SCAFFOLDING
WHAT IS IT?
DIRECT or INDIRECT
An Overview

AUTHOR : RUFRAN C. FRAGO, P.Eng, PMP®, CCP, PMI-RMP®
REVISION : January 17, 2014
AUTHOR
Rufran C. Frago, P. Eng., PMP®, CCP, PMI-RMP®

Rufran has a wide-range of expertise & specialization
while working in the Manufacturing, Petrochemical,
Oleo-chemicals, Oil and Gas, Education & Training Industries
for more than 36 years in various roles and capacities. He has worked
in Asia, Africa, Middle East and North America.
His expertise includes: Primavera Database
Administration, Program and Project Planning & Scheduling,
Qualitative/Quantitative Risk Management, Problem Solving, Project
Management, Cost Engineering, Project Control, Construction
Management/Coordination, Project Review & Implementation Audit,
Estimating, Engineering & Design, Fab/Mod Management, Preventive &
Predictive Reliability-Based Maintenance, Operation, Material Selection,
Warehousing, EH&S, and Training.

2
PURPOSE
Since scaffolding can easily account for a substantial 5%
to 15% or more of construction hours, it is a very
significant value in terms of progress. Once it becomes a
part of the progressing process, and the resources
quantity uploaded to the schedule, then it will work very
much in favor of the contractor or the execution team.
As such, I would like you and I to try to answer the
contentious question below:
In a construction project, how are Scaffolding Hours"
categorized?
Are they Directs or Indirects?

3
PROJECT - XYZ
DIRECT HOURS WITHOUT SCAFFOLDING

4
PROJECT - XYZ
DIRECT HOURS WITH SCAFFOLDING

5
PROJECT - XYZ
PLAN PROGRESS COMPARISON

6
PROJECT - XYZ
Scaffolding as Direct (Plan) is the plan
progress considering all scaffolding work
as direct hours. In this case, 31518 work
hours were added (see slides 4 & 5)
Scaffolding as Indirect (Plan) is the plan
progress if all scaffolding work remain as
indirect hours. In this case, the total direct
is less by 31,518 hours (see slides 4 & 5)
7
METHODS OF PROGRESSING
Four known methods of progressing
Scaffolding Work hours regardless of whether it
is considered Direct or Indirect:
1. Equal periodic withdrawal from start to end of
Construction.
2. Equal periodic withdrawal from start of Civil works to
end of Construction.
3. Equal periodic withdrawal from start of Mechanical
or Structural works (which ever start first) to end of
Construction.
4. Scaffolding hours specifically calculated in each
Work Package.
8
Using equal periodic withdrawal from start of
Civil works to end of Construction

0.6% padding

Scaffolding works hours are usually claimed in a straight line without
respect to earned value. This creates the padding.

9
Scaffolding hours specifically calculated in
each Work Package
Ishii-iiw.co Domed Tank, 2013

Ishii-iiw.co Domed Tank, 2013

Removal of scaffolding

Unless the scaffoldings remained in place and become part of the
facility constructed, then they are indirectly supporting construction and
the hours expended should be considered indirect hours.
Source: Ishii-iiw.co, 2013.Internet picture.Retrieved from http://www.ishiiiiw.co.jp/seihin/sub/drf02.jpg

10
Why should scaffolding work hours be
considered as indirect?
Indirect labors are those whose output is not directly part of the assets
erected, much like camp or construction site snow removal, overhead,
security, transportation, etc. In turn it will align and translate to indirect
costs. Indirect costs are costs that are not directly accountable to a cost
object such as a particular facility, equipment, module, function or product
(Wikipedia, 2013.Indirect Costs).
If scaffolding hours is reflected as direct hours in the estimate and became
part of the schedule resource loading, the resource distribution in place
will be suspect. Calculating/checking labor density, peak resources,
resource leveling, resource planning, resource distribution, scope
completeness, quantitative risk assessment, and measuring/monitoring
bench mark quantities with production rates will not be accurate nor will it
be useful in the future (Frago, R., 2013.Linkedin).
Source:
Wikipedia, (2013).Indirect Costs.Retrieved from http://en.wikipedia.org/wiki/Indirect_costs
Frago, R. (2013).On scaffolding hours.Retrieved from
http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059&type=mem
ber&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DISCUSSION_COMMENT
_YOU_CREATED#commentID_5816648952941928448

