Horipur power plant
360MW combine cycle power plant
 GT- GAS TURBINE= 247MW
 ST-STEAM TURBINE= 131.6MW
 Type of fuel: natural gas from titas.
 Axial compressor , reaction turbine.
 Required water 20-22 ton per day.
 Gas turbine:
 Shaft speed: 3000 RPM
 Compression ratio: ( 17:1)
 80% RH , 26* C Tem , 1 atm .
 Combined Cycle Power Plant:
The Combined Cycle Power Plant or combined cycle gas turbine, a gas turbine
generator generates electricity and waste heat is used to make steam to generate
additional electricity via a steam turbine.
 How a Combined-Cycle Power Plant Produces Electricity:
 Gas turbine burns fuel:
The fast-spinning turbine drives a generator that converts a portion of the spinning
energy into electricity.
 Heat recovery system captures exhaust:
The HRSG creates steam from the gas turbine exhaust heat and delivers it to the
steam turbine.
 Steam turbine delivers additional electricity:
The steam turbine sends its energy to the generator drive shaft, where it is converted
into additional electricity.
Basic Components of gas turbine:
 •Compressor
–Draws in air & compresses it
 •Combustion Chamber
–Fuel pumped in and ignited to burn with compressed air
 •Turbine
–Hot gases converted to work
–Can drive compressor & external load
 STEAM TURBINE: A steam turbine is a prime mover in which the potential
energy of the steam is transformed into kinetic energy and later in its turn is
transformed into the mechanical energy of rotation of the turbine shaft.
Note: Combined cycle gas turbine(CCGT) - refers to a gas fired electricity
generation plant which uses waste heat to run a steam turbine.
COMPONENTS USED IN POWER PLANT (GAS TURBINE)
• SCRUBBERS: FUEL PASSES THROUGH SCRUBBERS THROUGH 10 INCH
HEADER TO REMOVE & TO CONTROL MAJOR DUST , DIRTY PARTICLES ALONG
WITH LIQUID GASES.
• FLAME ARRESTER: IT IS USED TO AVOID ANY KINGD OF ACCIDENTAL FIRE &
ANY ENVIRONMENTAL HAZARD CAUSES DUE TO GAS.
• GAS BOOSTING COMPRESSOR: INITIAL GAS IS PASSES THROUGH GBC FOR
COMPRESSION TO THE REQUIRED INCREASE IN PRESSURE AND
TEMPERATURE.
• COOLING TOWER: WATER IS USED A COOLING MEDIUM AT VARIOUS STAGES IN
GAS BOOSTING CHAMBER SUCH AS LUBRICATION UNIT & BYPASS CHAMBER.
THERE WERE 3 COOLING TOWERS FOR THE PURPOSE WITH 4 FANS.
STEAM TURBINE
CONFIGURATION FOR STEAM TURBINE
 • THE TURBINE IS A SINGLE SHAFT MACHINE WITH SEPARATE HP-IP (COMBINED) AND LP PARTS.
 • THE INDIVIDUAL TURBINE ROTORS AND GENERATOR ROTOR ARE CONNECTED BY RIGID COUPLING.
 • THE HP-IP CYLINDER HAS A THROTTLE CONTROL GOVERNING.
TURBINE GOVERNING SYSTEM:
 • THE TURBINE HAS A HIGH PRESSURE ELECTROHYDRAULIC GOVERNING SYSTEM.
 • AN ELECTRIC SYSTEM MEASURES AND CONTROLS SPEED AND OUTPUT.
 • THE ELECTRIC SYSTEM OPERATES THE CONTROL VALVES IN THE ELECTROHYDRAULIC GOVERNING SYSTEM
PERMITS RUN-UP CONTROL OF TURBINE UP TO RATED SPEED AND KEEPS SPEED SWINGS.
Basic Components of gas turbine:
•Compressor
–Draws in air & compresses it
•Combustion Chamber
–Fuel pumped in and ignited to burn with compressed air
•Turbine
–Hot gases converted to work
–Can drive compressor & external load
GENERAL OVERVIEW
Note: A heat recovery steam generator (HRSG) is an energy recovery heat exchanger that recovers heat
from a hot gas stream. It produces steam that can be used in a process (cogeneration) or used to drive a
steam turbine (combined cycle).
power plant in bangladesh "horipur power plant"

Weitere ähnliche Inhalte

Was ist angesagt?

heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15Satish Joshi
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer trainingDebasish Das
 
