1
Outline 
Upon completing this presentation you are supposed 
to understand the following concepts breifly: 
1. What do we mean by facility layout? 
2. What is the strategic importance of layout 
decisions? 
3. What are the main factors that effect facility 
layout? 
4. What are the main types of facility layout ? 
2
What do we mean by facility layout? 
ā€¢ layout design considers how to achieve higher 
utilization of space and people, how to improve 
flow of information, materials or people, how to 
improve employee morale and safer working 
conditions , how to improve customer interaction 
with flexibility. 
ā€¢ Although facility layout can be modeled 
mathematically, layout and design of physical 
facilities are still something of an art. 
3
The Strategic Importance of Layout Decisions 
http://www.citeman.com/108-the-importance-of-layout.html#ixzz2hRMrOXU4 
Layout is one of the key decisions that: 
Layout has numerous strategic implications because it establishes an 
organizationā€™s competitive priorities in regard to capacity, process, 
flexibility, firmā€™s image ,cost and quality. An effective layout can help an 
organization to achieve a strategy that supports a differentiation, low cost, 
or response. So the objective of layout strategy is to develop an effective 
and efficient layout that will meet the firmā€™s competitive requirements. 
1. Determines the long-run efficiency of operations. Establishing the firmā€™s 
image to be taken by others who dealing with the organization. 
2. It makes the production process smooth and efficient and controlled. 
3. Repeat orders and new customers will be the result of prompt execution 
of orders. Plant layout is a significant factor in the timely execution of 
orders 
4. An ideal layout eliminates such causes of delays as shortage of space, 
long-distance movements of materials. 
5. An ideal layout provides for inspection to ensure better quality control. 
6. A good plant layout is one of the factors in effective utilization of labor 
and space. 
7. Planned layout avoids frequent changes which are difficult and costly. 
4
Factors affecting Facility Layout 
ā€¢ Flexibility: Facility layout should provide flexibility 
for expansion or modification. 
ā€¢ Space Utilization: Optimum space utilization 
reduces the time in material and people 
movement and promotes safety. 
ā€¢ Capital: Capital investment should be minimal 
when finalizing different models of facility layout. 
www.managementstudyguide.com/facility-layout.htm 
5
Types of layout 
ā€¢ Office layout 
ā€¢ Retail layout 
ā€¢ Warehouse layout 
ā€¢ Fixed-position layout 
ā€¢ Process layout 
ā€¢ Cellular layout 
ā€¢ Product-oriented layout 
6
Office Layout 
7
Office layout 
ā€¢ Should office layout be private or open for 
public? 
ā€¢ Should all employees use the same entrance, rest 
room, lockers, and cafeteria? 
ā€¢ Should the layout will meet the rapid in the 
technological advancements? 
ā€¢ Should the layout cope with nature of the work? 
ā€¢ Should the layout will promote the firmā€™s image 
and give a competitive advantage? 
8
Office Layout 
ā€¢ Provides employees with the space and tools they need to complete 
assigned tasks. 
ā€¢ Use of comfortable chairs and adequate lighting may reduce muscle 
aches and eyestrain. 
ā€¢ Place employee workstations near frequently used office equipment, 
such as copiers, postage machines and printers. 
Private Spaces versus Open Plan 
ā€¢ An open office, employees work at communal tables or at low-walled 
workstations that allow them to view and interact with coworkers. 
ā€¢ If the employees perform the type of work that requires intense 
concentration or privacy, traditional offices might be a better option. 
ā€¢ Place communal spaces near employee work areas and provide 
enough room to meet the needs of the various groups. Informal 
communal spaces provide areas in which employees can take breaks 
and recharge. 
9
Office Layout 
Defined as grouping the workers, their equipments, and 
spaces to provide comfort, safety and movement of 
information. Technological advancements change a lot in 
office layout. 
ā€¢ Some layout considerations are universal, they have to work with 
10 
working conditions, teamwork, authority, and status. 
ā€¢ The office reception is very significant, because putting the right 
impression which can help out you to increase your business. 
ā€¢ Delay in the response could put a negative impression. 
ā€¢ When you plan to design your office layout, make a list of key tasks 
employees perform. 
ā€¢ An effective office layout groups people together based on the 
functions they perform.
Retail layout 
Based on the idea that sales and profitability vary 
directly with customer exposure to products. 
maximizing profit through product exposure 
ā€¢ The main objective of retail layout is to maximize 
profitability per square foot of floor space. 
