PPP in Urban Development
India, Transport Sector, Jharkhand Road Programme
Turkey, Transport Sector, Eurasia Tunnel
Eurasia Tunnel
Project Eurasia Tunnel
Project Proponent Government of Turkey
Project Organization Avrasya Tuneli İsletme ve Yatirim A.S
Public Organization
Directorate General of Infrastructure Investments (AYGM)
Private Organization
Yapi Merkezi İnsaat ve Sanayi A.S.
SK Engineering & Construction Co. Ltd
CAPITAL PROVIDERS
US$960 MILLION FIXED RATE LOAN US$277 MILLION
EBRD, EIB, KOREAN EMIX, Korean Export Insurance Bank,
Standard chattered bank, Sumitomo Mitsui banking
corporation and Mizuho bank
AYGM
Where
• Istanbul located at the crossroads of Europe and Asia and it is surrounded and divided by
sea. The two sides are connected by 3 bridges
• The tunnel constructed between Kazlicesme on the European side of Istanbul and Goztepe
on the Asian side of Istanbul and connects the two parts a city of 15 million together under
the seabed together with the bridges.
Why
• Before the construction of this Project, the two existing bridges which connect the different
continents of Istanbul were carrying much higher than their capacity,
• The congestion on these bridges led to millions of hours spent in traffic, emission of millions of
tones of CO2 and was causing a decrease in peoples’ life quality.
• Project provides fast, safe and comfortable transportation alternative for Istanbul
• Feasibility studies show that the project achieve Value-for-Money (VfM) if delivered as a PPP
Context and Strategy Supporting the Project:
What
• The tunnel contributes to the growth of Istanbul’s air transport by providing the most practical
link between the city’s two airports: Atatürk Airport and Sabiha Gökçen Airport.
• By decreasing distance, it will indirectly contribute to reductions in fuel consumption, noise
pollution and CO2 emissions.
Who
• Key stakeholders for this project are Istanbul citizens and the other stakeholders are;
Government of Turkey, Directorate General of Infrastructure Investments (AYGM)
Istanbul Metropolitan Municipality, Avrasya Tuneli İsletme ve Yatirim A.S.(ATAS)
• Private side : Responsible for building and operating the tunnel, expansions on the existing
connection roads of the tunnel.
• Public side: Is responsible for permissions and guarantee mechanism (min. demand guarantee,
debt assumption)
When
• Construction Period: 3 years 11 months 3 days,
• Operation Period: 25 years 11 months 9 days,
• Project got the approval to be tendered as a BOT: 6/2006,
• Implementation Contract: 11/2011,
• Financing Agreement: 12/2012.
• The tunnel was officially opened to traffic on 22 December 2016.
Context and Strategy Supporting the Project:
The project creates a convenient and direct link between Asia and Europe.
Increase access to essential services and promote equity
Istanbul is the largest city in Turkey and also one of the largest cities in the world in terms of population.
The number of registered vehicles in Istanbul reached 3.6 million in 2018.
Together with rapid population growth and economic development considerable pressure has been added on the
existing transportation system
Tunnel relieves Istanbul’s transcontinental traffic pressure and serves as a 'Fast', 'Economic', 'Safe', 'Comfortable' and
'Environment friendly' transportation alternative for the Istanbul Strait crossing.
During the EIA, all stakeholders were involved.
Total investment value: 1.4 billion dollars
Construction Period: 4 years 7 months
Operation Period: 25 years 11 months 9 days
Demonstrate the economic and financial effectiveness of the project
Engage all stakeholders
Besides the contracting authority and the SPV, the most important stakeholder is the people of İstanbul. The
construction of this Project required some main arterial roads to be closed for months. To manage the public reaction
against the Project, the benefits were expressed clearly.
During the Environmental and Social Impact Assessment, process feedbacks were taken from the related
municipalities, 25 different neighborhoods to ensure that the process includes their concerns. Besides this process is
open to the participation of all affected parties (citizens and institutions).
User-paid project with a traffic guarantee provided by the Contracting Agency. It has already reached %70 of guarantee
level in 2017.
The economic benefits of the Tunnel arising from the operation year 2018 is estimated 1.2 billion Turkish Liras.
Estimated time savings: 23 million hours Estimated savings of operating a car: 109 million vehicle/km
Estimated fuel savings: 30.000 tonnes Estimated CO2 emission savings: 18.000 tonnes
References
Thank You
Valusa Saikiran
2016BPLN007

