Productivity of Human resources
Prepared by
S.SELVAPRAKASH
LABOUR PRODUCTIVITY
 It can be measured in terms of output per
labour hour.
Productivity =
Outputs
Inputs
Measures of Productivity
 Performance ratio =
(Actual Productivity / Expected Productivity)
Variables Affecting Labor Productivity
 Physical work environment
 Technology, equipment, materials, lighting, layout
 Product quality
 Defects, scrap, rework
 Employee job performance
 Employee ability, motivation
 Employee Job Performance
FACTORS THAT AFFECT THE PRODUCTIVITY
1) Lack of material
2) Labour strikes
3) Delay in arrival of materials
4) Financial difficulties of the owner
5) Unclear instruction to labourer and high absentism of labours
6) Bad weather (e.g. rain, heat, etc.)
7) Non discipline labour and use of alcohol and drugs
8) Bad leadership
LABOUR PRODUCTIVITY
 Technological improvement, better
organization and management, the
development of better method of production by
labor and management, greater ingenuity and
skill by labor are the responsible for the
increase in productivity.
 Actually, productivity measures the
contributions of all the resource factors – men,
material, machines, and management.
GUIDELINES FOR IMPROVING THE LABOUR
PRODUCTIVITY
1.Properly training to the labours
2.Motivation to workers towards project completion
3.On time payment to the workers
4.Systematic flow of work
5.Properly , clearly & in time supervision
6.Maintain work discipline
7.Facilities to the labourers
8.Premonsoon plan to avoid work stop
9.Maximum use of machinery and automation system
10.Advance equipment planning
7
MEASURING LABOUR PRODUCTIVITY
Single-factor measures
Output / (Single Input)
All-factors measure
Output / (Total Inputs)
9
Single-factor Output Output Output Output
measures Labor Machine Capital Energy
All-factors Output
measure All inputs
Measures of Productivity
Single Factor Approach to Measuring
Productivity
 Capital - Number of products produced
Divided by asset value
 Materials - Number of products produced
Divided by dollars spent on materials
 Direct Labor - Number of products produced
Divided by direct labor-hours
 Overhead - Number of products produced
Divided by dollars spent on overhead
11
10,000 Units Produced
Sold for $10/unit
500 labor hours
Labor rate: $9/hr
What is the
labor productivity?
Example: Single Factor Productivity
12
 10,000 units / 500hrs = 20 units/hr
 (10,000 units * $10/unit) / 500hrs = $200/hr
 10,000 units / (500hrs * $9/hr) = 2.2 unit/$
 (10,000 units * $10/unit) / (500hrs * $9/hr) = 22.22
The last one is unit-less
Example: Labor Productivity
13
All-factors Goods or Services produced
measure All inputs used to produce them
All Factors
14
10,000 Units Produced
Sold for $10/unit
500 labor hours
Labor rate: $9/hr
Cost of raw material: $30,000
Overhead: $15,500
Example
15
Output
Labor + Materials + Overhead
(10,000 units) * ($10)
(500)*($9) + ($30,000) + ($15,500)
AFP = 2.0
Example : All-Factor Productivity
AFP =
AFP =
Thank you

More Related Content

What's hot (20)

Concept of reward and total reward system
Concept of reward and total reward systemConcept of reward and total reward system
Concept of reward and total reward system
 
Identifying training needs
Identifying training needsIdentifying training needs
Identifying training needs
 
Presentation on Productivity Mesurement
Presentation on Productivity MesurementPresentation on Productivity Mesurement
Presentation on Productivity Mesurement
 
Wastage analysis
Wastage analysisWastage analysis
Wastage analysis
 
Role of HR Manager
Role of HR ManagerRole of HR Manager
Role of HR Manager
 
Ppt on hrd
Ppt on hrdPpt on hrd
Ppt on hrd
 
Functions of HRM.ppt
Functions of HRM.pptFunctions of HRM.ppt
Functions of HRM.ppt
 
Wage policy
Wage policyWage policy
Wage policy
 
Human Resource Management and Human Resource Development
Human Resource Management and Human Resource DevelopmentHuman Resource Management and Human Resource Development
Human Resource Management and Human Resource Development
 
National commission on labour
National commission on labourNational commission on labour
National commission on labour
 
Fringe benefits
Fringe benefitsFringe benefits
Fringe benefits
 
Pay for -performance
Pay for -performancePay for -performance
Pay for -performance
 
HR Audit.
HR Audit. HR Audit.
HR Audit.
 