ā€¢ The most the customers exposed to the products, 
the greater the sales and the higher return on 
investment. 
11
Retail Layout 
Useful arrangements: 
ā€¢ Locate the high-draw items around the periphery Ų§Ł„Ł…Ų­ŁŠŲ· 
of the store. 
ā€¢ Use prominent locations for high-impulse and high-margin 
items. 
ā€¢ Use end-aisle locations because they have a very high 
exposure rate. 
ā€¢ Convey the mission of the store by carefully selecting the 
position of the lead-off department, to be in broad view 
upon entering the store. 
Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010. P 
379. 12
Retail layout 
physical surroundings in which the service takes place have 
humanistic effect on customers and employees: 
ā€¢ Ambient conditions: such as lighting, sound, smell and 
temperature. 
ā€¢ Spatial layout and functionality: involves customer 
circulation path planning, aisle, and product grouping. 
ā€¢ Signs, symbols, and artifacts: which are characteristics of 
building design that carry social significant (as carpeted 
area that encourage shoppers to slow down and browse 
the assortments of the store). 
Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010.P 380 
13
Warehousing and Storage Layout 
Utilization of the total space of the warehouse while 
maintaining low material handling costs. Minimizing 
the damage and spoilage of material within the 
warehouse. 
Nowadays, most the warehouses introduced the 
automated computerized system in managing the 
warehouse, so the layout should be designed to 
cope with new systems where everything will be 
computerized from the (automated order through 
storing on digital shelves till exporting items to 
clients). 
14
Warehousing and Storage Layout 
Three terms in warehouse layout have to be mentioned: 
ā€¢ Cross-docking: means to avoid placing materials or supplies in 
storage by processing them as they are received. This policy can 
reduce the cost of inventory handling. This system require tight 
scheduling and accurate inbound product identification. 
ā€¢ Random stocking: Automatic Identification Systems(AISs), like 
bar codes to load units anywhere in the warehouse randomly. 
Computerized random stocking systems often include accurate 
records of existing inventory and its locations , sequencing items 
to minimize travel time. This can utilize the facility and decrease 
labor cost. 
ā€¢ Customizing: to add value to a product through modification, 
repair, labeling and packaging in order to generate competitive 
advantage in markets. 
Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010. 
15
Fixed-Position Layout 
The item being worked on remain stationary Ų«Ų§ŲØŲŖŲ© and 
workers, materials, and equipment are moved as 
needed. 
ā€¢ Fixed-position are used in large construction 
projects like(buildings, power plants, dams, 
shipbuilding, space mission rockets, large aircraft, 
drilling for oil, operating room in hospital etcā€¦.). 
ā€¢ Because problems with fixed-Position Layout are so 
difficult to solve well onsite, an alternative strategy 
is to complete as much of the project as possible 
offsite. 
16
Fixed-position layout 
Some disadvantages with this kind: 
ā€¢ Space. For many fixed-position layouts, the work 
area may be crowded so that little storage space 
is available. This also can cause material handling 
problems. 
ā€¢ Administration. The administrative burden is 
higher for fixed-position layouts like the span of 
control can be narrow, and coordination difficult. 
http://www.referenceforbusiness.com/management/IntLoc/Layout.html#ixzz2hWsY69U 
17
Process-Oriented Layout 
To minimize transportation cost, distance, and time. 
This usually achieved by locating departments with 
relatively high interdepartmental work flow as 
close together as possible. 
Process-oriented layout deals with low-volume, high-variety 
production in which machines and 
equipment are grouped together. It is most 
efficient when making products differentiation or 
when handling customers, patients, or clients with 
different needs. 
Mathematical approaches can deal best with 
process layout issues 
18
Process-Oriented Layout 
The design of process layout requires the following 
information: 
ā€¢ A list of work centers to be arranged, their approximate 
dimensions and the dimensions of the building that will 
house the centers. 
ā€¢ A projection of future work flows between the various 
work centers. 
ā€¢ The distance between locations. 
ā€¢ A list of any special considerations like (operations that 
must be separated or be closed together) 
ā€¢ The location of key utilities, access and exit points. 
William J. Stevenson, ā€œOperation Managementā€, 8Th ed. McGraw-Hill/Irwin. New York,2005.P 
247 19
Cellular Layout 
Recognizing people and machines into a group so that they 
can focus on making a single product or a group of 
related products. 
