Introduction
 Recent data suggest that spending on transmission infrastructure will be strong over the next decade. Anticipated
investment for transmission projects scheduled to be completed by the end of 2023 is $74B
 While the numbers suggest continued growth in transmission, there are various factors that will impact whether
those projections come to fruition. Broadly, these trends can be placed into three categories:


Driving forces, including:

– Changing generation mix
– Aging infrastructure


Restraining forces, including:
– Declining demand growth
– Challenges to transmission ROEs



Complicating factors, including
– Demand response and energy efficiency
– Distributed generation
– Electric and gas convergence

1
Copyright © 2013 by ScottMadden, Inc. All rights reserved.
Investments in U.S. Transmission, 2013–2023
Total In-Service Cost of U.S. Transmission Projects
$13.2

$14

$12.5

 According to recent SNL data, total in-service
costs for transmission projects to be completed
in the United States by 2023 are projected to be
$74B

$13.1

$12
$10
$ Billions

$8

$8.8

$7.9
$6.3

$6.0

$6

 These investments are projected to result in
39,100 new transmission line miles

$4.3

$4
$1.5

$2

$0.1 $0.2
$0

Total In-Service Cost of U.S. Transmission
Projects by NERC Region, 2013–2023

MRO
$8B
7,760 mi
WECC
$30B
14,076 mi

SPP
$5B
2,346 mi
TRE
$5B
3,492 mi

2

Sources: SNL data; ScottMadden analysis

Copyright © 2013 by ScottMadden, Inc. All rights reserved.

RFC
$13B
4,479 mi

NPCC
$7B
2,913 mi

SERC
$5B
3,469 mi
FRCC
$0B
565 mi

 More than 28,000 of these line miles are
scheduled to be in service by 2018
 The amount of transmission planned varies
significantly across the regions of the United
States, as do the drivers of that investment
Changing Generation Mix
Planned Coal Capacity Retirements, 2013–2022

Coal Retirements/Shift to Gas
 Approximately 71 GW of fossil‐fired generation is
projected to retire by 2022 (with more than 90%
retiring by 2017) due to federal environmental
regulations, low natural gas prices, and economics
 Several ISO/RTOs have identified transmission
projects and/or expenditures specifically related to
the transition away from coal
 In 2012, PJM authorized over $5B for more
than 750 transmission improvement projects to
ensure reliability as coal plants retire

Renewable Portfolio Standard Policies (as of March 2013)

Renewables Integration
 State RPS and federal incentives remain important
drivers of transmission development
 In EEI’s annual Transmission Projects at a Glance,
of $51.1B in planned investment, 76% or $38.6B are
related to the integration of renewables

3

Sources: Platts; EE News; MISO EPA Impact Analysis; SNL Financial; Database of State Incentives for Renewables & Efficiency

Copyright © 2013 by ScottMadden, Inc. All rights reserved.
Aging Infrastructure and System Hardening
Top Ten Industry Issues Facing Utilities in 2013

 Utilities are investing heavily to replace aging
infrastructure and bolster existing infrastructure
against the damaging effects of increasingly
frequent extreme weather events

More
Important

 In Black & Veatch’s 2012 report, aging infrastructure
was the most important issue for respondents

Less
Important

 In response to recent extreme weather events,
utilities are investing in system hardening, and
these investments are expected to be greatest in
areas that have been hit particularly hard by recent
events
 Aging infrastructure will not be addressed in
isolation. Asset management programs and Smart
Grid implementations will be part of the investment
to address both reliability and resiliency challenges

2011–2012 Extreme Events and Reported
Customers Affected by Power Outages
Event

Date

Region, Division,
or State

Customers
Affected
(in millions)

Derecho

July 2012 Middle Atlantic

4.2

Oct 2011 New England

3.0

Aug 2011 Middle Atlantic

3.2

Wildfires

July 2012 California, Colorado

2.0

Windstorm

Sources: Black & Veatch 2013 Electric Utility Report (Top Ten Issues Facing Utilities)

8.1

Tropical Storm Irene

4

Oct 2012 Northeast

Early season snow

Copyright © 2013 by ScottMadden, Inc. All rights reserved.

