* © Tetrahedron Manufacturing Services Pvt Ltd
Manufacturing Excellence Case
Studies
Lean Management in Fettling Operation
Leading Global Automotive Part Manufacturer (Bhubaneswar)
(Before TMS – Operating as a batch process fettling operation leading to huge
WIPs and frequent delivery failures due to unavailability of finished goods)
Tetrahedron conducted Time & Motion Study for Shot blasting to
painting operation of the fettling line with a target to develop a
Lean Line with 5 Yrs capacity projection.
The result achieved in 6 months:-
1. 3 Shifts (24 Hrs ) operation reduced to 19 Hrs
2. Line Balancing Implemented – Sequential Flow of Goods, FIFO
3. Line formation with exact manpower requirement with projections
4. Identified 20+ Simple Automation
5. Multiple Operation by single workman by formation improvement
Productivity Improvement
Automotive Assembly Manufacturer (Gurgaon)
(Before TMS – Not able to match customer order despite of 24 Hrs X 7 Day
operations resulting in 20% business/revenue loss every month. Client was
planning to take additional space on rent to set up new line to cater to
existing customer order)
Tetrahedron conducted Time & Motion Study on Horn Assembly
Line as a pilot and later horizontal-deployed to all Inspection
line. The result achieved in 3 months:-
1. Improved the Parts / Man-Hour by 28 %
2. Identified bottle neck operation and created sub-tier set up
3. Deployed Manuf. Line Assembly set up ( earlier batch set up)
4. One Piece flow implemented
Manpower Cost Standardization
Medical Diagnostic Equipment Manufacturer (Manesar)
(Before TMS – Management was concerned for high / fluctuating manpower
cost /piece and unavailability of skilled manpower. When enquired by TMS,
the supervisor said “we need more manpower to execute/produce given
quantity”)
Tetrahedron conducted Time & Motion Study for the existing
assembly line to see the deviation on manufacturing cost
The result achieved in 3 months:-
1. Identified 12 bottle neck operations (more than average) in the line
2. Developed SOPs for 78 process with end-to-end standardisation
3. Number of manpower allocated reduced from 23 to 17
4. Skill level improvement and multi-skilling of line operator
Manufacturing Excellence in Flock Manufacturing
India’s Leading Velvet Cloth Manufacturing
Before Tetrahedron
1. Low Productivity Leading to Lower VAPE
2. High WIP and Inventory due to improper Planning
3. Manual Loading leading to high labour and time
Tetrahedron implemented S&OP to improve the Production planning reduce
WIP reduction due to reduce order production mismatch , Designing of low
cost automation for material handling
1. VAPE improved by 17%
2. WIP reduction by 23%
3. Truck Loading Time Reduced by 28%
Manufacturing Excellence in Cement Manufacturing
Leading Cement Manufacturer (French Conglomerate)
Before Tetrahedron
1. High Process Variability Leading to uncontrolled quality & B Grade Cement
2. High Truck Retention Time in side plant : 8 Hr
3. INR 75 Lakh / Month Demurrage to Indian Railway due to loading delays
Tetrahedron implemented Six Sigma concept to standardize / reduce the
variability in input material and by using online monitoring controlled the
parameter to reduce B Grade output. Implemented lean logistics concepts
to trigger series based on truck reporting in gate to reduce the truck
retention time and railway wagon loading process
• A Grade : B Grade ratio increased from 79:21 to 89:11
Over Time Reduction in Jewelry Manufacturing
India’s Largest Silver Jewelry Manufacturer & Exporter
Before Tetrahedron
1. 7 Lakhs/ Month Over time expenses in Manufacturing
2. Material Mismatch and Poor Delivery Adherence ( 85%)
3. Increasing Absenteeism for Overtime Allocation (14%)
Tetrahedron implemented Lean Flow Management with FIFO ( First In and
First Out ) with multi-colur bin tracking system on Delivery Dates.
Manufacturing Data analysis and visualization of real time data helped
identify the real time bottle neck and take immediate and appropriate
corrective actions.
• Over Time Reduction from 2,20,000 to 1,05,000 in 2 Months in Mfg Dept

More Related Content

What's hot

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulationavijit biswas
 
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...Prathamesh Mohite
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die Nikunj Rana
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarWakil Kumar
 
Production planning & control (ppc)
Production planning & control (ppc)Production planning & control (ppc)
Production planning & control (ppc)VARUN MODI
 
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011ExerciseLeanLLC
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementYagnik Savaliya
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptDeepak Joshi
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 

What's hot (20)

Line balancing
Line balancingLine balancing
Line balancing
 
Line balancing
Line balancingLine balancing
Line balancing
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Module 2 plant design
Module 2  plant designModule 2  plant design
Module 2 plant design
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Replacement
ReplacementReplacement
Replacement
 
