Facility Layout
Facility Layout
• Facilities is defined as the workspace and
equipment needed to carry out the operations
of the organization. This includes offices,
factories, computers, and trucks.
• The location, design, and layout of an
organizations' facilities are central to
maximizing the efficiency of the overall
operations system.
Facility design & layout
• After choosing the facility's location, the next stage in operations planning
is to design the best physical layout for the facility.
• The available space needs to be assessed with workstations, equipment,
storage, and other amenities need to be arranged.
• The aim is to allow for the most efficient workflow without disruption.
• A workplace that has carefully arranged its layout will allow for a more
effective and efficient workflow and produce its good or services to a high
standard.
• There are three types of workflow layouts that managers can choose from:
• Process layout: arranged in departments (e.g., hospitals).
• Product layout: production line (e.g., a car assembly plant).
• Fixed-position layout: building a large item (e.g., jumbo jet).
Facility layout consideration
• Facility managers should consider several factors when
designing the layout of a facility to achieve maximum
effectiveness.
• does the design and layout allow for growth or change?
• Is there a chance that your company will experience
significant growth?
• Could some other change come about that could influence
the layout of your facility?
• Is the process flow smooth?
• Are materials being handled efficiently?
• Does the layout contribute to employee satisfaction and
moral?
• Does the layout lend itself to promotional activities?
Are the facilities for an office or a
factory?
An office will have different layout requirements than a factory.
Facility layout objectives
• To provide optimum space to organize equipment and
facilitate movement of goods and to create safe and
comfortable work environment.
• To promote order in production towards a single
objective
• To reduce movement of workers, raw material and
equipment
• To promote safety of plant as well as its workers
• To facilitate extension or change in the layout to
accommodate new product line or technology up
gradation
• To increase production capacity of the organization
Types of Layout
• Four basic layout types consisting of:
– Process layouts - Group similar resources together
– Product layouts - Designed to produce a specific
product efficiently
– Hybrid layouts - Combine aspects of both process and
product layouts
– Fixed-Position layouts - Product is two large to move;
e.g. a building
Process Layouts
• Process layout unique characteristics include:
– Resources used are general purpose
– Facilities are less capital intensive
– Facilities are more labor intensive
– Resources have greater flexibility
– Processing rates are slower
– Material handling costs are higher
– Scheduling resources & work flow is more
complex
– Space requirements are higher
Product Layouts
• Product layout unique characteristics are:
– Resources are specialized
– Facilities are capital intensive
– Processing rates are faster
– Material handling costs are lower
– Space requirements for inventory storage are
lower
– Flexibility is low relative to the market
Process vs. Product Layout
Here are the characteristic differences between a process and product
layout.
Hybrid Layouts
• Combine elements of both product & process
layouts
– Maintain some of the efficiencies of product layouts
– Maintain some of the flexibility of process layouts
• Examples:
– Group technology & manufacturing cells
– Grocery stores
Fixed-Position Layout
• Used when product is large
• Product is difficult or impossible to move, i.e.
very large or fixed
• All resources must be brought to the site
• Scheduling of crews and resources is a
challenge
Designing Process Layouts
Step 1: Gather information:
Space needed, space available, identify closeness measures
Step 2: Develop alternative block plans:
Using trial-and-error or decision support tools
Step 3: Develop a detailed layout:
Consider exact sizes/shapes of departments and work
centers including aisles and stairways
Tools like drawings, 3-D models, and CAD software are
available to facilitate this process
Special Cases of Process Layouts
A number of unique process layouts require
special attention. We will look at two of these:
• Warehouse layouts
• Office Layouts
Warehouse Layouts
Warehouse Layout Considerations:
– Primary decision is where to locate each department
relative to the dock
– Departments can be organized to minimize “ld” totals
– Departments of unequal size require modification of the
typical ld calculations to include a calculation of the
“ratio of trips to area needed”
– The usage of “Crossdocking” modifies the traditional
warehouse layouts; more docks, less storage space, and
less order picking
Office Layouts
Office Layout Considerations:
– Almost half of workforce works in an office environment
– Human interaction and communication are the primary
factors in designing office layouts
– Layouts need to account for physical environment and
psychological needs of the organization
– One key layout trade-off is between proximity and
privacy
– Open concept offices promote understanding & trust
– Flexible layouts incorporating “office landscaping” help
to solve the privacy issue in open office environments
Designing Product Layouts
• Designing product layouts requires
consideration of:
– Sequence of tasks to be performed by each
workstation
– Logical order
– Speed considerations – line balancing
Designing Product Layouts – con’t
Step 1: Identify tasks & immediate predecessors
Step 2: Determine output rate
Step 3: Determine cycle time
Step 4: Compute the Theoretical Minimum number
of Stations
Step 5: Assign tasks to workstations (balance the
line)
Step 6: Compute efficiency, idle time & balance
delay
Step 1: Identify Tasks & Immediate
Predecessors
Example 10.4 Vicki's Pizzeria and the Precedence Diagram
Immediate Task Time
Work Element Task Description Predecessor (seconds
A Roll dough None 50
B Place on cardboard backing A 5
C Sprinkle cheese B 25
D Spread Sauce C 15
E Add pepperoni D 12
F Add sausage D 10
G Add mushrooms D 15
H Shrinkwrap pizza E,F,G 18
I Pack in box H 15
Total task time 165
Layout Calculations
• Step 2: Determine output rate
– Vicki needs to produce 60 pizzas per hour
• Step 3: Determine cycle time
– The amount of time each workstation is allowed to
complete its tasks
– Limited by the bottleneck task (the longest task in a
process):
 
