Siddhirganj 2x120 mw peaking power plant

918 Aufrufe

Veröffentlicht am

Siddhirganj 2x120 mw peaking power plant. Two units 120 mega watt each (electric power, not thermal). Gas turbines running on open loop Brayton cycle. Thermal efficiency is pretty low (refer to the inside contents). One interesting thing is that an Indian company called BHEL (Bharat Heavy Electricals) manufactured/established this plant here in Bangladesh (some equipment from GE, I'd be remiss if I didn't at least mention). One last thing to notice is the term "peaking". It means the plant provides power to the grid during peak hour (6-11 pm).

Veröffentlicht in: Ingenieurwesen
  • Loggen Sie sich ein, um Kommentare anzuzeigen.

Siddhirganj 2x120 mw peaking power plant

  1. 1. Siddhirganj 2x120 MW Peaking Power Plant
  2. 2. Electricity Generation Company Of Bangladesh Limited An enterprise of Bangladesh power development board (BPDB) 23.11.1996 registration Name was Meghnahat Power Company Ltd (Private Limitrd ) 16.02.2004, Remaned: EGCB Ltd 15.01.2009: Public Limited Company
  3. 3. Vision  “Generation of quality electricity for the betterment of the nation” ‘Fitness of use’ 1. Frequency 2. Voltage 3. Reliability 4. Availability
  4. 4. Mission  ‘to excel in electricity business by generation efficient, reliability and cost effective electricity in an environmentally responsible manner to satisfy our customers’.
  5. 5. Plants  Siddhirganj 2x120 MW PPP  Haripur 412 MW CCPP  Siddhirganj 335 MW CCPP
  6. 6. Siddhirganj 2x120 MW PPP  MD FAZLUI RHAMN(CE)  124563 Lac Taka  ADB & GOB  25 YEARS LIFE  Bharat Heavy Electricals Limited (BHEL), India  Sub contractor: Bengal Electric Limited (BEL)  COD: 05.02.2012  2 GT, SIMPLE cycle  Natural gas  4.17 acres  31%  209.54 MW
  7. 7. Power Plant  Gas  Coal  Oil  Wind  Sun  Air/H2(fuel cell)  Potential energy of water /hydro  Tidal  Geothermal  Ocean wave  Nuclear energy (natural or uranium dioxide enriched 3.2% U235 )
  8. 8. Power plant  Gas turbine  Steam turbine  Combine cycle power plant  Solar plant  Wind turbine  Atomic power plant  Cole power plant  Hydro power plant /mini hydro
  9. 9. Gas turbine/open cycle
  10. 10. Advantages  Quick start and synchronize to grid  O&M easy  Less manpower  Operating cost low
  11. 11. Disadvantages  Starting unit means starting motor, 1305 kw  1800 rpm stop, self sustaining speed  Compressor power requires  Low output efficiency, exhaust high temperature  Combating chamber tem high, so life time short
  12. 12. Component  SM  COMPRESSOR  GENERATOR  GAS TURBINE  TRANSFORMER
  13. 13. Maintenance  CI=combustion inspection (flow slip, liner, transition pitch), after 12000h  HGPI= hot gas path inspection (flow slip, liner, transition pitch, turbine blade, nozzle change generator bearing, turbine bearing, all sensor(tem, vibration) after 24000h )  MI= major inspection (Generator rotor decoupling , retaining ring, generator inspection with HGPI work )
  14. 14. Blade Nozzle
  15. 15. Siddhirgang 2X120 MW PPP  GBC;2020KW, Induction motor  19-22=50MW  Above 22 kg/cm2 require above 50-110MW  Compressor 3 stage
  16. 16. One line diagram of Sid 2x120MW PPP
  17. 17. Generator turbine shaft
  18. 18. Transformer  2 GT(102/136/170MVA)  2 MVUAT(10/12MVA)  2 UAT (1.6MVA)  2 SAT (2.5MVA)
  19. 19. Motors  Induction (star/delta)(6.6KV, 415V, 230V)  6.6KV(GBC, SM)  De shunt motor (125V DC)
  20. 20. IA/PA  Plant air(for cleaning)  Instrument air (control pneumatic valve )  Nitrogen (sealing, inert gas , purging )
  21. 21. Chiller  Cooling purpose  Administrative building  Center control room
  22. 22. Switch gear  Air CB  Vacuum CB  SF6 GCB  Fuse  Relay
  23. 23. Switchyard  CT  PT  Isolator
  24. 24. Safety  Fire protection system  Heat detector  Smoke detector  UV detector  Water system
  25. 25. Water treatment system  Input : river water  Port able water  DM water
  26. 26. employees  Engineers  Finance  Acc.  HR  Staffs  Technical  Security 
  27. 27. Thanks Lecture prepared by MD ABU SAYEED SDE

×