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
Methods and Techniques to Improve the Design of Cell Phones Using Quality Fun...
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
smed
smedsmed
smed
 
Unit 4 ppc
Unit 4 ppcUnit 4 ppc
Unit 4 ppc
 
JIT
JITJIT
JIT
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
Production planning & control (ppc)
Production planning & control (ppc)Production planning & control (ppc)
Production planning & control (ppc)
 
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and Measurement
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project ppt
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

Similar to Manufacturing Excellence Case Studies By Tetrahedron

Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPLean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPHash Management Services LLP
 
Low Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By TetrahedronLow Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By TetrahedronSagar Sangam Sahu
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEPiyush Agarwal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...IRJET Journal
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGFuratAj
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@Pravin Sadare
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET Journal
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET Journal
 
Resume_戚志揚20160926
Resume_戚志揚20160926Resume_戚志揚20160926
Resume_戚志揚20160926Ted CHI
 
Just In Time Management with Precast Concrete Components.
Just In Time Management with Precast Concrete Components.Just In Time Management with Precast Concrete Components.
Just In Time Management with Precast Concrete Components.Zaman Amir Atayee
 

Similar to Manufacturing Excellence Case Studies By Tetrahedron (20)

Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPLean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
 
Low Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By TetrahedronLow Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By Tetrahedron
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
Resume_Damian
Resume_DamianResume_Damian
Resume_Damian
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPING
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
 
Resume_戚志揚20160926
Resume_戚志揚20160926Resume_戚志揚20160926
Resume_戚志揚20160926
 
Just In Time Management with Precast Concrete Components.
Just In Time Management with Precast Concrete Components.Just In Time Management with Precast Concrete Components.
Just In Time Management with Precast Concrete Components.
 

More from Sagar Sangam Sahu

Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSagar Sangam Sahu
 
Process FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by TetrahedronProcess FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by TetrahedronSagar Sangam Sahu
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Sagar Sangam Sahu
 
Advanced Maintenance Strategy Workshop by Tetrahedron
Advanced Maintenance Strategy Workshop by TetrahedronAdvanced Maintenance Strategy Workshop by Tetrahedron
Advanced Maintenance Strategy Workshop by TetrahedronSagar Sangam Sahu
 
Manufacturing Excellence Workshop by Tetrahedron
Manufacturing Excellence Workshop by TetrahedronManufacturing Excellence Workshop by Tetrahedron
Manufacturing Excellence Workshop by TetrahedronSagar Sangam Sahu
 
Training & Skill Development Workshop by Tetrahedron
Training & Skill Development Workshop by TetrahedronTraining & Skill Development Workshop by Tetrahedron
Training & Skill Development Workshop by TetrahedronSagar Sangam Sahu
 
WIP Manufacturing Excellence by Tetrahedron
WIP Manufacturing Excellence by TetrahedronWIP Manufacturing Excellence by Tetrahedron
WIP Manufacturing Excellence by TetrahedronSagar Sangam Sahu
 
Theory of Constraints 3-Day Workshop Program by Tetrahedron
Theory of Constraints 3-Day Workshop Program by TetrahedronTheory of Constraints 3-Day Workshop Program by Tetrahedron
Theory of Constraints 3-Day Workshop Program by TetrahedronSagar Sangam Sahu
 
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSagar Sangam Sahu
 
Team Building 1-Day Out-bound Workshop by Tetrahedron
Team Building 1-Day Out-bound Workshop by TetrahedronTeam Building 1-Day Out-bound Workshop by Tetrahedron
Team Building 1-Day Out-bound Workshop by TetrahedronSagar Sangam Sahu
 
Operational Effectiveness & Management Program Workshop by Tetrahedron
Operational Effectiveness & Management Program Workshop by TetrahedronOperational Effectiveness & Management Program Workshop by Tetrahedron
Operational Effectiveness & Management Program Workshop by TetrahedronSagar Sangam Sahu
 
Negotiation Skill Workshop by Tetrahedron
Negotiation Skill Workshop by TetrahedronNegotiation Skill Workshop by Tetrahedron
Negotiation Skill Workshop by TetrahedronSagar Sangam Sahu
 
International Financial Reporting Standard (IFRS) Workshop by Tetrahedron
International Financial Reporting Standard (IFRS) Workshop by TetrahedronInternational Financial Reporting Standard (IFRS) Workshop by Tetrahedron
International Financial Reporting Standard (IFRS) Workshop by TetrahedronSagar Sangam Sahu
 
Finance for Non-Finance Manager Workshop by Tetrahedron
Finance for Non-Finance Manager Workshop by TetrahedronFinance for Non-Finance Manager Workshop by Tetrahedron
Finance for Non-Finance Manager Workshop by TetrahedronSagar Sangam Sahu
 
