Sanchit Dubey CV.

SANCHIT DUBEY
: +91-8308785759, +91-9827721047
: sanchitdubey84@gmail.com
PROJECT PLANNING & NEW PRODUCT DEVELOPMENT PROFESSIONALPROJECT PLANNING & NEW PRODUCT DEVELOPMENT PROFESSIONAL
Seeking a challenging position with a growth-oriented organization, which would give me the opportunity to
utilize my skills for development of professional / personal goals & organizational objectives
PROFILE
 Technically competent Mechanical Engineer, with an experience of 9 years in managing each and
every responsibility related to Project Planning & New Product Development, new project
costing, material procurement, and project execution. Currently spearheading efforts with Tata
Motors, Pune as Project Support Engineer - Proto Planning & Development Department.(R & D )
 Exceptional capabilities in executing technically challenging projects, within defined time/cost
parameters; Excellent analytical and conflict resolving skills with managerial strengths in
synchronizing team efforts to catalyze work execution to specified quality standards.
 Additionally accented with techno-commercial skills, cost estimations, budgeting, material
management, quality management, inventory management and safety measures while ensuring
timely deliverables within pre-set cost parameters.
 Self motivated, hard working & consistent with a high degree of flexibility, creativity,
resourcefulness, commitment & optimism.
Core Competencies:
Project Execution Planning & Development Cost Estimation and Budgeting  Vendor
Management  Inspection  Cross Functional Coordination  Material Management
Software Proficiency:
Basic Knowledge of AUTOCAD, PRO-E, SAP, PLM.
Professional Experience
January 2011-Present Tata Motors, Pune Project Support Engineer
Tata Motors Ltd. is a leading Automobile company manufacturer of passenger vehicle, LCV, HCV, SCV
Role:
 Spearheading efforts as Project Support Engineer and working on Plan and develop new prototypes
of automobiles, mainly SCV and Electric vehicles.
 Presently working on SCV vehicles and Electric vehicles development for domestic market as well
export market.
 We plan product development according to DID and DDP and prepare checklist according to that
for further proto development and implementations to complete vehicle development on time.
 Cost estimation of new vehicle, includes costing of proprietary part, Parts manufactured by vendors
and in house fabricated or machined components.
 Coordinate with design department, regarding design issues for making the manufacturing process
of parts easier at production level, and finalization of design to freeze the product specification.
 Planning for Assembly of vehicles after detailed study of the drawings and DMU review
considering all the pros and cons with the best possible alternatives as per target date.
 Coordinate on-site activities to ensure smooth work progress and conceptualized and implemented
measures for enhancing operational efficient and optimizing resource utilization.
 Accountable for preparation of planning for new vehicle part development on time. we segregate
vehicle parts according to long term and short term items and according to their classes plan to
arrange parts on time.
 After study of drawings plan to manufacture the parts in-house or procure from outsource and
regular follow up of suppliers.
 Coordinate with assembly, machine shop, fabrication shop, purchase, testing, stores and dispatch
department to ensure timely completion of projects.
 Coordinate with testing department. For vehicle and part validation.
 Preparation of feedback report and final inspection report after completion of all the process and
development of vehicles.
 Responsible to updation of new developed part on vehicle to improve the efficiency of vehicles, and
trouble shoot all the problems occurs during or after replacement.
 Participate in daily meetings and weekly meetings to review targets and its completion dates and
follow regular status of parts to achieve target on time.
 Schedule and monitor program activity to achieve an “on-time” result including follow-up with
external suppliers to ensure timely response to action items using SAP and PLM.
 In depth knowledge of the manufacturing and inspection process of the commodity for
development of Prototype parts.
