Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad

Sudhir Cement Industries Pvt. Ltd. Meerut
Sudhir Cement Industries Pvt. Ltd. MeerutSudhir Cement Industries Pvt. Ltd. Meerut
Presentation On
Summer Training from UPPTCL
132/33 KV Sub-Station
Minto Park, Allahabad
SUBMITTED BY :-
SHAILESH YADAV
Mob.No.- 9415147950
Email-syee050@gmail.com
Introduction
 India has been divided into five regions for power system planning
and operation. These regions are the Northern region, Western region,
Eastern region and North-eastern region.
 Present almost 70% of the population is enjoying the fruits of
electricity.
 The present day electricity power system is AC i.e. electric power is
generated, transmitted and distributed in the form of alternating current.
 The electric power is produced at the power station, which are
located at favourable place, generally quite away from the consumers
1.Transformer:
A transformer is an electrical device that transfers energy
between two or more circuits through electromagnetic induction.
1.2Types Of Transformer:
 Step Up Transformer
 Step Down Transformer
 Power Transformer
 Distribution Transformer
1.3Ideal Transformer:
 Its primary and secondary winding resistances are negligible .
 Its leakage flux and leakage inductance are zero .
 There are no losses due to resistance, hysteresis and eddy currents.
 The efficiency is 100 percent.
 In case of ideal transformer Np*Ip = Ns*Is
Ideal transformer as a circuit element :
2.PROTECTION AND COOLING EQUIPMENT:
2.1CONSERVATOR:
As the temperature of oil increases or decreases during operation there is
corresponding rise or fall in volume. To account for this an expansion vessel is
connected to the transformer tank.
The conservator has got a capacity between minimum and maximum oil
level equal to 10% of the total oil in transformer.
The conservator is provided with magnetic oil level gauge on one of the end
covers which has a low oil level alarm. The ideal indicates empty 1/4, 30.c, ¾
and full oil level.
2.2 RADIATOR
Owing the transport limitation and considering possible transient
damages. Large transformer are provided with detachable radiators with
radiator value.
At the time of dispatch these radiators are detach and sent separately
keeping the valve in position on tank flange. The valve blanking plate is
to removed only when the radiators is ready for mounting on flanges. On
removal of blanking plate a small quantity of oil which may have
collected between valve and blanking plate will seep out.
 The radiator section is made of 1mm thick cold rolled carbon steel
sheets. The distance between each section is 50mm. The number of
section per radiators and the number of radiators per transformer will
depend upon cooling requirement of that transformer
2.3 BUCHHOLZ RELAY:
The transformer is fitted with double float buchholz relay.
It is fitted in the feed pipe from conservator to tank and it is provided with two
sets of mercury contacts.
The device comprises with the cast iron housing containing the hinged floats,
one in upper part and other in lower part . Each float is fitted with mercury
switches, leads of which are connected to terminal box for external connection.
An arrow in cast on the housing to indicate the direction of conservator. The
operation of buchholz relay should be tested before installing by injecting air at
the lowest cock.
 It is connected to the protection circuit to give an early alarm in case of gas
collection and to disconnection of transformer from supply in case the sever fault
inside the transformer.
2.4 SILICA GEL BREATHER:
When transformer is loaded or unloaded the oil temperature inside the
transformer is rise or falls. Accordingly the volume of air is changes by either by
sucking in or pushing out . This transformer phenomena is called BREATHING
of transformer.
The air which I being sucked in container may have foreign impurities and
humidity which changes dielectric stray of transformer oil . Hence it is necessary
that the air entering into the transformer is free room moisture and foreign
impurities. The breather is connected to an outlet pipe of conservator vessel and
the air which is sucked by the transformer is made to pass through silica gel
breather to dehumidify the air and remove the foreign impurities . The air which
is pass through the gel is pass first to oil compartment of the breather. The oil
removes all foreign impurities which enter into the gel compartment. Silica gel
breather keeps all the properties of oil constant so transformer has a long life.
2.5 MARSHALLING BOX:
It has two indicators which indicate the temperature of oil and winding of main
tank, known as OTI and WTI. If the temperature of oil or winding exceeds the
specified value , relay operates to sounds an alarm. If there is further increase in
temperature then relay completes the trip circuit open the circuit breaker
controlling the transformer.
2.6 COOLING
When a transformer is in operation the heat is generated due to iron loss in winding
and core loss. The process of minimise this heat is called cooling.
2.6.1 AIR NATURAL COOLING
In a dry type self-cooled transformer, the natural circulation of surrounding air is
used for cooling. This process of cooling is satisfactory for low voltage small
transformer up to few KVA.
2.6.2 AIR BLAST COOLING
It is similar to natural cooling with an addition that continuous blast of filtered
cooled air is forced through the core and winding for better cooling. A fan
produces the blast.
2.6.3 Forced Oil with Circulating Water Cooling:
In this type of system heat exchanger is used for cooling the
transformer .
This system is used for large rating of power transformer.
3. EQUIPMENT OF SUB-STATION:
3.1 LIGHTING ARRESTER:
Lighting arresters are protective device
for limiting surge voltages due to lighting
strikes or equipment faults or other events,
to prevent damage to equipment and
disruption of service. This type of
equipment also called surge arresters.
Lighting arresters are installed on many
different pieces of equipment such as
