 INTRODUCTION
 SCHEMATIC POWER SYSTEM DAIGRAM
 CLASSIFICATION OF SUBSTATION
 MAIN EQUIPMENTS OF SUBSTATION
 TYPE OF INSTRUMENT TRANSFORMER
 TYPES OF CIRCUIT BREAKERS
 EARTHING SWITCH
 LIGHTING ARRESTOR
 BUS BAR
 FUSE
 INTRODUCTION OF PROTECTION SCHEME
 PF IMPROVEMENT
 MINIMUM CLEARANCE
 CONCLUSION
 Chhattisgarh State Electricity Board was Formed in Accordance
with the section 5 of the Electricity Supply Act 1948 as Per the
Notification Published in the gazette of the Government of
Chhattisgarh Dated 15th November 2000. Chhattisgarh State
Electricity Board (CSEB)became functional w.e.f. 01.12.2000.
 Chhattisgarh State Electricity Board has been reorganized into
following Five Companies in accordance with the provisions
contained in the section 131-134 of Electricity Act 2003 by the
Government of Chhattisgarh vide notification dated 19.12.2008
33 KV
Bus P.T
11 KV
33/11 KV sub
station
LA
ES
ISO
CT
CB
CB
LA
LA
T/F
CB
CT
CT CT
CT
According to Design.
1.Indoor type
Sub-station.
2.Out door type
Sub-station.
(a) Pole mounted
Sub-station.
(b) Foundation mounted
Sub-station.
 1) Power transformer
 2) Circuit breaker
 3) Isolator
 4) Earthing switch
 5) lightning arrestor
 6) BusBar
 7) Current transformer
 8) Potential transformer
 9) Protective relay
 10) DC battery set
 11)Capacitor bank
 12)Fire fighting system
 Transformer is used to step down the voltage from 33 kv voltage
to 11kv voltage .
 Generally 3.15 MVA, 5 MVA, 10 MVA 33/11kv, Δ / Y transformer
are used in 33/11kv .
 Check Oil level in main tank & OLTC tank.
 Check the color of silica gel in breather ;it must
be blue in color .if it is turned pink then
recondition it or replace it.
 Check On load Tap Changer Lower/Raise trail
by Local & Remote.
 Trip trail by draining oil in Buchholz relay
 Check Earth resistance ,provide watering
arrangement for earthling pits.
 Tight all connections.
 Check breakdown voltage of oil.
 Clean the bushings.
 Attend the oil leakages
 Note Temperature of Oil & leakage.
 Check cooling system & confirm fan control
operation w.r.to temperature variation.
 33/11 KV, Δ / Y , 3.15 MVA, 5 MVA, 10 MVA
CURRENT
TRANSFORMER
POTENTIAL
TRANSFORMER
 Current T/F is used for protection and
metering purposes.
 It steps down the current level of the line for
following purposes.
1) Measurement :- ammeter , kw meter , kwh
meter , power factor meter
2) control and protection :- current when exceeds
the set value operates the relay which senses
the faulty condition .
 300 -150 / 5 A
 200-100 / 5 A
 100-50 / 5 A
 50-25 / 5 A
It steps down the voltage level of line for -
1) Measurement : voltmeter, frequency meter ,kw
meter, kwh meter ,power factor meter
2) Control & protection : used in directional over
current protection and under frequency relay
operation (48.8 Hz , df/dt relay)
 For 33 KV :- 33 KV / 110 V/√3
 For 11 KV :- 11 KV / 110 V/√3
 Circuit Breaker can switch automatically
during normal and abnormal conditions .
during faulty condition the fault is sensed by
the relay and operates the circuit breaker to
isolate the fault.
In 33kv substation generally vacuum circuit
breaker are used where are quenching medium
is vacuum
 Low voltage air circuit breaker.
 Oil circuit breaker.
 Air blast circuit breaker.
 SF6 circuit breaker.
 Vacuum circuit breaker.
11 KV 33 KV
Rated
Voltage
12 KV 36 KV
Normal
Current
400 A 630 A
S.C Breaking
Current
8 & 12.5 KA 12.5 KA (750
MVA)
DC Voltage 24 V 24 V
 High resistance interruption.
(1) Arc lengthening.
(2) Arc cooling.
(3) Arc splitting.
(4) Arc constraining.
 Low resistance interruption.
(1) Cooling.
(2) Gap lengthening.
(3) Blast effect.
 1) no oil is required for are quenching
 2) least maintenance
 3) compact size
 4) light in weight
Maintenance of circuit breaker
 1) close/trip through local/remote control
 2) trip trial through auto closer relay
 4) oiling & greasing of moving parts
 5) vermin proofing
 6) heater healthy
 Isolator is used to isolate the equipment.
 Isolator is operate at no load.
Maintenance of isolator:-
1) Oiling &greasing of moving parts.
2) check contact firmness .
3) check open / close trials.
4) Earthing switch .
 It is operated on No Load Only.
 Rated Voltage :- 12 KV
 Normal Current :- 400 A
 Rated Voltage :- 36 V
 Normal Current :- 630 A
 Earthing switch discharges the voltage an
deadline to earth . it is connected between line
unit of isolator to earth .
NOTE:- it there is breakdown at line then for
measurement of resistance by megger do not
close earth switch .
11 KV 33 KV
Voltage Rating 9 KV 30 KV
Normal
Discharge
Current
5 KA 10 KA
 Busbar are conducting rod to which a number
incoming and outgoing feeders are connected
in 33kv S/S there are 33kv bus & 11kv bus .
VARIOUS TYPES OF BUS BAR
ARRANGE- MENT SYSTEM:-
 Single bus bar system used in D.C. and A.C.
power station.
