SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
Deck Marking & Layout



                               OVERVIEW




Introduction

Marking and layout is the third step in building your deck. The layout is possibly the most important step after you have made
the decision to proceed. The placement of the footings is critical to the location of the support posts, which will ultimately make
your deck a safe and enjoyable place to enjoy the outdoors, and keep it from falling down!


Even though there is room for error in measuring the location of the footings, success comes from striving for accuracy--
measure to the 1/8th of an inch. This layout is simple and can easily be completed by any level of DIYer. Mistakes can be
corrected at a later part of the project if necessary. These mistakes however, will add time and money to your deck project if
left uncorrected.


To set up for this task, gather your drawings, tape measure, marking tools, level, all of your equipment, and put them on a site
worktable for easy reference and a place to find them. A paperweight of tools and other heavy objects will keep the plans in
place if the wind begins to blow.




  Time to complete this project depends on the size of the deck and the level of help available, the times listed here are for two
  people on a 10'x 30' deck with the house defining two sides of the deck.
  • Beginner - 3 hours
  • Intermediate - 2 hours
  • Advanced - 1 hours

               Check for hidden utility lines before you start.


                Check local code restrictions to be sure that you comply with their regulations on deck height off the ground and
  limitations on the amount of lot coverage allowed.


                      Rushing the layout can cause the deck to be built out of "square" which will make the final placement of
  deck boards and hand railings extremely difficult at the end of the project.


                   A helper who understands the overall design and layout process will be invaluable in holding the dummy end
  of the tape and helping to line up marking strings.
STEPS
1. Your first measurements and marking indicate where your deck connects to the house. After
   the height of the deck is marked, move away from the house to locate the remaining deck
   supports. Your measurements should take into account that the deck is an outdoor
   extension of your indoor living space, and needs to slope away from the house to allow any
   water that collects on the deck to drain away from the house and the foundation of your
   home.




2. Begin by marking the top of the ledger, the structural deck support that will attach to your
   house, in several locations. Use your level to verify that the top of the ledger matches your
   structural drawing. Keep in mind that if your finished deck surface is 2x material, the top of
   the ledger will be 1½" below the finished height of the deck as most 2x decking material is
   actually 1½". Repeat this step on all walls that join the deck. Note: The drainage slope on
   the deck will show on any adjacent deck wall markings.




3. Now we will mark the outside perimeter of the deck foundation where the deck will be
   supported from the ground as indicated on your construction drawing. To establish this line,
   take two equal measurements, in separate locations, from the longest parallel house wall as
   shown, and mark the location with the nylon line. These measurements should indicate the
   centerline of the post base. The string line(s) should be directly over the center of the post
   base. Be sure that you keep the measurements parallel to each other and perpendicular
   (square) to the wall.




4. The string line can be attached at the ledger location with a nail or screw at one end and
   tied around a stake driven into the ground at the other end. Be sure to drive the stake
   "outside" the deck perimeter so it can stay in place until the support posts are set. Be sure
   to keep the string line above the top of the ledger height if possible so the footings can be
   dug, the concrete can be poured, and the vertical support posts can be placed, without
   moving them.
5. Measure the distance from any adjacent walls to locate adjacent sides of the deck (post
   base) and mark with nylon line the same way as in step 2. Remember to keep the
   measurements parallel.




6. Layout any interior post bases using the same technique as the perimeter using two equal
   measurements and marking them with a string line.




7. The grid formed by the nylon line should be the same as the grid on your plans showing the
   structural members (girders) which will in turn support the joists, which support the finished
   deck boards. The intersection of the string lines indicates the center of the post bases.




8. Be sure to check your layout for square using the 3-4-5 right triangle method. Or you can
   check for square by measuring from opposite corners and comparing the dimensions, they
   should be equal: within 3/8 inch will be acceptable on this project In the next tutorial we
   will be pouring concrete in the post bases and attaching the ledger board to the house.




