FORECAST LESS AND GET BETTER RESULTS

                  subtitled

           LEAN FORECASTING

               sub-subtitled

   STAY OUT OF THE SUICIDE QUADRANT

                         by


      TOM WALLACE and BOB STAHL




        Copyright 2007   T. F. Wallace & Co.
TABLE OF CONTENTS



Executive Overview                             3


Volume and Mix Defined                         4


Projecting Future Volumes – The Old Way        4


Projecting Future Volumes – The New Way        5


The Planning Time Fence                        6


Aligned versus Non-aligned Resources           7


Rough-Cut Capacity Planning                    8


Simplifying Assumptions                       9


Beware of the Suicide Quadrant                10


Risk Assessment                               11


Conclusion                                    12


About the Authors                             13



                                       2
EXECUTIVE OVERVIEW


This paper challenges conventional wisdom in the area of forecasting and planning: that companies need
to project forecasts and plans far into the future at a detailed, highly granular level.

Our position is that, in most cases, this is not necessary. Rather, detailed forecasts and plans are normally
needed only inside of what’s called the Planning Time Fence. This is a point in the future: the cumulative
lead time to acquire material and to build the product, plus a short time allowance for planning and order
releasing. Inside of the Planning Time Fence, high granularity is needed. But, most often, not beyond it.

The paper presents four principles:

1. Inside the Planning Time Fence, you must view things at the detailed, mix level.

2. Outside the Planning Time Fence, you should deal with aggregate volumes except
   in certain circumstances.

3. Beware of the technological imperative: just because you can do something doesn’t
   mean you should do it.

4. Stay out of the Suicide Quadrant.

The Suicide Quadrant refers to forecasting and planning at a detailed level over a long horizon. This
approach results in poorer results and requires more work. In this era of Lean Manufacturing, it can be seen
as non-value adding activity. And, in this era of Sales & Operations Planning, it’s just not necessary to do
it that way.

Last, the use of aggregate forecasts and plans facilitates the evaluation of risk among competing strategies.




                                                      3
Volume and Mix Defined

The important task of getting products to customers centers around four fundamentals: demand and supply,
volume and mix.

Economists speak of supply and demand, which we feel carries a mind set from the 1950’s, the days
following World War II when companies could sell whatever they made. Obviously, those days are long
gone. Our world is demand driven, and thus we say “demand and supply.” Demand is the driver. Demand
is what the customers want, while supply refers to the resources we have available to meet that customer
demand – both external and internal. Simple enough.

The distinction between volume and mix may not be so clear. Volume is the big picture, expressed in
aggregate terms. It often deals with rates: rates of sales, of production, the aggregate finished goods
inventory, the aggregate customer order backlog. The volume question is: how much? See Figure 1.

                      Figure 1

                                              THE FOUR FUNDAMENTALS

                                                           Volume          •   The Big Picture
                                                                           •   Product Families
                                                                           •   How Much?

                             Demand                                        Supply

                                                                           •   The Details
                                                                           •   Individual SKUs, Orders
                                                                 Mix       •   Which Ones?


Mix, on the other hand, is the details – specific stockkeeping units (SKUs), customer orders, and so forth.
Mix issues are typically ones of timing and sequence; the mix question is which ones to produce first,
second, third.


                             Projecting Future Volumes – The Old Way

Back in olden times, around 40 years ago, the digital computer made its entry into many companies. It
was exciting; people were able to do things that couldn’t be done before. Of course, many of the things done
on the computer in those early days didn’t amount to much, and in some cases actually made things worse1.
Here’s one example.

In making longer range plans – necessary for the annual financial plan, among other things – the computer
enabled people to project SKU forecasts out into the future for 12 or 15 or 18 months. Then they could have
the computer roll up the individual forecasts (mix) into aggregate groupings such as families (volume).
These projections could serve as the volume forecasts out through the end of the upcoming fiscal year.
1.   Ollie Wight called this “the age of naive sophistication”

                                                                       4
But that’s not all. They could take those same detailed forecasts, input them into their master scheduling
software, get individual line item master schedules for the next 12 or more months, and roll them up into
aggregate production plans for the next fiscal year.

Pretty slick, eh? There was only one problem: the results weren’t very good. The forecasts in particular
seemed to be suspect, almost always at variance with the aggregate forecasts that the folks in Sales and
Marketing were projecting. And further, the mix-based forecasts usually turned out to be less accurate.

But that didn’t stop people from doing it. After all, this was the sophisticated approach; we were “harnessing
the power of the computer.” Over in Marketing, they were using mechanical calculators and manual
spreadsheets. How could that possibly be as good?

Well, actually, it was better. The sales and marketing people were focused on volume numbers for past
history and used those to project future forecasts . . . in aggregate. Then they modified those projections
with adjustments for expected economic conditions and trends, anticipated market share changes, new
product launches, the competitive climate, and so forth. They were looking at the big picture; others were
mired in the details.

But many companies – often encouraged by Finance and Accounting folks and also those in Manufacturing
– placed heavy reliance on the detailed, roll-up approach. Some still do. Why? Well, we suppose one reason
is that it gives the illusion of accuracy because the process seems to be more precise. However, one of the
things we were taught in Statistics 101 is not to mistake precision for validity. Precise numbers are not
necessarily valid; they often give the illusion of validity but not the reality of it.


                             Projecting Future Volumes – The New Way

Today, with the emergence of Sales & Operations Planning as a primary management tool for balancing
demand and supply, it’s become more and more apparent that the detail/roll-up approach is not the way to
go. Executive S&OP is all about volume. It’s an aggregate planning tool and, as such, its presence is leading
companies to make longer range forecasts in aggregate.

Further, companies can derive their medium to long term production plans directly from the aggregate
forecasts. This is an integral part of the Executive S&OP process, where the production plan is set to balance
future supply with future demand to meet targets for inventory and/or the size of the customer order backlog2.

Why is this approach superior? There are three primary reasons:

        •     The results are more valid; the projections are better indicators of the future.

        •     It’s easier to focus on big-picture issues such as economic indicators, competitors,
              market share changes, new product launches, end-of-life issues, and so forth – when
              one isn’t lost in the details.