Superstorm Sandy

Nov 2011 Southern California

0.4
Declining Demand Growth
U.S. Demand Growth, 1950–2040

 The Energy Information Administration (EIA)
projects growth in demand in the United
States to remain below 1% for the
foreseeable future
 According to NERC’s 2012 Long-Term
Reliability Assessment, demand growth for
the summer season was at its lowest level
since 1967 when NERC began reporting data

Reasons for Transmission Project Delays or Deferrals

 Reduced load-growth projections contribute
to the postponement or cancellation of large
transmission projects (i.e., MAPP and PATH
in PJM)
 The proliferation of DSM and EE initiatives,
coupled with expanding customer-side supply
alternatives, will likely suppress demand
growth for the foreseeable future

5

Sources: EIA; NERC 2012 Long-Term Reliability Assessment

Copyright © 2013 by ScottMadden, Inc. All rights reserved.
Challenges to ROEs
 In November of 2012, FERC reaffirmed and
clarified its commitment to incentives in
transmission and provided guidelines under which
these would be considered

Outstanding FERC Complaints
Current
(Proposed)
ROE

Requested
ROE

Bangor Hydro-Electric, Central Maine Power,
National Grid, NextEra, NSTAR, NE Utilities,
CL&P, WMECO, PSC of NH, United Illuminating,
Unitil, Vermont Transco

11.14%

9.20%

Florida Power (Progress Energy Florida)

10.80%

9.02%

Southwestern PSC

11.27%

9.65%

Cleco Power

10.50%

8.55%

PSC of Colorado

10.25%

9.15%

Maine PSC

10.50%

8.83%

Niagara Mohawk Power (National Grid)

11.50%2

9.49%2

Niagara Mohawk Power (NYISO)

11.50%2

9.25%2

11.14%

8.7%

10.8%3
11.3%4

8.7%

Pacific Gas and Electric Company

11.5%2

9.1%1,2

Southern California Edison Company

 In addition, scrutiny of ROEs has recently
increased

Utilities

12.6%5

11.03%1,5

 Intervenors have filed numerous Section 206
complaints with FERC requesting that authorized
ROEs be reduced because the current rates are
unjust and unreasonable
 Many intervenors believe transmission investment
opportunities should reflect a “new normal”
economy with lower interest rates and lower costs
of capital. The Commission’s decisions are
pending
 We would expect this trend to continue as
pressure on electric rates in general increases

Bangor Hydro-Electric, Central Maine Power,
National Grid, NextEra, NSTAR, NE Utilities,
CL&P, WMECO, PSC of NH, United Illuminating,
Unitil, Vermont Transco
Baltimore Gas & Electric Company, Pepco
Holdings, Delmarva Power & Light Company,
Atlantic City Electric Company, Potomac Electric
Power Company

1Complaint

filed during utility-initiated rate case proceeding
inclusive of 50bps adder
3Rate for projects before 2006
4Rate for projects after 2006
5Rate inclusive of 110bps adder
2Rate

6

Sources: EEI, “Transmission Investment: Adequate Returns and Regulatory Certainty
Are Key” (June 2013); SNL; Moody’s “May the FERC be With You” (May 2013)

Copyright © 2013 by ScottMadden, Inc. All rights reserved.
Complications…
Performance Incentives for Electric
Efficiency by State

 Energy efficiency and demand response programs
are reducing load and specifically peak load; more
and more these are being relied upon as capacity
resources
 Distributed generation and other customer self-supply
options are reducing utility loads and making them
less predictable
 These make planning and operating the transmission
system more difficult
Reported Potential Peak Reduction by ISOs and RTOs
in 2010 and 2012

Source: IEE, State Electric Efficiency Regulatory Frameworks, 2012

Net Metered Capacity (MW)
82
(3%)

111
(4%)

382
(14%)

Solar - Residential
1,022,
(38%)

Solar - Commercial
Solar - Industrial

1,088
(41%)

7

Sources: FERC, Assessment of Demand Response & Advanced Metering, December 2012; EIA, GTM Research, ScottMadden analysis

Copyright © 2013 by ScottMadden, Inc. All rights reserved.