The idea of work cells was first presented by R. E. Flanders 
in 1925. 
ā€¢ Cellular manufacturing, where machines are grouped 
according to the process requirements for a set of similar 
items (part families) that require similar processing. 
ā€¢ Processes are grouped into cells using a technique known 
as Group Technology (GT). Group technology involves 
identifying parts with similar design characteristics (size, 
shape, and function) and similar process characteristics 
(type of processing required) 
20
Cellular Layout 
ā€¢ Workers in cellular layouts are well cross-trained so 
that they can operate all the equipment within 
the cell and take responsibility for its output. 
ā€¢ An automated version of cellular manufacturing is 
the flexible manufacturing system (FMS). With 
FMS, a computer controls the transfer of parts to 
the various processes. 
21
Cellular Layout 
Advantages of cellular manufacturing : 
ā€¢ Cost. Cellular manufacturing provides for faster processing time, less 
material handling, less work-in-process inventory, and reduced 
setup time, all of which reduce costs. 
ā€¢ Flexibility. Cellular manufacturing allows for the production of small 
batches, which provides some degree of increased flexibility. This 
aspect is greatly enhanced with FMSs. 
ā€¢ Motivation. Since workers are well cross-trained to run every 
machine in the cell, boredom Ų§Ł„Ł…Ł„Ł„ is less of a factor. Also, since 
workers are responsible for their cells' output, more autonomy and 
job ownership is present. 
ā€¢ Utilization. Because the better scheduling and faster material flow. 
http://www.referenceforbusiness.com/management/IntLoc/Layout.html#ixzz2hX4u7Py 
22
Cellular Layout 
The requirements of cellular production include: 
1. Identification of families of products 
2. A high level of training , flexibility, and 
empowerment of employees. 
3. Being self-contained, with its own equipment and 
resources. 
4. Test ā€œpoka-yokeā€ at each station in the cell. 
23
Poka-Yoke (from Wikipedia) 
ā€¢ A poka-yoke is a Japanese concept (mistake-proofing) 
is a mechanism that helps an equipment 
operator avoid and void mistakes . Its purpose is to 
eliminate product defects by preventing, correcting, 
or drawing attention to human errors as they occur. 
The concept was formalized, and the term adopted, 
by Shigeo Shingo as part of the Toyota Production 
System. Example : 
Ethernet cable plug is designed to be plugged in only 
by one direction. 
24
Cellular Layout 
ā€¢ About 50% of the U.S plants with fewer than 100 
employees use some sort of cellular system, 
whereas 75% of larger plants have adopted 
cellular production methods. 
ā€¢ Commercial software, such as ProPlanner and 
Factory Flow, is available to managers in their 
move to work cells. These programs require info 
that includes AutoCAD layout drawings; part 
routing data, cost, speeds of material handling 
systems. 
ā€¢ 25
Product-Oriented Layout 
It is assembly lines that range from fairly short with 
just a few operations, to long lines that have a 
large number of operations. Automobiles are 
example of long lines where the part travels 
about miles from start to finish. 
ā€¢ Many of the benefits of a product layout relate 
to the ability to divide required work into a series 
of elemental tasks that can be performed quickly 
and routinely by low skilled workers or 
specialized equipment. 
26
Product-Oriented Layout 
ā€¢ Assigning tasks into workstations are called Line 
Balancing by task groupings that need equal time 
approximately. 
ā€¢ lines that are perfectly balanced will have a smooth 
flow of work as activities along with the line are 
synchronized to achieve maximum utilization of labor 
and equipment. 
Product layout requirements: 
ā€¢ Volume is adequate for high equipment utilization. 
ā€¢ Product demand is stable enough to justify high 
investment in specialized equipment. 
ā€¢ Product is standardized . 
27
Product-Oriented Layout 
Advantages of product-oriented layouts include: 
ā€¢ Output. Product layouts can generate a large volume of products. 
ā€¢ Cost. Unit cost is low as a result of the high volume. 
ā€¢ Labor specialization results in reduced training time and cost. 
ā€¢ Accounting, purchasing, and inventory control are routine. Because 
routing is fixed, less attention is required. 
ā€¢ Utilization. There is a high degree of labor and equipment utilization. 
Disadvantages of product-oriented layouts include: 
ā€¢ Motivation. Repetitive moves will lead to boredom and dull. 
ā€¢ Inflexibility. cannot easily respond to required system changes especially 
changes in product or process design. 
ā€¢ System protection. The system is at risk from equipment breakdown, 
absenteeism, and downtime due to preventive maintenance. 
William J. Stevenson, ā€œOperation Managementā€, 8Th ed. McGraw-Hill/Irwin. New York,2005. P 237 
28
Layout Decisions 
Than you for listening 
29

