SlideShare ist ein Scribd-Unternehmen logo
1 von 18
GUIDED BY:-
Mr. Deepak Somani
Asst. Prof. EE
PRESENTED BY:-
Ravi kant
Roll no. :-12ECOEE020
A
TRAINING SEMINAR
ON
“GRID SUB-STATION”
SESSION 2015-16
Bachelor of Technology
In
Electrical Engineering
1
CONTENTS
SUBSTATION.
TYPES OF SUB-STATION.
SINGLE LINE DIAGRAM.
EQUIPMENT.
• Lightening Arrester.
• Isolator.
• CVT.
• Instrument Transformer.
a. Current Transformers.
b. Potential Transformers.
• Circuit Breaker.
• Bus bars.
• Transformer.
• Protective Relaying.
• DC Power Supply.
2
SUB-STATION
• A substation is a part of an
electrical generation, transmission
and distribution system. Substations
transform voltage from high to low
or the reverse.
• Then that voltage we use in our
homes and industries etc.
Fig. SUB-STATION
3
CLASSIFICATION OF SUB-STATION
• ACCORDING TO SERVICE REQUIRMENT.
a) Transformer sub-station.
b) Switching sub-station.
c) Power factor correction sub-station.
d) Frequency changer sub-station.
e) Converting sub-station.
• ACCORDING TO CONSTRUCTIONAL FEATURE.
a) Indoor sub-station.
b) Outdoor sub-station.
c) Underground sub-station.
d) Pole-mounted sub-station.
4
SINGLE LINE DIAGRAM
5
EQUIPMENT OF SUB-STATION
• Lightening Arrester.
• Isolator.
• CVT.
• Instrument Transformer.
a. Current Transformers.
b. Potential Transformers.
• Circuit Breaker.
• Bus bars.
• Transformer.
• Protective Relaying
• DC Power Supply
6
LIGHTENING ARRESTER
• Lightening arrestors are the
instrument that are used to
prevent from lightening entering
the main station.
• It is also known as surge
arrester.
Fig. LIGHTENING ARRESTER
7
ISOLATORS
• The use of isolators is to off the
transformer and the other instrument in
the line.
• Isolators are used for maintenance
whenever fault occur.
• It is manually operated.
Fig. ISOLATORS
8
CVT(CAPACITOR VOLTAGE TRANSFORMER)
• A CVT is a transformer used
in GSS to step-down extra
high voltage and provide low
voltage either for
measurement or to operate a
protective relay.
Fig. CAPACITOR VOLTAGE TRANSFORMER
9
BUSBAR
• BUSBAR is a term we use
for a main bar or conductor
carrying electric current to
many connection.
Fig. BUSBAR
10
INSTRUMENT TRANSFORMER
• Current transformers are basically
used to take the readings of the
currents entering in the substation.
• The other uses of this CT.
a) Distance Protection.
b) Backup Protection.
c) Measurement.
Fig. INSTRUMENT TRANSFORMER
CURRENT TRANSFORMER
11
• The potential transformer uses for
Measurement and Protection.
• The main use of potential transformer
is to measure the voltage through the
Busbar.
• There are two main parts in it.
a) Measurement.
b) Protection.
POTENTIAL TRANSFORMER
Fig. POTENTIAL TRANSFORMER
12
PROTECTIVE RELAYS
• Relay is a device which sense the
fault and send message signal to
circuit breaker to trip the coil.
• It used for transformer protection.
Fig. PROTECTIVE RELAYS
13
CIRCUIT BREAKER
• A circuit breaker is used to receive
the fault message signal from the
relay and trip the coil.
TYPES:-
a) AIR CIRCUIT BREAKER.
b) OIL CIRCUIT BREAKER.
c) VACCUM CIRCUIT BREAKER.
d) SF6 CIRCUIT BREAKER.
Fig. CIRCUIT BREAKER
14
TRANSFORMERS
• Transformer is a static device by
which Transform AC electrical
power from one voltage level into
other level by keeping same
frequency.
• Transformer used in GSS is
called Power Transformer.
Fig. TRANSFORMERS
15
DC POWER SUPPLY
• DC power supply is used for
operate Circuit Breaker and
control room operation.
• 110V dc power supply is
used.
Fig. DC POWER SUPPLY
16
GRID SUB-STATION AT A GLANCE
17
18

Weitere ähnliche Inhalte

Was ist angesagt?

Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction pptragulkncet
 
MPPT Solar Charge Controller
MPPT Solar Charge ControllerMPPT Solar Charge Controller
MPPT Solar Charge ControllerShashank Narayan
 
Power system stability
Power system stabilityPower system stability
Power system stabilityBalaram Das
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmissionSonuKumarBairwa
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power systemsneh pratap singh
 
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.Shweta Yadav
 
GENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEGENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEJamil Abdullah
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Automatic load frequency control
Automatic load frequency controlAutomatic load frequency control
Automatic load frequency controlBalaram Das
 
Flexible ac transmission system
Flexible ac transmission systemFlexible ac transmission system
Flexible ac transmission systemUday Wankar
 

Was ist angesagt? (20)

Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
 
MPPT Solar Charge Controller
MPPT Solar Charge ControllerMPPT Solar Charge Controller
MPPT Solar Charge Controller
 
Solar Power Charge Controller
Solar Power Charge ControllerSolar Power Charge Controller
Solar Power Charge Controller
 
Energy meter
Energy meterEnergy meter
Energy meter
 
Power system stability
Power system stabilityPower system stability
Power system stability
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmission
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Electric substation
Electric substation Electric substation
Electric substation
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power system
 
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.Exp 4 (1)4.	Gauss Siedal Load flow analysis using Matlab Software.
Exp 4 (1)4. Gauss Siedal Load flow analysis using Matlab Software.
 
GENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEGENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGE
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
SEPIC CONVERTER
SEPIC CONVERTERSEPIC CONVERTER
SEPIC CONVERTER
 
Automatic load frequency control
Automatic load frequency controlAutomatic load frequency control
Automatic load frequency control
 
Hvdc notes
Hvdc notesHvdc notes
Hvdc notes
 
MTDC SYSTEMS
MTDC SYSTEMSMTDC SYSTEMS
MTDC SYSTEMS
 
Flexible ac transmission system
Flexible ac transmission systemFlexible ac transmission system
Flexible ac transmission system
 

Ähnlich wie GSS ppt

220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 
66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docxdnyaneshwarvidhate2
 
DISTRIBUTION SYSTEM.pptx
DISTRIBUTION SYSTEM.pptxDISTRIBUTION SYSTEM.pptx
DISTRIBUTION SYSTEM.pptxdwipayan2004
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014pinki199319
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxSNEHAKANWAR1
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limitedVSRAGHU
 
Kamal final presentation eee reb- comilla
Kamal final presentation eee  reb- comillaKamal final presentation eee  reb- comilla
Kamal final presentation eee reb- comillasiam hossain
 
“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.Priya Rachakonda
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurkishankky
 
Power Electronics 2 mark Questions
Power Electronics 2 mark Questions Power Electronics 2 mark Questions
Power Electronics 2 mark Questions BALACHANDRAN D
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Gangwal
 

Ähnlich wie GSS ppt (20)

220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx
 
DISTRIBUTION SYSTEM.pptx
DISTRIBUTION SYSTEM.pptxDISTRIBUTION SYSTEM.pptx
DISTRIBUTION SYSTEM.pptx
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Kamal final presentation eee reb- comilla
Kamal final presentation eee  reb- comillaKamal final presentation eee  reb- comilla
Kamal final presentation eee reb- comilla
 
“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
Three phase appliance protector.
Three phase appliance protector.Three phase appliance protector.
Three phase appliance protector.
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Ee6503(r 13) qb-2013_regulation
Ee6503(r 13) qb-2013_regulationEe6503(r 13) qb-2013_regulation
Ee6503(r 13) qb-2013_regulation
 
Power Electronics 2 mark Questions
Power Electronics 2 mark Questions Power Electronics 2 mark Questions
Power Electronics 2 mark Questions
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 

Mehr von ravi kant

MEMS technology technical seminar report
MEMS technology technical seminar report MEMS technology technical seminar report
MEMS technology technical seminar report ravi kant
 
smart meter technical seminar report
smart meter technical seminar reportsmart meter technical seminar report
smart meter technical seminar reportravi kant
 
Smart energy metering system
Smart energy metering systemSmart energy metering system
Smart energy metering systemravi kant
 
indian railway training report
indian railway training reportindian railway training report
indian railway training reportravi kant
 
BSNL training report
BSNL training reportBSNL training report
BSNL training reportravi kant
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
RRVUN hydro power plant
RRVUN hydro power plantRRVUN hydro power plant
RRVUN hydro power plantravi kant
 
Vedanta Hindustan zinc training
Vedanta Hindustan zinc trainingVedanta Hindustan zinc training
Vedanta Hindustan zinc trainingravi kant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantravi kant
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Circuit breaker presentation
Circuit breaker presentationCircuit breaker presentation
Circuit breaker presentationravi kant
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training reportravi kant
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc reportravi kant
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc reportravi kant
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report ravi kant
 

Mehr von ravi kant (15)

MEMS technology technical seminar report
MEMS technology technical seminar report MEMS technology technical seminar report
MEMS technology technical seminar report
 
smart meter technical seminar report
smart meter technical seminar reportsmart meter technical seminar report
smart meter technical seminar report
 
