38 MW PV PLANT
IZVOARELE - Giurgiu County - ROMANIA
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
January , 2012
Presentation to Potential Investors
Opportunity Background
The Big Picture
 Capitalize on Government-backed Green Certificate (GC) incentive scheme with top prices
achievable for early entrants (estimated top GC trading price at least 3 years from Renewable
Energy Law publishing)
 Tap in to high demand for renewable energy created by Romanian Government undertaking
targets vs. EU green energy policy.
 For the next 2-3 years at least, the revenues from green energy projects (MWh price plus GC price)
will slightly increase vs. the current price situation (no external market factors are considered).
Application of GC subsidies system is covered by a MWh price increasing (until 2020 it is estimated
a MWh price increasing up to 30%)
 Romania rated as the 3rd
fastest growing country in the EU for gaining planning permission for wind
turbine developments (according to European Wind Energy Association); After the coming into
force of Renewable Energy Law it is expected a similar growth for PV developments.
 Since launch of trading platform, GCs have been traded at the maximum price, i.e. 241.04 Ron. GC
are fully traded.
 Renewable Energy Law is applicable starting October 2011 (Government Order 88/12.10.2011)
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
1
IZVOARELE PV PLANTIZVOARELE PV PLANT
Tariff Review
 Romanian Government undertaking for renewable energy, including hydro, concerns an increasing
of renewable energy production vs. gross internal energy production at 38% by 2020
 Renewable energy, that benefits of GC system subsidies is set at 20% from total energy production
by 2020 (from 10% in 2011 and 12% in 2012)
 GC tariff schedule will operate for 15 years from commissioning date, providing project starts no
later then 2016
 Solar generated power will receive 6 GCs per MWh;
 GC prices: min. €27 to max. €55; starting with 2011, the GC price will be EU inflation-indexed at set
up in Ron based on average Eur/Ron at the BNR exchange rate established in December,
“previous” year.
 Current average electricity price €50 per MWh (average price for interval 1-24 h for 2011); tariff
used in the financial modelling, also.
 Penalties of €110 per non-purchased GC, payable by non-compliant electricity suppliers -> twice
the price of purchasing Green Certificates. The penalty is also EU inflation-indexed
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
2
IZVOARELE PV PLANTIZVOARELE PV PLANT
Project’s Specifics
 The Project has an installed power of 38 MW, being developed over a land with a surface of over 75
ha, divided in 3 plots interconnected with 20 kV underground power lines (see layout in page 6).
 The current use of land is agricultural; it is plane and free of any type of constraints (environmental
etc).
 The land is privately owned; the rights are secured for a period of 35 years, starting December
2011.
 The location is conveniently placed along a county road and within the close proximity of a railroad
station.
 There is a double 110 kV overhead power line crossing one of the 3 plots of land covered by the
project, owned by the local power distribution company (ENEL Muntenia); this line will be used to
connect the PV plant to the national power grid.
 The fixed ground-mounted PV panels will be of premium quality, supplied by REC Group – Norway
(type REC 235 PE), with an efficiency of up to 14.2%, a 10 year product warranty and a 25 year
linear power output warranty (max. degression in performance of 0.7% p.a.).
 The invertors will also be of premium quality, from SMA – Germany.
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
3
IZVOARELE PV PLANTIZVOARELE PV PLANT
Solar Resource
 Over 210 sunny days per annum
 1450-1500 kWh / sqm is the yearly sum of global irradiation
 The figures are submitted in kWh (per mp/year), on optimally – inclined PV modules, the most used
calculation method for energetic application.
 Photovoltaic Geographical Information Systems (PVGIS) is a software approved by the Centre for
Renewable Energy Sources
 The solar map related for Giurgiu area is developed and offered by Energy Research Institute – Italy,
entity under coordination of the EU
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
4
IZVOARELE PV PLANTIZVOARELE PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
5
Solar Resource
IZVOARELE PV PLANTIZVOARELE PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
6
Project’s
layout
IZVOARELE PV PLANTIZVOARELE PV PLANT
Permitting process – general overview:
 According to the Romania laws, there are two key-permits to be obtained:
1. The Construction Permit, as a result of a land use change procedure and an application file
including different additional permits (including Environmental Permit) and basic designs (civil
works and technical design) of the project;
2. The Connection-to-the-grid Permit, following a procedure that includes, among getting few
other additional permits, a Connection Solution Study performed by an authorized consultant.
Permitting process – project’s status:
 The procedure for the change of the land destination was initiated; civil works design and technical
designs are in progress already; the Construction Permit is expected to be issued in April 2012.
 The Connection Solution Study was contracted and initiated; the Connection Permit is expected to
be issued in March 2012.
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
7
IZVOARELE PV PLANTIZVOARELE PV PLANT
Financial figures for a ..... years investment :
 Estimated revenues: EUR ..... per year,
 Total investment costs: EUR .....,
 Estimated operation and maintenance costs per annum - 5% from total income
 Estimated debt / equity ratio: ....
 Recovering investment period: ..... years
 Other financial indicators:
 IRR project – .....%,
 EBITDA margin – .....%,
 Net margin profit – ......%,
 ROE – ......% (yearly average ROE – ......%),
 NPV – EUR ....., (@ assumed cost of capital ...% p.a.)
 ......
 ......
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
8
IZVOARELE PV PLANTIZVOARELE PV PLANT
Assumptions for revenues’ estimation:
Green Certificate price
 Considered the current price of EUR 56.16 (equiv. of RON 241 at an exchange rate of 4.25)
 Yearly adjusted with inflation rate (EUROSTAT data), estimated at 2.50% p.a. (average for 2005-2010 was
2.70%; for 2011 estimated at 2.70%)
 No changing negative adverse pricing up to 2015 (included)
 Starting with 2015 until 2020, we’ve considered a GC price decreasing of 30%, constantly distributed during
the analysed period.
Electricity Price
 2011 MWh price considered is EUR 50 (based on 2011 quantity electricity statistics, for 0-24h intervals; for
2011 the average price was EUR 51.75)
 From 2012 (included) to 2020 we estimate a price increasing of 27,5% (according to ANRE’s publication, the
price increasing of 30% is considered until 2017/2018), constantly distributed during the analysed period ;
 No external factors market considered which might affect the internal price energy
 No Romanian’s commitment considered to EU for market liberalisation of energy price
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
9
IZVOARELE PV PLANTIZVOARELE PV PLANT
Proposed Selling Structure
 ....
 ....
Photovoltaic Engineering
BORRABORRA
Energy Plant SrlEnergy Plant Srl
10
IZVOARELE PV PLANTIZVOARELE PV PLANT

