017 Programme
DHI UK & Ireland Symposium 2017 ProgrammeDHI UK & Ireland Symposium 2017 Programme
DHI UK & Ireland Symposium 2017 Programme
 
DHI UK & Ireland Symposium 2017 Announcement Flyer
DHI UK & Ireland Symposium 2017 Announcement FlyerDHI UK & Ireland Symposium 2017 Announcement Flyer
DHI UK & Ireland Symposium 2017 Announcement Flyer
 
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
 
Smart Real-time Control of Water Systems
Smart Real-time Control of Water SystemsSmart Real-time Control of Water Systems
Smart Real-time Control of Water Systems
 
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
 
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
 

Recently uploaded

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 

Recently uploaded (20)

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 

Undertaking Modelling of Flooding due to Wave Overtopping using the MIKE by DHI Software Suite - Dr Suzie Clarke (DHI)

  • 1. Flooding Due to Wave Overtopping of Coastal Defence Structures using the MIKE 21 Suite Suzie Clarke and Matt Easton
  • 2. © DHI 1. Concept Introduction 2. Project Example 3. Step-by-Step Guide Walkthrough 1) Planning and Data Analysis 2) MIKE 21 FMHD and SW Model Construction 3) MIKE 21 BW 1DH Model Construction 4) MIKE 21 BW 1DH Application Runs 5) MIKE 21 FMHD Flooding due to Wave Overtopping Runs 4. Questions? Agenda
  • 4. 01. Concept Introduction © DHI Aim of Study • Screening − Indicator of extent of flooding from wave overtopping − Use Overtopping Table approach with mean overtopping rates for a selection of water levels and wave characteristics • Individual Storm − Instantaneous overtopping volumes from phase-resolved wave environment providing a refined hazard assessment − Use Instantaneous Overtopping Time Series approach using instantaneous overtopping rates from MIKE 21 BW 1DH runs
  • 5. 01. Concept Introduction © DHI How: Incident Environmental Conditions MIKE 21 FM HD MIKE 21 SW Wave Transformation and Overtopping Overland Flows MIKE 21 BW 1DH MIKE 21 FM HD
  • 6. 01. Concept Introduction © DHI Why use BW? • Allows you to maintain the spectral characteristics of your wave climate – you can use a user-defined spectrum (output from SW) to generate your water level input to BW • You can use your actual structure! • You do not need to know the location of the toe of the structure for identifying relevant water depth and wave height, waves are transformed from offshore
  • 8. © DHI • Site of a proposed new infrastructure development thought to be susceptible to flooding • Potential for waves to overtop natural defences and contribute to inundation of low-lying areas • Develop a series of conceptual pathway mechanisms to determine overtopping volumes and inform inundation modelling Problem definition and overview
  • 9. Problem definition and overview © DHI
  • 10. Problem definition and overview © DHI
  • 11. General approach © DHI Source Pathway Receptor • Storm waves • Storm surge • Tidal water level • Overtopping of defences • Breach of natural defences • Proposed new infrastructure & personnel • Coastal morphology MIKE21 FM HD MIKE21 FM SW MIKE 21 BW MIKE21 FM HD
  • 12. The Source © DHI • Wave conditions − From MIKE21 FM SW model − Storm events at various return periods (1, 10, 50, 100 years) • Storm surge − From MIKE21 FM HD model − Water level rise (surge) (1, 10, 50, 100 years) • Tidal water level − From MIKE21 FM HD model − Local tide gauge
  • 13. Source – transformation of wave boundaries © DHI 100 year storm event Input boundary from regional SW model • D > 20 m • Hm0 = 6.4 m • Tp = 10.9 s • MWD = 79° Output point A from local SW model • D = 6 m • Hm0 = 2.3 m • Tp = 6.6 s • MWD = 95° A
  • 14. 1. Ratio of max. water depth to deep water wavelength: Hmax/L0 < 0.5 𝐿0 = 𝑔𝑇 𝑚𝑖𝑛 2 2𝜋  𝑇 𝑚𝑖𝑛 = 4𝜋𝐻 𝑚𝑎𝑥 𝑔 for Hmax = 6.0m, Tmin ≈ 2.8 s Tmin << TP  Criterion met  Pathway: check MIKE21 BW criteria © DHI 2. Resolve ~10 characteristic wave- lengths in BW model 𝐿 = 𝑇𝑃 𝑔𝐿 tanh(2𝜋𝐻 𝑚𝑎𝑥/𝐿) 2𝜋 Iterative solution gives Lmax ≈ 46m 10Lmax<< profile length  Criterion met 
  • 15. Pathway: 1D profile © DHI 1. Extract profile from MIKE21 SW mesh 2. Adjust profile for water level condition (note sign conventions!) e.g. SWL = MSL – HAT correction - surge level SWL = MSL – 1.1 – 0.6