 
sec./unit60
units/hr60
sec/min60xmin/hr60
units/hroutputdesired
sec./daytimeavailable
)(sec./unittimeCycle 
hourperpizzasorunits/hr,72
sec./unit50
sec./hr.3600
timetaskbottleneck
timeavailable
outputMaximum 
Layout Calculations con’t
• Step 4: Compute the theoretical minimum number of
stations
– TM = number of stations needed to achieve 100%
efficiency (every second is used)
– Always round up (no partial workstations)
– Serves as a lower bound for our analysis
 
stations3or2.75,
nsec/statio60
seconds165
timecycle
timestask
TM 

Layout Calculations con’t
• Step 5: Assign tasks to workstations
– Start at the first station & choose the longest eligible task following
precedence relationships
– Continue adding the longest eligible task that fits without going over the
desired cycle time
– When no additional tasks can be added within the desired cycle time, begin
assigning tasks to the next workstation until finished
Workstation Eligible task Task Selected Task time Idle time
A A 50 10
B B 5 5
C C 25 35
D D 15 20
E, F, G G 15 5
E, F E 12 48
F F 10 38
H H 18 20
I I 15 5
1
2
3
Last Layout Calculation
• Step 6: Compute efficiency and balance delay
– Efficiency (%) is the ratio of total productive time divided
by total time
– Balance delay (%) is the amount by which the line falls
short of 100%
  91.7%100
sec.60xstations3
sec.165
NC
t
(%)Efficiency 

8.3%91.7%100%delayBalance 
Other Product Layout Considerations
• Shape of the line (S, U, O, L):
– Share resources, enhance communication & visibility,
impact location of loading & unloading
• Paced versus Un-paced lines
– Paced lines use an automatically enforced cycle time
• Number of Product Models produced
– Single
– Mixed-model lines
Group Technology (CELL) Layouts
• One of the most popular hybrid layouts uses
Group Technology (GT) and a cellular layout
• GT has the advantage of bringing the
efficiencies of a product layout to a process
layout environment
Process Flows before the Use of GT
Cells
Process Flows after the Use of GT Cells
Facility Layout Across the Organization
Layout planning is organizationally important for
an efficient operations
– Marketing is affected by layout especially when
clients come to the site
– Human resources is affected as layout impacts
people
– Finance is involved as layout changes can be costly
endeavors
Reference
• http://www.managementstudyguide.com
• https://www.boundless.com