        •     It’s substantially less work, a not insignificant factor for a process such as Executive
              S&OP that happens on a monthly basis.
2
    The backlog of customer orders refers to all unshipped orders in house, future as well as current and past due. The backlog is significant: the larger the back-
     log, the longer the lead time on the next order that arrives. Too short a backlog can cause difficulties in the plants. Manufacturing flexibility can enable the
     plants to function well with smaller backlogs and thus shorter lead times. This can enhance the company’s competitive position.
                                                                                   5
A question arises: in the aggregate approach, how does one get an adequate view of the supply side? How
does one know how much of a workload the new aggregate forecast is placing on production and supplier
resources? Before we answer that, we need to get a key concept on the table.


                                 The Planning Time Fence

The Planning Time Fence is that future point inside of which we need high granularity; we need to know
the details. It represents the cumulative lead time to acquire material and to build the product, plus a short
time allowance for planning and order releasing.

Some companies build products on a cycle, for example once per quarter. In these cases, the Planning Time
Fence is set at the interval of that cycle time: 13 weeks in the once-per-quarter example.

For many companies, the Planning Time Fence (PTF) is four to eight weeks into the future. For companies
doing a good job with Lean Manufacturing, the PTF can be a week or less – except for those obtaining many
components from offshore. In those cases, the PTF could be at eight weeks or perhaps ten to twelve.

Given all of that, let’s look at a fundamental principle:

   Inside the Planning Time Fence, you must view things at the detailed, mix level.

You need a high degree of granularity inside the PTF because specific materials and components must be
acquired and specific products must be built.

Here’s another principle:

   Outside the Planning Time Fence, you should deal with aggregate volumes,
             except in rare circumstances.

The information needed outside the PTF needs to be directional, and the volume view provides that. It’s
important to know what the overall volumes look like for the next six or twelve or eighteen months, or
perhaps more, for a given resource (line, cell, work center, contract manufacturer, etc.).

What’s not necessary is to see which specific SKUs will run on Line 11 forty weeks into the future. Even
if you had that information, would it be of any value? Of course not – because it will change many times
over the upcoming months as changes occur to forecasts, orders, inventory levels, and so forth. Today’s
“snapshot” will be obsolete tomorrow.

Now let’s consider the disclaimer at the end of the second principle above: “except in rare circumstances.”
What’s that all about?

Well, let’s say we use a raw material that’s grown only in a tropical rain forest in a remote corner of Borneo.
Let’s call it RM 999. The lead time for harvesting, transportation, initial processing, further transportation,
final processing, and shipment of RM 999 to our plant is five months. But our Planning Time Fence is set
at six weeks. What should we do?


                                                       6
It’s simple: forecast and master schedule the individual product(s) using that raw material out for six or
more months3. But . . . don’t move the PTF for all products out to six months; do that for only the one(s)
using this raw material. See Figure 2, and note that the product using RM 999 is projected beyond the
Planning Time Fence.


                  Figure 2                                                 To d a y
                                                   History                                                 Forecast

                   Family

                   SKU 123
                                                                  A                      R
                                                                  G
                   SKU 234                                                               E
                                                                  G
                                                                  R                      C
                   SKU 345 (uses RM999)                           E                      O
                                                                  G                      N
                                                                  A
                   SKU 456                                        T
                                                                                         C
                                                                  E                      I
                   SKU 567                                                               L
                                                                  U                      E
                                                                  P
                   SKU 678

                                                                                                Planning Time Fence




                                Aligned Versus Non-Aligned Resources

Some companies have production resources that line up directly with their families4 (which are typically
market oriented groupings). In other words, all products within Family 1 are made in Resource A; all of
Family 2 is made in Resource B, and so forth. The resources are said to be aligned with the families5.

In these cases, the workload for the production resource can be seen right on the S&OP spreadsheet for the
family. It’s then a simple matter to compare that amount of work with the capacity for the resource. No
problem.

On the other hand, many companies have resources that we call non-aligned. For example, some individual
products within Family 5 are made in Resource A, others in Resource B, and still others in Resource C.

Thus it’s impossible to look at an S&OP spreadsheet for a given family and derive the workload for a given
resource. Complicating this is that fact that frequently the units of measure for the family (each, feet, liters,
thousands, etc.) are different from those of the resources, which are most often expressed in hours.




3
    And use MRP to calculate the specific requirements for RM 999.
4
    Sometimes called “product families” or “market families.” These are groupings that make sense to people in Sales and Marketing, and to the customers.
5
    One of the many contributions of Lean Manufacturing is that it leads companies to align resources. Substantial benefits can accrue.


                                                                              7
Rough-Cut Capacity Planning

The solution here is to use an approach called Rough-Cut Capacity Planning.6 This is a simple but effective
approach that “translates” the production plans for each family into workload by resource. These key
resources can be assembly lines, production cells, even individual work centers – in one’s own plants or
those of contract manufacturers. A key piece of data used in Rough-Cut Capacity Planning is the bill of
resources (sometimes called load profiles), shown in Figure 3.


           Figure 3
                                                       BILL OF RESOURCES

                                                          P r od u c t F a m i l y 5
                                                               (000 units)



                  1.5 hrs                              4.2 hrs                .9 hrs       11.3
                 Resource A                           Resource B            Resource C   Resource D


Typically companies will perform this Rough-Cut Planning on high impact resources – the 20 percent of
the resources that comprise 80 percent of the impact – and leave the detailed planning for the other resources
to the tools and processes used for mix.

Figure 3 is telling us that it takes 1.5 hours of production time in Resource A to make 1,000 units of Family
A, 4.2 hours in Resource B, and so on.

A similar technique, known as Rough-Cut Material Planning, translates family production plans into
medium to long range requirements for key materials, to provide volume information to key suppliers.
Note Resource D in the bill of resources: this may be a supplier, providing materials whose unit of measure
is pounds.

In the medium and long term, most suppliers are interested in the volume issue – how much? – and aren’t
normally concerned with mix – which ones: red, blue, or green? Close in, they care very much about the
mix but not far out into the future.

Given today’s expanded supply chains, companies today are including transportation and its required
resources as part of the rough cut planning process. Requirements for rail cars, trucks, material handling
stations, and the like can be estimated in a manner similar to production and supplier resources.

For a visual look at the Rough-Cut Planning approach, see Figure 4.