More Related Content

What's hot

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Atif Ghayas
Ā 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
Victor Molina
Ā 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
Hammaduddin
Ā 

What's hot (20)

Layout ppt
Layout pptLayout ppt
Layout ppt
Ā 
Chapter 2 Plant Location
Chapter 2 Plant LocationChapter 2 Plant Location
Chapter 2 Plant Location
Ā 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
Ā 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
Ā 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
Ā 
Process layout
Process layoutProcess layout
Process layout
Ā 
Types of layouts
Types of layoutsTypes of layouts
Types of layouts
Ā 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
Ā 
Facility layout
Facility layoutFacility layout
Facility layout
Ā 
Plant location & layout
Plant location & layoutPlant location & layout
Plant location & layout
Ā 
Facility planning
Facility planningFacility planning
Facility planning
Ā 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Ā 
Warehouse management
 Warehouse management Warehouse management
Warehouse management
Ā 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
Ā 
Plant layout
Plant layoutPlant layout
Plant layout
Ā 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
Ā 
Types of plant layout
Types of plant layoutTypes of plant layout
Types of plant layout
Ā 
Facility layout
Facility layoutFacility layout
Facility layout
Ā 
Types of layout
Types of layoutTypes of layout
Types of layout
Ā 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
Ā 

Similar to Facility layout

Chapter 16. Facility Layout DecisionAfter selecting a facility.docx
Chapter 16. Facility Layout DecisionAfter selecting a facility.docxChapter 16. Facility Layout DecisionAfter selecting a facility.docx
Chapter 16. Facility Layout DecisionAfter selecting a facility.docx
robert345678
Ā 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
MOHD ARISH
Ā 
Ch09
Ch09Ch09
Ch09
FNian
Ā 
layout-strategy. Credits to the owner pl
layout-strategy. Credits to the owner  pllayout-strategy. Credits to the owner  pl
layout-strategy. Credits to the owner pl
MonicaTeofilo
Ā 

Similar to Facility layout (20)

Chapter 16. Facility Layout DecisionAfter selecting a facility.docx
Chapter 16. Facility Layout DecisionAfter selecting a facility.docxChapter 16. Facility Layout DecisionAfter selecting a facility.docx
Chapter 16. Facility Layout DecisionAfter selecting a facility.docx
Ā 
Facility Layout Planning (sample slides).ppt
Facility Layout Planning (sample slides).pptFacility Layout Planning (sample slides).ppt
Facility Layout Planning (sample slides).ppt
Ā 
Chapter 7 layoutplanningstrategy
Chapter 7 layoutplanningstrategyChapter 7 layoutplanningstrategy
Chapter 7 layoutplanningstrategy
Ā 
heizer Chapter 9 layout strategies
heizer Chapter 9 layout strategiesheizer Chapter 9 layout strategies
heizer Chapter 9 layout strategies
Ā 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
Ā 
Process selection
Process selectionProcess selection
Process selection
Ā 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
Ā 
Ch09
Ch09Ch09
Ch09
Ā 
Plant layout
Plant layoutPlant layout
Plant layout
Ā 
Designing and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant LocationDesigning and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant Location
Ā 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
Ā 
layout-strategy. Credits to the owner pl
layout-strategy. Credits to the owner  pllayout-strategy. Credits to the owner  pl
layout-strategy. Credits to the owner pl
Ā 
Module 3 Operations Management Process Layout
Module 3 Operations Management  Process LayoutModule 3 Operations Management  Process Layout
Module 3 Operations Management Process Layout
Ā 
Plant layout
Plant layoutPlant layout
Plant layout
Ā 
Interior Offices.........................
Interior Offices.........................Interior Offices.........................
Interior Offices.........................
Ā 
Interior Offices
Interior OfficesInterior Offices
Interior Offices
Ā 
New Office Design
New Office DesignNew Office Design
New Office Design
Ā 
Interior Offices
Interior OfficesInterior Offices
Interior Offices
Ā 
Hospital Design Guidelines
Hospital Design GuidelinesHospital Design Guidelines
Hospital Design Guidelines
Ā 
Facility layout
Facility layoutFacility layout
Facility layout
Ā 

