Transformer ppt

A
Summer training
Presentation
on
“Transformer”
Presented By:
Name: Rakesh Gurjar
Roll no: 039
Department of Electrical Engineering
Poornima Institute of Engineering and Technology
ISI-6 RIICO Institutional Area,
Jaipur -302022
Submitted To:
Rajendra Singh
(Ass. Professor )
EE, PIET, Jaipur
2018-2019
CONTENTS
 Company Introduction
 Introduction
 Principle
 Classification of transformer
 Construction
 Construction Process
 Winding Construction
 Core Construction
 Core Coil Assembly (CCA)
 Tank Fabrication
 Paint
 Testing
COMPANY INTRODUCTION
 “Danish Private Limited” is established in 1985 and is today
India’s leading quality manufacturer
 Company Works in the field of Manufacturing and Exporting
of Transformers and Relay Panels.
 Product Generated by Company:
o Distribution Transformer
o Dry type Transformer
o Power Transformer
o CRP and Substation Automation
o Substations Projects
INTRODUCTION
 A transformer is a device that changes ac electric power at one
voltage level to ac electric power at another voltage level
through the action of a magnetic field.
 It can be either to step-up or step down the voltage.
 A transformer is a static device.
 The word ‘transformer’ comes form the word ‘transform’.
PRINCIPLE
 Transformers work on the principle of mutual induction.
“when the two coils are inductively coupled and if the current
in coil change uniformly then the e.m.f. induced in the other
coils. This e.m.f can drive a current when a closed path is
provide to it.”
 “The principle of mutual Induction
states that an e.m.f. is induced in a
coil when current in the neighbouring
coil changes”.
CLASSIFICATION OF TRANSFORMER
Instrument
Transformer
Power
Transformer
Step Up and
Step Down
Transformer
Single Phase and
Three Phase
Distribution
Transformer
Transformer
Current
Transformer
Potential
Transformer
 It consists of an iron core on which two separate coils of insulated
copper wire are wound.
 The function of the core is to transfer the changing magnetic flux
from the primary coil to the secondary coil
 The Secondary Coil has a load resistance connected to safe
transformer from being heating up.
 Construction of a simple transformer
Can be seen in Fig.
CONSTRUCTION
Winding Construction
Core Assembly
Core & Winding(Coil) Assembly
(CCA)
Tapping &Tap Changer
Drying Process
Tank Construction
Tanking & Final Fitting
Fittings & Accessories
Painting
Testing
CONSTRUCTION PROCESS
CONSTRUCTION OF WINDING
 Conducting material is used for construction of winding.
 The coils are used are wound on the limbs and insulated from
each other.
 The two different windings are wounds on two different limbs.
 The leakage flux increases which affects the performance and
efficiency of transformer.
 To reduce the leakage flux it is necessary that the windings
should be very close to each other to have high mutual
induction.
Transformer ppt
CORE TYPE CONSTRUCTION
 In this one magnetic circuit and cylindrical coils are used.
 Normally L and T shaped laminations are used.
 Commonly primary winding would on one limb while secondary
on the other but performance will be reduce.
 To get high performance it is
necessary that other the two winding
should be very close to each other.
 There are two type of core .
Transformer ppt
CORE COILASSEMBLY
 In this Process the Winding Coil and Core is Assembled
together .
 Core Coil Assembly defines the insulation scheme, cooling,
dynamic withstand capability, handling.
 Cooling is essential to prevent the thermal degradation of
insulation which enhances a transformer’s life.
 The core assembly is vertically placed with the foot plate
touching the ground. The top yoke of the core is removed.
Transformer ppt
Tapping & Tap Changer
 Generally Taps are provided on HV Windings for HV Variation
or LV Variation.
 To achieve proper voltage regulation on load tap changer is used
instead of OCTC.
 As it is mainly used for higher capacity transformers i.e. above
5000 KVA ratings, voltage can be supplied with On Load Tap
Changer along with necessary controls.
 After this the CCA is placed in Vacuum Auto Enclave to remove
moisture content at 90°c.
TANK FABRICATION
 Transformer tanks commonly used are of the following types;
1. Plain sheet steel tank.
2. Sheet steel tank with external cooling tubes.
3. Radiator tanks.
4. Tanks with corrugated wall panels.
 The tank is manufactured by forming and welding steel plate
which is used as a container for holding the core and coil
assembly together with insulating oil.
Transformer ppt
TANK UP PROCESS
 The core-coil assembly is taken out of the oven and the
"Muggers test" is carried out. If the merger value is as per the
specification then it is taken to Tank-up Dept.
 After this test the Core-Coil Assembly is placed into the tank
and locked up, this process is known as “Tank-Up Process”.
 Accessories are Fitted like drain valves, HV & LV Bushings,
conservator, oil level indicator and explosion vent are fitted in
the tanks.
 Pure filtered transformer oil is filled in the tank to immerse the
assembly only.
Transformer ppt
 After the Tank-up process the Transformer is Brought to the
Paint Department.
 In this process a zinc-32 rich primer is used to paint the
transformer tank for protection from corrosion.
PAINT SHOP
TESTING OF TRANSFORMER
Following test used for the various purposes:-
1. Megger Insulation Test
2. Ratio And Polarity Test
3. High Voltage Test
4. Low Voltage Test
5. D.V.D.F Test
6. Open Circuit Test
7. Short Circuit Test
8. Winding Resistance Test
9. Oil Dielectric Strength Test
10. Vector Group Test
11. Magnetic Balance Test
Transformer ppt
APPLICATIONAND USES
 The transformer used in television and photocopy Machines.
 The transmission and distribution of alternating power is possible
by transformer.
 Simple camera flash uses fly back transformer.
 Signal and audio transformer are used couple in amplifier.
ADVANTAGES
 Less cost
 Less Weight
 less size
 Less time require to assembling
 Require less space
 Deliver more power
 Higher efficiency
 Easier to install
 Easy transportation and installation
 Easy to repair
 Easy assembling
DISADVANTAGES
 Greater cost of standby Units
 Increased cost and inconvenience of repairs.
 In Single Phase transformer (Three Single Phase
Transformer) failure of one transformer, the other two,
Single Phase Transformer still supply the power, while it is
not possible in case of failing a Transformer.
Transformer ppt
1 von 26