More Related Content

What's hot

Ferryservicesummary
FerryservicesummaryFerryservicesummary
FerryservicesummaryRose Klein
 
GA Tech Alumni Mag_2007
GA Tech Alumni Mag_2007GA Tech Alumni Mag_2007
GA Tech Alumni Mag_2007Falynn
 
Ppp in mega infrastructure projects perspectives from mainland china
Ppp in mega infrastructure projects   perspectives from mainland chinaPpp in mega infrastructure projects   perspectives from mainland china
Ppp in mega infrastructure projects perspectives from mainland chinaWeisheng Lu
 
ISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBDISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBDOECDGlobalRelations
 
Seattle presentation 2
Seattle presentation 2Seattle presentation 2
Seattle presentation 2ce4710
 
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...The Business Council of Mongolia
 
Introduction to Civil Engineering - Highlighting the High Speed Rail
Introduction to Civil Engineering - Highlighting the High Speed RailIntroduction to Civil Engineering - Highlighting the High Speed Rail
Introduction to Civil Engineering - Highlighting the High Speed RailNebraska Transportation Center
 
Innovations of civil engineering
Innovations of civil engineeringInnovations of civil engineering
Innovations of civil engineeringAbhijit Pal
 
Principles and Practices of Tod
Principles and Practices  of Tod Principles and Practices  of Tod
Principles and Practices of Tod deespacio
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)padamatikona swapnika
 

What's hot (11)

Ferryservicesummary
FerryservicesummaryFerryservicesummary
Ferryservicesummary
 
mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...
 
GA Tech Alumni Mag_2007
GA Tech Alumni Mag_2007GA Tech Alumni Mag_2007
GA Tech Alumni Mag_2007
 
Ppp in mega infrastructure projects perspectives from mainland china
Ppp in mega infrastructure projects   perspectives from mainland chinaPpp in mega infrastructure projects   perspectives from mainland china
Ppp in mega infrastructure projects perspectives from mainland china
 
ISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBDISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBD
 
Seattle presentation 2
Seattle presentation 2Seattle presentation 2
Seattle presentation 2
 
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...
24.03.2014, Public Private Partnership in Mongolia: Now and Future Prospects,...
 
Introduction to Civil Engineering - Highlighting the High Speed Rail
Introduction to Civil Engineering - Highlighting the High Speed RailIntroduction to Civil Engineering - Highlighting the High Speed Rail
Introduction to Civil Engineering - Highlighting the High Speed Rail
 
Innovations of civil engineering
Innovations of civil engineeringInnovations of civil engineering
Innovations of civil engineering
 
Principles and Practices of Tod
Principles and Practices  of Tod Principles and Practices  of Tod
Principles and Practices of Tod
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
 

Similar to PPP in Urban Development

Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyTurkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyOECD Governance
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale BridgeZeynepUla2
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationAdam Smith
 
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...The Middle East Association
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arunKartikeya Pandey
 
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020Taju Abdulaziz
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarksCrosstown TO
 
Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road ProjectIOSR Journals
 
Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)Eton College
 
2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdf2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdfNabilaEram
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrailtutor2u
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of CrossrailEton College
 
Role of Infrastructure in Development 2
Role of Infrastructure in Development 2Role of Infrastructure in Development 2
Role of Infrastructure in Development 2Krushna Chandra Kar
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_iiVictor Peters
 
Session 3: River Transport Authority
Session 3: River Transport AuthoritySession 3: River Transport Authority
Session 3: River Transport AuthorityOECDGlobalRelations
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Nhi Nguyen (Katherine)
 
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Htike Aung Kyaw
 

Similar to PPP in Urban Development (20)

Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyTurkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale Bridge
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint Presentation
 
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020
Ethio-Djibouti railway modernization by Mr Taju |PDPU 2020
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarks
 
Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road Project
 
Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)
 
2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdf2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdf
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
Ocean finance
Ocean financeOcean finance
Ocean finance
 
Role of Infrastructure in Development 2
Role of Infrastructure in Development 2Role of Infrastructure in Development 2
Role of Infrastructure in Development 2
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii
 
Session 3: River Transport Authority
Session 3: River Transport AuthoritySession 3: River Transport Authority
Session 3: River Transport Authority
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
 
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
 

Recently uploaded

BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...amilabibi1
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoKayode Fayemi
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIINhPhngng3
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfSkillCertProExams
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatmentnswingard
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCamilleBoulbin1
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Delhi Call girls
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedDelhi Call girls
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Pooja Nehwal
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Baileyhlharris
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lodhisaajjda
 