6
    Sometimes called Resource Requirements Planning

                                                                      8
Figure 4
                              ROUGH-CU T C A PA C I T Y P L A N N I N G

         Volume
         Forecast by Family

         Volume
         Production Plan
         by Family

                                              Bills of Resources




                                                     Required Capacity
                                                    for Key Resources
                    P l a n n i n g Ti m e F e n c e



                                 Simplifying Assumptions

There are two kinds of simplifying assumptions that we need to talk about here: one regarding sales mix
and the other about resource consumption. Let’s raise some questions, first about the sales mix:

•   How many individual products make up Family 5 shown in Figure 3?
    Let’s say 30.

•   Do all 30 products place the same load on resources as shown here?
    Let’s say they don’t. For example, Product 5-1 may consume 1.2 hours of Resource A; Product 5-2
    might take 3.0 hours; Product 5-3 may require .8 and so forth. The bill of resources is an average of all
    these.

•   A simple average?
    No. It’s a weighted average based on the percentage of each individual product’s sales within the family.
    The assumption here is that the sales will follow a certain pattern.

• But what if they don’t follow that pattern?
    They probably won’t. And that’s why these assumptions need to be reviewed and verified – or modified
    – frequently, so that shifts in the popularity of one product versus the others within that family can be
    identified and then reflected in the bills of resources.

The second set of simplifying assumptions deals with resource consumption. The bill of resources may be
based, in part, on the fact that Product 5-2 uses 3.0 hours of Resource A. Might that change in the future?
Certainly. Perhaps due to better methods in the plant, Product 5-2 may need only 1.1 hours in Resource A.
Or perhaps Product 5-2 might be shifted to a new piece of equipment not in Resource A.
                                                      9
These kinds of changes call for corresponding changes in the bills of resources. This is a data maintenance
job that must be done frequently. It need not, however, be onerous as software tools can be developed to:

•   compare recent sales mix within families to that used in the bill of resources and point out the deltas
    to the people on the demand side of the business, and

•   compare the bills of resources to the current routings and point out the deltas to people on the supply
    side of the business.

The example above represents a fairly simple situation. Some companies with more complexity will
enhance this process, perhaps via the use of sub-families (broken out from their families along a resource
orientation) or by adding another level into the bills of resources. This enables them to achieve the necessary
level of focus while retaining the essential simplicity of the Rough-Cut process.

Doing this is far less work than forecasting and planning thousands of SKUs for many months into the
future. And, what’s even more important, it yields better results.


                               Beware of the Suicide Quadrant

The combination of detailed forecasts and plans – over a long horizon – is a losing proposition. In Figure
5, the area with high detail and long horizon is labeled “the Suicide Quadrant.” We call it that because it
yields poorer results, requires more work, and can drive you crazy. You might want to shoot yourself.

             Figure 5
                                              PTF
                        High

                         D                         Suicide
                         E                        Quadrant
                         T
                         A
                         I
                         L

                        Low

                                   Short              H O R I Z O N              Long



So our message is clear: avoid the Suicide Quadrant. If you’re in it, get out. Executive S&OP can help
here because, done properly, it will provide you with aggregate projections. These will be better than those
rolled up using the detail. From these aggregate forecasts, you can derive operational plans – normally via
the Rough-Cut technique discussed earlier – and future financial plans by dollarizing the aggregate plans.

But . . . implementing Executive S&OP can sometimes lead companies into a problem. Let’s take the case
of a company that decides to implement the process. They already have a statistical forecasting program
that they used for projecting forecasts out over a six month horizon. When they learn that Executive S&OP

                                                      10
needs an approximately 18 month horizon, they simply flip a switch in the forecasting program and set the
horizon at 18 months. Then they run those forecasts into their master scheduling program and project that
out for 18 months, so they can determine resource requirements.

Well, it’s easy to get the computer to do those things. The hard part is reconciling the sum of the detailed
forecasts with an aggregate forecast made perhaps by someone in Marketing. These people, as we saw
earlier, have information on economic conditions, market trends, competitive activity, and the like. If
Marketing’s aggregate forecast is accepted, then the difference has to be sent down into all the detail – to
rerun the master schedule and recalculate the workloads.

That’s a lot of work. And it adds little if any value. It complicates what is at heart a simple, straightforward
process – Executive S&OP.

The principle that applies here: Beware of the technological imperative: just because you can do
something doesn’t mean you should do it.

And this leads us to our last principle: Stay out of the Suicide Quadrant. Keep it simple; work with the
detail only where you need it. Use aggregate data where you can, and that’s almost always that entire area
beyond the Planning Time Fence.


                                         Risk Assessment

Here’s an example of how the Rough-Cut Capacity approach, coupled with Executive S&OP, can provide
significant support for decision-making. Let’s listen in on an Executive meeting at the Acme Widget
Company.

Executive S&OP Process Owner: Since we’ve introduced the new products into Family 5, sales are
increasing a lot. Starting this summer, Marketing is forecasting 100,000 per month for that family.

Based on that, we’re going to need additional equipment in Resource A by November. The lead time to
procure, install, and make the equipment operational is 6 months, which means that we’ll need to place an
order three months from now – in May.

President: How solid are you Marketing folks with that forecast? What’s the range?

VP Marketing: We’re comfortable with it. The high side forecast is 120,000 and the low is 80,000.

President: Let’s test those for the new equipment buy.

Process Owner (keying in the low side forecast): Okay, as you can see on the screen, at 80,000 we won’t
need the new equipment until February. And . . . (more keying) . . . here’s the picture on 120,000. It says
that we’ll need the equipment on-line in August. That means we need to order now.

VP Operations: We’re dealing with two different capacity strategies here: lead and lag. If we lead and buy
now, we run the risk of having excess capacity for many months. If we lag and don’t buy, but the high
numbers materialize, we’ll be incurring the costs of high overtime, expediting, poor customer service, and
lost business.
                                                       11
President: Right now I’m leaning towards the high plan. I think it makes the most sense strategically but
I’m concerned about the financial risk. Marty, could you have your folks dollarize these three plans against
each of the three levels of sales? I’d like to reconvene tomorrow afternoon and put this to bed.

CFO: Sure, John, we’ll be ready.


                                            Conclusion

Could the above scenario have happened – within a few minutes at an Executive meeting – if Acme Widget
were working with full detail out across their entire planning horizon? It’s very unlikely.