More Related Content

What's hot

Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Greenfirstgreen
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectSrini Chopakatla, PE, PMP
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_finalLoren Schwappach
 
RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE
 
Presentazione di Gruppo Veronagest
Presentazione di Gruppo VeronagestPresentazione di Gruppo Veronagest
Presentazione di Gruppo VeronagestVeronagest
 
Morocco
MoroccoMorocco
MoroccoRCREEE
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsJohn Blue
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE코리아
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Implementing Agreement (IA)
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Kite Turbine networks from Windswept and Interesting
Kite Turbine networks from Windswept and InterestingKite Turbine networks from Windswept and Interesting
Kite Turbine networks from Windswept and InterestingRoderick Read
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00Syed_Sajjad_Raza
 

What's hot (20)

Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Green
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power Project
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development
 
Barrack
BarrackBarrack
Barrack
 
Presentazione di Gruppo Veronagest
Presentazione di Gruppo VeronagestPresentazione di Gruppo Veronagest
Presentazione di Gruppo Veronagest
 
Converteam presentation
Converteam presentationConverteam presentation
Converteam presentation
 
Morocco
MoroccoMorocco
Morocco
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
 
SDTC Potential Difference Inc. - Siemens - Research and Development Project
SDTC Potential Difference Inc. - Siemens - Research and Development ProjectSDTC Potential Difference Inc. - Siemens - Research and Development Project
SDTC Potential Difference Inc. - Siemens - Research and Development Project
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Final faq booklet
Final faq bookletFinal faq booklet
Final faq booklet
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Kite Turbine networks from Windswept and Interesting
Kite Turbine networks from Windswept and InterestingKite Turbine networks from Windswept and Interesting
Kite Turbine networks from Windswept and Interesting
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
 

