The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes. Activity Activity Description Performance Time (mins) Predecessors A Attach wheels to tub 5.0 B Attach motor to lid 1.8 C Attach battery pack 2.8 B D Attach safety cutoff 3.6 C E Attach filters 3.0 B F Attach lid to tub 2.0 A, E G Assemble attachments 3.0 H Function test 3.7 D, F, G I Final inspection 2.0 H J Packing 2.0 I Part 2 a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2 Fig. 3 Fig. 1 . . . . Question content area right Part 1 GEHBCAJIFig. 1DF There are 10 circles labeled using the letters from A to J. There are arrows, connecting one circle to another in the following manner: A to F, B to E, B to C, G to H, E to F, C to D, F to H, D to H, H to I, and I to J. There are three distinct partitions that contain more than one circle. Top left partition contains circle A, B, and E. The partition under and to the right of that one contains circles G, C, D, and F. The rightmost partition contains circles H, J, and I. The diagram is labeled Fig. 1. GEHBCAJIFig. 2DF There are 10 circles labeled using the letters from A to J. There are arrows, connecting one circle to another in the following manner: A to F, B to E, B to C, G to H, E to F, C to D, F to H, D to H, H to I, and I to J. There are three distinct partitions that contain more than one circle. Left partition contains circles A, B, and G. Middle partition contains circles E, C, and D. Right partition contains circles F, H, I, and J. The diagram is labeled Fig. 2. GEHBCAJIFig. 3D.