So here’s a third benefit to using the aggregate approach in Executive S&OP. In addition to:

                                      a) less work, and

                                      b) better forecasts

it also enables a company to do valid simulations quickly. And more and more companies will begin to use
this kind of simulation heavily, enabling them to get the full “bang for the buck” out of Executive S&OP
and thereby make better decisions.

We need to add a word about software. Most successful users of Executive S&OP use Excel (or similar)
for processing the information outside the Planning Time Fence, including the kinds of simulation discussed
above. Recently, S&OP specific software has begun to emerge that can facilitate that and make it even
more powerful.

This new approach to doing forward planning is not only better, but simpler. However, don’t confuse
simpler with easier to implement. For many companies, this new way is very different from how they’ve
done it in the past, and thus can require major changes in organizational behavior.

But it’s well worth it. Executive S&OP, operating on a volume level and built on valid assumptions,
facilitates decision-making, enables simulation and risk assessment, and makes possible a more responsive,
proactive way of doing business.




                                                     12
ABOUT THE AUTHORS


Tom Wallace has over 30 years of experience in the supply chain and manufacturing fields. He’s
authored over ten books, including Sales & Operations Planning: The How-To Handbook, 2nd Ed.,
and with Bob Stahl Sales & Operations Planning: The How Executive’s Guide, Sales &
Operations Planning: The Self-Audit Workbook, Building to Customer Demand, Sales
Forecasting: A New Approach, and Master Scheduling in the 21st Century. Tom is a
Distinguished Fellow at Ohio State’s Center for Excellence in Manufacturing Management.

Tom can be reached at:      tom@tfwallace.com
                            513-281-0500
                            tfwallace.com


Bob Stahl has spent the last 30 years developing, teaching and helping companies implement leading
edge processes for manufacturing, logistics, and supply chain management. He is a developer, teacher,
writer, and consultant with a strong track record of success and has worked closely with a number of
the world’s leading corporations. Bob is the co-author of Sales & Operations Planning: The How
Executive’s Guide, Sales & Operations Planning: The Self-Audit Workbook, Building to
Customer Demand, Sales Forecasting: A New Approach, and Master Scheduling in the 21st
Century.

Bob can be reached at:      RStahlSr@aol.com
                            508-226-0477



______________________________________________________________________________



Copyright 2007 by T. F. Wallace & Company. All rights reserved. Permission to quote from this docu-
ment is hereby granted, provided that attribution is given. Permission to reproduce this document is
not granted except via written permission from T. F. Wallace & Company (tfwallace.com).




                                                 13

Weitere ähnliche Inhalte

Andere mochten auch

JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)
JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)
JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)UBC Corporation
 
Design Trend Report 2012
Design Trend Report 2012Design Trend Report 2012
Design Trend Report 2012RNA Design
 
JD Edwards EnterpriseOne Advanced Pricing Overview
JD Edwards EnterpriseOne Advanced Pricing OverviewJD Edwards EnterpriseOne Advanced Pricing Overview
JD Edwards EnterpriseOne Advanced Pricing OverviewUBC Corporation
 
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...OILWIRE
 
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - PresentationAker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - PresentationOILWIRE
 
Digital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldDigital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldEdelman
 
Fjord Trends 2017
Fjord Trends 2017 Fjord Trends 2017
Fjord Trends 2017 Fjord
 

Andere mochten auch (9)

Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia
 
JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)
JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)
JD Edwards EnterpriseOne Advanced Real Estate Forecasting (AREF)
 
Design Trend Report 2012
Design Trend Report 2012Design Trend Report 2012
Design Trend Report 2012
 
Bba 2012 market_forecast
Bba 2012 market_forecastBba 2012 market_forecast
Bba 2012 market_forecast
 
JD Edwards EnterpriseOne Advanced Pricing Overview
JD Edwards EnterpriseOne Advanced Pricing OverviewJD Edwards EnterpriseOne Advanced Pricing Overview
JD Edwards EnterpriseOne Advanced Pricing Overview
 
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...
Exxon Mobil Fourth Quarter Financial Results Earnings Call Q4 2016 - Presenta...
 
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - PresentationAker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
 
Digital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldDigital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing World
 
Fjord Trends 2017
Fjord Trends 2017 Fjord Trends 2017
Fjord Trends 2017
 

Ähnlich wie S&OP Volume Mix FORECAST LESS AND GET BETTER RESULTS

Drum buffer rope and buffer management in a make to stock environment
Drum buffer rope and buffer management in a make to stock environmentDrum buffer rope and buffer management in a make to stock environment
Drum buffer rope and buffer management in a make to stock environmentUtkan Uluçay, MSc., CDDP
 
mipb 2 capacityplanning v05_print_sam
mipb 2 capacityplanning v05_print_sammipb 2 capacityplanning v05_print_sam
mipb 2 capacityplanning v05_print_samJason Neale
 
Chapter - FIVE - DEMAND FORECASTING.pptx
Chapter - FIVE - DEMAND FORECASTING.pptxChapter - FIVE - DEMAND FORECASTING.pptx
Chapter - FIVE - DEMAND FORECASTING.pptxMahinRahman11
 
Chapter 4 5 Inventory.pptx
Chapter 4  5 Inventory.pptxChapter 4  5 Inventory.pptx
Chapter 4 5 Inventory.pptxSheldon Byron
 
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docx
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docxWBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docx
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docxcelenarouzie
 
Burt’S Bees Case Analysis
Burt’S Bees Case AnalysisBurt’S Bees Case Analysis
Burt’S Bees Case AnalysisJennifer Reither
 
Notes_For_Managerial_Economics.pdf
Notes_For_Managerial_Economics.pdfNotes_For_Managerial_Economics.pdf
Notes_For_Managerial_Economics.pdfAbhishekModak17
 
Startup financial modeling class - general assembly sf -- septemer 27
Startup financial modeling class  - general assembly sf -- septemer 27Startup financial modeling class  - general assembly sf -- septemer 27
Startup financial modeling class - general assembly sf -- septemer 27VentureArchetypes LLC
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideShannon Kearns
 
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportBlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportBlueRidgeInventory
 
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportBlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportJ Christopher Pariseau
 
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in Organisations
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in OrganisationsJason Fraser - A Leaders' Guide to Implementing Lean Startup in Organisations
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in OrganisationsLean Startup Summit EMEA
 
How to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costsHow to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costswilliamsjohnseoexperts
 