Energy audit of Condenser and CW System
Energy audit of Condenser and CW SystemEnergy audit of Condenser and CW System
Energy audit of Condenser and CW SystemManohar Tatwawadi
 
Introduction to heat pumps
Introduction to heat pumpsIntroduction to heat pumps
Introduction to heat pumpsLeonardo ENERGY
 
Te ii ppt(4rth unit)
Te ii ppt(4rth unit)Te ii ppt(4rth unit)
Te ii ppt(4rth unit)HARSHKABRA15
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSharshavardhan sivadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
Heat pump and heat engine
Heat pump and heat engineHeat pump and heat engine
Heat pump and heat engineKanchan Ramteke
 
Emerson Power plant applications
Emerson Power plant applicationsEmerson Power plant applications
Emerson Power plant applicationsmirfanm
 
Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessmentD.Pawan Kumar
 
ganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologyganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologynirgudebhau111
 
Industrial Traning at SSTPS ppt
Industrial Traning at SSTPS pptIndustrial Traning at SSTPS ppt
Industrial Traning at SSTPS pptshristi sahu
 
Combustion Chamber 4/5
Combustion Chamber 4/5Combustion Chamber 4/5
Combustion Chamber 4/5Jio Gayon
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpurRajessh Garhwal
 

Was ist angesagt? (19)

heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer training
 
GAS POWER PLANT
GAS POWER PLANTGAS POWER PLANT
GAS POWER PLANT
 
Heat pumps - An Introduction
Heat pumps - An IntroductionHeat pumps - An Introduction
Heat pumps - An Introduction
 
Energy audit of Condenser and CW System
Energy audit of Condenser and CW SystemEnergy audit of Condenser and CW System
Energy audit of Condenser and CW System
 
GAS TURBINE
GAS TURBINEGAS TURBINE
GAS TURBINE
 
Introduction to heat pumps
Introduction to heat pumpsIntroduction to heat pumps
Introduction to heat pumps
 
Te ii ppt(4rth unit)
Te ii ppt(4rth unit)Te ii ppt(4rth unit)
Te ii ppt(4rth unit)
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
Heat pump and heat engine
Heat pump and heat engineHeat pump and heat engine
Heat pump and heat engine
 
Emerson Power plant applications
Emerson Power plant applicationsEmerson Power plant applications
Emerson Power plant applications
 
Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessment
 
ganesh ppts on supercritical thenology
ganesh ppts on supercritical thenologyganesh ppts on supercritical thenology
ganesh ppts on supercritical thenology
 
Industrial Traning at SSTPS ppt
Industrial Traning at SSTPS pptIndustrial Traning at SSTPS ppt
Industrial Traning at SSTPS ppt
 
Brayton cycle
Brayton cycleBrayton cycle
Brayton cycle
 
Combustion Chamber 4/5
Combustion Chamber 4/5Combustion Chamber 4/5
Combustion Chamber 4/5
 
How dose heat pump work
How dose heat pump workHow dose heat pump work
How dose heat pump work
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpur
 

Ähnlich wie power plant in bangladesh "horipur power plant"

Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt nilesh choubey
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha powerAnish Ansari
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingDebasish Das
 
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptxUnit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptxprakash0712
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
EMERSON Power plant applications
EMERSON Power plant applicationsEMERSON Power plant applications
EMERSON Power plant applicationsmirfanm
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2swathi1995vangaram
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPCricha khatri
 
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)Rimjhim Raj singh
 
Chapter 71 gas turbine
Chapter 71  gas turbineChapter 71  gas turbine
Chapter 71 gas turbinedigisof
 
gas turbine power plant.pdf
gas turbine power plant.pdfgas turbine power plant.pdf
gas turbine power plant.pdfsubbu t
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUManohar Nagar
 

Ähnlich wie power plant in bangladesh "horipur power plant" (20)

Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha power
 
Ppt aman
Ppt amanPpt aman
Ppt aman
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer training
 
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptxUnit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
EMERSON Power plant applications
EMERSON Power plant applicationsEMERSON Power plant applications
EMERSON Power plant applications
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2
 
Richappt
RichapptRichappt
Richappt
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
IPGCL/PPCL( INDRAPRASTHA POWER GENERATION CO. LTD. & PRAGATI POWER GENERATION)
 
Chapter 71 gas turbine
Chapter 71  gas turbineChapter 71  gas turbine
Chapter 71 gas turbine
 
Gas Turbine Powerplants
Gas Turbine Powerplants Gas Turbine Powerplants
Gas Turbine Powerplants
 