Recomendados

Transformer Parts and functions von
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functionsSourabh sharma
10.7K views55 Folien
Power transformer von
Power transformerPower transformer
Power transformerAsif Ahmed Khan
7K views21 Folien
Testing of transformer von
Testing of transformerTesting of transformer
Testing of transformerSMRITI KESHARWANI
32.1K views30 Folien
Transformer von
TransformerTransformer
TransformerAugustien Raju
1.9K views14 Folien
Introduction to mv switchgear von
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgearModal Holong Education
10.1K views79 Folien
Internship report von
Internship report Internship report
Internship report Niteesh Shanbog
11.9K views109 Folien

Más contenido relacionado

Was ist angesagt?

parts of transformer von
parts of transformerparts of transformer
parts of transformerAbhishekLalkiya
9.7K views19 Folien
transformer slide prsentation von
transformer slide prsentation transformer slide prsentation
transformer slide prsentation abu jubayer
2.2K views22 Folien
Transformer basic von
Transformer basicTransformer basic
Transformer basicBHAGWAN PRASAD
5.4K views22 Folien
SUBSTATION OVERVIEW - A presentation on substation von
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
35.3K views44 Folien
Distribution transformer von
Distribution transformerDistribution transformer
Distribution transformerEngr Muhammad Imran
8.9K views20 Folien
Power transformer von
Power transformerPower transformer
Power transformerZunAib Ali
12.2K views40 Folien

Was ist angesagt?(20)

transformer slide prsentation von abu jubayer
transformer slide prsentation transformer slide prsentation
transformer slide prsentation
abu jubayer2.2K views
SUBSTATION OVERVIEW - A presentation on substation von raiamitesh8
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
raiamitesh835.3K views
Power transformer von ZunAib Ali
Power transformerPower transformer
Power transformer
ZunAib Ali12.2K views
Presentation on Power Transformer von Ajay Maurya
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power Transformer
Ajay Maurya10.7K views
Transformer Repair Workshop Report [EEE] von Nik Sharma
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
Nik Sharma19.5K views
Transformers seminar von vinayvickky
Transformers seminarTransformers seminar
Transformers seminar
vinayvickky12.4K views

Similar a Transformer ppt

Industrial visit report uttam transformers von
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformersMahipalSoni4
1K views4 Folien
TELK Industrial Visit Report von
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit ReportVaisakh Shanmughan
3.9K views16 Folien
Tbea vocatinal training von
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
1.9K views52 Folien
transformer Sales, after sales & service presentation von
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
2K views21 Folien
Transformer report-Siemens von
Transformer report-SiemensTransformer report-Siemens
Transformer report-SiemensMahmood Ali
1.4K views13 Folien
Industrial training report von
Industrial training report Industrial training report
Industrial training report Pritam Samanta
10.4K views28 Folien

Similar a Transformer ppt(20)