Failure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
Failure Mode Effects & Criticality Analysis 2-Day Workshop by TetrahedronFailure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
Failure Mode Effects & Criticality Analysis 2-Day Workshop by TetrahedronSagar Sangam Sahu
 
Finance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
Finance for Non-Finance Manager (FNFM) Workshop by TetrahedronFinance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
Finance for Non-Finance Manager (FNFM) Workshop by TetrahedronSagar Sangam Sahu
 
Design Review Based on Failure Mode 1-Day Workshop by Tetrahedron
Design Review Based on Failure Mode 1-Day Workshop by TetrahedronDesign Review Based on Failure Mode 1-Day Workshop by Tetrahedron
Design Review Based on Failure Mode 1-Day Workshop by TetrahedronSagar Sangam Sahu
 
Design for Six Sigma (DFSS) 2-Day Workshop
Design for Six Sigma (DFSS) 2-Day WorkshopDesign for Six Sigma (DFSS) 2-Day Workshop
Design for Six Sigma (DFSS) 2-Day WorkshopSagar Sangam Sahu
 
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSagar Sangam Sahu
 
Sales Training Workshop Series by Tetrahedron
Sales Training Workshop Series by TetrahedronSales Training Workshop Series by Tetrahedron
Sales Training Workshop Series by TetrahedronSagar Sangam Sahu
 

More from Sagar Sangam Sahu (20)

Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
 
Process FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by TetrahedronProcess FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by Tetrahedron
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
 
Advanced Maintenance Strategy Workshop by Tetrahedron
Advanced Maintenance Strategy Workshop by TetrahedronAdvanced Maintenance Strategy Workshop by Tetrahedron
Advanced Maintenance Strategy Workshop by Tetrahedron
 
Manufacturing Excellence Workshop by Tetrahedron
Manufacturing Excellence Workshop by TetrahedronManufacturing Excellence Workshop by Tetrahedron
Manufacturing Excellence Workshop by Tetrahedron
 
Training & Skill Development Workshop by Tetrahedron
Training & Skill Development Workshop by TetrahedronTraining & Skill Development Workshop by Tetrahedron
Training & Skill Development Workshop by Tetrahedron
 
WIP Manufacturing Excellence by Tetrahedron
WIP Manufacturing Excellence by TetrahedronWIP Manufacturing Excellence by Tetrahedron
WIP Manufacturing Excellence by Tetrahedron
 
Theory of Constraints 3-Day Workshop Program by Tetrahedron
Theory of Constraints 3-Day Workshop Program by TetrahedronTheory of Constraints 3-Day Workshop Program by Tetrahedron
Theory of Constraints 3-Day Workshop Program by Tetrahedron
 
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
 
Team Building 1-Day Out-bound Workshop by Tetrahedron
Team Building 1-Day Out-bound Workshop by TetrahedronTeam Building 1-Day Out-bound Workshop by Tetrahedron
Team Building 1-Day Out-bound Workshop by Tetrahedron
 
Operational Effectiveness & Management Program Workshop by Tetrahedron
Operational Effectiveness & Management Program Workshop by TetrahedronOperational Effectiveness & Management Program Workshop by Tetrahedron
Operational Effectiveness & Management Program Workshop by Tetrahedron
 
Negotiation Skill Workshop by Tetrahedron
Negotiation Skill Workshop by TetrahedronNegotiation Skill Workshop by Tetrahedron
Negotiation Skill Workshop by Tetrahedron
 
International Financial Reporting Standard (IFRS) Workshop by Tetrahedron
International Financial Reporting Standard (IFRS) Workshop by TetrahedronInternational Financial Reporting Standard (IFRS) Workshop by Tetrahedron
International Financial Reporting Standard (IFRS) Workshop by Tetrahedron
 
Finance for Non-Finance Manager Workshop by Tetrahedron
Finance for Non-Finance Manager Workshop by TetrahedronFinance for Non-Finance Manager Workshop by Tetrahedron
Finance for Non-Finance Manager Workshop by Tetrahedron
 
Failure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
Failure Mode Effects & Criticality Analysis 2-Day Workshop by TetrahedronFailure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
Failure Mode Effects & Criticality Analysis 2-Day Workshop by Tetrahedron
 
Finance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
Finance for Non-Finance Manager (FNFM) Workshop by TetrahedronFinance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
Finance for Non-Finance Manager (FNFM) Workshop by Tetrahedron
 
Design Review Based on Failure Mode 1-Day Workshop by Tetrahedron
Design Review Based on Failure Mode 1-Day Workshop by TetrahedronDesign Review Based on Failure Mode 1-Day Workshop by Tetrahedron
Design Review Based on Failure Mode 1-Day Workshop by Tetrahedron
 