power poles and towers, power
transformer, circuit breaker, bus structure,
and steel superstructure in substation.
3.2 WAVE TRAP:
Wave trap unit is inserted between bus bar and connection of coupling
capacitor to the line. It is parrel tuned circuit comprising L and C. It has low
impedance to 50 Hz and high impedance to carrier frequencies.
Thus coupling capacitor allows carrier frequencies signals to enter the
carrier equipment, but does not allows 50Hz power frequency current to
enter the carrier equipment. This unit prevents the high frequencies signal
from entering the neighbouring line, and the carrier current to flow only in
the protected line for communication between different substations.
3.3 CURRENT TRANSFORMER:
They are commonly used in metering and protective relaying in the electrical
power industry where they facilitate the safe measurement of large currents,
often in the presence of high voltages.
The current transformer safely isolates measurement and control circuitry from
high voltage typically present on the circuit being measured. The CT acts as
constant current series device with an apparent power burden a fraction of that of
high voltage primary circuit.
Common secondary's are 1 or 5 amperes . For example; a 400:1 CT would
provide an output current of 1 ampere when the primary was passing 400
amperes.
3.4 POTENTIAL TRANSFORMER:
Potential transformer is designed for monitoring single - phase and three –
phase line voltages in power metering application. The primary terminals can
be connected either in line – to –line or in line – to – neutral configuration.
A potential Transformer is a special type of transformer that allows meters
to take reading from electrical service connections with higher voltage than
the meter is normally capable of handling without at potential transformer .
 Potential transformer has an accuracy of +_ 5% from 0 to 130% of their
rated voltage.
3.5 ISOLATOR:
 Mainly the isolator is connected after the circuit breaker .The circuit breaker is
trip due to the fault, or when suddenly a heavy current is flows , it means that
the current will not flow after the breaker ,but small amount of current is flows
inner circuit.
For making this current total zero the isolator is open and isolator is connected
to ground so all inner current will grounded. This is the main work of isolator
and other equipments are saved.
3.6 INSULATOR:
The insulator serve two purpose . They support the conductor (bus bar ) and
confine the current to the conductor . The most commonly used material for the
manufacturer of insulator is porcelain .
But the most wild use of insulator is to insulate the support or tower from the
electric current .These are several type of insulators (e.g. pin type ,suspension
type , post insulator ,shackle insulator etc.) and their use in the substation will
depend upon the service requirement .For example post insulator is used for bus
bars can directly bolted to the cap.
3.7 CIRCUIT BREAKER:
Circuit breaker is mechanical device which is so designed by which circuit
normal current fault position will be on and off .They are used for high capacity.
A circuit breaker can make or break a circuit either manually or automatically
under all condition viz. no load and short circuit condition .
Types of circuit breaker is :
1. Low voltage air circuit breaker
2. oil circuit breaker
3. Sulphur Hexa Fluoride circuit breaker
4. Air blast circuit breaker
5. vacuum circuit breaker
3.8 CAPACITOR BANK:
The load on the power is varying, being high during morning and evening and
low at other times. During low load period, supply voltage is increased which
increases the magnetization current, this result in the decreased power factor. The
low power factor is mainly due to the fact that most of the load power factor is
highly undesirable as it causes an increases in current, resulting in additional
losses.
It is important to have power factor is closed as close to unity as possible. In
order to improve the power factor some device taking leading power factor
should be connected parallel with the load. One of such device can be a capacitor
bank. The capacitor draws a leading current and partly or completely neutralizes
the lagging reactive component of load current.
Practically the voltage inside the capacitor bank in the 132KV substation is of
33KV.When the voltage inside the capacitor bank is bellow from 33.5KV the
capacitor bank operated and increased the voltage unto the desired level. If the
voltage is greater than 36.1KV the capacitor bank is of.
Capacitor bank accomplishes following operation
I. To supply reactive power
II. Increase terminal voltage
III. Improve power factor
3.9 CONTROL PANEL:
This is the main part of the substation. We plant it outside the switchyard. All the
equipment which is install inside the switchyard is connected to the control panel
by a underground cable. These cable are connected to the measuring devices like
as voltmeter and ammeter of high rating.
This control panel also consists a different type of relays like as differential,
earth fault, auxiliary etc. control panel gives all the correct reading for example
when a line is come in switch yard is connected to CVT. This CVT gives an
exact value of incoming voltage on the control panel, If any fault is occurs, the
relay is trip and we can see it on control panel and except it control panel gives
the rating of all feeders and temperature of oil and winding in the transformer.
3.10 BATTERY ROOM :
This is the room, which consist DC batteries. There are 55 DC cell of 2
Volt each. These cells are connected in series, so it will give total of 110V.
This 110V DC Supply is used for operating the control panel, when the AC
supply is off. This 110V DC voltage is also supplied to circuit breakers for
operating; this supply is used when AC is off. We use this supply as a
secondary supply. It means that this DC voltage is used when the AC is
interrupted.
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
1 von 24