Viewers also liked

Supersticions around the world
Supersticions around the worldSupersticions around the world
Supersticions around the worldBeca Pacheco
 
Dolor de espalda (lumbalgia) en las embarazadas
Dolor de espalda (lumbalgia) en las embarazadasDolor de espalda (lumbalgia) en las embarazadas
Dolor de espalda (lumbalgia) en las embarazadasJairo Lara
 
Чем таргетированная реклама отличается от контекстной?
Чем таргетированная реклама отличается от контекстной?Чем таргетированная реклама отличается от контекстной?
Чем таргетированная реклама отличается от контекстной?Katerina Tulyankina
 
Lesson Plan 9
Lesson Plan 9Lesson Plan 9
Lesson Plan 9elvictorc
 
Как выбрать доменное имя
Как выбрать доменное имяКак выбрать доменное имя
Как выбрать доменное имяAlexander Gruzov
 
Nightlife Discotheques Lounge Bars Night Clubs Pubs in hyderabad india
Nightlife  Discotheques Lounge Bars Night Clubs Pubs in hyderabad indiaNightlife  Discotheques Lounge Bars Night Clubs Pubs in hyderabad india
Nightlife Discotheques Lounge Bars Night Clubs Pubs in hyderabad indiaVarthak India
 
Lesson Plan 3
Lesson Plan 3Lesson Plan 3
Lesson Plan 3elvictorc
 
Masters search jake
Masters search jakeMasters search jake
Masters search jakejakedreiling
 
How i learned to stop worrying about common core
How i learned to stop worrying about common coreHow i learned to stop worrying about common core
How i learned to stop worrying about common coreAdam Blum
 
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatatea
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatateaStudiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatatea
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatateaEdenred Romania
 
Photo presentation
Photo presentationPhoto presentation
Photo presentationjakedreiling
 
ปอสัมพันธ์4757
ปอสัมพันธ์4757ปอสัมพันธ์4757
ปอสัมพันธ์4757Suwannee Pun
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTRenato Borra
 
Approaches to communication in response to geo-hydrological risk: the Euro...
Approaches to communication in response to geo-hydrological risk:  the Euro...Approaches to communication in response to geo-hydrological risk:  the Euro...
Approaches to communication in response to geo-hydrological risk: the Euro...Umberto Pernice
 

Viewers also liked (17)

Supersticions around the world
Supersticions around the worldSupersticions around the world
Supersticions around the world
 
Dolor de espalda (lumbalgia) en las embarazadas
Dolor de espalda (lumbalgia) en las embarazadasDolor de espalda (lumbalgia) en las embarazadas
Dolor de espalda (lumbalgia) en las embarazadas
 
Чем таргетированная реклама отличается от контекстной?
Чем таргетированная реклама отличается от контекстной?Чем таргетированная реклама отличается от контекстной?
Чем таргетированная реклама отличается от контекстной?
 
Lesson Plan 9
Lesson Plan 9Lesson Plan 9
Lesson Plan 9
 
Как выбрать доменное имя
Как выбрать доменное имяКак выбрать доменное имя
Как выбрать доменное имя
 
Nightlife Discotheques Lounge Bars Night Clubs Pubs in hyderabad india
Nightlife  Discotheques Lounge Bars Night Clubs Pubs in hyderabad indiaNightlife  Discotheques Lounge Bars Night Clubs Pubs in hyderabad india
Nightlife Discotheques Lounge Bars Night Clubs Pubs in hyderabad india
 
Lesson Plan 3
Lesson Plan 3Lesson Plan 3
Lesson Plan 3
 
My ple
My pleMy ple
My ple
 
Masters search jake
Masters search jakeMasters search jake
Masters search jake
 
How i learned to stop worrying about common core
How i learned to stop worrying about common coreHow i learned to stop worrying about common core
How i learned to stop worrying about common core
 