11
Why should scaffolding work hours be
considered as indirect? (continuation…)
Scaffolding erection does not produce a product or a
deliverable that becomes part of the capital equipment,
or constructed facilities & structures. They are
temporary fixtures that are removed right after direct
works are done to the capital assets such as a tank, a
compressor or a building. Scaffoldings are erected so
one can have access to the upper tank tiers Iike when
welding or painting. After all is completed, the
scaffolding is taken down (Francisco, R., 2013).
Source:
Frago, R. (2013).On scaffolding hours.Retrieved from
http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059&type=member
&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DISCUSSION_COMMENT_YOU_
CREATED#commentID_5816648952941928448

12
AACEi DEFINITION OF DIRECTS AND INDIRECTS
Direct costs are those resources that are expected
solely to complete the activity or asset. It can be any
cost that is specifically identified with a particular final
cost objective, but not necessarily limited to items that
are incorporated in the end product as material or labor
(Amos, S., 2007)
Indirect costs are those resources that need to be
expended to support the activity or asset but that are
also associated with other activities and assets. It is
any cost not directly identified with two or more final
cost objectives.
Source:
Amos, S., (2007).Cost ElementsCost Structuring.Skills & Knowledge of Cost Engineering-5th
Edition.page12

13
CONCLUDING REFLECTION ON SCAFFOLDING?
Was scaffolding used solely to complete the activity or
asset; say a Vessel?
•

Very unlikely, because scaffolding erected on the same
spot will also be used for erection, painting, welding,
piping, insulation, electrical, mixer, float, I&C installation,
and others. As such, scaffolding is an Indirect
because expended resources are also associated
with other activities and assets.

Note that the only catch is how the project defines its
final cost objectives. Any change to that final cost
objectives can change scaffolding to either Direct or
Indirect.
14
Bibliography
Frago, R. (2013).On scaffolding hours.Retrieved from
http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059
&type=member&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DIS
CUSSION_COMMENT_YOU_CREATED#commentID_5816648952941928448
Wikipedia, (2013).Indirect Costs.Retrieved from
http://en.wikipedia.org/wiki/Indirect_costs
Frago, R. (2013).On scaffolding hours.Retrieved from
http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059
&type=member&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DIS
CUSSION_COMMENT_YOU_CREATED#commentID_5816648952941928448
Ishii-iiw.co, 2013.Internet picture.Retrieved from http://www.ishiiiiw.co.jp/seihin/sub/drf02.jpg

Amos, S., (2007).Cost ElementsCost Structuring.Skills & Knowledge of Cost
Engineering-5th Edition.page12

15
END

16

Weitere ähnliche Inhalte

Was ist angesagt?

Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone SafetySelva Prakash
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPushpendra Bansi
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsAlan Bassett
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHASNIZAM BIN MD SAAD
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CVSony Mani
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of RiggerMajid Hussain
 
1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hourJohn Newquist
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
Types of cranes
Types of cranesTypes of cranes
Types of cranesZiad Salem
 
28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templatesDwarika Bhushan Sharma
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manualSyam Tawakkal
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 

Was ist angesagt? (20)

Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansi
 
HSE Engineer Resume
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
Lifting using excavator
Lifting using excavatorLifting using excavator
Lifting using excavator
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Types of cranes
Types of cranesTypes of cranes
Types of cranes
 
28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manual
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 

Andere mochten auch (20)

Scaffold
ScaffoldScaffold
Scaffold
 
Caledonia Scaffolding Company Induction
Caledonia Scaffolding Company InductionCaledonia Scaffolding Company Induction
Caledonia Scaffolding Company Induction
 
Scaffolding Power Point
Scaffolding Power PointScaffolding Power Point
Scaffolding Power Point
 