Wage and salary administration
Wage and salary administrationWage and salary administration
Wage and salary administration
 
Human resource management
Human resource managementHuman resource management
Human resource management
 
hrp micro and macro level
hrp micro and macro levelhrp micro and macro level
hrp micro and macro level
 
Compensation management
Compensation managementCompensation management
Compensation management
 
Introduction to HRM
Introduction to HRMIntroduction to HRM
Introduction to HRM
 
Social security and welfare
Social security and welfare Social security and welfare
Social security and welfare
 
Work Study
Work StudyWork Study
Work Study
 

Viewers also liked

10.resources measurement and its utilization
10.resources measurement and its utilization10.resources measurement and its utilization
10.resources measurement and its utilizationSelva Prakash
 
Fast track construction of elvated roads in metro
Fast  track construction of elvated roads in metroFast  track construction of elvated roads in metro
Fast track construction of elvated roads in metroSelva Prakash
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESSelva Prakash
 
04.development & operation of human resources
04.development & operation of human resources04.development & operation of human resources
04.development & operation of human resourcesSelva Prakash
 
Impact strength in concrete test
Impact strength in concrete testImpact strength in concrete test
Impact strength in concrete testSelva Prakash
 
Advanced concrete technology 3
Advanced concrete technology 3Advanced concrete technology 3
Advanced concrete technology 3Selva Prakash
 
SERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESelva Prakash
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Selva Prakash
 
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test ResultPredicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test ResultMonjurul Shuvo
 
Flexural strength in concrete test
Flexural strength in concrete test Flexural strength in concrete test
Flexural strength in concrete test Selva Prakash
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipmentsSelva Prakash
 
Engineering drawing
Engineering  drawing Engineering  drawing
Engineering drawing Selva Prakash
 
Compressive strength of the concrete
Compressive strength of the concreteCompressive strength of the concrete
Compressive strength of the concretereboundhammer
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteSelva Prakash
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concreteSelva Prakash
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies Capterra
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durabilityMECandPMV
 

Viewers also liked (20)

10.resources measurement and its utilization
10.resources measurement and its utilization10.resources measurement and its utilization
10.resources measurement and its utilization
 
Fast track construction of elvated roads in metro
Fast  track construction of elvated roads in metroFast  track construction of elvated roads in metro
Fast track construction of elvated roads in metro
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIES
 
04.development & operation of human resources
04.development & operation of human resources04.development & operation of human resources
04.development & operation of human resources
 
Impact strength in concrete test
Impact strength in concrete testImpact strength in concrete test
Impact strength in concrete test
 
Advanced concrete technology 3
Advanced concrete technology 3Advanced concrete technology 3
Advanced concrete technology 3
 
SERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETE
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
 
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test ResultPredicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
 
Construction Management Project
Construction Management ProjectConstruction Management Project
Construction Management Project
 
Flexural strength in concrete test
Flexural strength in concrete test Flexural strength in concrete test
Flexural strength in concrete test
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Engineering drawing
Engineering  drawing Engineering  drawing
Engineering drawing
 
Compressive strength of the concrete
Compressive strength of the concreteCompressive strength of the concrete
Compressive strength of the concrete
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concrete
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
 
Chemical attack on concrete
Chemical attack on concreteChemical attack on concrete
Chemical attack on concrete
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 

Similar to Productivity of human resources

Productivity management
Productivity management Productivity management
Productivity management NsbmUcd
 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivityPacific Cotton
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivityMd Nazir Ansari
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Brian Balayan
 
