4. HOSPITAL DESCRIPTION
Public entity since 2009
Lisbon Metropolitan area
About 3.000 employees
Serving above 600.000 inhabitants
About 23 Clinical Delivery Services
First King’s Fund Accreditation Hospital
10 certified ISO 9001:2008 departments
13. SERVERS VIRTUALIZATION
Aplication Servers
160
Hardware Servers
Cloud ComputingVirtual Servers
Virtualized Servers
~60%
Getting Ready
Rising up
Reducing
Saving Energy Consumption
Saving in Air Treatment
Space Saving
National IT Rationalizing Plan
Ministry Resolution n.º
46/201 workgroup GPTIC
GPTIC
14. Oracle Sunray 3
max TDP 14,15W
LWAd less than 3.0 dB
Desktop PC
28W > TDP < 110W
LWAd > than 4.5 dB
Low Voltage Directive 2006/95/EC (73/23/EEC), TDP – Termal Design Power
ISO 9296: Noise Declaration of Information Technology Equipment , LWA – Sound Power Level
Phasing out (get rid of…) Emergent
1.000 units
280...units
Ex. 100 watts x half day x 365 days
100x10x365 = 365kw/yr
100x12x365x1000 = 365.000kw/yr
36.500€ /yr
Ex. 15 watts x half day x 365 days
15x10x365 = 54,7kw/yr
100x12x365x1.000 = 54.750kw/yr
5.475€ /yr
85%
efficiency
DESKTOP VIRTUALIZATION
25. Tradicional Process New approach - Boardmeeting
Director
Board
Board
Member
SUPPORTDELIVERY PROCESSES
26. • Board Meeting - Executive Worflow Processes
• Intranet colaborative portal & self build and sharing area
• Consumables and materials requisitions to Supply Chain
• E- Learning capabilities – SCORM standars
• Complains Management – CRM and internal affairs
Savingssofar
85 trees
19 tons of wood
161M BTU’s( = energy consumption of 2 homes/year)
10 tons of solid waste
Environmental impact estimates were calculated using the Environmental
Defense Fund calculator. For more information, please visit
http://www.papercalculator.org.
111 094 liters of water
SUPPORTDELIVERY PROCESSES