Wind
Other
Driving, Restraining, and Complicating Factors
The industry is in a unique position with certain factors favoring significant transmission development and others working
against it. At a minimum, transmission planning, development, and operations will become even more complex in the years to
come.

Driving Forces

Restraining Forces

 Renewables integration

 Economic malaise

 Generation retirements

 Declining demand growth

 Shift to gas-fired generation

 Uncertainty about ROEs

 Aging infrastructure

 Rate pressure
 Siting and permitting

Complicating Factors
 Distributed generation
 Demand response
 Electric and gas convergence
8
Copyright © 2013 by ScottMadden, Inc. All rights reserved.
Cristin M. Lyons
Partner
ScottMadden, Inc.
2626 Glenwood Avenue
Suite 480
Raleigh, NC 27608
cmlyons@scottmadden.com
O: 919-781-4191 M: 919-247-1031

9
Copyright © 2013 by ScottMadden, Inc. All rights reserved.

Weitere ähnliche Inhalte

Was ist angesagt?

Academia version - Louisville Sustainability Analysis and Recommendations for...
Academia version - Louisville Sustainability Analysis and Recommendations for...Academia version - Louisville Sustainability Analysis and Recommendations for...
Academia version - Louisville Sustainability Analysis and Recommendations for...Jason McConnell
 
ACORE_USEPA_111(d)_Comments_12-1-2014
ACORE_USEPA_111(d)_Comments_12-1-2014ACORE_USEPA_111(d)_Comments_12-1-2014
ACORE_USEPA_111(d)_Comments_12-1-2014Scott Clausen
 
Project 2011 April
Project 2011 AprilProject 2011 April
Project 2011 AprilCGC CGC
 
Gridlocked a long term look at south africas electricity sector
Gridlocked   a long term look at south africas electricity sectorGridlocked   a long term look at south africas electricity sector
Gridlocked a long term look at south africas electricity sectorMarketing Durban Chamber
 
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...IEA DSM Implementing Agreement (IA)
 
WEF Report: Fostering effective energy transition 2019
WEF Report: Fostering effective energy transition 2019WEF Report: Fostering effective energy transition 2019
WEF Report: Fostering effective energy transition 2019Energy for One World
 
Energy Subsidies for VT
Energy Subsidies for VTEnergy Subsidies for VT
Energy Subsidies for VTLaura Felone
 
FEI Submission to EE Panel_26Jul2016_Final
FEI Submission to EE Panel_26Jul2016_FinalFEI Submission to EE Panel_26Jul2016_Final
FEI Submission to EE Panel_26Jul2016_FinalKevin Heal
 
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...Dr. Hachimenum Amadi
 
Fake Study: Power System Reliability in New England
Fake Study: Power System Reliability in New EnglandFake Study: Power System Reliability in New England
Fake Study: Power System Reliability in New EnglandMarcellus Drilling News
 
2018 general assembly guide
2018 general assembly guide2018 general assembly guide
2018 general assembly guideSOPEC
 
Flexibility Tracker Country Report - Italy
Flexibility Tracker Country Report - ItalyFlexibility Tracker Country Report - Italy
Flexibility Tracker Country Report - ItalyLeonardo ENERGY
 
2020 annual report
2020 annual report2020 annual report
2020 annual reportSOPEC
 
Renewable Energy The Sunrise Industry
Renewable Energy   The Sunrise IndustryRenewable Energy   The Sunrise Industry
Renewable Energy The Sunrise IndustryFernando Penarroyo
 
2017 general assembly guide.docx
2017 general assembly guide.docx2017 general assembly guide.docx
2017 general assembly guide.docxSOPEC
 
Wellington&Cira Law Seminars Presentation 072610
Wellington&Cira Law Seminars Presentation 072610Wellington&Cira Law Seminars Presentation 072610
Wellington&Cira Law Seminars Presentation 072610fredwellington
 
Exports To The Us Northeast
Exports To The Us NortheastExports To The Us Northeast
Exports To The Us Northeastjohndalton
 

Was ist angesagt? (20)

Academia version - Louisville Sustainability Analysis and Recommendations for...
Academia version - Louisville Sustainability Analysis and Recommendations for...Academia version - Louisville Sustainability Analysis and Recommendations for...
Academia version - Louisville Sustainability Analysis and Recommendations for...
 