Recently uploaded

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
Ā 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
Ā 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
amitlee9823
Ā 

Recently uploaded (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
Ā 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Ā 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
Ā 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
Ā 
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’
Ā 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
Ā 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
Ā 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Ā 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Ā 
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
Ā 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Ā 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
Ā 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Ā 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
Ā 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
Ā 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Ā 

Facility layout

  • 1. Facility Layout Contemporary Selected Issues Prepared by Sameeh Swaitti Supervised by Dr.Samir Abuznaid 2014 1
  • 2. Outline Upon completing this presentation you are supposed to understand the following concepts breifly: 1. What do we mean by facility layout? 2. What is the strategic importance of layout decisions? 3. What are the main factors that effect facility layout? 4. What are the main types of facility layout ? 2
  • 3. What do we mean by facility layout? ā€¢ layout design considers how to achieve higher utilization of space and people, how to improve flow of information, materials or people, how to improve employee morale and safer working conditions , how to improve customer interaction with flexibility. ā€¢ Although facility layout can be modeled mathematically, layout and design of physical facilities are still something of an art. 3
  • 4. The Strategic Importance of Layout Decisions http://www.citeman.com/108-the-importance-of-layout.html#ixzz2hRMrOXU4 Layout is one of the key decisions that: Layout has numerous strategic implications because it establishes an organizationā€™s competitive priorities in regard to capacity, process, flexibility, firmā€™s image ,cost and quality. An effective layout can help an organization to achieve a strategy that supports a differentiation, low cost, or response. So the objective of layout strategy is to develop an effective and efficient layout that will meet the firmā€™s competitive requirements. 1. Determines the long-run efficiency of operations. Establishing the firmā€™s image to be taken by others who dealing with the organization. 2. It makes the production process smooth and efficient and controlled. 3. Repeat orders and new customers will be the result of prompt execution of orders. Plant layout is a significant factor in the timely execution of orders 4. An ideal layout eliminates such causes of delays as shortage of space, long-distance movements of materials. 5. An ideal layout provides for inspection to ensure better quality control. 6. A good plant layout is one of the factors in effective utilization of labor and space. 7. Planned layout avoids frequent changes which are difficult and costly. 4
  • 5. Factors affecting Facility Layout ā€¢ Flexibility: Facility layout should provide flexibility for expansion or modification. ā€¢ Space Utilization: Optimum space utilization reduces the time in material and people movement and promotes safety. ā€¢ Capital: Capital investment should be minimal when finalizing different models of facility layout. www.managementstudyguide.com/facility-layout.htm 5
  • 6. Types of layout ā€¢ Office layout ā€¢ Retail layout ā€¢ Warehouse layout ā€¢ Fixed-position layout ā€¢ Process layout ā€¢ Cellular layout ā€¢ Product-oriented layout 6
  • 8. Office layout ā€¢ Should office layout be private or open for public? ā€¢ Should all employees use the same entrance, rest room, lockers, and cafeteria? ā€¢ Should the layout will meet the rapid in the technological advancements? ā€¢ Should the layout cope with nature of the work? ā€¢ Should the layout will promote the firmā€™s image and give a competitive advantage? 8
  • 9. Office Layout ā€¢ Provides employees with the space and tools they need to complete assigned tasks. ā€¢ Use of comfortable chairs and adequate lighting may reduce muscle aches and eyestrain. ā€¢ Place employee workstations near frequently used office equipment, such as copiers, postage machines and printers. Private Spaces versus Open Plan ā€¢ An open office, employees work at communal tables or at low-walled workstations that allow them to view and interact with coworkers. ā€¢ If the employees perform the type of work that requires intense concentration or privacy, traditional offices might be a better option. ā€¢ Place communal spaces near employee work areas and provide enough room to meet the needs of the various groups. Informal communal spaces provide areas in which employees can take breaks and recharge. 9