Recomendados

132 33kv substation von
132 33kv substation132 33kv substation
132 33kv substationManishKushwaha97
2.6K views44 Folien
132 kv von
132 kv132 kv
132 kvSourabh Bhattacharya
20K views21 Folien
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION von
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONSwatantra SwAt
2K views22 Folien
Training report-in-a-132-k-v-substation von
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
3.7K views32 Folien
Presentation on 132/33 KVSubstation Training von
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Sakshi Rastogi
1.5K views27 Folien
Switch yard & Protection von
Switch yard & ProtectionSwitch yard & Protection
Switch yard & ProtectionMANOJ KUMAR MAHARANA
26K views53 Folien

Más contenido relacionado

Was ist angesagt?

Electrical substations: 132 KV von
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
72.5K views38 Folien
ppt on summer training on uppcl von
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
14.9K views25 Folien
Methods of Voltage Control von
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage ControlYashvi Mehta
11.6K views18 Folien
substation internship report von
substation internship report substation internship report
substation internship report Arun Thapa
17.5K views28 Folien
Report on industrial summer training on 220 kv substation von
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
45.1K views49 Folien
Protective relay von
Protective relay Protective relay
Protective relay Uday Wankar
35.6K views48 Folien

Was ist angesagt?(20)

Electrical substations: 132 KV von Girish Gupta
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
Girish Gupta72.5K views
ppt on summer training on uppcl von Sunny Daksh
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh14.9K views
Methods of Voltage Control von Yashvi Mehta
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage Control
Yashvi Mehta11.6K views
substation internship report von Arun Thapa
substation internship report substation internship report
substation internship report
Arun Thapa17.5K views
Report on industrial summer training on 220 kv substation von Ashutosh Srivastava
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
Ashutosh Srivastava45.1K views
Protective relay von Uday Wankar
Protective relay Protective relay
Protective relay
Uday Wankar35.6K views
Industrial summer training on 220 kv substation ppt von Ashutosh Srivastava
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
Ashutosh Srivastava16.1K views
Substation protection devices von Rahul Aman
Substation protection devicesSubstation protection devices
Substation protection devices
Rahul Aman31.1K views
Load dispatch center von ddxdharmesh
Load dispatch centerLoad dispatch center
Load dispatch center
ddxdharmesh16K views
132kv substation inplant training seminar von Shrikant Bhansali
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
Shrikant Bhansali1.4K views
PPT ON 33/11KV SUBSTATION von Ravi Phadtare
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
Ravi Phadtare27.3K views
220 kv Sub-station Summer Training ppt von Shubham Patel
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel3.6K views
Directional over current relay von CS V
Directional over current relayDirectional over current relay
Directional over current relay
CS V65.9K views
Electrical 132kv substation project .. shakir von Sheikh Shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
Sheikh Shakir3.1K views