ACORE_USEPA_111(d)_Comments_12-1-2014
ACORE_USEPA_111(d)_Comments_12-1-2014ACORE_USEPA_111(d)_Comments_12-1-2014
ACORE_USEPA_111(d)_Comments_12-1-2014
 
Project 2011 April
Project 2011 AprilProject 2011 April
Project 2011 April
 
LeftonCapstone IRP+RPS
LeftonCapstone IRP+RPSLeftonCapstone IRP+RPS
LeftonCapstone IRP+RPS
 
Gridlocked a long term look at south africas electricity sector
Gridlocked   a long term look at south africas electricity sectorGridlocked   a long term look at south africas electricity sector
Gridlocked a long term look at south africas electricity sector
 
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...
U.S. Experiences with Energy Efficiency Resource Standards – A View from the ...
 
WEF Report: Fostering effective energy transition 2019
WEF Report: Fostering effective energy transition 2019WEF Report: Fostering effective energy transition 2019
WEF Report: Fostering effective energy transition 2019
 
Energy Subsidies for VT
Energy Subsidies for VTEnergy Subsidies for VT
Energy Subsidies for VT
 
Annual report
Annual reportAnnual report
Annual report
 
FEI Submission to EE Panel_26Jul2016_Final
FEI Submission to EE Panel_26Jul2016_FinalFEI Submission to EE Panel_26Jul2016_Final
FEI Submission to EE Panel_26Jul2016_Final
 
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
 
Fake Study: Power System Reliability in New England
Fake Study: Power System Reliability in New EnglandFake Study: Power System Reliability in New England
Fake Study: Power System Reliability in New England
 
2018 general assembly guide
2018 general assembly guide2018 general assembly guide
2018 general assembly guide
 
Flexibility Tracker Country Report - Italy
Flexibility Tracker Country Report - ItalyFlexibility Tracker Country Report - Italy
Flexibility Tracker Country Report - Italy
 
2020 annual report
2020 annual report2020 annual report
2020 annual report
 
Renewable Energy The Sunrise Industry
Renewable Energy   The Sunrise IndustryRenewable Energy   The Sunrise Industry
Renewable Energy The Sunrise Industry
 
2017 general assembly guide.docx
2017 general assembly guide.docx2017 general assembly guide.docx
2017 general assembly guide.docx
 
Wellington&Cira Law Seminars Presentation 072610
Wellington&Cira Law Seminars Presentation 072610Wellington&Cira Law Seminars Presentation 072610
Wellington&Cira Law Seminars Presentation 072610
 
Exports To The Us Northeast
Exports To The Us NortheastExports To The Us Northeast
Exports To The Us Northeast
 
GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4
 

Ähnlich wie Transmission Development

Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015
Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015
Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015Scott Clausen
 
The ScottMadden Energy Industry Update - Winter 2012-2013
The ScottMadden Energy Industry Update - Winter 2012-2013The ScottMadden Energy Industry Update - Winter 2012-2013
The ScottMadden Energy Industry Update - Winter 2012-2013ScottMadden, Inc.
 
Transmission Summit West 2013
Transmission Summit West 2013Transmission Summit West 2013
Transmission Summit West 2013ScottMadden, Inc.
 
Overview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar EnergyOverview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar EnergyScottMadden, Inc.
 