Recently uploaded (20)

BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptx
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 

PPP in Urban Development

  • 1. PPP in Urban Development India, Transport Sector, Jharkhand Road Programme Turkey, Transport Sector, Eurasia Tunnel
  • 2. Eurasia Tunnel Project Eurasia Tunnel Project Proponent Government of Turkey Project Organization Avrasya Tuneli İsletme ve Yatirim A.S Public Organization Directorate General of Infrastructure Investments (AYGM) Private Organization Yapi Merkezi İnsaat ve Sanayi A.S. SK Engineering & Construction Co. Ltd CAPITAL PROVIDERS US$960 MILLION FIXED RATE LOAN US$277 MILLION EBRD, EIB, KOREAN EMIX, Korean Export Insurance Bank, Standard chattered bank, Sumitomo Mitsui banking corporation and Mizuho bank AYGM
  • 3. Where • Istanbul located at the crossroads of Europe and Asia and it is surrounded and divided by sea. The two sides are connected by 3 bridges • The tunnel constructed between Kazlicesme on the European side of Istanbul and Goztepe on the Asian side of Istanbul and connects the two parts a city of 15 million together under the seabed together with the bridges. Why • Before the construction of this Project, the two existing bridges which connect the different continents of Istanbul were carrying much higher than their capacity, • The congestion on these bridges led to millions of hours spent in traffic, emission of millions of tones of CO2 and was causing a decrease in peoples’ life quality. • Project provides fast, safe and comfortable transportation alternative for Istanbul • Feasibility studies show that the project achieve Value-for-Money (VfM) if delivered as a PPP Context and Strategy Supporting the Project:
  • 4. What • The tunnel contributes to the growth of Istanbul’s air transport by providing the most practical link between the city’s two airports: Atatürk Airport and Sabiha Gökçen Airport. • By decreasing distance, it will indirectly contribute to reductions in fuel consumption, noise pollution and CO2 emissions. Who • Key stakeholders for this project are Istanbul citizens and the other stakeholders are; Government of Turkey, Directorate General of Infrastructure Investments (AYGM) Istanbul Metropolitan Municipality, Avrasya Tuneli İsletme ve Yatirim A.S.(ATAS) • Private side : Responsible for building and operating the tunnel, expansions on the existing connection roads of the tunnel. • Public side: Is responsible for permissions and guarantee mechanism (min. demand guarantee, debt assumption) When • Construction Period: 3 years 11 months 3 days, • Operation Period: 25 years 11 months 9 days, • Project got the approval to be tendered as a BOT: 6/2006, • Implementation Contract: 11/2011, • Financing Agreement: 12/2012. • The tunnel was officially opened to traffic on 22 December 2016. Context and Strategy Supporting the Project:
  • 5. The project creates a convenient and direct link between Asia and Europe. Increase access to essential services and promote equity Istanbul is the largest city in Turkey and also one of the largest cities in the world in terms of population. The number of registered vehicles in Istanbul reached 3.6 million in 2018. Together with rapid population growth and economic development considerable pressure has been added on the existing transportation system Tunnel relieves Istanbul’s transcontinental traffic pressure and serves as a 'Fast', 'Economic', 'Safe', 'Comfortable' and 'Environment friendly' transportation alternative for the Istanbul Strait crossing.
  • 6. During the EIA, all stakeholders were involved. Total investment value: 1.4 billion dollars Construction Period: 4 years 7 months Operation Period: 25 years 11 months 9 days Demonstrate the economic and financial effectiveness of the project Engage all stakeholders Besides the contracting authority and the SPV, the most important stakeholder is the people of İstanbul. The construction of this Project required some main arterial roads to be closed for months. To manage the public reaction against the Project, the benefits were expressed clearly. During the Environmental and Social Impact Assessment, process feedbacks were taken from the related municipalities, 25 different neighborhoods to ensure that the process includes their concerns. Besides this process is open to the participation of all affected parties (citizens and institutions). User-paid project with a traffic guarantee provided by the Contracting Agency. It has already reached %70 of guarantee level in 2017. The economic benefits of the Tunnel arising from the operation year 2018 is estimated 1.2 billion Turkish Liras. Estimated time savings: 23 million hours Estimated savings of operating a car: 109 million vehicle/km Estimated fuel savings: 30.000 tonnes Estimated CO2 emission savings: 18.000 tonnes