Lecture1429900757gfg (1)
Lecture1429900757gfg (1)Lecture1429900757gfg (1)
Lecture1429900757gfg (1)Abhinav Sinha
 
Production & Operation Management Lecture Notes
Production & Operation Management Lecture NotesProduction & Operation Management Lecture Notes
Production & Operation Management Lecture NotesFellowBuddy.com
 
Production and Operation Management Lecture Notes
Production and Operation Management Lecture NotesProduction and Operation Management Lecture Notes
Production and Operation Management Lecture NotesFellowBuddy.com
 
Lecture notes of production & operation management
Lecture notes of production & operation managementLecture notes of production & operation management
Lecture notes of production & operation managementComplaint2015
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
 

Similar to Productivity of human resources (20)

Productivity management
Productivity management Productivity management
Productivity management
 
Productivity.ppt
Productivity.pptProductivity.ppt
Productivity.ppt
 
Productivity (1)
 Productivity (1) Productivity (1)
Productivity (1)
 
Productivity
ProductivityProductivity
Productivity
 
Productivity.pdf
Productivity.pdfProductivity.pdf
Productivity.pdf
 
5. productivity
5. productivity5. productivity
5. productivity
 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivity
 
Productivity.pptx
Productivity.pptxProductivity.pptx
Productivity.pptx
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivity
 
Production & productivity
Production & productivityProduction & productivity
Production & productivity
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)
 
lecture1429900757.pdf
lecture1429900757.pdflecture1429900757.pdf
lecture1429900757.pdf
 
Lecture1429900757gfg (1)
Lecture1429900757gfg (1)Lecture1429900757gfg (1)
Lecture1429900757gfg (1)
 
Lecture1429900757
Lecture1429900757Lecture1429900757
Lecture1429900757
 
Production & Operation Management Lecture Notes
Production & Operation Management Lecture NotesProduction & Operation Management Lecture Notes
Production & Operation Management Lecture Notes
 
Production and Operation Management Lecture Notes
Production and Operation Management Lecture NotesProduction and Operation Management Lecture Notes
Production and Operation Management Lecture Notes
 
Lecture notes of production & operation management
Lecture notes of production & operation managementLecture notes of production & operation management
Lecture notes of production & operation management
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
Arjun Negi
Arjun NegiArjun Negi
Arjun Negi
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 

More from Selva Prakash

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netSelva Prakash
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone SafetySelva Prakash
 
safety and health programs
safety and health programssafety and health programs
safety and health programsSelva Prakash
 
staffing ,recruitment and selection
staffing ,recruitment and selectionstaffing ,recruitment and selection
staffing ,recruitment and selectionSelva Prakash
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealinkSelva Prakash
 
Green Technologies for Buildings
Green Technologies for  BuildingsGreen Technologies for  Buildings
Green Technologies for BuildingsSelva Prakash
 
Detailed project report
Detailed project reportDetailed project report
Detailed project reportSelva Prakash
 
Engineering drawing graphics
Engineering drawing graphics Engineering drawing graphics
Engineering drawing graphics Selva Prakash
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete testSelva Prakash
 
Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009 Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009 Selva Prakash
 
Advanced concrete technology 2
Advanced concrete technology 2 Advanced concrete technology 2
Advanced concrete technology 2 Selva Prakash
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technologySelva Prakash
 
Hydraulics & hydraulic machinery
Hydraulics & hydraulic machineryHydraulics & hydraulic machinery
Hydraulics & hydraulic machinerySelva Prakash
 
Organisation information
Organisation  informationOrganisation  information
Organisation informationSelva Prakash
 

More from Selva Prakash (17)

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.net
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
 
safety and health programs
safety and health programssafety and health programs
safety and health programs
 
staffing ,recruitment and selection
staffing ,recruitment and selectionstaffing ,recruitment and selection
staffing ,recruitment and selection
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
DESIGN METHODLOGY
DESIGN METHODLOGYDESIGN METHODLOGY
DESIGN METHODLOGY
 