Forecasting Product Performance Like a Meteorologist (June 2012)
Forecasting Product Performance Like a Meteorologist (June 2012)Forecasting Product Performance Like a Meteorologist (June 2012)
Forecasting Product Performance Like a Meteorologist (June 2012)ProductCamp Boston
 
Forecasting Product Performance060912
Forecasting Product Performance060912Forecasting Product Performance060912
Forecasting Product Performance060912Ananda Chakravarty
 
Forecasting New Product Performance Like A Meteorologist
Forecasting New Product Performance Like A MeteorologistForecasting New Product Performance Like A Meteorologist
Forecasting New Product Performance Like A MeteorologistAnanda Chakravarty
 
Doing Less with Less
Doing Less with LessDoing Less with Less
Doing Less with LessBruce Janda
 
Building an agile business
Building an agile businessBuilding an agile business
Building an agile businessBarry Thomas
 

Ähnlich wie S&OP Volume Mix FORECAST LESS AND GET BETTER RESULTS (20)

Drum buffer rope and buffer management in a make to stock environment
Drum buffer rope and buffer management in a make to stock environmentDrum buffer rope and buffer management in a make to stock environment
Drum buffer rope and buffer management in a make to stock environment
 
Production operations management
Production operations managementProduction operations management
Production operations management
 
mipb 2 capacityplanning v05_print_sam
mipb 2 capacityplanning v05_print_sammipb 2 capacityplanning v05_print_sam
mipb 2 capacityplanning v05_print_sam
 
Chapter - FIVE - DEMAND FORECASTING.pptx
Chapter - FIVE - DEMAND FORECASTING.pptxChapter - FIVE - DEMAND FORECASTING.pptx
Chapter - FIVE - DEMAND FORECASTING.pptx
 
Schragenheim mts dbr
Schragenheim mts dbrSchragenheim mts dbr
Schragenheim mts dbr
 
Chapter 4 5 Inventory.pptx
Chapter 4  5 Inventory.pptxChapter 4  5 Inventory.pptx
Chapter 4 5 Inventory.pptx
 
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docx
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docxWBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docx
WBS with Gantt ChartWORK BREAKDOWN STRUCTURE WITH GANTT CHARTPROJE.docx
 
Burt’S Bees Case Analysis
Burt’S Bees Case AnalysisBurt’S Bees Case Analysis
Burt’S Bees Case Analysis
 
Notes_For_Managerial_Economics.pdf
Notes_For_Managerial_Economics.pdfNotes_For_Managerial_Economics.pdf
Notes_For_Managerial_Economics.pdf
 
Startup financial modeling class - general assembly sf -- septemer 27
Startup financial modeling class  - general assembly sf -- septemer 27Startup financial modeling class  - general assembly sf -- septemer 27
Startup financial modeling class - general assembly sf -- septemer 27
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step Guide
 
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportBlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
 
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-reportBlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
BlueRidge-gartner-supply-chain-planning-magic-quadrant-2016-report
 
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in Organisations
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in OrganisationsJason Fraser - A Leaders' Guide to Implementing Lean Startup in Organisations
Jason Fraser - A Leaders' Guide to Implementing Lean Startup in Organisations
 
How to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costsHow to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costs
 
Forecasting Product Performance Like a Meteorologist (June 2012)
Forecasting Product Performance Like a Meteorologist (June 2012)Forecasting Product Performance Like a Meteorologist (June 2012)
Forecasting Product Performance Like a Meteorologist (June 2012)
 
Forecasting Product Performance060912
Forecasting Product Performance060912Forecasting Product Performance060912
Forecasting Product Performance060912
 
Forecasting New Product Performance Like A Meteorologist
Forecasting New Product Performance Like A MeteorologistForecasting New Product Performance Like A Meteorologist
Forecasting New Product Performance Like A Meteorologist
 
Doing Less with Less
Doing Less with LessDoing Less with Less
Doing Less with Less
 
Building an agile business
Building an agile businessBuilding an agile business
Building an agile business
 

Mehr von Steelwedge

Strategic Planning Forw In Rev By Hayes
Strategic Planning Forw In Rev By HayesStrategic Planning Forw In Rev By Hayes
Strategic Planning Forw In Rev By HayesSteelwedge
 
Executive S&OP
Executive S&OPExecutive S&OP
Executive S&OPSteelwedge
 
Sales and Operations Planning
Sales and Operations PlanningSales and Operations Planning
Sales and Operations PlanningSteelwedge
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations PlanningSteelwedge
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP ConferenceSteelwedge
 
Steel Wedge Webcast
Steel Wedge WebcastSteel Wedge Webcast
Steel Wedge WebcastSteelwedge
 

Mehr von Steelwedge (6)

Strategic Planning Forw In Rev By Hayes
Strategic Planning Forw In Rev By HayesStrategic Planning Forw In Rev By Hayes
Strategic Planning Forw In Rev By Hayes
 
Executive S&OP
Executive S&OPExecutive S&OP
Executive S&OP
 
Sales and Operations Planning
Sales and Operations PlanningSales and Operations Planning
Sales and Operations Planning
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP Conference
 
Steel Wedge Webcast
Steel Wedge WebcastSteel Wedge Webcast
Steel Wedge Webcast
 

Kürzlich hochgeladen

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 

Kürzlich hochgeladen (20)