Walshe the outlook for new generation additions 2-25-13 final
Walshe   the outlook for new generation additions 2-25-13 finalWalshe   the outlook for new generation additions 2-25-13 final
Walshe the outlook for new generation additions 2-25-13 finalbrianwalshe
 
R42576, PTC 2012
R42576, PTC 2012R42576, PTC 2012
R42576, PTC 2012Keri
 
Doe Solar Energy Forcast Report
Doe Solar Energy Forcast ReportDoe Solar Energy Forcast Report
Doe Solar Energy Forcast Reportkiakaha
 
Solar Energy Industry Forecast DOE 2008
Solar Energy Industry Forecast DOE 2008Solar Energy Industry Forecast DOE 2008
Solar Energy Industry Forecast DOE 2008Dmitry Tseitlin
 
DOE Solar Energy Industry Forecast
DOE Solar Energy Industry ForecastDOE Solar Energy Industry Forecast
DOE Solar Energy Industry Forecastkiakaha
 
Supply Trends- What are the Impacts on Transmission?
Supply Trends- What are the Impacts on Transmission? Supply Trends- What are the Impacts on Transmission?
Supply Trends- What are the Impacts on Transmission? ScottMadden, Inc.
 
1-s2.0-S2772783122000462-main-2.pdf
1-s2.0-S2772783122000462-main-2.pdf1-s2.0-S2772783122000462-main-2.pdf
1-s2.0-S2772783122000462-main-2.pdflvskumar1
 
The ScottMadden Energy Industry Update – August 2014
The ScottMadden Energy Industry Update – August 2014The ScottMadden Energy Industry Update – August 2014
The ScottMadden Energy Industry Update – August 2014ScottMadden, Inc.
 
The Energy Industry Update – Spring 2012
The Energy Industry Update – Spring 2012The Energy Industry Update – Spring 2012
The Energy Industry Update – Spring 2012ScottMadden, Inc.
 
Eai presentation investment challenges in wind energy in india delhi mar 2010
Eai presentation investment challenges in wind energy in india delhi mar 2010Eai presentation investment challenges in wind energy in india delhi mar 2010
Eai presentation investment challenges in wind energy in india delhi mar 2010Renganathan M G
 
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docxhyacinthshackley2629
 
Impacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability EvaluationImpacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability Evaluationinventy
 
Edison International Business Update
Edison International Business UpdateEdison International Business Update
Edison International Business UpdateEdisonInternational
 
2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White PaperPhilip Clark
 
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden, Inc.
 

Ähnlich wie Transmission Development (20)

Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015
Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015
Why Policy Matters - Renewable Energy Market Momentum at Risk - June 2015
 
The ScottMadden Energy Industry Update - Winter 2012-2013
The ScottMadden Energy Industry Update - Winter 2012-2013The ScottMadden Energy Industry Update - Winter 2012-2013
The ScottMadden Energy Industry Update - Winter 2012-2013
 
Transmission Summit West 2013
Transmission Summit West 2013Transmission Summit West 2013
Transmission Summit West 2013
 
Overview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar EnergyOverview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar Energy
 
Walshe the outlook for new generation additions 2-25-13 final
Walshe   the outlook for new generation additions 2-25-13 finalWalshe   the outlook for new generation additions 2-25-13 final
Walshe the outlook for new generation additions 2-25-13 final
 
R42576, PTC 2012
R42576, PTC 2012R42576, PTC 2012
R42576, PTC 2012
 
Doe Solar Energy Forcast Report
Doe Solar Energy Forcast ReportDoe Solar Energy Forcast Report
Doe Solar Energy Forcast Report
 
Solar Energy Industry Forecast DOE 2008
Solar Energy Industry Forecast DOE 2008Solar Energy Industry Forecast DOE 2008
Solar Energy Industry Forecast DOE 2008
 
DOE Solar Energy Industry Forecast
DOE Solar Energy Industry ForecastDOE Solar Energy Industry Forecast
DOE Solar Energy Industry Forecast
 
Supply Trends- What are the Impacts on Transmission?
Supply Trends- What are the Impacts on Transmission? Supply Trends- What are the Impacts on Transmission?
Supply Trends- What are the Impacts on Transmission?
 