  • 16. Pathway: 1D profile © DHI 3. Create unstructured mesh (MIKE21 toolbox) − Fixed resolution of 40 nodes per wavelength − Dependent on characteristic wave period (peak wave period)
  • 17. Defining the pathway – wave boundary © DHI • The model is forced by waves generated inside the model domain. • The internal wave generation of waves allows you to absorb all waves leaving the model domain (radiation type boundaries). • Time series’ of water elevations synthesised from random wave generator (MIKE21 toolbox) − Input derived from MIKE21 FM SW model
  • 18. Defining the pathway – running BW © DHI − Sponge Layer (included) − Wave breaking (included, default parameters) − Filter (included) − Moving shoreline (included, increased slot width) − Porosity layer (not included)
  • 19. Pathway – model results © DHI
  • 20. Pathway – model results (breach case) © DHI
  • 21. Scenario modelling © DHI • Storm wave return periods (1, 10, 50, 100 years) • Storm surge return periods (1, 10, 50, 100 years) • Tidal water level variations over semidiurnal tidal cycle • Climate change scenarios (projected sea level rise) • Modification to existing natural defences (breach scenarios) Each combination of scenarios requires modification of model inputs (bathymetry profile, mesh, waves, etc.) and a review of the BW model criteria.
  • 22. Scenario modelling: varying water level © DHI Time Water level (mMSL) Mean OT flux [m3/s/m] Mean OT flux (breach scenario [m3/s/m] 00:00 1.58 0.00199 0.00215 01:00 1.66 0.00249 0.00443 02:00 1.72 0.00419 0.01120 03:00 1.66 0.00249 0.00443 04:00 1.59 0.00199 0.00215
  • 24. 03_1a. Planning and Data Analysis © DHI Example: • Penzance Promenade • Wave and Bathymetry Data from Channel Coastal Observatory • Tide Data from DHI Global Tide Model
  • 25. 03_1b. Planning and Data Analysis © DHI • 27 December 2010 • Hs = 4m • Tp = 9.5s • Surge = 2.2m
  • 26. 03_2a. MIKE 21 FMHD and SW Model Construction © DHI Points to Consider: • Include arcs in the mesh to define where the defence structures are and add breaklines on top of these to ensure any sharp changes in bathymetry / ground level due to the presence of the defence structures is preserved • You should output the defence arcs as xyz files so you can load them in later as the defence locations in the dike structure in the HD model • Cut your buildings out of the mesh or elevate them sufficiently to avoid rapid depth changes if you don’t have building outlines
  • 27. 03_2a. MIKE 21 FMHD and SW Model Construction © DHI Example mesh:
  • 28. 03_2b. MIKE 21 FMHD and SW Model Construction © DHI Undertake preliminary HD and SW runs: • To determine the tidal water levels and wave conditions in the region where the BW profiles are expected to be…
  • 29. 03_3a. MIKE 21 BW 1DH Model Construction © DHI Profiles – how to define them: Calculate dominant wavelength L with Dispersion Equation using Tp 10xL is first guess at the profile length Find approximate offshore total water depth from preliminary HD runs Use BW Set Up Planner to calc Tmin Is Tmin acceptable in comparison to Tp? Reduce profile length to reduce offshore depth Use original profile length but set depths along it that are greater than acceptable offshore depth to acceptable offshore depth No Yes L = 𝑔 2𝜋 𝑇2 𝑡𝑎𝑛ℎ 2𝜋ℎ 𝐿
  • 30. 03_3a. MIKE 21 BW 1DH Model Construction © DHI Example profiles’ locations:
  • 31. 03_3a. MIKE 21 BW 1DH Model Construction © DHI Profile development process: • Create baseline regular profile (to vertical datum 0mODN) • Create adjusted regular profile for each water level (do not forget to add surge to tidal level to create total water level) • Create unstructured (u/s) profile from adjusted regular profile • Repeat for all your profile / water level combinations
  • 32. 03_3b. MIKE 21 BW 1DH Model Construction © DHI Create offshore boundary conditions using: • Total water depth at the Wave Generation Line (WGL) location (from profile – located just inshore of the outer sponge layer) • Tmin for each wave condition (from BW Set Up Planner) • Hs & Tp for each wave condition (from the preliminary SW runs)