Green Technologies for Buildings
Green Technologies for  BuildingsGreen Technologies for  Buildings
Green Technologies for Buildings
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Burj khalifa
Burj  khalifaBurj  khalifa
Burj khalifa
 
Engineering drawing graphics
Engineering drawing graphics Engineering drawing graphics
Engineering drawing graphics
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
 
Bond strenth
Bond strenthBond strenth
Bond strenth
 
Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009 Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009
 
Advanced concrete technology 2
Advanced concrete technology 2 Advanced concrete technology 2
Advanced concrete technology 2
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technology
 
Hydraulics & hydraulic machinery
Hydraulics & hydraulic machineryHydraulics & hydraulic machinery
Hydraulics & hydraulic machinery
 
Organisation information
Organisation  informationOrganisation  information
Organisation information
 

Recently uploaded

BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 

Recently uploaded (20)

BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 

Productivity of human resources

  • 1. Productivity of Human resources Prepared by S.SELVAPRAKASH
  • 2. LABOUR PRODUCTIVITY  It can be measured in terms of output per labour hour. Productivity = Outputs Inputs
  • 3. Measures of Productivity  Performance ratio = (Actual Productivity / Expected Productivity)
  • 4. Variables Affecting Labor Productivity  Physical work environment  Technology, equipment, materials, lighting, layout  Product quality  Defects, scrap, rework  Employee job performance  Employee ability, motivation  Employee Job Performance
  • 5. FACTORS THAT AFFECT THE PRODUCTIVITY 1) Lack of material 2) Labour strikes 3) Delay in arrival of materials 4) Financial difficulties of the owner 5) Unclear instruction to labourer and high absentism of labours 6) Bad weather (e.g. rain, heat, etc.) 7) Non discipline labour and use of alcohol and drugs 8) Bad leadership
  • 6. LABOUR PRODUCTIVITY  Technological improvement, better organization and management, the development of better method of production by labor and management, greater ingenuity and skill by labor are the responsible for the increase in productivity.  Actually, productivity measures the contributions of all the resource factors – men, material, machines, and management.
  • 7. GUIDELINES FOR IMPROVING THE LABOUR PRODUCTIVITY 1.Properly training to the labours 2.Motivation to workers towards project completion 3.On time payment to the workers 4.Systematic flow of work 5.Properly , clearly & in time supervision 6.Maintain work discipline 7.Facilities to the labourers 8.Premonsoon plan to avoid work stop 9.Maximum use of machinery and automation system 10.Advance equipment planning 7
  • 8. MEASURING LABOUR PRODUCTIVITY Single-factor measures Output / (Single Input) All-factors measure Output / (Total Inputs)
  • 9. 9 Single-factor Output Output Output Output measures Labor Machine Capital Energy All-factors Output measure All inputs Measures of Productivity
  • 10. Single Factor Approach to Measuring Productivity  Capital - Number of products produced Divided by asset value  Materials - Number of products produced Divided by dollars spent on materials  Direct Labor - Number of products produced Divided by direct labor-hours  Overhead - Number of products produced Divided by dollars spent on overhead
  • 11. 11 10,000 Units Produced Sold for $10/unit 500 labor hours Labor rate: $9/hr What is the labor productivity? Example: Single Factor Productivity
  • 12. 12  10,000 units / 500hrs = 20 units/hr  (10,000 units * $10/unit) / 500hrs = $200/hr  10,000 units / (500hrs * $9/hr) = 2.2 unit/$  (10,000 units * $10/unit) / (500hrs * $9/hr) = 22.22 The last one is unit-less Example: Labor Productivity
  • 13. 13 All-factors Goods or Services produced measure All inputs used to produce them All Factors
  • 14. 14 10,000 Units Produced Sold for $10/unit 500 labor hours Labor rate: $9/hr Cost of raw material: $30,000 Overhead: $15,500 Example
  • 15. 15 Output Labor + Materials + Overhead (10,000 units) * ($10) (500)*($9) + ($30,000) + ($15,500) AFP = 2.0 Example : All-Factor Productivity AFP = AFP =