Smart energy metering system
Smart energy metering systemSmart energy metering system
Smart energy metering system
 
indian railway training report
indian railway training reportindian railway training report
indian railway training report
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
RRVUN hydro power plant
RRVUN hydro power plantRRVUN hydro power plant
RRVUN hydro power plant
 
Vedanta Hindustan zinc training
Vedanta Hindustan zinc trainingVedanta Hindustan zinc training
Vedanta Hindustan zinc training
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Circuit breaker presentation
Circuit breaker presentationCircuit breaker presentation
Circuit breaker presentation
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training report
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc report
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc report
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report
 

Kürzlich hochgeladen

OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 

Kürzlich hochgeladen (20)

OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 

GSS ppt

  • 1. GUIDED BY:- Mr. Deepak Somani Asst. Prof. EE PRESENTED BY:- Ravi kant Roll no. :-12ECOEE020 A TRAINING SEMINAR ON “GRID SUB-STATION” SESSION 2015-16 Bachelor of Technology In Electrical Engineering 1
  • 2. CONTENTS SUBSTATION. TYPES OF SUB-STATION. SINGLE LINE DIAGRAM. EQUIPMENT. • Lightening Arrester. • Isolator. • CVT. • Instrument Transformer. a. Current Transformers. b. Potential Transformers. • Circuit Breaker. • Bus bars. • Transformer. • Protective Relaying. • DC Power Supply. 2
  • 3. SUB-STATION • A substation is a part of an electrical generation, transmission and distribution system. Substations transform voltage from high to low or the reverse. • Then that voltage we use in our homes and industries etc. Fig. SUB-STATION 3
  • 4. CLASSIFICATION OF SUB-STATION • ACCORDING TO SERVICE REQUIRMENT. a) Transformer sub-station. b) Switching sub-station. c) Power factor correction sub-station. d) Frequency changer sub-station. e) Converting sub-station. • ACCORDING TO CONSTRUCTIONAL FEATURE. a) Indoor sub-station. b) Outdoor sub-station. c) Underground sub-station. d) Pole-mounted sub-station. 4
  • 6. EQUIPMENT OF SUB-STATION • Lightening Arrester. • Isolator. • CVT. • Instrument Transformer. a. Current Transformers. b. Potential Transformers. • Circuit Breaker. • Bus bars. • Transformer. • Protective Relaying • DC Power Supply 6
  • 7. LIGHTENING ARRESTER • Lightening arrestors are the instrument that are used to prevent from lightening entering the main station. • It is also known as surge arrester. Fig. LIGHTENING ARRESTER 7
  • 8. ISOLATORS • The use of isolators is to off the transformer and the other instrument in the line. • Isolators are used for maintenance whenever fault occur. • It is manually operated. Fig. ISOLATORS 8
  • 9. CVT(CAPACITOR VOLTAGE TRANSFORMER) • A CVT is a transformer used in GSS to step-down extra high voltage and provide low voltage either for measurement or to operate a protective relay. Fig. CAPACITOR VOLTAGE TRANSFORMER 9
  • 10. BUSBAR • BUSBAR is a term we use for a main bar or conductor carrying electric current to many connection. Fig. BUSBAR 10
  • 11. INSTRUMENT TRANSFORMER • Current transformers are basically used to take the readings of the currents entering in the substation. • The other uses of this CT. a) Distance Protection. b) Backup Protection. c) Measurement. Fig. INSTRUMENT TRANSFORMER CURRENT TRANSFORMER 11
  • 12. • The potential transformer uses for Measurement and Protection. • The main use of potential transformer is to measure the voltage through the Busbar. • There are two main parts in it. a) Measurement. b) Protection. POTENTIAL TRANSFORMER Fig. POTENTIAL TRANSFORMER 12
  • 13. PROTECTIVE RELAYS • Relay is a device which sense the fault and send message signal to circuit breaker to trip the coil. • It used for transformer protection. Fig. PROTECTIVE RELAYS 13
  • 14. CIRCUIT BREAKER • A circuit breaker is used to receive the fault message signal from the relay and trip the coil. TYPES:- a) AIR CIRCUIT BREAKER. b) OIL CIRCUIT BREAKER. c) VACCUM CIRCUIT BREAKER. d) SF6 CIRCUIT BREAKER. Fig. CIRCUIT BREAKER 14
  • 15. TRANSFORMERS • Transformer is a static device by which Transform AC electrical power from one voltage level into other level by keeping same frequency. • Transformer used in GSS is called Power Transformer. Fig. TRANSFORMERS 15
  • 16. DC POWER SUPPLY • DC power supply is used for operate Circuit Breaker and control room operation. • 110V dc power supply is used. Fig. DC POWER SUPPLY 16
  • 17. GRID SUB-STATION AT A GLANCE 17
  • 18. 18