1-s2.0-S2772783122000462-main-2.pdf
1-s2.0-S2772783122000462-main-2.pdf1-s2.0-S2772783122000462-main-2.pdf
1-s2.0-S2772783122000462-main-2.pdf
 
The ScottMadden Energy Industry Update – August 2014
The ScottMadden Energy Industry Update – August 2014The ScottMadden Energy Industry Update – August 2014
The ScottMadden Energy Industry Update – August 2014
 
The Energy Industry Update – Spring 2012
The Energy Industry Update – Spring 2012The Energy Industry Update – Spring 2012
The Energy Industry Update – Spring 2012
 
Clareo jaouiche utility
Clareo jaouiche utilityClareo jaouiche utility
Clareo jaouiche utility
 
Eai presentation investment challenges in wind energy in india delhi mar 2010
Eai presentation investment challenges in wind energy in india delhi mar 2010Eai presentation investment challenges in wind energy in india delhi mar 2010
Eai presentation investment challenges in wind energy in india delhi mar 2010
 
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
 
Impacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability EvaluationImpacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability Evaluation
 
Edison International Business Update
Edison International Business UpdateEdison International Business Update
Edison International Business Update
 
2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper
 
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
ScottMadden's Energy Industry Update for the 2019 Utility Supply Chain Confer...
 

Mehr von ScottMadden, Inc.

Creating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsCreating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsScottMadden, Inc.
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden, Inc.
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden, Inc.
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden, Inc.
 
ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden, Inc.
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...ScottMadden, Inc.
 
Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'ScottMadden, Inc.
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared ServicesScottMadden, Inc.
 
Building a Business Case for Shared Services
Building a Business Case for Shared ServicesBuilding a Business Case for Shared Services
Building a Business Case for Shared ServicesScottMadden, Inc.
 
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterFundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterScottMadden, Inc.
 
Next Generation Shared Services Centers
Next Generation Shared Services CentersNext Generation Shared Services Centers
Next Generation Shared Services CentersScottMadden, Inc.
 
California’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveCalifornia’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveScottMadden, Inc.
 
Capital Program Assessment Overview
Capital Program Assessment OverviewCapital Program Assessment Overview
Capital Program Assessment OverviewScottMadden, Inc.
 
Value of Strategic Direction
Value of Strategic DirectionValue of Strategic Direction
Value of Strategic DirectionScottMadden, Inc.
 
Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? ScottMadden, Inc.
 
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...ScottMadden, Inc.
 

Mehr von ScottMadden, Inc. (20)

Creating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsCreating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment Decisions
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis
 
ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
 
Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'
 
Combined Cycles
Combined CyclesCombined Cycles
Combined Cycles
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared Services
 
Building a Business Case for Shared Services
Building a Business Case for Shared ServicesBuilding a Business Case for Shared Services
Building a Business Case for Shared Services
 
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterFundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
 
Next Generation Shared Services Centers
Next Generation Shared Services CentersNext Generation Shared Services Centers
Next Generation Shared Services Centers
 
California’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveCalifornia’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck Curve
 
Capital Program Assessment Overview
Capital Program Assessment OverviewCapital Program Assessment Overview
Capital Program Assessment Overview
 
Value of Strategic Direction
Value of Strategic DirectionValue of Strategic Direction
Value of Strategic Direction
 
Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission?
 
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
 

Kürzlich hochgeladen

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCRalexsharmaa01
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Kürzlich hochgeladen (20)

