1. BUILDING SPECIFICATIONS AREA: Approx 153,000 square feet STORIES: 3 stories FRAMING: Steel Frame EXTERIOR: Metal Studs, Brick, Storefront Glass PRIMARY USE: Class-A Office Space CONTRACTING: Negotiated BUDGET: Varied City Center Office Building Southfield, MI Brookfield Office Park Southfield, MI BUILDING SPECIFICATIONS AREA: Approx 286,000 square feet STORIES: 3 stories each FRAMING: Steel Frame EXTERIOR: Metal Studs, Brick, Storefront Glass, Curtain Wall, Stone Facades PRIMARY USE: Class A Office Space CONTRACTING: Negotiated BUDGET: Varied
2. R onald K empf E nterprises Project Management Cost Management Claims Settlement “ We allow our clients to do what they do best While they allow us to do what we do best”
3.
4.
5.
6. North County Medical Office Building Escondido, CA BUILDING SPECIFICATIONS AREA: 50,000 square feet STORIES: 2-stories FRAMING: Structural Steel EXTERIOR: Plaster on Metal Studs PRIMARY USE: Medical Office Suite. CONTRACTING: Negotiated Fee with Guaranteed Maximum Price BUDGET: $8,000,000 Village of Torrey Pines East (North Campus Housing) Campus of UC San Diego BUILDING SPECIFICATIONS AREA: Approx 146,000 square feet STORIES: Multiple buildings including 13-story FRAMING: Concrete Frame EXTERIOR: Plaster on Metal Studs PRIMARY USE: Student Housing. CONTRACTING: CM at Risk BUDGET: $96,000,000
7.
8.
9.
10.
11. BUILDING SPECIFICATIONS AREA: Approx 46,000 square feet STORIES: Existing 2-story FRAMING: Concrete Frame EXTERIOR: Painted concrete with aluminum framed windows and glass curtain wall PRIMARY USE: Office CONTRACTING: Fixed Fee with Guaranteed Maximum Price BUDGET: $8,000,000 BUILDING SPECIFICATIONS AREA: Approx 62,000 square feet STORIES: Existing 4-story FRAMING: Steel Frame EXTERIOR: Metal Stud frame with plaster and aluminum framed windows and glass curtain wall PRIMARY USE: Medical Office CONTRACTING: Preconstruction Services, Competitive Bid BUDGET: $12,000,000 Mission Internal Medical Group Mission Viejo, CA Hunsaker & Associates San Diego, CA
12.
13.
14.
15. Muir Housing Campus of UC San Diego BUILDING SPECIFICATIONS AREA: Approx 91,000 square feet STORIES: Multiple 9-story buildings FRAMING: Concrete Frame EXTERIOR: Plaster on Metal Studs with punched openings PRIMARY USE: Student Housing. CONTRACTING: CM at Risk BUDGET: $42,500,000 National Oceanic Atmospheric Agency La Jolla, CA BUILDING SPECIFICATIONS AREA: Approx 220,000 square feet STORIES: 4-story building with 2 subterranean parking levels FRAMING: Concrete Frame EXTERIOR: Plaster on Metal Studs with aluminum framed windows and glass curtain wall PRIMARY USE: Office and Research CONTRACTING: Competitive Bid BUDGET: $98,000,000