 Single bus bar system with sectionalization .
 Ring bus bar system.
 Duplicate bus bar system.
Copper.
Tin
Lead.
Silver.
TYPES OF MATERIAL USED IN FUSE WIRE:-
 Rewireable fuse.
 Cartridge type fuse.
 Drop out fuse.
 High capacity H.R.C. fuse.
 High voltage H.R.C. fuse.
Types of Fuse element
 Rewireable fuse.
 Cartridge type fuse.
 Drop out fuse.
 High capacity H.R.C. fuse.
 High voltage H.R.C. fuse.
TYPES OF FUSES:-
 11 KV , 50 HZ.
 Rated Voltage :- 12 KV
 Rated Normal Current:- 100 A.
 DESIRED CHARECTERISTICS OF PROTECTION SYSTEM:-
Characteristics of protection system.
1.Reliability
2.Sensitivity.
3.Selectivity.
4.Descrimination.
5.Speed.
6.Simplicity.
7.Economy.
FUNCTION OF PROTECTIVE RELAYS:-
 The relay is used to cut off the power supply,
promptly to any element of power system which
undergoes short –circuit it starts operating
abnormally.
Main features of a good protective relay.
1.Reliability
2.Sensitivity.
3.Selectivity.
4.Quickness.
5.Non interference
With future extension.
1) Differential Relay
2) Over Current Earth Fault Relay
3) Buchholz Relay
 This is the main protection provided to the transformer. This takes
care of all the internal faults within the protection zone at this
relay it from hv, ct to lv ct ,it is also called as Differential zone.
Fault lying within this zone are called as external fault or through
fault.
 Details of the relay
 Transformer Differential protection relay
 Percentage Bias type
 Suitable for 2 winding transformer ,CTR-iA,
 operating current 20-100%
 Bias setting 20-30% , operating time less than msec for time setting
contact 2 nos
 Over current earth fault protection is also
called as back up protection . It two
transformers are used in parallel than
directional Over Current Earth fault relay
should be used.
 These relay are provided on 33kv hv side of
the transformer ,11kv (lv) side of the
transformer and on 11kv feeders.
 It is used to provide protection against internal
faults in transformer . Incipient faults are due to
the arcing in the oil because of the failure of the
inter -lamination or core bolt insulation or poor
electrical connection causing spark in the oil.
These fault occurs the gas in the main tank
rushes upwards and gets accumulated in the
relay chamber . initially it initiates buchholz
alarm it the fault persist then buchholz trip
command is extended to the CB.
 Generally for 33kv S/S
 Auxiliary DC volt is 30 v DC , 15 nos of cells are used
 DC voltage supply is used for following control circuit
1) Tripping circuit of CB
2) Closing circuit of CB
3) Alarm circuit , (buchholz alarm, winding temp alarm, trip alarm
,DC fail alarm)
4) Semaphore indicator (indicators the close/open position of isobar
and CB)
5) Breaker on/off indicates (indication bulbs are used )
6) Trip circuit healthy indication (indication bulb is used )
 Specific Gravity of electrolyte and amount of
charged
 Hydrometer :- it is the device used for
measurement of specific gravity of electrolyte
range is 1150 to 1433.
100 75 50 25 Discharged
Specific Gravity
At 27o C
1200-1230 1200-1210 1170-1185 1150-1160 Below 1150
 3 ph Capacitor bank is used for improvement
of power factor . It is normally connected to 11
kv bus . VCB is used for Capacitor bank
switching .
 Normally capacitor banks are connected in star.
 12 KV , 1200 KVAr, 2400 KVAr , 3600 KVAr
The advantages of power factors improvement by
Capacitor addition:-
 a) Reactive component of the network is
reduced and so also the total current in the
system from the source end
 b) I2R power losses are reduced in the system
because of reduction in current
 c) voltage level at the load end is increased
 Reduced kvA (maximum demand ) charges in
utility bill.
 Reduced distribution losses (kwh) within the
plant network.
 Better voltage and improved performance of
system.
 A high power factor eliminates penalty charges
imposed when operating with a low power
factor.
ISO ABISO
AB
AB
3PH SUPPLY
ISO
ISO
ISO
ISO
ISO
ISO
ISO
ISO
AB
AB
R Y B
R Y B
R
Y
B
R
Y
B
R
Y
B
POWER X’MER
INCOMING BUSBAR OUTGOING BUSBAR
Voltage
level
(kV)
Standar
d bay
widths
(in
Mtrs.)
For equipments
and rigid
conductors in air
Phase to Phase spacing in
isolators and switches
Phase
to
phase
(mm)
Phase to
earth
(mm)
Isolator
(mm)
Switches with
Arc Horns
(mm)
132 9.5 1700 1000 2135 3050
66 7 1220 750 1525 2135
33 4.6 915 610 765 1220
11 3.5 560 305 610 915
0.415 -- 380 305 -- --
 The training session was very educational and
very informative this CSPDCL Office have
good harmonic relation and co-ordination
between staff members. As the vocational
training seems laborious job to gate in touch
with the activities. It was nobility of the people
to provide the information and the required
theoretical background at there continuous job
hour.
C.S.P.D.C.L.AMBIKAPUR (TOWN)