Similar a Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad

Presentation training von
Presentation trainingPresentation training
Presentation trainingSrajan Raj
2.5K views41 Folien
132 KV Substation Gajraula.pptx von
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptxAsif682330
27 views24 Folien
Anurag Attri.pptx von
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptxAsif682330
5 views24 Folien
Ashish.pptx von
Ashish.pptxAshish.pptx
Ashish.pptxAkhilKanyal1
14 views19 Folien
rough.pptx von
rough.pptxrough.pptx
rough.pptxvirat217995
4 views20 Folien
Substation Training presentation von
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
47K views20 Folien

Similar a Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad(20)

Presentation training von Srajan Raj
Presentation trainingPresentation training
Presentation training
Srajan Raj2.5K views
132 KV Substation Gajraula.pptx von Asif682330
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
Asif68233027 views
Substation Training presentation von Kamal Mittal
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal47K views
Ppt on 132 kv gss by ashok khoja von ASHOK KHOJA
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA11.9K views
Presentation on KESCO sub-station, kanpur von Shubham Sachan
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
Shubham Sachan4.5K views
PPT on 33/11 sub-station uppcl von VISHAL VERMA
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
VISHAL VERMA24.7K views
Protection of power transformer von Ritesh Verma
Protection of power transformerProtection of power transformer
Protection of power transformer
Ritesh Verma95.8K views
132 KV Grid Station Intern ship training report von Muntazir Mehdi
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
Muntazir Mehdi21.9K views
power house training seminar von Paras kumar
power house training seminarpower house training seminar
power house training seminar
Paras kumar203 views
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar von Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Yatendra Parashar673 views
220 KV Substation Operation & Maintenance von Himansu Pradhan
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan5.4K views
Vocational Training Report ( Sealdah Power House) von shovandey07
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
shovandey071.2K views

Último

Global airborne satcom market report von
Global airborne satcom market reportGlobal airborne satcom market report
Global airborne satcom market reportdefencereport78
6 views13 Folien
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth von
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for GrowthInnomantra
15 views4 Folien
Design of machine elements-UNIT 3.pptx von
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptxgopinathcreddy
37 views31 Folien
Web Dev Session 1.pptx von
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptxVedVekhande
17 views22 Folien
Créativité dans le design mécanique à l’aide de l’optimisation topologique von
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueLIEGE CREATIVE
8 views84 Folien
Robotics in construction enterprise von
Robotics in construction enterpriseRobotics in construction enterprise
Robotics in construction enterpriseKhalid Abdel Naser Abdel Rahim
5 views1 Folie

Último(20)

BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth von Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 15 views
Design of machine elements-UNIT 3.pptx von gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy37 views
Web Dev Session 1.pptx von VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande17 views
Créativité dans le design mécanique à l’aide de l’optimisation topologique von LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
LIEGE CREATIVE8 views
MongoDB.pdf von ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR349 views
GDSC Mikroskil Members Onboarding 2023.pdf von gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil63 views
SUMIT SQL PROJECT SUPERSTORE 1.pptx von Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 22 views
Ansari: Practical experiences with an LLM-based Islamic Assistant von M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous9 views
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf von AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure8 views
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... von csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn8 views
REACTJS.pdf von ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR337 views

Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad

  • 1. Presentation On Summer Training from UPPTCL 132/33 KV Sub-Station Minto Park, Allahabad SUBMITTED BY :- SHAILESH YADAV Mob.No.- 9415147950 Email-syee050@gmail.com
  • 2. Introduction  India has been divided into five regions for power system planning and operation. These regions are the Northern region, Western region, Eastern region and North-eastern region.  Present almost 70% of the population is enjoying the fruits of electricity.  The present day electricity power system is AC i.e. electric power is generated, transmitted and distributed in the form of alternating current.  The electric power is produced at the power station, which are located at favourable place, generally quite away from the consumers
  • 3. 1.Transformer: A transformer is an electrical device that transfers energy between two or more circuits through electromagnetic induction. 1.2Types Of Transformer:  Step Up Transformer  Step Down Transformer  Power Transformer  Distribution Transformer 1.3Ideal Transformer:  Its primary and secondary winding resistances are negligible .  Its leakage flux and leakage inductance are zero .  There are no losses due to resistance, hysteresis and eddy currents.  The efficiency is 100 percent.
  • 4.  In case of ideal transformer Np*Ip = Ns*Is Ideal transformer as a circuit element :
  • 5. 2.PROTECTION AND COOLING EQUIPMENT: 2.1CONSERVATOR: As the temperature of oil increases or decreases during operation there is corresponding rise or fall in volume. To account for this an expansion vessel is connected to the transformer tank. The conservator has got a capacity between minimum and maximum oil level equal to 10% of the total oil in transformer. The conservator is provided with magnetic oil level gauge on one of the end covers which has a low oil level alarm. The ideal indicates empty 1/4, 30.c, ¾ and full oil level.
  • 6. 2.2 RADIATOR Owing the transport limitation and considering possible transient damages. Large transformer are provided with detachable radiators with radiator value. At the time of dispatch these radiators are detach and sent separately keeping the valve in position on tank flange. The valve blanking plate is to removed only when the radiators is ready for mounting on flanges. On removal of blanking plate a small quantity of oil which may have collected between valve and blanking plate will seep out.  The radiator section is made of 1mm thick cold rolled carbon steel sheets. The distance between each section is 50mm. The number of section per radiators and the number of radiators per transformer will depend upon cooling requirement of that transformer
  • 7. 2.3 BUCHHOLZ RELAY: The transformer is fitted with double float buchholz relay. It is fitted in the feed pipe from conservator to tank and it is provided with two sets of mercury contacts. The device comprises with the cast iron housing containing the hinged floats, one in upper part and other in lower part . Each float is fitted with mercury switches, leads of which are connected to terminal box for external connection. An arrow in cast on the housing to indicate the direction of conservator. The operation of buchholz relay should be tested before installing by injecting air at the lowest cock.  It is connected to the protection circuit to give an early alarm in case of gas collection and to disconnection of transformer from supply in case the sever fault inside the transformer.
  • 8. 2.4 SILICA GEL BREATHER: When transformer is loaded or unloaded the oil temperature inside the transformer is rise or falls. Accordingly the volume of air is changes by either by sucking in or pushing out . This transformer phenomena is called BREATHING of transformer. The air which I being sucked in container may have foreign impurities and humidity which changes dielectric stray of transformer oil . Hence it is necessary that the air entering into the transformer is free room moisture and foreign impurities. The breather is connected to an outlet pipe of conservator vessel and the air which is sucked by the transformer is made to pass through silica gel breather to dehumidify the air and remove the foreign impurities . The air which is pass through the gel is pass first to oil compartment of the breather. The oil removes all foreign impurities which enter into the gel compartment. Silica gel breather keeps all the properties of oil constant so transformer has a long life.
  • 9. 2.5 MARSHALLING BOX: It has two indicators which indicate the temperature of oil and winding of main tank, known as OTI and WTI. If the temperature of oil or winding exceeds the specified value , relay operates to sounds an alarm. If there is further increase in temperature then relay completes the trip circuit open the circuit breaker controlling the transformer.
  • 10. 2.6 COOLING When a transformer is in operation the heat is generated due to iron loss in winding and core loss. The process of minimise this heat is called cooling. 2.6.1 AIR NATURAL COOLING In a dry type self-cooled transformer, the natural circulation of surrounding air is used for cooling. This process of cooling is satisfactory for low voltage small transformer up to few KVA.
  • 11. 2.6.2 AIR BLAST COOLING It is similar to natural cooling with an addition that continuous blast of filtered cooled air is forced through the core and winding for better cooling. A fan produces the blast.
  • 12. 2.6.3 Forced Oil with Circulating Water Cooling: In this type of system heat exchanger is used for cooling the transformer . This system is used for large rating of power transformer.
  • 13. 3. EQUIPMENT OF SUB-STATION: 3.1 LIGHTING ARRESTER: Lighting arresters are protective device for limiting surge voltages due to lighting strikes or equipment faults or other events, to prevent damage to equipment and disruption of service. This type of equipment also called surge arresters. Lighting arresters are installed on many different pieces of equipment such as power poles and towers, power transformer, circuit breaker, bus structure, and steel superstructure in substation.