More Related Content

What's hot

Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Manu Alias
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation managementSaravanan Murugan
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Facility layout
Facility layoutFacility layout
Facility layoutJassi Dutt
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chartParvesh Mittal
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation schedulingKamal Subedi
 
Product layout
Product layoutProduct layout
Product layoutDhruv Shah
 
types of production system
types of production systemtypes of production system
types of production systemram4181
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processRohan Monis
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/ManufacturingFahad Ali
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysisNoopur Koli
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Process selection
Process selectionProcess selection
Process selectionShikha Sota
 

What's hot (20)

Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
Work study
Work studyWork study
Work study
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Facility layout
Facility layoutFacility layout
Facility layout
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chart
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Product layout
Product layoutProduct layout
Product layout
 
Plant layout
Plant layout Plant layout
Plant layout
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
types of production system
types of production systemtypes of production system
types of production system
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning process
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysis
 
Method study
Method studyMethod study
Method study
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Process selection
Process selectionProcess selection
Process selection
 
Lean operations presentation
Lean operations   presentationLean operations   presentation
Lean operations presentation
 

Similar to Mba ii pmom_unit-2.3 facility layout a

facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptRenu Lamba
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionJayavendhanJ
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingDrGopiKrishnanPonnus
 
Chap08- Facility Layout.pptx
Chap08- Facility Layout.pptxChap08- Facility Layout.pptx
Chap08- Facility Layout.pptxKritikaRaj30
 
Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)rajnitj19
 
Process design layout
Process design layoutProcess design layout
Process design layoutAL Kindi
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter FiveAYNETUTEREFE1
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxssusera46859
 
Operations Management - chapter 6.pdf
Operations Management - chapter 6.pdfOperations Management - chapter 6.pdf
Operations Management - chapter 6.pdfKhatVillados
 

Similar to Mba ii pmom_unit-2.3 facility layout a (20)

facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
layout planning
layout planninglayout planning
layout planning
 
Om plant_layout
Om   plant_layoutOm   plant_layout
Om plant_layout
 
Facility+layout
Facility+layoutFacility+layout
Facility+layout
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.ppt
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Layout
LayoutLayout
Layout
 
layout.ppt
layout.pptlayout.ppt
layout.ppt
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular Manufacturing
 
Chap08- Facility Layout.pptx
Chap08- Facility Layout.pptxChap08- Facility Layout.pptx
Chap08- Facility Layout.pptx
 
Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
Process design layout
Process design layoutProcess design layout
Process design layout
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter Five
 
Systems Engineering
Systems EngineeringSystems Engineering
Systems Engineering
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
 
Operations Management - chapter 6.pdf
Operations Management - chapter 6.pdfOperations Management - chapter 6.pdf
Operations Management - chapter 6.pdf
 

More from Rai University

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University Rai University
 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,Rai University
 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02Rai University
 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditureRai University
 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public financeRai University
 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introductionRai University
 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflationRai University
 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economicsRai University
 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructureRai University
 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competitionRai University
 

More from Rai University (20)

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University
 
Mm unit 4point2
Mm unit 4point2Mm unit 4point2
Mm unit 4point2
 
Mm unit 4point1
Mm unit 4point1Mm unit 4point1
Mm unit 4point1
 
Mm unit 4point3
Mm unit 4point3Mm unit 4point3
Mm unit 4point3
 
Mm unit 3point2
Mm unit 3point2Mm unit 3point2
Mm unit 3point2
 
Mm unit 3point1
Mm unit 3point1Mm unit 3point1
Mm unit 3point1
 
Mm unit 2point2
Mm unit 2point2Mm unit 2point2
Mm unit 2point2
 
Mm unit 2 point 1
Mm unit 2 point 1Mm unit 2 point 1
Mm unit 2 point 1
 
Mm unit 1point3
Mm unit 1point3Mm unit 1point3
Mm unit 1point3
 
Mm unit 1point2
Mm unit 1point2Mm unit 1point2
Mm unit 1point2
 
Mm unit 1point1
Mm unit 1point1Mm unit 1point1
Mm unit 1point1
 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditure
 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public finance
 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introduction
 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflation
 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economics
 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructure
 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competition
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Recently uploaded (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Mba ii pmom_unit-2.3 facility layout a