Stallion Products - Aluminium Scaffold Installation Guide
Stallion Products - Aluminium Scaffold Installation GuideStallion Products - Aluminium Scaffold Installation Guide
Stallion Products - Aluminium Scaffold Installation Guide
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Scaffold Safety Part 3
Scaffold Safety Part 3Scaffold Safety Part 3
Scaffold Safety Part 3
 
scaffold 2015
scaffold 2015scaffold 2015
scaffold 2015
 
Supported scaffold safety
Supported scaffold safetySupported scaffold safety
Supported scaffold safety
 
Scaffold Safety Part 2
Scaffold Safety Part 2Scaffold Safety Part 2
Scaffold Safety Part 2
 
CORP - GRADUATE HSE TRN - AMANA1
CORP - GRADUATE HSE TRN - AMANA1CORP - GRADUATE HSE TRN - AMANA1
CORP - GRADUATE HSE TRN - AMANA1
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Scaffold Safety Part 1
Scaffold Safety Part 1Scaffold Safety Part 1
Scaffold Safety Part 1
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Scaffolding Technique
Scaffolding TechniqueScaffolding Technique
Scaffolding Technique
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Session 2 General Safety Requirements
Session 2   General Safety RequirementsSession 2   General Safety Requirements
Session 2 General Safety Requirements
 

Ähnlich wie 011614 Scaffolding, what is it? Direct or Indirect?

Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Mohammad Lemar ZALMAİ
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...IRJET Journal
 
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTEARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTIAEME Publication
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction projectIAEME Publication
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET Journal
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPMIRJET Journal
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...IRJET Journal
 
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET Journal
 
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysisEvaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysiseSAT Publishing House
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Projectijtsrd
 
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”IRJET Journal
 
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...ijtsrd
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectIJERA Editor
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateSHAZEBALIKHAN1
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...IRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 

Ähnlich wie 011614 Scaffolding, what is it? Direct or Indirect? (20)

Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTEARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction project
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
 
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
 
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysisEvaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
 
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
 
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel Template
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 

Mehr von PM SOLUTION PRO| Risk-based Management and Services Inc.

Mehr von PM SOLUTION PRO| Risk-based Management and Services Inc. (20)

121717 Kindle Issue 2 : Figures become so small than desired
121717 Kindle Issue 2 : Figures become so small than desired121717 Kindle Issue 2 : Figures become so small than desired
121717 Kindle Issue 2 : Figures become so small than desired
 
121717 Kindle Issue : Table lines were showing in kindle
121717 Kindle Issue : Table lines were showing in kindle121717 Kindle Issue : Table lines were showing in kindle
121717 Kindle Issue : Table lines were showing in kindle
 
101116 Risk-based Planning & Scheduling (My SAIT Slides)
101116 Risk-based Planning & Scheduling (My SAIT Slides)101116 Risk-based Planning & Scheduling (My SAIT Slides)
101116 Risk-based Planning & Scheduling (My SAIT Slides)
 
063016 Man is the Center of the Risk Universe
063016 Man is the Center of the Risk Universe063016 Man is the Center of the Risk Universe
063016 Man is the Center of the Risk Universe
 
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
 
032815 DBM Schedule Development Workshop
032815 DBM Schedule Development Workshop032815 DBM Schedule Development Workshop
032815 DBM Schedule Development Workshop
 
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
 
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique 102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
 
091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)
 
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
 
082314 Road to Operational Excellence
082314 Road to Operational Excellence082314 Road to Operational Excellence
082314 Road to Operational Excellence
 
072414 Resource Distribution Copy-Paste Problem
072414 Resource Distribution Copy-Paste Problem072414 Resource Distribution Copy-Paste Problem
072414 Resource Distribution Copy-Paste Problem
 
080714-Rufran's Primavera Scheduling Tips Tricks 02-14
080714-Rufran's Primavera Scheduling Tips  Tricks 02-14080714-Rufran's Primavera Scheduling Tips  Tricks 02-14
080714-Rufran's Primavera Scheduling Tips Tricks 02-14
 