  • 10. Office Layout Defined as grouping the workers, their equipments, and spaces to provide comfort, safety and movement of information. Technological advancements change a lot in office layout. ā€¢ Some layout considerations are universal, they have to work with 10 working conditions, teamwork, authority, and status. ā€¢ The office reception is very significant, because putting the right impression which can help out you to increase your business. ā€¢ Delay in the response could put a negative impression. ā€¢ When you plan to design your office layout, make a list of key tasks employees perform. ā€¢ An effective office layout groups people together based on the functions they perform.
  • 11. Retail layout Based on the idea that sales and profitability vary directly with customer exposure to products. maximizing profit through product exposure ā€¢ The main objective of retail layout is to maximize profitability per square foot of floor space. ā€¢ The most the customers exposed to the products, the greater the sales and the higher return on investment. 11
  • 12. Retail Layout Useful arrangements: ā€¢ Locate the high-draw items around the periphery Ų§Ł„Ł…Ų­ŁŠŲ· of the store. ā€¢ Use prominent locations for high-impulse and high-margin items. ā€¢ Use end-aisle locations because they have a very high exposure rate. ā€¢ Convey the mission of the store by carefully selecting the position of the lead-off department, to be in broad view upon entering the store. Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010. P 379. 12
  • 13. Retail layout physical surroundings in which the service takes place have humanistic effect on customers and employees: ā€¢ Ambient conditions: such as lighting, sound, smell and temperature. ā€¢ Spatial layout and functionality: involves customer circulation path planning, aisle, and product grouping. ā€¢ Signs, symbols, and artifacts: which are characteristics of building design that carry social significant (as carpeted area that encourage shoppers to slow down and browse the assortments of the store). Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010.P 380 13
  • 14. Warehousing and Storage Layout Utilization of the total space of the warehouse while maintaining low material handling costs. Minimizing the damage and spoilage of material within the warehouse. Nowadays, most the warehouses introduced the automated computerized system in managing the warehouse, so the layout should be designed to cope with new systems where everything will be computerized from the (automated order through storing on digital shelves till exporting items to clients). 14
  • 15. Warehousing and Storage Layout Three terms in warehouse layout have to be mentioned: ā€¢ Cross-docking: means to avoid placing materials or supplies in storage by processing them as they are received. This policy can reduce the cost of inventory handling. This system require tight scheduling and accurate inbound product identification. ā€¢ Random stocking: Automatic Identification Systems(AISs), like bar codes to load units anywhere in the warehouse randomly. Computerized random stocking systems often include accurate records of existing inventory and its locations , sequencing items to minimize travel time. This can utilize the facility and decrease labor cost. ā€¢ Customizing: to add value to a product through modification, repair, labeling and packaging in order to generate competitive advantage in markets. Jay Heizer & Barry Render, ā€œOperation Managementā€, 10th ed. Pearson Prentice Hall, New Jersy,2010. 15
  • 16. Fixed-Position Layout The item being worked on remain stationary Ų«Ų§ŲØŲŖŲ© and workers, materials, and equipment are moved as needed. ā€¢ Fixed-position are used in large construction projects like(buildings, power plants, dams, shipbuilding, space mission rockets, large aircraft, drilling for oil, operating room in hospital etcā€¦.). ā€¢ Because problems with fixed-Position Layout are so difficult to solve well onsite, an alternative strategy is to complete as much of the project as possible offsite. 16
  • 17. Fixed-position layout Some disadvantages with this kind: ā€¢ Space. For many fixed-position layouts, the work area may be crowded so that little storage space is available. This also can cause material handling problems. ā€¢ Administration. The administrative burden is higher for fixed-position layouts like the span of control can be narrow, and coordination difficult. http://www.referenceforbusiness.com/management/IntLoc/Layout.html#ixzz2hWsY69U 17
  • 18. Process-Oriented Layout To minimize transportation cost, distance, and time. This usually achieved by locating departments with relatively high interdepartmental work flow as close together as possible. Process-oriented layout deals with low-volume, high-variety production in which machines and equipment are grouped together. It is most efficient when making products differentiation or when handling customers, patients, or clients with different needs. Mathematical approaches can deal best with process layout issues 18
  • 19. Process-Oriented Layout The design of process layout requires the following information: ā€¢ A list of work centers to be arranged, their approximate dimensions and the dimensions of the building that will house the centers. ā€¢ A projection of future work flows between the various work centers. ā€¢ The distance between locations. ā€¢ A list of any special considerations like (operations that must be separated or be closed together) ā€¢ The location of key utilities, access and exit points. William J. Stevenson, ā€œOperation Managementā€, 8Th ed. McGraw-Hill/Irwin. New York,2005.P 247 19