 Sound knowledge of manufacturing process (casting, machined parts, sheet metal parts, fabricated
component).
 Good knowledge of Parts/aggregates used in Chassis & Bus body building manufacturing process
Achievements:
 Completed development of SCV vehicle for international market (including manufacturing of fixtures
components and assembly)
 Development of Electric vehicles.
 Successfully completed two Auto Expo project.
 Trims parts development for Passenger vehicle.
July 20088 to Dec 2010 Mahle Engine Components Senior Supervisor (Production)
Mahle is a German MNC large manufacturer of Auto components, its key customer include Tata Motors,
John Deere, Swaraj Mazda, General Motors, Eicher, Cummins
Role:
 Handling a team to achieve daily & monthly production targets.
 Manage efficiency of manufacturing operations by reviewing available data.
 Compile regular production schedules.
 Analyze routing to ensure accuracy at all times.
 Track production process.
 Maintain inventory.
 Perform capacity planning and shop order releases.
 Prepare detailed updates for report generation.
 Ascertaining requirements of material for development activities & interfacing with vendors for
cost effective, timely sourcing of quality material for monitoring jigs and fixtures in assembly line.
 Ensuring in process compliance by monitoring processes; identifying defects & modifying final
scale up.
 Co-ordinating with Design Development, Tool Room & Maintenance departments for designs and
customer requirements.
 Ascertaining defect free material supply to the dispatch area & maintaining low rejection targets.
 Identifying areas of improvement and recommending process modifications and equipment
calibrations to enhance operational efficiencies of the systems.
 Executing cost saving techniques/ measures and modifications to achieve substantial reduction in
O&M expenditures and work within the budget.
Achievements:
 Innovatively changed the process by eliminating the cam lapping by improving the cam-grinding
process.
 Brought about cost saving by reusing the grinding wheel on rough grinding operation.
 Distinction of introducing two more steady which resulted in less vibration and bending of the job
 Successfully completed customer audit and won award for best quality supply.
Aug 2007 to Jun 2008 Eicher Engineering Component GET
(Eicher Engineering component is a Gear manufacturing unit of Eicher Motors Ltd.)
Role:
 Handling a team to achieve daily & monthly production targets.
 Ascertaining requirements of material for development activities.
 Facilitating the implementation of quality standards like 5S across the shop floor.
 Analysing customer complaints & to working towards improving the quality of product with
regard to application, fitment & aesthetic value.
 Reviewing the operational practices, identifying the areas of obstruction/ quality failures and
working on system and process changes for qualitative improvement/ energy conservation.
Achievements:
 Successfully reduced the cycle time by modifying the shaving fixture.
 Efficiently maintained records as ISO records.
 Monitor compliance with standards.
 Identify areas for improvement.
Aug 2006- Jul 2007 Gajra Gear Limited Apprentice Trainee
Gajra Gear is a large gear manufacturing company key customer Eicher, Tata Motors, Mahindra)
Role:
 Understand the manufacturing process of gears.
 Facilitating the implementation of quality standards like 5S across the shop floor.
 Equipment calibrations to enhance operational efficiencies of the systems.
 Coordination with design, maintenance department for defect free production.
 Ensure availability of material in shop.
Achievements:
 Successfully completed CNC training.
 Completed ISO audit.
 Monitor compliance with standards.
Academics
Degree College University/Board Percentage Year
B.E. (Mech.) Bansal Institute of
Science &
Technology
R.G.P.V. 63.28% 2006
XIIth Pt. Ram Lal Sharma
School
M.P.Board 62.66% 2002
Xth Pt. Ram Lal Sharma
School
M.P.Board 78% 2000
Personal Details
Fathers Name : Shri Rajendra Kumar Dubey
Date of Birth : 06th
Sept. 1984
Marital Status : Married
Hobbies : Listening Music, Reading books
Language Known : English, Hindi
Address : 52B, Prabhakar Apartments, Bhelke nagar, Kothrud, Pune-411038
Date:
Place: (Sanchit Dubey)