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Transmission Development

  • 1. Transmission Development – Key Issues to Watch Cristin Lyons, Partner October 17, 2013 Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 2. Introduction  Recent data suggest that spending on transmission infrastructure will be strong over the next decade. Anticipated investment for transmission projects scheduled to be completed by the end of 2023 is $74B  While the numbers suggest continued growth in transmission, there are various factors that will impact whether those projections come to fruition. Broadly, these trends can be placed into three categories:  Driving forces, including: – Changing generation mix – Aging infrastructure  Restraining forces, including: – Declining demand growth – Challenges to transmission ROEs  Complicating factors, including – Demand response and energy efficiency – Distributed generation – Electric and gas convergence 1 Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 3. Investments in U.S. Transmission, 2013–2023 Total In-Service Cost of U.S. Transmission Projects $13.2 $14 $12.5  According to recent SNL data, total in-service costs for transmission projects to be completed in the United States by 2023 are projected to be $74B $13.1 $12 $10 $ Billions $8 $8.8 $7.9 $6.3 $6.0 $6  These investments are projected to result in 39,100 new transmission line miles $4.3 $4 $1.5 $2 $0.1 $0.2 $0 Total In-Service Cost of U.S. Transmission Projects by NERC Region, 2013–2023 MRO $8B 7,760 mi WECC $30B 14,076 mi SPP $5B 2,346 mi TRE $5B 3,492 mi 2 Sources: SNL data; ScottMadden analysis Copyright © 2013 by ScottMadden, Inc. All rights reserved. RFC $13B 4,479 mi NPCC $7B 2,913 mi SERC $5B 3,469 mi FRCC $0B 565 mi  More than 28,000 of these line miles are scheduled to be in service by 2018  The amount of transmission planned varies significantly across the regions of the United States, as do the drivers of that investment
  • 4. Changing Generation Mix Planned Coal Capacity Retirements, 2013–2022 Coal Retirements/Shift to Gas  Approximately 71 GW of fossil‐fired generation is projected to retire by 2022 (with more than 90% retiring by 2017) due to federal environmental regulations, low natural gas prices, and economics  Several ISO/RTOs have identified transmission projects and/or expenditures specifically related to the transition away from coal  In 2012, PJM authorized over $5B for more than 750 transmission improvement projects to ensure reliability as coal plants retire Renewable Portfolio Standard Policies (as of March 2013) Renewables Integration  State RPS and federal incentives remain important drivers of transmission development  In EEI’s annual Transmission Projects at a Glance, of $51.1B in planned investment, 76% or $38.6B are related to the integration of renewables 3 Sources: Platts; EE News; MISO EPA Impact Analysis; SNL Financial; Database of State Incentives for Renewables & Efficiency Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 5. Aging Infrastructure and System Hardening Top Ten Industry Issues Facing Utilities in 2013  Utilities are investing heavily to replace aging infrastructure and bolster existing infrastructure against the damaging effects of increasingly frequent extreme weather events More Important  In Black & Veatch’s 2012 report, aging infrastructure was the most important issue for respondents Less Important  In response to recent extreme weather events, utilities are investing in system hardening, and these investments are expected to be greatest in areas that have been hit particularly hard by recent events  Aging infrastructure will not be addressed in isolation. Asset management programs and Smart Grid implementations will be part of the investment to address both reliability and resiliency challenges 2011–2012 Extreme Events and Reported Customers Affected by Power Outages Event Date Region, Division, or State Customers Affected (in millions) Derecho July 2012 Middle Atlantic 4.2 Oct 2011 New England 3.0 Aug 2011 Middle Atlantic 3.2 Wildfires July 2012 California, Colorado 2.0 Windstorm Sources: Black & Veatch 2013 Electric Utility Report (Top Ten Issues Facing Utilities) 8.1 Tropical Storm Irene 4 Oct 2012 Northeast Early season snow Copyright © 2013 by ScottMadden, Inc. All rights reserved. Superstorm Sandy Nov 2011 Southern California 0.4