  • 1. Course: MBA Subject: Production & Operation Management Unit: 2.3 Facility Layout
  • 2. Facility Layout • Facilities is defined as the workspace and equipment needed to carry out the operations of the organization. This includes offices, factories, computers, and trucks. • The location, design, and layout of an organizations' facilities are central to maximizing the efficiency of the overall operations system.
  • 3. Facility design & layout • After choosing the facility's location, the next stage in operations planning is to design the best physical layout for the facility. • The available space needs to be assessed with workstations, equipment, storage, and other amenities need to be arranged. • The aim is to allow for the most efficient workflow without disruption. • A workplace that has carefully arranged its layout will allow for a more effective and efficient workflow and produce its good or services to a high standard. • There are three types of workflow layouts that managers can choose from: • Process layout: arranged in departments (e.g., hospitals). • Product layout: production line (e.g., a car assembly plant). • Fixed-position layout: building a large item (e.g., jumbo jet).
  • 4. Facility layout consideration • Facility managers should consider several factors when designing the layout of a facility to achieve maximum effectiveness. • does the design and layout allow for growth or change? • Is there a chance that your company will experience significant growth? • Could some other change come about that could influence the layout of your facility? • Is the process flow smooth? • Are materials being handled efficiently? • Does the layout contribute to employee satisfaction and moral? • Does the layout lend itself to promotional activities?
  • 5. Are the facilities for an office or a factory? An office will have different layout requirements than a factory.
  • 6. Facility layout objectives • To provide optimum space to organize equipment and facilitate movement of goods and to create safe and comfortable work environment. • To promote order in production towards a single objective • To reduce movement of workers, raw material and equipment • To promote safety of plant as well as its workers • To facilitate extension or change in the layout to accommodate new product line or technology up gradation • To increase production capacity of the organization
  • 7. Types of Layout • Four basic layout types consisting of: – Process layouts - Group similar resources together – Product layouts - Designed to produce a specific product efficiently – Hybrid layouts - Combine aspects of both process and product layouts – Fixed-Position layouts - Product is two large to move; e.g. a building
  • 8. Process Layouts • Process layout unique characteristics include: – Resources used are general purpose – Facilities are less capital intensive – Facilities are more labor intensive – Resources have greater flexibility – Processing rates are slower – Material handling costs are higher – Scheduling resources & work flow is more complex – Space requirements are higher
  • 9. Product Layouts • Product layout unique characteristics are: – Resources are specialized – Facilities are capital intensive – Processing rates are faster – Material handling costs are lower – Space requirements for inventory storage are lower – Flexibility is low relative to the market
  • 10. Process vs. Product Layout Here are the characteristic differences between a process and product layout.
  • 11. Hybrid Layouts • Combine elements of both product & process layouts – Maintain some of the efficiencies of product layouts – Maintain some of the flexibility of process layouts • Examples: – Group technology & manufacturing cells – Grocery stores
  • 12. Fixed-Position Layout • Used when product is large • Product is difficult or impossible to move, i.e. very large or fixed • All resources must be brought to the site • Scheduling of crews and resources is a challenge
  • 13. Designing Process Layouts Step 1: Gather information: Space needed, space available, identify closeness measures Step 2: Develop alternative block plans: Using trial-and-error or decision support tools Step 3: Develop a detailed layout: Consider exact sizes/shapes of departments and work centers including aisles and stairways Tools like drawings, 3-D models, and CAD software are available to facilitate this process
  • 14. Special Cases of Process Layouts A number of unique process layouts require special attention. We will look at two of these: • Warehouse layouts • Office Layouts