Ganga associates
Ganga associatesGanga associates
Ganga associates
 
Reinos
ReinosReinos
Reinos
 
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatatea
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatateaStudiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatatea
Studiu Edenred: obiceiurile alimentare ale romanilor le pun in pericol sanatatea
 
Photo presentation
Photo presentationPhoto presentation
Photo presentation
 
ปอสัมพันธ์4757
ปอสัมพันธ์4757ปอสัมพันธ์4757
ปอสัมพันธ์4757
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
 
Approaches to communication in response to geo-hydrological risk: the Euro...
Approaches to communication in response to geo-hydrological risk:  the Euro...Approaches to communication in response to geo-hydrological risk:  the Euro...
Approaches to communication in response to geo-hydrological risk: the Euro...
 

Similar to 38 MW Romania PV Plant Investment Opportunity

Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phonesVito Gamberale
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar ProjectIvSatinLtd
 
Eu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesEu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesantonis000
 
PV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPARIS
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Atanas Georgiev
 
SETT seminar presentation, RU2
SETT seminar presentation, RU2SETT seminar presentation, RU2
SETT seminar presentation, RU2artursskroderis
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridMykola Shlapak
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?Atanas Georgiev
 
News 20110830 grants
News 20110830 grantsNews 20110830 grants
News 20110830 grantsPaul Keisch
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8Dr. Oliver Massmann
 
Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccPARITET
 
Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccPARITET
 

Similar to 38 MW Romania PV Plant Investment Opportunity (20)

Romania
RomaniaRomania
Romania
 
Montenegro
MontenegroMontenegro
Montenegro
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phones
 
Czech republic
Czech republicCzech republic
Czech republic
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar Project
 
Eu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesEu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sources
 
PV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPV development in France Market, Policy & Forecasts
PV development in France Market, Policy & Forecasts
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
SETT seminar presentation, RU2
SETT seminar presentation, RU2SETT seminar presentation, RU2
SETT seminar presentation, RU2
 
RPVF PR10
RPVF PR10RPVF PR10
RPVF PR10
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity Grid
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?
 
News 20110830 grants
News 20110830 grantsNews 20110830 grants
News 20110830 grants
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
 
Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nucc
 
Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nucc
 

Recently uploaded

Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 

Recently uploaded (20)

Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 

38 MW Romania PV Plant Investment Opportunity

  • 1. 38 MW PV PLANT IZVOARELE - Giurgiu County - ROMANIA Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl January , 2012 Presentation to Potential Investors
  • 2. Opportunity Background The Big Picture  Capitalize on Government-backed Green Certificate (GC) incentive scheme with top prices achievable for early entrants (estimated top GC trading price at least 3 years from Renewable Energy Law publishing)  Tap in to high demand for renewable energy created by Romanian Government undertaking targets vs. EU green energy policy.  For the next 2-3 years at least, the revenues from green energy projects (MWh price plus GC price) will slightly increase vs. the current price situation (no external market factors are considered). Application of GC subsidies system is covered by a MWh price increasing (until 2020 it is estimated a MWh price increasing up to 30%)  Romania rated as the 3rd fastest growing country in the EU for gaining planning permission for wind turbine developments (according to European Wind Energy Association); After the coming into force of Renewable Energy Law it is expected a similar growth for PV developments.  Since launch of trading platform, GCs have been traded at the maximum price, i.e. 241.04 Ron. GC are fully traded.  Renewable Energy Law is applicable starting October 2011 (Government Order 88/12.10.2011) Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 1 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 3. Tariff Review  Romanian Government undertaking for renewable energy, including hydro, concerns an increasing of renewable energy production vs. gross internal energy production at 38% by 2020  Renewable energy, that benefits of GC system subsidies is set at 20% from total energy production by 2020 (from 10% in 2011 and 12% in 2012)  GC tariff schedule will operate for 15 years from commissioning date, providing project starts no later then 2016  Solar generated power will receive 6 GCs per MWh;  GC prices: min. €27 to max. €55; starting with 2011, the GC price will be EU inflation-indexed at set up in Ron based on average Eur/Ron at the BNR exchange rate established in December, “previous” year.  Current average electricity price €50 per MWh (average price for interval 1-24 h for 2011); tariff used in the financial modelling, also.  Penalties of €110 per non-purchased GC, payable by non-compliant electricity suppliers -> twice the price of purchasing Green Certificates. The penalty is also EU inflation-indexed Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 2 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 4. Project’s Specifics  The Project has an installed power of 38 MW, being developed over a land with a surface of over 75 ha, divided in 3 plots interconnected with 20 kV underground power lines (see layout in page 6).  The current use of land is agricultural; it is plane and free of any type of constraints (environmental etc).  The land is privately owned; the rights are secured for a period of 35 years, starting December 2011.  The location is conveniently placed along a county road and within the close proximity of a railroad station.  There is a double 110 kV overhead power line crossing one of the 3 plots of land covered by the project, owned by the local power distribution company (ENEL Muntenia); this line will be used to connect the PV plant to the national power grid.  The fixed ground-mounted PV panels will be of premium quality, supplied by REC Group – Norway (type REC 235 PE), with an efficiency of up to 14.2%, a 10 year product warranty and a 25 year linear power output warranty (max. degression in performance of 0.7% p.a.).  The invertors will also be of premium quality, from SMA – Germany. Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 3 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 5. Solar Resource  Over 210 sunny days per annum  1450-1500 kWh / sqm is the yearly sum of global irradiation  The figures are submitted in kWh (per mp/year), on optimally – inclined PV modules, the most used calculation method for energetic application.  Photovoltaic Geographical Information Systems (PVGIS) is a software approved by the Centre for Renewable Energy Sources  The solar map related for Giurgiu area is developed and offered by Energy Research Institute – Italy, entity under coordination of the EU Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 4 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 6. Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 5 Solar Resource IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 7. Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 6 Project’s layout IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 8. Permitting process – general overview:  According to the Romania laws, there are two key-permits to be obtained: 1. The Construction Permit, as a result of a land use change procedure and an application file including different additional permits (including Environmental Permit) and basic designs (civil works and technical design) of the project; 2. The Connection-to-the-grid Permit, following a procedure that includes, among getting few other additional permits, a Connection Solution Study performed by an authorized consultant. Permitting process – project’s status:  The procedure for the change of the land destination was initiated; civil works design and technical designs are in progress already; the Construction Permit is expected to be issued in April 2012.  The Connection Solution Study was contracted and initiated; the Connection Permit is expected to be issued in March 2012. Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 7 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 9. Financial figures for a ..... years investment :  Estimated revenues: EUR ..... per year,  Total investment costs: EUR .....,  Estimated operation and maintenance costs per annum - 5% from total income  Estimated debt / equity ratio: ....  Recovering investment period: ..... years  Other financial indicators:  IRR project – .....%,  EBITDA margin – .....%,  Net margin profit – ......%,  ROE – ......% (yearly average ROE – ......%),  NPV – EUR ....., (@ assumed cost of capital ...% p.a.)  ......  ...... Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 8 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 10. Assumptions for revenues’ estimation: Green Certificate price  Considered the current price of EUR 56.16 (equiv. of RON 241 at an exchange rate of 4.25)  Yearly adjusted with inflation rate (EUROSTAT data), estimated at 2.50% p.a. (average for 2005-2010 was 2.70%; for 2011 estimated at 2.70%)  No changing negative adverse pricing up to 2015 (included)  Starting with 2015 until 2020, we’ve considered a GC price decreasing of 30%, constantly distributed during the analysed period. Electricity Price  2011 MWh price considered is EUR 50 (based on 2011 quantity electricity statistics, for 0-24h intervals; for 2011 the average price was EUR 51.75)  From 2012 (included) to 2020 we estimate a price increasing of 27,5% (according to ANRE’s publication, the price increasing of 30% is considered until 2017/2018), constantly distributed during the analysed period ;  No external factors market considered which might affect the internal price energy  No Romanian’s commitment considered to EU for market liberalisation of energy price Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 9 IZVOARELE PV PLANTIZVOARELE PV PLANT
  • 11. Proposed Selling Structure  ....  .... Photovoltaic Engineering BORRABORRA Energy Plant SrlEnergy Plant Srl 10 IZVOARELE PV PLANTIZVOARELE PV PLANT