  • 6. Declining Demand Growth U.S. Demand Growth, 1950–2040  The Energy Information Administration (EIA) projects growth in demand in the United States to remain below 1% for the foreseeable future  According to NERC’s 2012 Long-Term Reliability Assessment, demand growth for the summer season was at its lowest level since 1967 when NERC began reporting data Reasons for Transmission Project Delays or Deferrals  Reduced load-growth projections contribute to the postponement or cancellation of large transmission projects (i.e., MAPP and PATH in PJM)  The proliferation of DSM and EE initiatives, coupled with expanding customer-side supply alternatives, will likely suppress demand growth for the foreseeable future 5 Sources: EIA; NERC 2012 Long-Term Reliability Assessment Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 7. Challenges to ROEs  In November of 2012, FERC reaffirmed and clarified its commitment to incentives in transmission and provided guidelines under which these would be considered Outstanding FERC Complaints Current (Proposed) ROE Requested ROE Bangor Hydro-Electric, Central Maine Power, National Grid, NextEra, NSTAR, NE Utilities, CL&P, WMECO, PSC of NH, United Illuminating, Unitil, Vermont Transco 11.14% 9.20% Florida Power (Progress Energy Florida) 10.80% 9.02% Southwestern PSC 11.27% 9.65% Cleco Power 10.50% 8.55% PSC of Colorado 10.25% 9.15% Maine PSC 10.50% 8.83% Niagara Mohawk Power (National Grid) 11.50%2 9.49%2 Niagara Mohawk Power (NYISO) 11.50%2 9.25%2 11.14% 8.7% 10.8%3 11.3%4 8.7% Pacific Gas and Electric Company 11.5%2 9.1%1,2 Southern California Edison Company  In addition, scrutiny of ROEs has recently increased Utilities 12.6%5 11.03%1,5  Intervenors have filed numerous Section 206 complaints with FERC requesting that authorized ROEs be reduced because the current rates are unjust and unreasonable  Many intervenors believe transmission investment opportunities should reflect a “new normal” economy with lower interest rates and lower costs of capital. The Commission’s decisions are pending  We would expect this trend to continue as pressure on electric rates in general increases Bangor Hydro-Electric, Central Maine Power, National Grid, NextEra, NSTAR, NE Utilities, CL&P, WMECO, PSC of NH, United Illuminating, Unitil, Vermont Transco Baltimore Gas & Electric Company, Pepco Holdings, Delmarva Power & Light Company, Atlantic City Electric Company, Potomac Electric Power Company 1Complaint filed during utility-initiated rate case proceeding inclusive of 50bps adder 3Rate for projects before 2006 4Rate for projects after 2006 5Rate inclusive of 110bps adder 2Rate 6 Sources: EEI, “Transmission Investment: Adequate Returns and Regulatory Certainty Are Key” (June 2013); SNL; Moody’s “May the FERC be With You” (May 2013) Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 8. Complications… Performance Incentives for Electric Efficiency by State  Energy efficiency and demand response programs are reducing load and specifically peak load; more and more these are being relied upon as capacity resources  Distributed generation and other customer self-supply options are reducing utility loads and making them less predictable  These make planning and operating the transmission system more difficult Reported Potential Peak Reduction by ISOs and RTOs in 2010 and 2012 Source: IEE, State Electric Efficiency Regulatory Frameworks, 2012 Net Metered Capacity (MW) 82 (3%) 111 (4%) 382 (14%) Solar - Residential 1,022, (38%) Solar - Commercial Solar - Industrial 1,088 (41%) 7 Sources: FERC, Assessment of Demand Response & Advanced Metering, December 2012; EIA, GTM Research, ScottMadden analysis Copyright © 2013 by ScottMadden, Inc. All rights reserved. Wind Other
  • 9. Driving, Restraining, and Complicating Factors The industry is in a unique position with certain factors favoring significant transmission development and others working against it. At a minimum, transmission planning, development, and operations will become even more complex in the years to come. Driving Forces Restraining Forces  Renewables integration  Economic malaise  Generation retirements  Declining demand growth  Shift to gas-fired generation  Uncertainty about ROEs  Aging infrastructure  Rate pressure  Siting and permitting Complicating Factors  Distributed generation  Demand response  Electric and gas convergence 8 Copyright © 2013 by ScottMadden, Inc. All rights reserved.
  • 10. Cristin M. Lyons Partner ScottMadden, Inc. 2626 Glenwood Avenue Suite 480 Raleigh, NC 27608 cmlyons@scottmadden.com O: 919-781-4191 M: 919-247-1031 9 Copyright © 2013 by ScottMadden, Inc. All rights reserved.