Energy Centre
Energy CentreEnergy Centre
Energy Centre
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
gas turbine power plant.pdf
gas turbine power plant.pdfgas turbine power plant.pdf
gas turbine power plant.pdf
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 

Kürzlich hochgeladen

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 

Kürzlich hochgeladen (20)

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 

power plant in bangladesh "horipur power plant"

  • 1.
  • 2. Horipur power plant 360MW combine cycle power plant  GT- GAS TURBINE= 247MW  ST-STEAM TURBINE= 131.6MW  Type of fuel: natural gas from titas.  Axial compressor , reaction turbine.  Required water 20-22 ton per day.  Gas turbine:  Shaft speed: 3000 RPM  Compression ratio: ( 17:1)  80% RH , 26* C Tem , 1 atm .
  • 3.  Combined Cycle Power Plant: The Combined Cycle Power Plant or combined cycle gas turbine, a gas turbine generator generates electricity and waste heat is used to make steam to generate additional electricity via a steam turbine.  How a Combined-Cycle Power Plant Produces Electricity:  Gas turbine burns fuel: The fast-spinning turbine drives a generator that converts a portion of the spinning energy into electricity.  Heat recovery system captures exhaust: The HRSG creates steam from the gas turbine exhaust heat and delivers it to the steam turbine.  Steam turbine delivers additional electricity: The steam turbine sends its energy to the generator drive shaft, where it is converted into additional electricity.
  • 4.
  • 5. Basic Components of gas turbine:  •Compressor –Draws in air & compresses it  •Combustion Chamber –Fuel pumped in and ignited to burn with compressed air  •Turbine –Hot gases converted to work –Can drive compressor & external load  STEAM TURBINE: A steam turbine is a prime mover in which the potential energy of the steam is transformed into kinetic energy and later in its turn is transformed into the mechanical energy of rotation of the turbine shaft.
  • 6.
  • 7. Note: Combined cycle gas turbine(CCGT) - refers to a gas fired electricity generation plant which uses waste heat to run a steam turbine. COMPONENTS USED IN POWER PLANT (GAS TURBINE) • SCRUBBERS: FUEL PASSES THROUGH SCRUBBERS THROUGH 10 INCH HEADER TO REMOVE & TO CONTROL MAJOR DUST , DIRTY PARTICLES ALONG WITH LIQUID GASES. • FLAME ARRESTER: IT IS USED TO AVOID ANY KINGD OF ACCIDENTAL FIRE & ANY ENVIRONMENTAL HAZARD CAUSES DUE TO GAS.
  • 8. • GAS BOOSTING COMPRESSOR: INITIAL GAS IS PASSES THROUGH GBC FOR COMPRESSION TO THE REQUIRED INCREASE IN PRESSURE AND TEMPERATURE. • COOLING TOWER: WATER IS USED A COOLING MEDIUM AT VARIOUS STAGES IN GAS BOOSTING CHAMBER SUCH AS LUBRICATION UNIT & BYPASS CHAMBER. THERE WERE 3 COOLING TOWERS FOR THE PURPOSE WITH 4 FANS.
  • 9. STEAM TURBINE CONFIGURATION FOR STEAM TURBINE  • THE TURBINE IS A SINGLE SHAFT MACHINE WITH SEPARATE HP-IP (COMBINED) AND LP PARTS.  • THE INDIVIDUAL TURBINE ROTORS AND GENERATOR ROTOR ARE CONNECTED BY RIGID COUPLING.  • THE HP-IP CYLINDER HAS A THROTTLE CONTROL GOVERNING. TURBINE GOVERNING SYSTEM:  • THE TURBINE HAS A HIGH PRESSURE ELECTROHYDRAULIC GOVERNING SYSTEM.  • AN ELECTRIC SYSTEM MEASURES AND CONTROLS SPEED AND OUTPUT.  • THE ELECTRIC SYSTEM OPERATES THE CONTROL VALVES IN THE ELECTROHYDRAULIC GOVERNING SYSTEM PERMITS RUN-UP CONTROL OF TURBINE UP TO RATED SPEED AND KEEPS SPEED SWINGS.
  • 10. Basic Components of gas turbine: •Compressor –Draws in air & compresses it •Combustion Chamber –Fuel pumped in and ignited to burn with compressed air •Turbine –Hot gases converted to work –Can drive compressor & external load
  • 11. GENERAL OVERVIEW Note: A heat recovery steam generator (HRSG) is an energy recovery heat exchanger that recovers heat from a hot gas stream. It produces steam that can be used in a process (cogeneration) or used to drive a steam turbine (combined cycle).