Industrial visit report uttam transformers von MahipalSoni4
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
MahipalSoni41K views
Tbea vocatinal training von Deep Shah
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
Deep Shah1.9K views
transformer Sales, after sales & service presentation von Fawaz Baik
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
Fawaz Baik2K views
Transformer report-Siemens von Mahmood Ali
Transformer report-SiemensTransformer report-Siemens
Transformer report-Siemens
Mahmood Ali1.4K views
Industrial training report von Pritam Samanta
Industrial training report Industrial training report
Industrial training report
Pritam Samanta10.4K views
Presentation Design of Computer aided design of power transformer von SMDDTech
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformer
SMDDTech4.1K views
Kanti Thermal Power Station von neeraj prasad
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
neeraj prasad412 views
Wings automobile products pvt von Vikram Singh
Wings automobile products pvtWings automobile products pvt
Wings automobile products pvt
Vikram Singh422 views
summer internship report on erection, commissioning and pre-comissioning of50... von Rahul Akinapelli
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
Rahul Akinapelli747 views
TRANSFORMER WORKING MANUFACTURINIG von Sumit Saini
 TRANSFORMER WORKING MANUFACTURINIG TRANSFORMER WORKING MANUFACTURINIG
TRANSFORMER WORKING MANUFACTURINIG
Sumit Saini359 views
Training report trw von Chandan Garg
Training report trwTraining report trw
Training report trw
Chandan Garg1.5K views
How to reduced transformer losses report von kamal soni
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses report
kamal soni1.2K views
IPGCL/PPCL Training presentation von Shubhra Dhyani
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
Shubhra Dhyani18.3K views
INDUSTRIAL TRAINING AT KERALA ELECTRICAL & ALLIED ENGINEERING.pdf von SooryajithT
INDUSTRIAL TRAINING AT KERALA ELECTRICAL & ALLIED ENGINEERING.pdfINDUSTRIAL TRAINING AT KERALA ELECTRICAL & ALLIED ENGINEERING.pdf
INDUSTRIAL TRAINING AT KERALA ELECTRICAL & ALLIED ENGINEERING.pdf
SooryajithT42 views

Último

Proposal Presentation.pptx von
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptxkeytonallamon
42 views36 Folien
Investor Presentation von
Investor PresentationInvestor Presentation
Investor Presentationeser sevinç
25 views26 Folien
Design of machine elements-UNIT 3.pptx von
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptxgopinathcreddy
32 views31 Folien
Instrumentation & Control Lab Manual.pdf von
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdfNTU Faisalabad
6 views63 Folien
Generative AI Models & Their Applications von
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their ApplicationsSN
8 views1 Folie
fakenews_DBDA_Mar23.pptx von
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptxdeepmitra8
15 views34 Folien

Último(20)

Design of machine elements-UNIT 3.pptx von gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy32 views
Instrumentation & Control Lab Manual.pdf von NTU Faisalabad
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdf
NTU Faisalabad 6 views
Generative AI Models & Their Applications von SN
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their Applications
SN8 views
fakenews_DBDA_Mar23.pptx von deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra815 views
Design_Discover_Develop_Campaign.pptx von ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth632 views
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx von lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang7883 views
_MAKRIADI-FOTEINI_diploma thesis.pptx von fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi8 views
SUMIT SQL PROJECT SUPERSTORE 1.pptx von Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 15 views
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) von Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Effect of deep chemical mixing columns on properties of surrounding soft clay... von AltinKaradagli
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...
AltinKaradagli9 views