More Related Content

What's hot

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
Mohit Awasthi
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA
 

What's hot (20)

A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
sub-station training report
sub-station training reportsub-station training report
sub-station training report
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
220 kv G.S.S (report)
220 kv G.S.S (report)220 kv G.S.S (report)
220 kv G.S.S (report)
 

Similar to C.S.P.D.C.L.AMBIKAPUR (TOWN)

Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
Jayashree Behera
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
RAJKIRANR3
 

Similar to C.S.P.D.C.L.AMBIKAPUR (TOWN) (20)

Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kv
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
220kv substation
220kv substation220kv substation
220kv substation
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTSCIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 

Recently uploaded (20)

Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 

C.S.P.D.C.L.AMBIKAPUR (TOWN)

  • 1.
  • 2. PRESENTATION ON VOCATIONAL TRAINING TRANING PLACE :- C.S.P.D.C.L.AMBIKAPUR TRAINING STARTING ON 07.05.2013 TO 06.06.2013  SUPERVISION BY:-  MR.D.K.SHARMA A.E.IN CSPDCL(O&M) (AMBIKAPUR TOWN)  SUBMITTED TO :-  MR.P.R.MISHRA H.O.D. E.E. VEC LAKHANPUR
  • 3.  INTRODUCTION  SCHEMATIC POWER SYSTEM DAIGRAM  CLASSIFICATION OF SUBSTATION  MAIN EQUIPMENTS OF SUBSTATION  TYPE OF INSTRUMENT TRANSFORMER  TYPES OF CIRCUIT BREAKERS  EARTHING SWITCH  LIGHTING ARRESTOR  BUS BAR  FUSE  INTRODUCTION OF PROTECTION SCHEME  PF IMPROVEMENT  MINIMUM CLEARANCE  CONCLUSION
  • 4.  Chhattisgarh State Electricity Board was Formed in Accordance with the section 5 of the Electricity Supply Act 1948 as Per the Notification Published in the gazette of the Government of Chhattisgarh Dated 15th November 2000. Chhattisgarh State Electricity Board (CSEB)became functional w.e.f. 01.12.2000.  Chhattisgarh State Electricity Board has been reorganized into following Five Companies in accordance with the provisions contained in the section 131-134 of Electricity Act 2003 by the Government of Chhattisgarh vide notification dated 19.12.2008
  • 5. 33 KV Bus P.T 11 KV 33/11 KV sub station LA ES ISO CT CB CB LA LA T/F CB CT CT CT CT
  • 6. According to Design. 1.Indoor type Sub-station. 2.Out door type Sub-station. (a) Pole mounted Sub-station. (b) Foundation mounted Sub-station.
  • 7.  1) Power transformer  2) Circuit breaker  3) Isolator  4) Earthing switch  5) lightning arrestor  6) BusBar  7) Current transformer  8) Potential transformer  9) Protective relay  10) DC battery set  11)Capacitor bank  12)Fire fighting system
  • 8.  Transformer is used to step down the voltage from 33 kv voltage to 11kv voltage .  Generally 3.15 MVA, 5 MVA, 10 MVA 33/11kv, Δ / Y transformer are used in 33/11kv .
  • 9.
  • 10.
  • 11.  Check Oil level in main tank & OLTC tank.  Check the color of silica gel in breather ;it must be blue in color .if it is turned pink then recondition it or replace it.  Check On load Tap Changer Lower/Raise trail by Local & Remote.  Trip trail by draining oil in Buchholz relay
  • 12.  Check Earth resistance ,provide watering arrangement for earthling pits.  Tight all connections.  Check breakdown voltage of oil.  Clean the bushings.  Attend the oil leakages  Note Temperature of Oil & leakage.
  • 13.  Check cooling system & confirm fan control operation w.r.to temperature variation.
  • 14.  33/11 KV, Δ / Y , 3.15 MVA, 5 MVA, 10 MVA
  • 16.  Current T/F is used for protection and metering purposes.  It steps down the current level of the line for following purposes. 1) Measurement :- ammeter , kw meter , kwh meter , power factor meter 2) control and protection :- current when exceeds the set value operates the relay which senses the faulty condition .