Recomendados

Sathishbabu von
SathishbabuSathishbabu
Sathishbabusathish babu
51 views4 Folien
Rakesh burman resume von
Rakesh burman resume Rakesh burman resume
Rakesh burman resume Rakesh burman
428 views4 Folien
Resume von
ResumeResume
ResumeBipadbhanjon Dey
227 views4 Folien
12 von
1212
12SAIYAD MAHAMADRAFI
151 views6 Folien
Rohan Kesharwani_121216 von
Rohan Kesharwani_121216Rohan Kesharwani_121216
Rohan Kesharwani_121216Rohan Kesharwani
308 views3 Folien
sanjay resume von
sanjay resumesanjay resume
sanjay resumesanjay patel
315 views3 Folien

Más contenido relacionado

Was ist angesagt?

GM-Automotive von
GM-AutomotiveGM-Automotive
GM-AutomotiveGunasekaran Venugopal
157 views2 Folien
Devaraju Updated CV von
Devaraju Updated CVDevaraju Updated CV
Devaraju Updated CVDevaraju Degala
98 views2 Folien
KiranKumaraCJSeniorproductionEngineer von
KiranKumaraCJSeniorproductionEngineerKiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineerkiran kumar
147 views3 Folien
Ganesh B Gawali von
Ganesh B GawaliGanesh B Gawali
Ganesh B Gawaliganesh gawali
393 views5 Folien
CV_Pooranpr von
CV_PooranprCV_Pooranpr
CV_PooranprPooran Shahani
116 views4 Folien
pankaj maniar von
pankaj maniarpankaj maniar
pankaj maniarpankaj maniar
94 views6 Folien

Was ist angesagt?(19)

KiranKumaraCJSeniorproductionEngineer von kiran kumar
KiranKumaraCJSeniorproductionEngineerKiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineer
kiran kumar147 views
kabilanpj_resume 10 von kabilan pj
kabilanpj_resume 10kabilanpj_resume 10
kabilanpj_resume 10
kabilan pj92 views

Destacado

Ppt for slideshare von
Ppt for slidesharePpt for slideshare
Ppt for slidesharemstraetmans
69 views1 Folie
abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft) von
abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)
abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)Anne Struiksma
101 views3 Folien
Lessons learned 1.0 von
Lessons learned 1.0Lessons learned 1.0
Lessons learned 1.0Sharewood
311 views11 Folien
De citit von
De cititDe citit
De cititMovi Movileanu
93 views1 Folie
Practica 3 von
Practica 3Practica 3
Practica 3Looye
39 views1 Folie
CURRICULUM VITAE Rajan-1 von
CURRICULUM VITAE Rajan-1CURRICULUM VITAE Rajan-1
CURRICULUM VITAE Rajan-1MACWAN RAJAN
193 views3 Folien

Destacado(17)

abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft) von Anne Struiksma
abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)
abstract_Transparante akoestische oplossingen - Anne Struiksma (TUDelft)
Anne Struiksma101 views
Lessons learned 1.0 von Sharewood
Lessons learned 1.0Lessons learned 1.0
Lessons learned 1.0
Sharewood311 views
Practica 3 von Looye
Practica 3Practica 3
Practica 3
Looye39 views
CURRICULUM VITAE Rajan-1 von MACWAN RAJAN
CURRICULUM VITAE Rajan-1CURRICULUM VITAE Rajan-1
CURRICULUM VITAE Rajan-1
MACWAN RAJAN193 views
Sante physique-et-mentale-au-travail-dossier-0409 von Mhammed Hamdaoui
Sante physique-et-mentale-au-travail-dossier-0409Sante physique-et-mentale-au-travail-dossier-0409
Sante physique-et-mentale-au-travail-dossier-0409
Mhammed Hamdaoui231 views
Ap 1. lettre de cadrage - v.2016.08 4-1029 von Mhammed Hamdaoui
Ap   1. lettre de cadrage - v.2016.08 4-1029Ap   1. lettre de cadrage - v.2016.08 4-1029
Ap 1. lettre de cadrage - v.2016.08 4-1029
Mhammed Hamdaoui166 views
Unrestricted - Complex Regulation Practical Security FINAL von Wayne Anderson
Unrestricted - Complex Regulation Practical Security FINALUnrestricted - Complex Regulation Practical Security FINAL
Unrestricted - Complex Regulation Practical Security FINAL
Wayne Anderson119 views
Báo cáo thực tập - Nhơn Mỹ - Lê Trọng Nhân - 2016 von nhonmy luu
Báo cáo thực tập - Nhơn Mỹ - Lê Trọng Nhân - 2016Báo cáo thực tập - Nhơn Mỹ - Lê Trọng Nhân - 2016
Báo cáo thực tập - Nhơn Mỹ - Lê Trọng Nhân - 2016
nhonmy luu510 views

Similar a Sanchit Dubey CV.