121013 Blackberry Business Audit (BMC 205 @ UofC)
121013 Blackberry Business Audit (BMC 205 @ UofC)121013 Blackberry Business Audit (BMC 205 @ UofC)
121013 Blackberry Business Audit (BMC 205 @ UofC)
 
103013 Case Study, Potash Corporation (BMC205, UofC)
103013 Case Study, Potash Corporation (BMC205, UofC)103013 Case Study, Potash Corporation (BMC205, UofC)
103013 Case Study, Potash Corporation (BMC205, UofC)
 
080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1 080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1
 
072213 Understanding Acumen Fuse Scoring Methods
072213 Understanding Acumen Fuse Scoring Methods072213 Understanding Acumen Fuse Scoring Methods
072213 Understanding Acumen Fuse Scoring Methods
 
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
 
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
 
071513 How to Prepare for Schedule Quantitative Risk Analysis
071513 How to Prepare for Schedule Quantitative Risk Analysis071513 How to Prepare for Schedule Quantitative Risk Analysis
071513 How to Prepare for Schedule Quantitative Risk Analysis
 

Kürzlich hochgeladen

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 

Kürzlich hochgeladen (20)

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 

011614 Scaffolding, what is it? Direct or Indirect?

  • 1. SCAFFOLDING WHAT IS IT? DIRECT or INDIRECT An Overview AUTHOR : RUFRAN C. FRAGO, P.Eng, PMP®, CCP, PMI-RMP® REVISION : January 17, 2014
  • 2. AUTHOR Rufran C. Frago, P. Eng., PMP®, CCP, PMI-RMP® Rufran has a wide-range of expertise & specialization while working in the Manufacturing, Petrochemical, Oleo-chemicals, Oil and Gas, Education & Training Industries for more than 36 years in various roles and capacities. He has worked in Asia, Africa, Middle East and North America. His expertise includes: Primavera Database Administration, Program and Project Planning & Scheduling, Qualitative/Quantitative Risk Management, Problem Solving, Project Management, Cost Engineering, Project Control, Construction Management/Coordination, Project Review & Implementation Audit, Estimating, Engineering & Design, Fab/Mod Management, Preventive & Predictive Reliability-Based Maintenance, Operation, Material Selection, Warehousing, EH&S, and Training. 2
  • 3. PURPOSE Since scaffolding can easily account for a substantial 5% to 15% or more of construction hours, it is a very significant value in terms of progress. Once it becomes a part of the progressing process, and the resources quantity uploaded to the schedule, then it will work very much in favor of the contractor or the execution team. As such, I would like you and I to try to answer the contentious question below: In a construction project, how are Scaffolding Hours" categorized? Are they Directs or Indirects? 3
  • 4. PROJECT - XYZ DIRECT HOURS WITHOUT SCAFFOLDING 4
  • 5. PROJECT - XYZ DIRECT HOURS WITH SCAFFOLDING 5
  • 6. PROJECT - XYZ PLAN PROGRESS COMPARISON 6
  • 7. PROJECT - XYZ Scaffolding as Direct (Plan) is the plan progress considering all scaffolding work as direct hours. In this case, 31518 work hours were added (see slides 4 & 5) Scaffolding as Indirect (Plan) is the plan progress if all scaffolding work remain as indirect hours. In this case, the total direct is less by 31,518 hours (see slides 4 & 5) 7
  • 8. METHODS OF PROGRESSING Four known methods of progressing Scaffolding Work hours regardless of whether it is considered Direct or Indirect: 1. Equal periodic withdrawal from start to end of Construction. 2. Equal periodic withdrawal from start of Civil works to end of Construction. 3. Equal periodic withdrawal from start of Mechanical or Structural works (which ever start first) to end of Construction. 4. Scaffolding hours specifically calculated in each Work Package. 8
  • 9. Using equal periodic withdrawal from start of Civil works to end of Construction 0.6% padding Scaffolding works hours are usually claimed in a straight line without respect to earned value. This creates the padding. 9
  • 10. Scaffolding hours specifically calculated in each Work Package Ishii-iiw.co Domed Tank, 2013 Ishii-iiw.co Domed Tank, 2013 Removal of scaffolding Unless the scaffoldings remained in place and become part of the facility constructed, then they are indirectly supporting construction and the hours expended should be considered indirect hours. Source: Ishii-iiw.co, 2013.Internet picture.Retrieved from http://www.ishiiiiw.co.jp/seihin/sub/drf02.jpg 10