  • 17.
  • 18.  300 -150 / 5 A  200-100 / 5 A  100-50 / 5 A  50-25 / 5 A
  • 19. It steps down the voltage level of line for - 1) Measurement : voltmeter, frequency meter ,kw meter, kwh meter ,power factor meter 2) Control & protection : used in directional over current protection and under frequency relay operation (48.8 Hz , df/dt relay)
  • 20.
  • 21.  For 33 KV :- 33 KV / 110 V/√3  For 11 KV :- 11 KV / 110 V/√3
  • 22.  Circuit Breaker can switch automatically during normal and abnormal conditions . during faulty condition the fault is sensed by the relay and operates the circuit breaker to isolate the fault. In 33kv substation generally vacuum circuit breaker are used where are quenching medium is vacuum
  • 23.  Low voltage air circuit breaker.  Oil circuit breaker.  Air blast circuit breaker.  SF6 circuit breaker.  Vacuum circuit breaker.
  • 24. 11 KV 33 KV Rated Voltage 12 KV 36 KV Normal Current 400 A 630 A S.C Breaking Current 8 & 12.5 KA 12.5 KA (750 MVA) DC Voltage 24 V 24 V
  • 25.  High resistance interruption. (1) Arc lengthening. (2) Arc cooling. (3) Arc splitting. (4) Arc constraining.  Low resistance interruption. (1) Cooling. (2) Gap lengthening. (3) Blast effect.
  • 26.  1) no oil is required for are quenching  2) least maintenance  3) compact size  4) light in weight Maintenance of circuit breaker  1) close/trip through local/remote control  2) trip trial through auto closer relay  4) oiling & greasing of moving parts  5) vermin proofing  6) heater healthy
  • 27.  Isolator is used to isolate the equipment.  Isolator is operate at no load. Maintenance of isolator:- 1) Oiling &greasing of moving parts. 2) check contact firmness . 3) check open / close trials. 4) Earthing switch .
  • 28.  It is operated on No Load Only.  Rated Voltage :- 12 KV  Normal Current :- 400 A
  • 29.  Rated Voltage :- 36 V  Normal Current :- 630 A
  • 30.  Earthing switch discharges the voltage an deadline to earth . it is connected between line unit of isolator to earth . NOTE:- it there is breakdown at line then for measurement of resistance by megger do not close earth switch .
  • 31.
  • 32. 11 KV 33 KV Voltage Rating 9 KV 30 KV Normal Discharge Current 5 KA 10 KA
  • 33.  Busbar are conducting rod to which a number incoming and outgoing feeders are connected in 33kv S/S there are 33kv bus & 11kv bus . VARIOUS TYPES OF BUS BAR ARRANGE- MENT SYSTEM:-  Single bus bar system used in D.C. and A.C. power station.  Single bus bar system with sectionalization .  Ring bus bar system.  Duplicate bus bar system.
  • 34.
  • 35.
  • 37.  Rewireable fuse.  Cartridge type fuse.  Drop out fuse.  High capacity H.R.C. fuse.  High voltage H.R.C. fuse. Types of Fuse element
  • 38.  Rewireable fuse.  Cartridge type fuse.  Drop out fuse.  High capacity H.R.C. fuse.  High voltage H.R.C. fuse. TYPES OF FUSES:-
  • 39.  11 KV , 50 HZ.  Rated Voltage :- 12 KV  Rated Normal Current:- 100 A.
  • 40.
  • 41.  DESIRED CHARECTERISTICS OF PROTECTION SYSTEM:- Characteristics of protection system. 1.Reliability 2.Sensitivity. 3.Selectivity. 4.Descrimination. 5.Speed. 6.Simplicity. 7.Economy.
  • 42. FUNCTION OF PROTECTIVE RELAYS:-  The relay is used to cut off the power supply, promptly to any element of power system which undergoes short –circuit it starts operating abnormally.
  • 43. Main features of a good protective relay. 1.Reliability 2.Sensitivity. 3.Selectivity. 4.Quickness. 5.Non interference With future extension.
  • 44. 1) Differential Relay 2) Over Current Earth Fault Relay 3) Buchholz Relay