Design for Six Sigma (DFSS) 2-Day Workshop
Design for Six Sigma (DFSS) 2-Day WorkshopDesign for Six Sigma (DFSS) 2-Day Workshop
Design for Six Sigma (DFSS) 2-Day Workshop
 
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by TetrahedronSales Training Workshop Series 12 Module Workshop by Tetrahedron
Sales Training Workshop Series 12 Module Workshop by Tetrahedron
 
Sales Training Workshop Series by Tetrahedron
Sales Training Workshop Series by TetrahedronSales Training Workshop Series by Tetrahedron
Sales Training Workshop Series by Tetrahedron
 

Recently uploaded

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Recently uploaded (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Manufacturing Excellence Case Studies By Tetrahedron

  • 1. * © Tetrahedron Manufacturing Services Pvt Ltd Manufacturing Excellence Case Studies
  • 2. Lean Management in Fettling Operation Leading Global Automotive Part Manufacturer (Bhubaneswar) (Before TMS – Operating as a batch process fettling operation leading to huge WIPs and frequent delivery failures due to unavailability of finished goods) Tetrahedron conducted Time & Motion Study for Shot blasting to painting operation of the fettling line with a target to develop a Lean Line with 5 Yrs capacity projection. The result achieved in 6 months:- 1. 3 Shifts (24 Hrs ) operation reduced to 19 Hrs 2. Line Balancing Implemented – Sequential Flow of Goods, FIFO 3. Line formation with exact manpower requirement with projections 4. Identified 20+ Simple Automation 5. Multiple Operation by single workman by formation improvement
  • 3. Productivity Improvement Automotive Assembly Manufacturer (Gurgaon) (Before TMS – Not able to match customer order despite of 24 Hrs X 7 Day operations resulting in 20% business/revenue loss every month. Client was planning to take additional space on rent to set up new line to cater to existing customer order) Tetrahedron conducted Time & Motion Study on Horn Assembly Line as a pilot and later horizontal-deployed to all Inspection line. The result achieved in 3 months:- 1. Improved the Parts / Man-Hour by 28 % 2. Identified bottle neck operation and created sub-tier set up 3. Deployed Manuf. Line Assembly set up ( earlier batch set up) 4. One Piece flow implemented
  • 4. Manpower Cost Standardization Medical Diagnostic Equipment Manufacturer (Manesar) (Before TMS – Management was concerned for high / fluctuating manpower cost /piece and unavailability of skilled manpower. When enquired by TMS, the supervisor said “we need more manpower to execute/produce given quantity”) Tetrahedron conducted Time & Motion Study for the existing assembly line to see the deviation on manufacturing cost The result achieved in 3 months:- 1. Identified 12 bottle neck operations (more than average) in the line 2. Developed SOPs for 78 process with end-to-end standardisation 3. Number of manpower allocated reduced from 23 to 17 4. Skill level improvement and multi-skilling of line operator
  • 5. Manufacturing Excellence in Flock Manufacturing India’s Leading Velvet Cloth Manufacturing Before Tetrahedron 1. Low Productivity Leading to Lower VAPE 2. High WIP and Inventory due to improper Planning 3. Manual Loading leading to high labour and time Tetrahedron implemented S&OP to improve the Production planning reduce WIP reduction due to reduce order production mismatch , Designing of low cost automation for material handling 1. VAPE improved by 17% 2. WIP reduction by 23% 3. Truck Loading Time Reduced by 28%
  • 6. Manufacturing Excellence in Cement Manufacturing Leading Cement Manufacturer (French Conglomerate) Before Tetrahedron 1. High Process Variability Leading to uncontrolled quality & B Grade Cement 2. High Truck Retention Time in side plant : 8 Hr 3. INR 75 Lakh / Month Demurrage to Indian Railway due to loading delays Tetrahedron implemented Six Sigma concept to standardize / reduce the variability in input material and by using online monitoring controlled the parameter to reduce B Grade output. Implemented lean logistics concepts to trigger series based on truck reporting in gate to reduce the truck retention time and railway wagon loading process • A Grade : B Grade ratio increased from 79:21 to 89:11
  • 7. Over Time Reduction in Jewelry Manufacturing India’s Largest Silver Jewelry Manufacturer & Exporter Before Tetrahedron 1. 7 Lakhs/ Month Over time expenses in Manufacturing 2. Material Mismatch and Poor Delivery Adherence ( 85%) 3. Increasing Absenteeism for Overtime Allocation (14%) Tetrahedron implemented Lean Flow Management with FIFO ( First In and First Out ) with multi-colur bin tracking system on Delivery Dates. Manufacturing Data analysis and visualization of real time data helped identify the real time bottle neck and take immediate and appropriate corrective actions. • Over Time Reduction from 2,20,000 to 1,05,000 in 2 Months in Mfg Dept