  • 33. 03_4a. MIKE 21 BW 1DH Application Runs © DHI Important parameters for a successful run completion: • Moving Shoreline − DO: try increasing the slot friction coefficient and/or decreasing slot smoothing parameter to help the model remain stable − DO: increase your slot depth if you want to get away with larger “errors” before crashing! − DO NOT: change the slot width as this represents the porosity of the artificially permeable structure and needs to be small in order to keep flows through the structure as small as possible
  • 34. 03_4a. MIKE 21 BW 1DH Application Runs © DHI Important parameters for a successful run completion: • Filter − Choose a suitable depth to apply the filter from and increase the value of the filter rather than taking the filter layer further offshore • Porosity − Try including a low porosity (for example, 0.98) for steep structures – apply the layer to roughly one quarter of your most energetic wavelength (L, calculated earlier) offshore from the crest of your structure
  • 35. 03_4b. MIKE 21 BW 1DH Application Runs © DHI And remember: • Adjust Cell Locations − The unstructured mesh location of the WGL (edge of the outer sponge layer) and structure crest changes with each new water level and profile so update your cell locations in WGL and Outputs • Output Interval − Output fluxes at a very small time step to ensure all instantaneous overtopping is identified and captured (for example, 100x per Tp) • Timing − Add a few extra minutes to the start of the run to give the first waves time to reach the structure
  • 36. 03_4b. MIKE 21 BW 1DH Application Runs © DHI • Profile 01, TS 03 Movie
  • 37. 03_5a. MIKE 21 FMHD Application Runs © DHI Wave overtopping rates are applied to dike structures: • Table (for Screening Studies) − Take average overtopping rates from the BW model outputs (or use EuroTop) and create a table for each profile that considers the range of freeboards (crest height – SWL) and wave conditions − Create a time series for wave conditions or use output from the preliminary SW run
  • 38. 03_5a. MIKE 21 FMHD Application Runs © DHI Wave overtopping rates are applied to dike structures: • Time Series (for Storm or Enhanced Studies) − Remember to remove the overtopping rates calculated for the extra minutes added at the start of each BW run to allow the waves to reach the structure − Create one concatenated time series of instantaneous overtopping rates from the various BW runs for each profile − Add extra steps at the start of the overtopping time series with zero values to account for spin up of the HD model − Make sure the overtopping rates have the correct sign – positive fluxes are from right to left when looking from the start of the dike structure to the end
  • 39. 03_5a. MIKE 21 FMHD Application Runs © DHI Wave overtopping rates are applied to dike structures: • Time Series (for Storm or Enhanced Studies) − In order to avoid losing overtopping volume due to time step difference between HD run and BW output frequency, use an HD time step that is close to the output frequency of the BW results and is less than Tp − For larger HD time steps, take a moving average of the BW data over a period equal to the time step of the HD model. For example, output from BW is every 0.1s, HD time step is 10s so take moving average of BW data over 100 BW time steps (=10s). Use the Time Series Interpolation tool in the MZ Toolbox to convert from 0.1s to 10s time steps in the dfs0 input file
  • 40. 03_5b. MIKE 21 FMHD Application Runs © DHI Final Instantaneous Overtopping Rate Time Series:
  • 41. 03_5b. MIKE 21 FMHD Application Runs © DHI Movie with buildings cut out - TS
  • 42. 03_5b. MIKE 21 FMHD Application Runs © DHI Movie with buildings cut out - Table
  • 43. 03_5b. MIKE 21 FMHD Application Runs © DHI • Instantaneous • Table
  • 45. DHI are the first people you should call when you have a tough challenge to solve in a water environment. In the world of water, our knowledge is second-to-none, and we strive to make it globally accessible to clients and partners. So whether you need to save water, share it fairly, improve its quality, quantify its impact or manage its flow, we can help. Our knowledge, combined with our team’s expertise and the power of our technology, hold the key to unlocking the right solution. © DHI About DHI