                                SHOP LIST


Materials Needed
• 24" to 30" stakes. (Use 1x2 wood or metal stakes) Two stakes per corner
• 16d nails


Tools Needed
• 25' tape measure

• Carpenters pencil or a permanent marker
• 100' "reel" tape, or longer if the diagonal measurement is greater than 100'

• 500' of nylon line (this "string" comes in highly visible colors and is good for laying out piers and footings for any
 construction project)

• Hammer

• Water level, string level or some other tool to find level.

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (18)

Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
Timber Panels Installation
Timber Panels InstallationTimber Panels Installation
Timber Panels Installation
 
Wall fixings for hollow & solid surfaces
Wall fixings for hollow & solid surfacesWall fixings for hollow & solid surfaces
Wall fixings for hollow & solid surfaces
 
Build a carport
Build a carportBuild a carport
Build a carport
 
Build a shed
Build a shedBuild a shed
Build a shed
 
Certainteed Drywall Installation Guide
Certainteed Drywall Installation GuideCertainteed Drywall Installation Guide
Certainteed Drywall Installation Guide
 
Stone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalogStone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalog
 
Designing with Tile
Designing with TileDesigning with Tile
Designing with Tile
 
Superseal Tile Subfloor Installation Instructions
Superseal Tile Subfloor Installation InstructionsSuperseal Tile Subfloor Installation Instructions
Superseal Tile Subfloor Installation Instructions
 
Haleys how to guide powerpoint[1]
Haleys how to guide powerpoint[1]Haleys how to guide powerpoint[1]
Haleys how to guide powerpoint[1]
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Timber floor
Timber floorTimber floor
Timber floor
 
Low cost puneet
Low cost puneetLow cost puneet
Low cost puneet
 
FLOORING
FLOORINGFLOORING
FLOORING
 
Fireplace
FireplaceFireplace
Fireplace
 
Technology of Mateiral, Terrazzo
Technology of Mateiral, TerrazzoTechnology of Mateiral, Terrazzo
Technology of Mateiral, Terrazzo
 
newtableconcept user manual
newtableconcept user manualnewtableconcept user manual
newtableconcept user manual
 

Ähnlich wie Deck marking

Ähnlich wie Deck marking (20)

Deck marking
Deck markingDeck marking
Deck marking
 
How to install False Ceiling?
How to install False Ceiling?How to install False Ceiling?
How to install False Ceiling?
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railing
 
Planning a new internal partition
Planning a new internal partitionPlanning a new internal partition
Planning a new internal partition
 
Deck structural design
Deck structural designDeck structural design
Deck structural design
 
6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shed6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shed
 
Deck structural design
Deck structural designDeck structural design
Deck structural design
 
Installing deck boards
Installing deck boardsInstalling deck boards
Installing deck boards
 
5. How to build shed walls
5. How to build shed walls5. How to build shed walls
5. How to build shed walls
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Installing deck posts
Installing deck postsInstalling deck posts
Installing deck posts
 
Build a carport
Build a carportBuild a carport
Build a carport
 
Timber decking
Timber deckingTimber decking
Timber decking
 
2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?
 
Installing deck joists
Installing deck joistsInstalling deck joists
Installing deck joists
 
Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairs
 
Scale models
Scale modelsScale models
Scale models
 
Apply set out work.pdf
Apply set out work.pdfApply set out work.pdf
Apply set out work.pdf
 

Mehr von Praveen Sudarsan

Mehr von Praveen Sudarsan (20)

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipes
 
How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaper
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
Hanging wallpaper
Hanging wallpaperHanging wallpaper
Hanging wallpaper
 
Hanging a door
Hanging a doorHanging a door
Hanging a door
 
Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Timber care
Timber careTimber care
Timber care
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 
Fitting a mortice latch
Fitting a mortice latchFitting a mortice latch
Fitting a mortice latch
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Earth bonding
Earth bondingEarth bonding
Earth bonding
 

Kürzlich hochgeladen

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCRalexsharmaa01
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 

Kürzlich hochgeladen (20)

