9. The mission of the East Baton Rouge Parish
Library is to serve all residents of the parish as an
educational, informational, recreational and
cultural center through a wide variety of
resources, services and programs.
12. Observations and Recommendations
Observations:
-Building as designed is energy efficient and takes advantage of proper
building orientation, etc.
-Current design is fully code compliant and meets the library’s programmatic
requirements
-As designed the library should achieve LEED Silver certification or better
-Energy Model performed on current design shows significant energy savings
Recommendations:
-Proceed with project as designed.
-Consider implementing additional sustainable elements if budget permits.
13.
14.
15. Sustainable Sites
Building Element: Net Cost: Benefits:
1. Bike Racks/Shower 1. $20,000 1. Program requirement, safe storage
of bicycles leading to greater access
for all visitors.
2. Pervious Pavers and 2. $450,000 2. Increased filtration of stormwater
Bio Swales runoff, Meets local code requirements,
Benefits the community.
3. Vegetated Roof 3. $148,240 3. Increased filtration of stormwater,
attractive design element.
16.
17. Water Efficiency
Building Element: Net Cost: Benefits:
1. Efficient Fixtures 1. None 1. Reduced Water Consumption
2. Programmable 2. None 2. Reduced Water Consumption
Irrigation
3. Efficient Appliances 3. None 3. Reduced Water Consumption
18.
19. Energy and Atmosphere
Building Element: Net Cost: Benefits:
1. Efficient A/C System 1. $80,000 1. Significant energy cost savings,
reduced maintenance costs
2. Building 2. $275,500 2. Third party verification of systems,
Commissioning reduced maintenance costs, fewer
change orders, better understanding of
operations, fewer callbacks.
3. Sun Screens 3. $121,000 3. Energy cost savings. Attractive
Design feature.
20.
21. Materials and Resources
Building Element: Net Cost: Benefits:
1. Storage and 1. None 1. Reduction of recyclable materials
Collection of sent to landfills benefiting the
Recyclables community.
2. Construction Waste 2. $9,500 2. Reduction of construction waste
Management sent to landfills
3. Recycled Content 3. None 3. Reduce the impact resulted from
extraction and harvesting of virgin
materials.
4. Regional Materials 4. None 4. Increase demand for locally
manufactured and harvested materials.
Benefits the community.
5. Rapidly Renewable 5. None 5. Reduce the use and depletion of
Materials finite materials
22.
23.
24.
25. Indoor Environmental Quality
Building Element: Net Cost: Benefits:
1. Outdoor Delivery 1. $30,000 1. Monitor outdoor air intake to
Monitoring promote occupant comfort and
increased A/C efficiency
2. Environmental 2. None 2. Required by state law. Ensures good
Tobacco Smoke Control air quality for inhabitants.
3. Construction Indoor 3. None 3. Improve air quality in building during
Air Quality Management construction and before occupancy.
Plan Tremendous health benefit for building
occupants.
4. Low-Emitting 4. None 4. Reduce indoor air contaminants.
Materials Tremendous health benefit for building
occupants. Fewer sick days, higher
employee retention.
5. Thermal Comfort of 5. $9,500 5. Survey of Occupants Determining
Occupants Proper Operation of Systems.
26.
27. Innovation in Design/
Regional Priority
Building Element: Cost: Benefits:
1. Regional Priorities 1. None 1. Encourages Sustainable practices
within the community.
2. Educational Outreach 2. None 2. Public Education Opportunity
3. Occupant Recycling 3. None 3. Serving as a Hub for the Community
for Recyclable Items Not Usually
Accepted (Printer Cartridges, Batteries,
etc…)
28.
29.
30.
31.
32.
33. Summary
Base Building : Yearly 30 Years
1. Energy $304,296 $15,708,574
2. Operation and Maintenance $157,500 $8,130,571
3. Employee Productivity Average
4. Occupant Health Average
Design Building: Yearly 30 Years
1. Energy $253,764 $13,099,977
2. Operation and Maintenance $133,875 $6,910,985
3. Employee Productivity Improved
4. Occupant Health Improved
34. TOTALS
Base Building : $23,839,145
Design Building : $20,010,963
TOTAL 30 Year Savings = $3,828,182
Payback time on upgrades = 8.5 Years