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 

S&OP Volume Mix FORECAST LESS AND GET BETTER RESULTS

  • 1. FORECAST LESS AND GET BETTER RESULTS subtitled LEAN FORECASTING sub-subtitled STAY OUT OF THE SUICIDE QUADRANT by TOM WALLACE and BOB STAHL Copyright 2007 T. F. Wallace & Co.
  • 2. TABLE OF CONTENTS Executive Overview 3 Volume and Mix Defined 4 Projecting Future Volumes – The Old Way 4 Projecting Future Volumes – The New Way 5 The Planning Time Fence 6 Aligned versus Non-aligned Resources 7 Rough-Cut Capacity Planning 8 Simplifying Assumptions 9 Beware of the Suicide Quadrant 10 Risk Assessment 11 Conclusion 12 About the Authors 13 2
  • 3. EXECUTIVE OVERVIEW This paper challenges conventional wisdom in the area of forecasting and planning: that companies need to project forecasts and plans far into the future at a detailed, highly granular level. Our position is that, in most cases, this is not necessary. Rather, detailed forecasts and plans are normally needed only inside of what’s called the Planning Time Fence. This is a point in the future: the cumulative lead time to acquire material and to build the product, plus a short time allowance for planning and order releasing. Inside of the Planning Time Fence, high granularity is needed. But, most often, not beyond it. The paper presents four principles: 1. Inside the Planning Time Fence, you must view things at the detailed, mix level. 2. Outside the Planning Time Fence, you should deal with aggregate volumes except in certain circumstances. 3. Beware of the technological imperative: just because you can do something doesn’t mean you should do it. 4. Stay out of the Suicide Quadrant. The Suicide Quadrant refers to forecasting and planning at a detailed level over a long horizon. This approach results in poorer results and requires more work. In this era of Lean Manufacturing, it can be seen as non-value adding activity. And, in this era of Sales & Operations Planning, it’s just not necessary to do it that way. Last, the use of aggregate forecasts and plans facilitates the evaluation of risk among competing strategies. 3
  • 4. Volume and Mix Defined The important task of getting products to customers centers around four fundamentals: demand and supply, volume and mix. Economists speak of supply and demand, which we feel carries a mind set from the 1950’s, the days following World War II when companies could sell whatever they made. Obviously, those days are long gone. Our world is demand driven, and thus we say “demand and supply.” Demand is the driver. Demand is what the customers want, while supply refers to the resources we have available to meet that customer demand – both external and internal. Simple enough. The distinction between volume and mix may not be so clear. Volume is the big picture, expressed in aggregate terms. It often deals with rates: rates of sales, of production, the aggregate finished goods inventory, the aggregate customer order backlog. The volume question is: how much? See Figure 1. Figure 1 THE FOUR FUNDAMENTALS Volume • The Big Picture • Product Families • How Much? Demand Supply • The Details • Individual SKUs, Orders Mix • Which Ones? Mix, on the other hand, is the details – specific stockkeeping units (SKUs), customer orders, and so forth. Mix issues are typically ones of timing and sequence; the mix question is which ones to produce first, second, third. Projecting Future Volumes – The Old Way Back in olden times, around 40 years ago, the digital computer made its entry into many companies. It was exciting; people were able to do things that couldn’t be done before. Of course, many of the things done on the computer in those early days didn’t amount to much, and in some cases actually made things worse1. Here’s one example. In making longer range plans – necessary for the annual financial plan, among other things – the computer enabled people to project SKU forecasts out into the future for 12 or 15 or 18 months. Then they could have the computer roll up the individual forecasts (mix) into aggregate groupings such as families (volume). These projections could serve as the volume forecasts out through the end of the upcoming fiscal year. 1. Ollie Wight called this “the age of naive sophistication” 4
  • 5. But that’s not all. They could take those same detailed forecasts, input them into their master scheduling software, get individual line item master schedules for the next 12 or more months, and roll them up into aggregate production plans for the next fiscal year. Pretty slick, eh? There was only one problem: the results weren’t very good. The forecasts in particular seemed to be suspect, almost always at variance with the aggregate forecasts that the folks in Sales and Marketing were projecting. And further, the mix-based forecasts usually turned out to be less accurate. But that didn’t stop people from doing it. After all, this was the sophisticated approach; we were “harnessing the power of the computer.” Over in Marketing, they were using mechanical calculators and manual spreadsheets. How could that possibly be as good? Well, actually, it was better. The sales and marketing people were focused on volume numbers for past history and used those to project future forecasts . . . in aggregate. Then they modified those projections with adjustments for expected economic conditions and trends, anticipated market share changes, new product launches, the competitive climate, and so forth. They were looking at the big picture; others were mired in the details. But many companies – often encouraged by Finance and Accounting folks and also those in Manufacturing – placed heavy reliance on the detailed, roll-up approach. Some still do. Why? Well, we suppose one reason is that it gives the illusion of accuracy because the process seems to be more precise. However, one of the things we were taught in Statistics 101 is not to mistake precision for validity. Precise numbers are not necessarily valid; they often give the illusion of validity but not the reality of it. Projecting Future Volumes – The New Way Today, with the emergence of Sales & Operations Planning as a primary management tool for balancing demand and supply, it’s become more and more apparent that the detail/roll-up approach is not the way to go. Executive S&OP is all about volume. It’s an aggregate planning tool and, as such, its presence is leading companies to make longer range forecasts in aggregate. Further, companies can derive their medium to long term production plans directly from the aggregate forecasts. This is an integral part of the Executive S&OP process, where the production plan is set to balance future supply with future demand to meet targets for inventory and/or the size of the customer order backlog2. Why is this approach superior? There are three primary reasons: • The results are more valid; the projections are better indicators of the future. • It’s easier to focus on big-picture issues such as economic indicators, competitors, market share changes, new product launches, end-of-life issues, and so forth – when one isn’t lost in the details. • It’s substantially less work, a not insignificant factor for a process such as Executive S&OP that happens on a monthly basis. 2 The backlog of customer orders refers to all unshipped orders in house, future as well as current and past due. The backlog is significant: the larger the back- log, the longer the lead time on the next order that arrives. Too short a backlog can cause difficulties in the plants. Manufacturing flexibility can enable the plants to function well with smaller backlogs and thus shorter lead times. This can enhance the company’s competitive position. 5