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 

Deck marking

  • 1. Deck Marking & Layout OVERVIEW Introduction Marking and layout is the third step in building your deck. The layout is possibly the most important step after you have made the decision to proceed. The placement of the footings is critical to the location of the support posts, which will ultimately make your deck a safe and enjoyable place to enjoy the outdoors, and keep it from falling down! Even though there is room for error in measuring the location of the footings, success comes from striving for accuracy-- measure to the 1/8th of an inch. This layout is simple and can easily be completed by any level of DIYer. Mistakes can be corrected at a later part of the project if necessary. These mistakes however, will add time and money to your deck project if left uncorrected. To set up for this task, gather your drawings, tape measure, marking tools, level, all of your equipment, and put them on a site worktable for easy reference and a place to find them. A paperweight of tools and other heavy objects will keep the plans in place if the wind begins to blow. Time to complete this project depends on the size of the deck and the level of help available, the times listed here are for two people on a 10'x 30' deck with the house defining two sides of the deck. • Beginner - 3 hours • Intermediate - 2 hours • Advanced - 1 hours Check for hidden utility lines before you start. Check local code restrictions to be sure that you comply with their regulations on deck height off the ground and limitations on the amount of lot coverage allowed. Rushing the layout can cause the deck to be built out of "square" which will make the final placement of deck boards and hand railings extremely difficult at the end of the project. A helper who understands the overall design and layout process will be invaluable in holding the dummy end of the tape and helping to line up marking strings.
  • 2. STEPS 1. Your first measurements and marking indicate where your deck connects to the house. After the height of the deck is marked, move away from the house to locate the remaining deck supports. Your measurements should take into account that the deck is an outdoor extension of your indoor living space, and needs to slope away from the house to allow any water that collects on the deck to drain away from the house and the foundation of your home. 2. Begin by marking the top of the ledger, the structural deck support that will attach to your house, in several locations. Use your level to verify that the top of the ledger matches your structural drawing. Keep in mind that if your finished deck surface is 2x material, the top of the ledger will be 1½" below the finished height of the deck as most 2x decking material is actually 1½". Repeat this step on all walls that join the deck. Note: The drainage slope on the deck will show on any adjacent deck wall markings. 3. Now we will mark the outside perimeter of the deck foundation where the deck will be supported from the ground as indicated on your construction drawing. To establish this line, take two equal measurements, in separate locations, from the longest parallel house wall as shown, and mark the location with the nylon line. These measurements should indicate the centerline of the post base. The string line(s) should be directly over the center of the post base. Be sure that you keep the measurements parallel to each other and perpendicular (square) to the wall. 4. The string line can be attached at the ledger location with a nail or screw at one end and tied around a stake driven into the ground at the other end. Be sure to drive the stake "outside" the deck perimeter so it can stay in place until the support posts are set. Be sure to keep the string line above the top of the ledger height if possible so the footings can be dug, the concrete can be poured, and the vertical support posts can be placed, without moving them.
  • 3. 5. Measure the distance from any adjacent walls to locate adjacent sides of the deck (post base) and mark with nylon line the same way as in step 2. Remember to keep the measurements parallel. 6. Layout any interior post bases using the same technique as the perimeter using two equal measurements and marking them with a string line. 7. The grid formed by the nylon line should be the same as the grid on your plans showing the structural members (girders) which will in turn support the joists, which support the finished deck boards. The intersection of the string lines indicates the center of the post bases. 8. Be sure to check your layout for square using the 3-4-5 right triangle method. Or you can check for square by measuring from opposite corners and comparing the dimensions, they should be equal: within 3/8 inch will be acceptable on this project In the next tutorial we will be pouring concrete in the post bases and attaching the ledger board to the house. SHOP LIST Materials Needed • 24" to 30" stakes. (Use 1x2 wood or metal stakes) Two stakes per corner • 16d nails Tools Needed • 25' tape measure • Carpenters pencil or a permanent marker
  • 4. • 100' "reel" tape, or longer if the diagonal measurement is greater than 100' • 500' of nylon line (this "string" comes in highly visible colors and is good for laying out piers and footings for any construction project) • Hammer • Water level, string level or some other tool to find level.