  • 14. 3.2 WAVE TRAP: Wave trap unit is inserted between bus bar and connection of coupling capacitor to the line. It is parrel tuned circuit comprising L and C. It has low impedance to 50 Hz and high impedance to carrier frequencies. Thus coupling capacitor allows carrier frequencies signals to enter the carrier equipment, but does not allows 50Hz power frequency current to enter the carrier equipment. This unit prevents the high frequencies signal from entering the neighbouring line, and the carrier current to flow only in the protected line for communication between different substations.
  • 15. 3.3 CURRENT TRANSFORMER: They are commonly used in metering and protective relaying in the electrical power industry where they facilitate the safe measurement of large currents, often in the presence of high voltages. The current transformer safely isolates measurement and control circuitry from high voltage typically present on the circuit being measured. The CT acts as constant current series device with an apparent power burden a fraction of that of high voltage primary circuit. Common secondary's are 1 or 5 amperes . For example; a 400:1 CT would provide an output current of 1 ampere when the primary was passing 400 amperes.
  • 16. 3.4 POTENTIAL TRANSFORMER: Potential transformer is designed for monitoring single - phase and three – phase line voltages in power metering application. The primary terminals can be connected either in line – to –line or in line – to – neutral configuration. A potential Transformer is a special type of transformer that allows meters to take reading from electrical service connections with higher voltage than the meter is normally capable of handling without at potential transformer .  Potential transformer has an accuracy of +_ 5% from 0 to 130% of their rated voltage.
  • 17. 3.5 ISOLATOR:  Mainly the isolator is connected after the circuit breaker .The circuit breaker is trip due to the fault, or when suddenly a heavy current is flows , it means that the current will not flow after the breaker ,but small amount of current is flows inner circuit. For making this current total zero the isolator is open and isolator is connected to ground so all inner current will grounded. This is the main work of isolator and other equipments are saved.
  • 18. 3.6 INSULATOR: The insulator serve two purpose . They support the conductor (bus bar ) and confine the current to the conductor . The most commonly used material for the manufacturer of insulator is porcelain . But the most wild use of insulator is to insulate the support or tower from the electric current .These are several type of insulators (e.g. pin type ,suspension type , post insulator ,shackle insulator etc.) and their use in the substation will depend upon the service requirement .For example post insulator is used for bus bars can directly bolted to the cap.
  • 19. 3.7 CIRCUIT BREAKER: Circuit breaker is mechanical device which is so designed by which circuit normal current fault position will be on and off .They are used for high capacity. A circuit breaker can make or break a circuit either manually or automatically under all condition viz. no load and short circuit condition . Types of circuit breaker is : 1. Low voltage air circuit breaker 2. oil circuit breaker 3. Sulphur Hexa Fluoride circuit breaker 4. Air blast circuit breaker 5. vacuum circuit breaker
  • 20. 3.8 CAPACITOR BANK: The load on the power is varying, being high during morning and evening and low at other times. During low load period, supply voltage is increased which increases the magnetization current, this result in the decreased power factor. The low power factor is mainly due to the fact that most of the load power factor is highly undesirable as it causes an increases in current, resulting in additional losses. It is important to have power factor is closed as close to unity as possible. In order to improve the power factor some device taking leading power factor should be connected parallel with the load. One of such device can be a capacitor bank. The capacitor draws a leading current and partly or completely neutralizes the lagging reactive component of load current. Practically the voltage inside the capacitor bank in the 132KV substation is of 33KV.When the voltage inside the capacitor bank is bellow from 33.5KV the capacitor bank operated and increased the voltage unto the desired level. If the voltage is greater than 36.1KV the capacitor bank is of. Capacitor bank accomplishes following operation I. To supply reactive power II. Increase terminal voltage III. Improve power factor
  • 21. 3.9 CONTROL PANEL: This is the main part of the substation. We plant it outside the switchyard. All the equipment which is install inside the switchyard is connected to the control panel by a underground cable. These cable are connected to the measuring devices like as voltmeter and ammeter of high rating. This control panel also consists a different type of relays like as differential, earth fault, auxiliary etc. control panel gives all the correct reading for example when a line is come in switch yard is connected to CVT. This CVT gives an exact value of incoming voltage on the control panel, If any fault is occurs, the relay is trip and we can see it on control panel and except it control panel gives the rating of all feeders and temperature of oil and winding in the transformer.
  • 22. 3.10 BATTERY ROOM : This is the room, which consist DC batteries. There are 55 DC cell of 2 Volt each. These cells are connected in series, so it will give total of 110V. This 110V DC Supply is used for operating the control panel, when the AC supply is off. This 110V DC voltage is also supplied to circuit breakers for operating; this supply is used when AC is off. We use this supply as a secondary supply. It means that this DC voltage is used when the AC is interrupted.