  • 6. A question arises: in the aggregate approach, how does one get an adequate view of the supply side? How does one know how much of a workload the new aggregate forecast is placing on production and supplier resources? Before we answer that, we need to get a key concept on the table. The Planning Time Fence The Planning Time Fence is that future point inside of which we need high granularity; we need to know the details. It represents the cumulative lead time to acquire material and to build the product, plus a short time allowance for planning and order releasing. Some companies build products on a cycle, for example once per quarter. In these cases, the Planning Time Fence is set at the interval of that cycle time: 13 weeks in the once-per-quarter example. For many companies, the Planning Time Fence (PTF) is four to eight weeks into the future. For companies doing a good job with Lean Manufacturing, the PTF can be a week or less – except for those obtaining many components from offshore. In those cases, the PTF could be at eight weeks or perhaps ten to twelve. Given all of that, let’s look at a fundamental principle: Inside the Planning Time Fence, you must view things at the detailed, mix level. You need a high degree of granularity inside the PTF because specific materials and components must be acquired and specific products must be built. Here’s another principle: Outside the Planning Time Fence, you should deal with aggregate volumes, except in rare circumstances. The information needed outside the PTF needs to be directional, and the volume view provides that. It’s important to know what the overall volumes look like for the next six or twelve or eighteen months, or perhaps more, for a given resource (line, cell, work center, contract manufacturer, etc.). What’s not necessary is to see which specific SKUs will run on Line 11 forty weeks into the future. Even if you had that information, would it be of any value? Of course not – because it will change many times over the upcoming months as changes occur to forecasts, orders, inventory levels, and so forth. Today’s “snapshot” will be obsolete tomorrow. Now let’s consider the disclaimer at the end of the second principle above: “except in rare circumstances.” What’s that all about? Well, let’s say we use a raw material that’s grown only in a tropical rain forest in a remote corner of Borneo. Let’s call it RM 999. The lead time for harvesting, transportation, initial processing, further transportation, final processing, and shipment of RM 999 to our plant is five months. But our Planning Time Fence is set at six weeks. What should we do? 6
  • 7. It’s simple: forecast and master schedule the individual product(s) using that raw material out for six or more months3. But . . . don’t move the PTF for all products out to six months; do that for only the one(s) using this raw material. See Figure 2, and note that the product using RM 999 is projected beyond the Planning Time Fence. Figure 2 To d a y History Forecast Family SKU 123 A R G SKU 234 E G R C SKU 345 (uses RM999) E O G N A SKU 456 T C E I SKU 567 L U E P SKU 678 Planning Time Fence Aligned Versus Non-Aligned Resources Some companies have production resources that line up directly with their families4 (which are typically market oriented groupings). In other words, all products within Family 1 are made in Resource A; all of Family 2 is made in Resource B, and so forth. The resources are said to be aligned with the families5. In these cases, the workload for the production resource can be seen right on the S&OP spreadsheet for the family. It’s then a simple matter to compare that amount of work with the capacity for the resource. No problem. On the other hand, many companies have resources that we call non-aligned. For example, some individual products within Family 5 are made in Resource A, others in Resource B, and still others in Resource C. Thus it’s impossible to look at an S&OP spreadsheet for a given family and derive the workload for a given resource. Complicating this is that fact that frequently the units of measure for the family (each, feet, liters, thousands, etc.) are different from those of the resources, which are most often expressed in hours. 3 And use MRP to calculate the specific requirements for RM 999. 4 Sometimes called “product families” or “market families.” These are groupings that make sense to people in Sales and Marketing, and to the customers. 5 One of the many contributions of Lean Manufacturing is that it leads companies to align resources. Substantial benefits can accrue. 7
  • 8. Rough-Cut Capacity Planning The solution here is to use an approach called Rough-Cut Capacity Planning.6 This is a simple but effective approach that “translates” the production plans for each family into workload by resource. These key resources can be assembly lines, production cells, even individual work centers – in one’s own plants or those of contract manufacturers. A key piece of data used in Rough-Cut Capacity Planning is the bill of resources (sometimes called load profiles), shown in Figure 3. Figure 3 BILL OF RESOURCES P r od u c t F a m i l y 5 (000 units) 1.5 hrs 4.2 hrs .9 hrs 11.3 Resource A Resource B Resource C Resource D Typically companies will perform this Rough-Cut Planning on high impact resources – the 20 percent of the resources that comprise 80 percent of the impact – and leave the detailed planning for the other resources to the tools and processes used for mix. Figure 3 is telling us that it takes 1.5 hours of production time in Resource A to make 1,000 units of Family A, 4.2 hours in Resource B, and so on. A similar technique, known as Rough-Cut Material Planning, translates family production plans into medium to long range requirements for key materials, to provide volume information to key suppliers. Note Resource D in the bill of resources: this may be a supplier, providing materials whose unit of measure is pounds. In the medium and long term, most suppliers are interested in the volume issue – how much? – and aren’t normally concerned with mix – which ones: red, blue, or green? Close in, they care very much about the mix but not far out into the future. Given today’s expanded supply chains, companies today are including transportation and its required resources as part of the rough cut planning process. Requirements for rail cars, trucks, material handling stations, and the like can be estimated in a manner similar to production and supplier resources. For a visual look at the Rough-Cut Planning approach, see Figure 4. 6 Sometimes called Resource Requirements Planning 8
  • 9. Figure 4 ROUGH-CU T C A PA C I T Y P L A N N I N G Volume Forecast by Family Volume Production Plan by Family Bills of Resources Required Capacity for Key Resources P l a n n i n g Ti m e F e n c e Simplifying Assumptions There are two kinds of simplifying assumptions that we need to talk about here: one regarding sales mix and the other about resource consumption. Let’s raise some questions, first about the sales mix: • How many individual products make up Family 5 shown in Figure 3? Let’s say 30. • Do all 30 products place the same load on resources as shown here? Let’s say they don’t. For example, Product 5-1 may consume 1.2 hours of Resource A; Product 5-2 might take 3.0 hours; Product 5-3 may require .8 and so forth. The bill of resources is an average of all these. • A simple average? No. It’s a weighted average based on the percentage of each individual product’s sales within the family. The assumption here is that the sales will follow a certain pattern. • But what if they don’t follow that pattern? They probably won’t. And that’s why these assumptions need to be reviewed and verified – or modified – frequently, so that shifts in the popularity of one product versus the others within that family can be identified and then reflected in the bills of resources. The second set of simplifying assumptions deals with resource consumption. The bill of resources may be based, in part, on the fact that Product 5-2 uses 3.0 hours of Resource A. Might that change in the future? Certainly. Perhaps due to better methods in the plant, Product 5-2 may need only 1.1 hours in Resource A. Or perhaps Product 5-2 might be shifted to a new piece of equipment not in Resource A. 9