Rsume von
RsumeRsume
RsumeManikandan Srm
471 views6 Folien
Vittal Resume 22.07.2015.2 von
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal B
485 views10 Folien
CV_AVINASH B. WADASKAR-2016-08-23 von
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23Avinash Wadaskar
190 views4 Folien
Debahis CV von
Debahis CVDebahis CV
Debahis CVpriyacivil93
90 views3 Folien
Ketul Resume von
Ketul ResumeKetul Resume
Ketul ResumePatel Ketul
444 views4 Folien
Resumepmlatest von
ResumepmlatestResumepmlatest
ResumepmlatestRajasekar Sundarajan
187 views7 Folien

Similar a Sanchit Dubey CV.(20)

Vittal Resume 22.07.2015.2 von Vittal B
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
Vittal B485 views
Resume_Press Tool Design & Development & Product Engineering.DOCX von Rohit Tyagi
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
Rohit Tyagi307 views
karthigairaj Process control andTechnical service resume von Karthigairaj Kandan
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
Seanresume3-15.docx-2 von Sean Hedden
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
Sean Hedden197 views

Sanchit Dubey CV.

  • 1. SANCHIT DUBEY : +91-8308785759, +91-9827721047 : sanchitdubey84@gmail.com PROJECT PLANNING & NEW PRODUCT DEVELOPMENT PROFESSIONALPROJECT PLANNING & NEW PRODUCT DEVELOPMENT PROFESSIONAL Seeking a challenging position with a growth-oriented organization, which would give me the opportunity to utilize my skills for development of professional / personal goals & organizational objectives PROFILE  Technically competent Mechanical Engineer, with an experience of 9 years in managing each and every responsibility related to Project Planning & New Product Development, new project costing, material procurement, and project execution. Currently spearheading efforts with Tata Motors, Pune as Project Support Engineer - Proto Planning & Development Department.(R & D )  Exceptional capabilities in executing technically challenging projects, within defined time/cost parameters; Excellent analytical and conflict resolving skills with managerial strengths in synchronizing team efforts to catalyze work execution to specified quality standards.  Additionally accented with techno-commercial skills, cost estimations, budgeting, material management, quality management, inventory management and safety measures while ensuring timely deliverables within pre-set cost parameters.  Self motivated, hard working & consistent with a high degree of flexibility, creativity, resourcefulness, commitment & optimism. Core Competencies: Project Execution Planning & Development Cost Estimation and Budgeting  Vendor Management  Inspection  Cross Functional Coordination  Material Management Software Proficiency: Basic Knowledge of AUTOCAD, PRO-E, SAP, PLM. Professional Experience January 2011-Present Tata Motors, Pune Project Support Engineer Tata Motors Ltd. is a leading Automobile company manufacturer of passenger vehicle, LCV, HCV, SCV Role:  Spearheading efforts as Project Support Engineer and working on Plan and develop new prototypes of automobiles, mainly SCV and Electric vehicles.  Presently working on SCV vehicles and Electric vehicles development for domestic market as well export market.  We plan product development according to DID and DDP and prepare checklist according to that for further proto development and implementations to complete vehicle development on time.  Cost estimation of new vehicle, includes costing of proprietary part, Parts manufactured by vendors and in house fabricated or machined components.  Coordinate with design department, regarding design issues for making the manufacturing process of parts easier at production level, and finalization of design to freeze the product specification.  Planning for Assembly of vehicles after detailed study of the drawings and DMU review considering all the pros and cons with the best possible alternatives as per target date.  Coordinate on-site activities to ensure smooth work progress and conceptualized and implemented measures for enhancing operational efficient and optimizing resource utilization.  Accountable for preparation of planning for new vehicle part development on time. we segregate vehicle parts according to long term and short term items and according to their classes plan to arrange parts on time.  After study of drawings plan to manufacture the parts in-house or procure from outsource and regular follow up of suppliers.