Transformer ppt

  • 1. A Summer training Presentation on “Transformer” Presented By: Name: Rakesh Gurjar Roll no: 039 Department of Electrical Engineering Poornima Institute of Engineering and Technology ISI-6 RIICO Institutional Area, Jaipur -302022 Submitted To: Rajendra Singh (Ass. Professor ) EE, PIET, Jaipur 2018-2019
  • 2. CONTENTS  Company Introduction  Introduction  Principle  Classification of transformer  Construction  Construction Process  Winding Construction  Core Construction  Core Coil Assembly (CCA)  Tank Fabrication  Paint  Testing
  • 3. COMPANY INTRODUCTION  “Danish Private Limited” is established in 1985 and is today India’s leading quality manufacturer  Company Works in the field of Manufacturing and Exporting of Transformers and Relay Panels.  Product Generated by Company: o Distribution Transformer o Dry type Transformer o Power Transformer o CRP and Substation Automation o Substations Projects
  • 4. INTRODUCTION  A transformer is a device that changes ac electric power at one voltage level to ac electric power at another voltage level through the action of a magnetic field.  It can be either to step-up or step down the voltage.  A transformer is a static device.  The word ‘transformer’ comes form the word ‘transform’.
  • 5. PRINCIPLE  Transformers work on the principle of mutual induction. “when the two coils are inductively coupled and if the current in coil change uniformly then the e.m.f. induced in the other coils. This e.m.f can drive a current when a closed path is provide to it.”  “The principle of mutual Induction states that an e.m.f. is induced in a coil when current in the neighbouring coil changes”.
  • 6. CLASSIFICATION OF TRANSFORMER Instrument Transformer Power Transformer Step Up and Step Down Transformer Single Phase and Three Phase Distribution Transformer Transformer Current Transformer Potential Transformer
  • 7.  It consists of an iron core on which two separate coils of insulated copper wire are wound.  The function of the core is to transfer the changing magnetic flux from the primary coil to the secondary coil  The Secondary Coil has a load resistance connected to safe transformer from being heating up.  Construction of a simple transformer Can be seen in Fig. CONSTRUCTION
  • 8. Winding Construction Core Assembly Core & Winding(Coil) Assembly (CCA) Tapping &Tap Changer Drying Process Tank Construction Tanking & Final Fitting Fittings & Accessories Painting Testing CONSTRUCTION PROCESS
  • 9. CONSTRUCTION OF WINDING  Conducting material is used for construction of winding.  The coils are used are wound on the limbs and insulated from each other.  The two different windings are wounds on two different limbs.  The leakage flux increases which affects the performance and efficiency of transformer.  To reduce the leakage flux it is necessary that the windings should be very close to each other to have high mutual induction.
  • 11. CORE TYPE CONSTRUCTION  In this one magnetic circuit and cylindrical coils are used.  Normally L and T shaped laminations are used.  Commonly primary winding would on one limb while secondary on the other but performance will be reduce.  To get high performance it is necessary that other the two winding should be very close to each other.  There are two type of core .
  • 13. CORE COILASSEMBLY  In this Process the Winding Coil and Core is Assembled together .  Core Coil Assembly defines the insulation scheme, cooling, dynamic withstand capability, handling.  Cooling is essential to prevent the thermal degradation of insulation which enhances a transformer’s life.  The core assembly is vertically placed with the foot plate touching the ground. The top yoke of the core is removed.
  • 15. Tapping & Tap Changer  Generally Taps are provided on HV Windings for HV Variation or LV Variation.  To achieve proper voltage regulation on load tap changer is used instead of OCTC.  As it is mainly used for higher capacity transformers i.e. above 5000 KVA ratings, voltage can be supplied with On Load Tap Changer along with necessary controls.  After this the CCA is placed in Vacuum Auto Enclave to remove moisture content at 90°c.
  • 16. TANK FABRICATION  Transformer tanks commonly used are of the following types; 1. Plain sheet steel tank. 2. Sheet steel tank with external cooling tubes. 3. Radiator tanks. 4. Tanks with corrugated wall panels.  The tank is manufactured by forming and welding steel plate which is used as a container for holding the core and coil assembly together with insulating oil.
  • 18. TANK UP PROCESS  The core-coil assembly is taken out of the oven and the "Muggers test" is carried out. If the merger value is as per the specification then it is taken to Tank-up Dept.  After this test the Core-Coil Assembly is placed into the tank and locked up, this process is known as “Tank-Up Process”.  Accessories are Fitted like drain valves, HV & LV Bushings, conservator, oil level indicator and explosion vent are fitted in the tanks.  Pure filtered transformer oil is filled in the tank to immerse the assembly only.
  • 20.  After the Tank-up process the Transformer is Brought to the Paint Department.  In this process a zinc-32 rich primer is used to paint the transformer tank for protection from corrosion. PAINT SHOP
  • 21. TESTING OF TRANSFORMER Following test used for the various purposes:- 1. Megger Insulation Test 2. Ratio And Polarity Test 3. High Voltage Test 4. Low Voltage Test 5. D.V.D.F Test 6. Open Circuit Test 7. Short Circuit Test 8. Winding Resistance Test 9. Oil Dielectric Strength Test 10. Vector Group Test 11. Magnetic Balance Test
  • 23. APPLICATIONAND USES  The transformer used in television and photocopy Machines.  The transmission and distribution of alternating power is possible by transformer.  Simple camera flash uses fly back transformer.  Signal and audio transformer are used couple in amplifier.
  • 24. ADVANTAGES  Less cost  Less Weight  less size  Less time require to assembling  Require less space  Deliver more power  Higher efficiency  Easier to install  Easy transportation and installation  Easy to repair  Easy assembling
  • 25. DISADVANTAGES  Greater cost of standby Units  Increased cost and inconvenience of repairs.  In Single Phase transformer (Three Single Phase Transformer) failure of one transformer, the other two, Single Phase Transformer still supply the power, while it is not possible in case of failing a Transformer.