  • 45.  This is the main protection provided to the transformer. This takes care of all the internal faults within the protection zone at this relay it from hv, ct to lv ct ,it is also called as Differential zone. Fault lying within this zone are called as external fault or through fault.  Details of the relay  Transformer Differential protection relay  Percentage Bias type  Suitable for 2 winding transformer ,CTR-iA,  operating current 20-100%  Bias setting 20-30% , operating time less than msec for time setting contact 2 nos
  • 46.  Over current earth fault protection is also called as back up protection . It two transformers are used in parallel than directional Over Current Earth fault relay should be used.  These relay are provided on 33kv hv side of the transformer ,11kv (lv) side of the transformer and on 11kv feeders.
  • 47.  It is used to provide protection against internal faults in transformer . Incipient faults are due to the arcing in the oil because of the failure of the inter -lamination or core bolt insulation or poor electrical connection causing spark in the oil. These fault occurs the gas in the main tank rushes upwards and gets accumulated in the relay chamber . initially it initiates buchholz alarm it the fault persist then buchholz trip command is extended to the CB.
  • 48.  Generally for 33kv S/S  Auxiliary DC volt is 30 v DC , 15 nos of cells are used  DC voltage supply is used for following control circuit 1) Tripping circuit of CB 2) Closing circuit of CB 3) Alarm circuit , (buchholz alarm, winding temp alarm, trip alarm ,DC fail alarm) 4) Semaphore indicator (indicators the close/open position of isobar and CB) 5) Breaker on/off indicates (indication bulbs are used ) 6) Trip circuit healthy indication (indication bulb is used )
  • 49.  Specific Gravity of electrolyte and amount of charged  Hydrometer :- it is the device used for measurement of specific gravity of electrolyte range is 1150 to 1433. 100 75 50 25 Discharged Specific Gravity At 27o C 1200-1230 1200-1210 1170-1185 1150-1160 Below 1150
  • 50.  3 ph Capacitor bank is used for improvement of power factor . It is normally connected to 11 kv bus . VCB is used for Capacitor bank switching .  Normally capacitor banks are connected in star.
  • 51.  12 KV , 1200 KVAr, 2400 KVAr , 3600 KVAr
  • 52.
  • 53. The advantages of power factors improvement by Capacitor addition:-  a) Reactive component of the network is reduced and so also the total current in the system from the source end  b) I2R power losses are reduced in the system because of reduction in current  c) voltage level at the load end is increased
  • 54.  Reduced kvA (maximum demand ) charges in utility bill.  Reduced distribution losses (kwh) within the plant network.  Better voltage and improved performance of system.  A high power factor eliminates penalty charges imposed when operating with a low power factor.
  • 55. ISO ABISO AB AB 3PH SUPPLY ISO ISO ISO ISO ISO ISO ISO ISO AB AB R Y B R Y B R Y B R Y B R Y B POWER X’MER INCOMING BUSBAR OUTGOING BUSBAR
  • 56.
  • 57. Voltage level (kV) Standar d bay widths (in Mtrs.) For equipments and rigid conductors in air Phase to Phase spacing in isolators and switches Phase to phase (mm) Phase to earth (mm) Isolator (mm) Switches with Arc Horns (mm) 132 9.5 1700 1000 2135 3050 66 7 1220 750 1525 2135 33 4.6 915 610 765 1220 11 3.5 560 305 610 915 0.415 -- 380 305 -- --
  • 58.  The training session was very educational and very informative this CSPDCL Office have good harmonic relation and co-ordination between staff members. As the vocational training seems laborious job to gate in touch with the activities. It was nobility of the people to provide the information and the required theoretical background at there continuous job hour.