  • 11. Why should scaffolding work hours be considered as indirect? Indirect labors are those whose output is not directly part of the assets erected, much like camp or construction site snow removal, overhead, security, transportation, etc. In turn it will align and translate to indirect costs. Indirect costs are costs that are not directly accountable to a cost object such as a particular facility, equipment, module, function or product (Wikipedia, 2013.Indirect Costs). If scaffolding hours is reflected as direct hours in the estimate and became part of the schedule resource loading, the resource distribution in place will be suspect. Calculating/checking labor density, peak resources, resource leveling, resource planning, resource distribution, scope completeness, quantitative risk assessment, and measuring/monitoring bench mark quantities with production rates will not be accurate nor will it be useful in the future (Frago, R., 2013.Linkedin). Source: Wikipedia, (2013).Indirect Costs.Retrieved from http://en.wikipedia.org/wiki/Indirect_costs Frago, R. (2013).On scaffolding hours.Retrieved from http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059&type=mem ber&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DISCUSSION_COMMENT _YOU_CREATED#commentID_5816648952941928448 11
  • 12. Why should scaffolding work hours be considered as indirect? (continuation…) Scaffolding erection does not produce a product or a deliverable that becomes part of the capital equipment, or constructed facilities & structures. They are temporary fixtures that are removed right after direct works are done to the capital assets such as a tank, a compressor or a building. Scaffoldings are erected so one can have access to the upper tank tiers Iike when welding or painting. After all is completed, the scaffolding is taken down (Francisco, R., 2013). Source: Frago, R. (2013).On scaffolding hours.Retrieved from http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059&type=member &commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DISCUSSION_COMMENT_YOU_ CREATED#commentID_5816648952941928448 12
  • 13. AACEi DEFINITION OF DIRECTS AND INDIRECTS Direct costs are those resources that are expected solely to complete the activity or asset. It can be any cost that is specifically identified with a particular final cost objective, but not necessarily limited to items that are incorporated in the end product as material or labor (Amos, S., 2007) Indirect costs are those resources that need to be expended to support the activity or asset but that are also associated with other activities and assets. It is any cost not directly identified with two or more final cost objectives. Source: Amos, S., (2007).Cost ElementsCost Structuring.Skills & Knowledge of Cost Engineering-5th Edition.page12 13
  • 14. CONCLUDING REFLECTION ON SCAFFOLDING? Was scaffolding used solely to complete the activity or asset; say a Vessel? • Very unlikely, because scaffolding erected on the same spot will also be used for erection, painting, welding, piping, insulation, electrical, mixer, float, I&C installation, and others. As such, scaffolding is an Indirect because expended resources are also associated with other activities and assets. Note that the only catch is how the project defines its final cost objectives. Any change to that final cost objectives can change scaffolding to either Direct or Indirect. 14
  • 15. Bibliography Frago, R. (2013).On scaffolding hours.Retrieved from http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059 &type=member&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DIS CUSSION_COMMENT_YOU_CREATED#commentID_5816648952941928448 Wikipedia, (2013).Indirect Costs.Retrieved from http://en.wikipedia.org/wiki/Indirect_costs Frago, R. (2013).On scaffolding hours.Retrieved from http://www.linkedin.com/groupItem?view=&gid=6575331&item=5816221500834861059 &type=member&commentID=5816648952941928448&trk=hb_ntf_LIKED_GROUP_DIS CUSSION_COMMENT_YOU_CREATED#commentID_5816648952941928448 Ishii-iiw.co, 2013.Internet picture.Retrieved from http://www.ishiiiiw.co.jp/seihin/sub/drf02.jpg Amos, S., (2007).Cost ElementsCost Structuring.Skills & Knowledge of Cost Engineering-5th Edition.page12 15