  • 10. These kinds of changes call for corresponding changes in the bills of resources. This is a data maintenance job that must be done frequently. It need not, however, be onerous as software tools can be developed to: • compare recent sales mix within families to that used in the bill of resources and point out the deltas to the people on the demand side of the business, and • compare the bills of resources to the current routings and point out the deltas to people on the supply side of the business. The example above represents a fairly simple situation. Some companies with more complexity will enhance this process, perhaps via the use of sub-families (broken out from their families along a resource orientation) or by adding another level into the bills of resources. This enables them to achieve the necessary level of focus while retaining the essential simplicity of the Rough-Cut process. Doing this is far less work than forecasting and planning thousands of SKUs for many months into the future. And, what’s even more important, it yields better results. Beware of the Suicide Quadrant The combination of detailed forecasts and plans – over a long horizon – is a losing proposition. In Figure 5, the area with high detail and long horizon is labeled “the Suicide Quadrant.” We call it that because it yields poorer results, requires more work, and can drive you crazy. You might want to shoot yourself. Figure 5 PTF High D Suicide E Quadrant T A I L Low Short H O R I Z O N Long So our message is clear: avoid the Suicide Quadrant. If you’re in it, get out. Executive S&OP can help here because, done properly, it will provide you with aggregate projections. These will be better than those rolled up using the detail. From these aggregate forecasts, you can derive operational plans – normally via the Rough-Cut technique discussed earlier – and future financial plans by dollarizing the aggregate plans. But . . . implementing Executive S&OP can sometimes lead companies into a problem. Let’s take the case of a company that decides to implement the process. They already have a statistical forecasting program that they used for projecting forecasts out over a six month horizon. When they learn that Executive S&OP 10
  • 11. needs an approximately 18 month horizon, they simply flip a switch in the forecasting program and set the horizon at 18 months. Then they run those forecasts into their master scheduling program and project that out for 18 months, so they can determine resource requirements. Well, it’s easy to get the computer to do those things. The hard part is reconciling the sum of the detailed forecasts with an aggregate forecast made perhaps by someone in Marketing. These people, as we saw earlier, have information on economic conditions, market trends, competitive activity, and the like. If Marketing’s aggregate forecast is accepted, then the difference has to be sent down into all the detail – to rerun the master schedule and recalculate the workloads. That’s a lot of work. And it adds little if any value. It complicates what is at heart a simple, straightforward process – Executive S&OP. The principle that applies here: Beware of the technological imperative: just because you can do something doesn’t mean you should do it. And this leads us to our last principle: Stay out of the Suicide Quadrant. Keep it simple; work with the detail only where you need it. Use aggregate data where you can, and that’s almost always that entire area beyond the Planning Time Fence. Risk Assessment Here’s an example of how the Rough-Cut Capacity approach, coupled with Executive S&OP, can provide significant support for decision-making. Let’s listen in on an Executive meeting at the Acme Widget Company. Executive S&OP Process Owner: Since we’ve introduced the new products into Family 5, sales are increasing a lot. Starting this summer, Marketing is forecasting 100,000 per month for that family. Based on that, we’re going to need additional equipment in Resource A by November. The lead time to procure, install, and make the equipment operational is 6 months, which means that we’ll need to place an order three months from now – in May. President: How solid are you Marketing folks with that forecast? What’s the range? VP Marketing: We’re comfortable with it. The high side forecast is 120,000 and the low is 80,000. President: Let’s test those for the new equipment buy. Process Owner (keying in the low side forecast): Okay, as you can see on the screen, at 80,000 we won’t need the new equipment until February. And . . . (more keying) . . . here’s the picture on 120,000. It says that we’ll need the equipment on-line in August. That means we need to order now. VP Operations: We’re dealing with two different capacity strategies here: lead and lag. If we lead and buy now, we run the risk of having excess capacity for many months. If we lag and don’t buy, but the high numbers materialize, we’ll be incurring the costs of high overtime, expediting, poor customer service, and lost business. 11
  • 12. President: Right now I’m leaning towards the high plan. I think it makes the most sense strategically but I’m concerned about the financial risk. Marty, could you have your folks dollarize these three plans against each of the three levels of sales? I’d like to reconvene tomorrow afternoon and put this to bed. CFO: Sure, John, we’ll be ready. Conclusion Could the above scenario have happened – within a few minutes at an Executive meeting – if Acme Widget were working with full detail out across their entire planning horizon? It’s very unlikely. So here’s a third benefit to using the aggregate approach in Executive S&OP. In addition to: a) less work, and b) better forecasts it also enables a company to do valid simulations quickly. And more and more companies will begin to use this kind of simulation heavily, enabling them to get the full “bang for the buck” out of Executive S&OP and thereby make better decisions. We need to add a word about software. Most successful users of Executive S&OP use Excel (or similar) for processing the information outside the Planning Time Fence, including the kinds of simulation discussed above. Recently, S&OP specific software has begun to emerge that can facilitate that and make it even more powerful. This new approach to doing forward planning is not only better, but simpler. However, don’t confuse simpler with easier to implement. For many companies, this new way is very different from how they’ve done it in the past, and thus can require major changes in organizational behavior. But it’s well worth it. Executive S&OP, operating on a volume level and built on valid assumptions, facilitates decision-making, enables simulation and risk assessment, and makes possible a more responsive, proactive way of doing business. 12
  • 13. ABOUT THE AUTHORS Tom Wallace has over 30 years of experience in the supply chain and manufacturing fields. He’s authored over ten books, including Sales & Operations Planning: The How-To Handbook, 2nd Ed., and with Bob Stahl Sales & Operations Planning: The How Executive’s Guide, Sales & Operations Planning: The Self-Audit Workbook, Building to Customer Demand, Sales Forecasting: A New Approach, and Master Scheduling in the 21st Century. Tom is a Distinguished Fellow at Ohio State’s Center for Excellence in Manufacturing Management. Tom can be reached at: tom@tfwallace.com 513-281-0500 tfwallace.com Bob Stahl has spent the last 30 years developing, teaching and helping companies implement leading edge processes for manufacturing, logistics, and supply chain management. He is a developer, teacher, writer, and consultant with a strong track record of success and has worked closely with a number of the world’s leading corporations. Bob is the co-author of Sales & Operations Planning: The How Executive’s Guide, Sales & Operations Planning: The Self-Audit Workbook, Building to Customer Demand, Sales Forecasting: A New Approach, and Master Scheduling in the 21st Century. Bob can be reached at: RStahlSr@aol.com 508-226-0477 ______________________________________________________________________________ Copyright 2007 by T. F. Wallace & Company. All rights reserved. Permission to quote from this docu- ment is hereby granted, provided that attribution is given. Permission to reproduce this document is not granted except via written permission from T. F. Wallace & Company (tfwallace.com). 13