  • 15. Warehouse Layouts Warehouse Layout Considerations: – Primary decision is where to locate each department relative to the dock – Departments can be organized to minimize “ld” totals – Departments of unequal size require modification of the typical ld calculations to include a calculation of the “ratio of trips to area needed” – The usage of “Crossdocking” modifies the traditional warehouse layouts; more docks, less storage space, and less order picking
  • 16. Office Layouts Office Layout Considerations: – Almost half of workforce works in an office environment – Human interaction and communication are the primary factors in designing office layouts – Layouts need to account for physical environment and psychological needs of the organization – One key layout trade-off is between proximity and privacy – Open concept offices promote understanding & trust – Flexible layouts incorporating “office landscaping” help to solve the privacy issue in open office environments
  • 17. Designing Product Layouts • Designing product layouts requires consideration of: – Sequence of tasks to be performed by each workstation – Logical order – Speed considerations – line balancing
  • 18. Designing Product Layouts – con’t Step 1: Identify tasks & immediate predecessors Step 2: Determine output rate Step 3: Determine cycle time Step 4: Compute the Theoretical Minimum number of Stations Step 5: Assign tasks to workstations (balance the line) Step 6: Compute efficiency, idle time & balance delay
  • 19. Step 1: Identify Tasks & Immediate Predecessors Example 10.4 Vicki's Pizzeria and the Precedence Diagram Immediate Task Time Work Element Task Description Predecessor (seconds A Roll dough None 50 B Place on cardboard backing A 5 C Sprinkle cheese B 25 D Spread Sauce C 15 E Add pepperoni D 12 F Add sausage D 10 G Add mushrooms D 15 H Shrinkwrap pizza E,F,G 18 I Pack in box H 15 Total task time 165
  • 20. Layout Calculations • Step 2: Determine output rate – Vicki needs to produce 60 pizzas per hour • Step 3: Determine cycle time – The amount of time each workstation is allowed to complete its tasks – Limited by the bottleneck task (the longest task in a process):     sec./unit60 units/hr60 sec/min60xmin/hr60 units/hroutputdesired sec./daytimeavailable )(sec./unittimeCycle  hourperpizzasorunits/hr,72 sec./unit50 sec./hr.3600 timetaskbottleneck timeavailable outputMaximum 
  • 21. Layout Calculations con’t • Step 4: Compute the theoretical minimum number of stations – TM = number of stations needed to achieve 100% efficiency (every second is used) – Always round up (no partial workstations) – Serves as a lower bound for our analysis   stations3or2.75, nsec/statio60 seconds165 timecycle timestask TM  
  • 22. Layout Calculations con’t • Step 5: Assign tasks to workstations – Start at the first station & choose the longest eligible task following precedence relationships – Continue adding the longest eligible task that fits without going over the desired cycle time – When no additional tasks can be added within the desired cycle time, begin assigning tasks to the next workstation until finished Workstation Eligible task Task Selected Task time Idle time A A 50 10 B B 5 5 C C 25 35 D D 15 20 E, F, G G 15 5 E, F E 12 48 F F 10 38 H H 18 20 I I 15 5 1 2 3
  • 23. Last Layout Calculation • Step 6: Compute efficiency and balance delay – Efficiency (%) is the ratio of total productive time divided by total time – Balance delay (%) is the amount by which the line falls short of 100%   91.7%100 sec.60xstations3 sec.165 NC t (%)Efficiency   8.3%91.7%100%delayBalance 
  • 24. Other Product Layout Considerations • Shape of the line (S, U, O, L): – Share resources, enhance communication & visibility, impact location of loading & unloading • Paced versus Un-paced lines – Paced lines use an automatically enforced cycle time • Number of Product Models produced – Single – Mixed-model lines
  • 25. Group Technology (CELL) Layouts • One of the most popular hybrid layouts uses Group Technology (GT) and a cellular layout • GT has the advantage of bringing the efficiencies of a product layout to a process layout environment
  • 26. Process Flows before the Use of GT Cells
  • 27. Process Flows after the Use of GT Cells
  • 28. Facility Layout Across the Organization Layout planning is organizationally important for an efficient operations – Marketing is affected by layout especially when clients come to the site – Human resources is affected as layout impacts people – Finance is involved as layout changes can be costly endeavors