  • 2.  Coordinate with assembly, machine shop, fabrication shop, purchase, testing, stores and dispatch department to ensure timely completion of projects.  Coordinate with testing department. For vehicle and part validation.  Preparation of feedback report and final inspection report after completion of all the process and development of vehicles.  Responsible to updation of new developed part on vehicle to improve the efficiency of vehicles, and trouble shoot all the problems occurs during or after replacement.  Participate in daily meetings and weekly meetings to review targets and its completion dates and follow regular status of parts to achieve target on time.  Schedule and monitor program activity to achieve an “on-time” result including follow-up with external suppliers to ensure timely response to action items using SAP and PLM.  In depth knowledge of the manufacturing and inspection process of the commodity for development of Prototype parts.  Sound knowledge of manufacturing process (casting, machined parts, sheet metal parts, fabricated component).  Good knowledge of Parts/aggregates used in Chassis & Bus body building manufacturing process Achievements:  Completed development of SCV vehicle for international market (including manufacturing of fixtures components and assembly)  Development of Electric vehicles.  Successfully completed two Auto Expo project.  Trims parts development for Passenger vehicle. July 20088 to Dec 2010 Mahle Engine Components Senior Supervisor (Production) Mahle is a German MNC large manufacturer of Auto components, its key customer include Tata Motors, John Deere, Swaraj Mazda, General Motors, Eicher, Cummins Role:  Handling a team to achieve daily & monthly production targets.  Manage efficiency of manufacturing operations by reviewing available data.  Compile regular production schedules.  Analyze routing to ensure accuracy at all times.  Track production process.  Maintain inventory.  Perform capacity planning and shop order releases.  Prepare detailed updates for report generation.  Ascertaining requirements of material for development activities & interfacing with vendors for cost effective, timely sourcing of quality material for monitoring jigs and fixtures in assembly line.  Ensuring in process compliance by monitoring processes; identifying defects & modifying final scale up.  Co-ordinating with Design Development, Tool Room & Maintenance departments for designs and customer requirements.  Ascertaining defect free material supply to the dispatch area & maintaining low rejection targets.  Identifying areas of improvement and recommending process modifications and equipment calibrations to enhance operational efficiencies of the systems.  Executing cost saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget. Achievements:  Innovatively changed the process by eliminating the cam lapping by improving the cam-grinding process.  Brought about cost saving by reusing the grinding wheel on rough grinding operation.  Distinction of introducing two more steady which resulted in less vibration and bending of the job  Successfully completed customer audit and won award for best quality supply.
  • 3. Aug 2007 to Jun 2008 Eicher Engineering Component GET (Eicher Engineering component is a Gear manufacturing unit of Eicher Motors Ltd.) Role:  Handling a team to achieve daily & monthly production targets.  Ascertaining requirements of material for development activities.  Facilitating the implementation of quality standards like 5S across the shop floor.  Analysing customer complaints & to working towards improving the quality of product with regard to application, fitment & aesthetic value.  Reviewing the operational practices, identifying the areas of obstruction/ quality failures and working on system and process changes for qualitative improvement/ energy conservation. Achievements:  Successfully reduced the cycle time by modifying the shaving fixture.  Efficiently maintained records as ISO records.  Monitor compliance with standards.  Identify areas for improvement. Aug 2006- Jul 2007 Gajra Gear Limited Apprentice Trainee Gajra Gear is a large gear manufacturing company key customer Eicher, Tata Motors, Mahindra) Role:  Understand the manufacturing process of gears.  Facilitating the implementation of quality standards like 5S across the shop floor.  Equipment calibrations to enhance operational efficiencies of the systems.  Coordination with design, maintenance department for defect free production.  Ensure availability of material in shop. Achievements:  Successfully completed CNC training.  Completed ISO audit.  Monitor compliance with standards. Academics Degree College University/Board Percentage Year B.E. (Mech.) Bansal Institute of Science & Technology R.G.P.V. 63.28% 2006 XIIth Pt. Ram Lal Sharma School M.P.Board 62.66% 2002 Xth Pt. Ram Lal Sharma School M.P.Board 78% 2000 Personal Details Fathers Name : Shri Rajendra Kumar Dubey Date of Birth : 06th Sept. 1984 Marital Status : Married Hobbies : Listening Music, Reading books Language Known : English, Hindi Address : 52B, Prabhakar Apartments, Bhelke nagar, Kothrud, Pune-411038 Date: Place: (Sanchit Dubey)