  • 20. Cellular Layout Recognizing people and machines into a group so that they can focus on making a single product or a group of related products. The idea of work cells was first presented by R. E. Flanders in 1925. ā€¢ Cellular manufacturing, where machines are grouped according to the process requirements for a set of similar items (part families) that require similar processing. ā€¢ Processes are grouped into cells using a technique known as Group Technology (GT). Group technology involves identifying parts with similar design characteristics (size, shape, and function) and similar process characteristics (type of processing required) 20
  • 21. Cellular Layout ā€¢ Workers in cellular layouts are well cross-trained so that they can operate all the equipment within the cell and take responsibility for its output. ā€¢ An automated version of cellular manufacturing is the flexible manufacturing system (FMS). With FMS, a computer controls the transfer of parts to the various processes. 21
  • 22. Cellular Layout Advantages of cellular manufacturing : ā€¢ Cost. Cellular manufacturing provides for faster processing time, less material handling, less work-in-process inventory, and reduced setup time, all of which reduce costs. ā€¢ Flexibility. Cellular manufacturing allows for the production of small batches, which provides some degree of increased flexibility. This aspect is greatly enhanced with FMSs. ā€¢ Motivation. Since workers are well cross-trained to run every machine in the cell, boredom Ų§Ł„Ł…Ł„Ł„ is less of a factor. Also, since workers are responsible for their cells' output, more autonomy and job ownership is present. ā€¢ Utilization. Because the better scheduling and faster material flow. http://www.referenceforbusiness.com/management/IntLoc/Layout.html#ixzz2hX4u7Py 22
  • 23. Cellular Layout The requirements of cellular production include: 1. Identification of families of products 2. A high level of training , flexibility, and empowerment of employees. 3. Being self-contained, with its own equipment and resources. 4. Test ā€œpoka-yokeā€ at each station in the cell. 23
  • 24. Poka-Yoke (from Wikipedia) ā€¢ A poka-yoke is a Japanese concept (mistake-proofing) is a mechanism that helps an equipment operator avoid and void mistakes . Its purpose is to eliminate product defects by preventing, correcting, or drawing attention to human errors as they occur. The concept was formalized, and the term adopted, by Shigeo Shingo as part of the Toyota Production System. Example : Ethernet cable plug is designed to be plugged in only by one direction. 24
  • 25. Cellular Layout ā€¢ About 50% of the U.S plants with fewer than 100 employees use some sort of cellular system, whereas 75% of larger plants have adopted cellular production methods. ā€¢ Commercial software, such as ProPlanner and Factory Flow, is available to managers in their move to work cells. These programs require info that includes AutoCAD layout drawings; part routing data, cost, speeds of material handling systems. ā€¢ 25
  • 26. Product-Oriented Layout It is assembly lines that range from fairly short with just a few operations, to long lines that have a large number of operations. Automobiles are example of long lines where the part travels about miles from start to finish. ā€¢ Many of the benefits of a product layout relate to the ability to divide required work into a series of elemental tasks that can be performed quickly and routinely by low skilled workers or specialized equipment. 26
  • 27. Product-Oriented Layout ā€¢ Assigning tasks into workstations are called Line Balancing by task groupings that need equal time approximately. ā€¢ lines that are perfectly balanced will have a smooth flow of work as activities along with the line are synchronized to achieve maximum utilization of labor and equipment. Product layout requirements: ā€¢ Volume is adequate for high equipment utilization. ā€¢ Product demand is stable enough to justify high investment in specialized equipment. ā€¢ Product is standardized . 27
  • 28. Product-Oriented Layout Advantages of product-oriented layouts include: ā€¢ Output. Product layouts can generate a large volume of products. ā€¢ Cost. Unit cost is low as a result of the high volume. ā€¢ Labor specialization results in reduced training time and cost. ā€¢ Accounting, purchasing, and inventory control are routine. Because routing is fixed, less attention is required. ā€¢ Utilization. There is a high degree of labor and equipment utilization. Disadvantages of product-oriented layouts include: ā€¢ Motivation. Repetitive moves will lead to boredom and dull. ā€¢ Inflexibility. cannot easily respond to required system changes especially changes in product or process design. ā€¢ System protection. The system is at risk from equipment breakdown, absenteeism, and downtime due to preventive maintenance. William J. Stevenson, ā€œOperation Managementā€, 8Th ed. McGraw-Hill/Irwin. New York,2005. P 237 28
  • 29. Layout Decisions Than you for listening 29