To achieve good weighing results, always use flexible connections
to the vessel and check that no ladders or other arrangements
connect the weighed vessel to surrounding foundation, walls or roof.
www.blhnobel.com
Mounting Advice
KIS 1-2-3-8-9-11 and KIM-1
Example of LOAD MODULE orientation
Document no. 35125
Publication 850 204 R4
© Vishay Nobel AB, 2010-07-28
Subject to changes without notice.
POWER SPECIALTIES, INC.
9118 E. 72nd Terrace
Raytown, MO 64133
Toll Free: (800) 432-6550
Phone: (816) 353-6550
Fax: (816) 353-1740
Web: www.powerspecialties.com
Check again the measure "x" between
BRACKET and YOKE, and that the
lateral play between YOKE and LOAD
CELL is preserved. See point 3 and 4.
For installations with four LOAD
MODULES or more, the LOAD CELL
output signals should be checked.
Add shims between vessel support and
YOKE to achieve similar signal levels.
Correct
Recommended loading point, check measure "x".
Level the LOAD MODULE within ±1° in both directions.
Control that the load cell silicone protection is aligned
with bracket front (KIS-1-2-3-11).
Standard LOAD MODULE parts1
2
Attach YOKES under the vessel supports
and position the vessel on the LOAD
MODULES. Observe that the bedding
should be horizontal.
3
4
Check that there is
a lateral play between
YOKE and LOAD CELL.
5
6
7
8
Mark the hole pattern and drill.
Mount the bolts; re-position
the LOAD MODULES
and the vessel.
Assemble LOAD CELL, BRACKET,
and YOKE to one LOAD MODULE.
TILT GUARD
OPTION
BRACKET OR PLATE
LOAD CELL YOKE
Important notices:
IMPORTANT! WHEN DELIVERED THE MODULES ARE
ONLY MOUNTED FOR TRANSPORTATION!
Tighten all bolts and nuts according to engineering standards.
Do not perform any welding with the LOAD MODULE in place.
KIS 1-2-3 -11 KIS-8 KIM-1 KIS-9
X (mm) X (mm) X (mm) X (mm)
1 kN 35 1 kN 31
2 kN 35 2 kN 31
5 kN 35 5 kN 50 5 kN 23
10 kN 55 10 kN 50 10 kN 23
20 kN 55 20 kN 50 20 kN 23
30 kN 55
50 kN 65 50 kN 65 50 kN 33
100 kN 65 100 kN 65 100 kN 42
200 kN 65 200 kN 65 200 kN 60
300 kN 65
Adjust the measuring
direction of the LOAD CELL
(KIS-1-2-3-11)
x
x
Observe loading point
position relative
surrounding mechanical
construction. It is very
important that this is
strong and must be rigid
enough.
KIS-9
KIS-1-2-3-8-11 and KIM -1
Wrong

More Related Content

Similar to BLH Nobel KIS Load Cell Mounting Advice

Defelection of beams
Defelection of beamsDefelection of beams
Defelection of beams
Talha Shah
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
Egyptian Engineers Association
 
The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. fellenius
cfpbolivia
 
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
Electromate
 

Similar to BLH Nobel KIS Load Cell Mounting Advice (8)

1988 tosio a new sugar mill
1988 tosio a new sugar mill1988 tosio a new sugar mill
1988 tosio a new sugar mill
 
Defelection of beams
Defelection of beamsDefelection of beams
Defelection of beams
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. fellenius
 
Thomson bsa xcm_specsheet
Thomson bsa xcm_specsheetThomson bsa xcm_specsheet
Thomson bsa xcm_specsheet
 
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
Thomson BSA Advanced Anti-Backlash Supernuts XCM 1800
 
Volvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manualVolvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manual
 
Volvo ec210 b nc ec210bnc excavator service repair manual
Volvo ec210 b nc ec210bnc excavator service repair manualVolvo ec210 b nc ec210bnc excavator service repair manual
Volvo ec210 b nc ec210bnc excavator service repair manual
 

More from Power Specialties, Inc.

More from Power Specialties, Inc. (20)

Case Study on Thermal Flow Meter Calibration for Natural Gas Service
Case Study on Thermal Flow Meter Calibration for Natural Gas ServiceCase Study on Thermal Flow Meter Calibration for Natural Gas Service
Case Study on Thermal Flow Meter Calibration for Natural Gas Service
 
Glossary of Technical Terms for Process Weighing
Glossary of Technical Terms for Process WeighingGlossary of Technical Terms for Process Weighing
Glossary of Technical Terms for Process Weighing
 
PR Electronics 3000 Series High Performance Temperature Transmitters and Sign...
PR Electronics 3000 Series High Performance Temperature Transmitters and Sign...PR Electronics 3000 Series High Performance Temperature Transmitters and Sign...
PR Electronics 3000 Series High Performance Temperature Transmitters and Sign...
 
PR Electronics Signal Conditioning & Communication Interfaces Product Catalog
PR Electronics Signal Conditioning & Communication Interfaces Product CatalogPR Electronics Signal Conditioning & Communication Interfaces Product Catalog
PR Electronics Signal Conditioning & Communication Interfaces Product Catalog
 
Yokogawa Model GX10/GX20/GP10/GP20 Paperless Recorder First Step Guide
Yokogawa Model GX10/GX20/GP10/GP20 Paperless Recorder First Step GuideYokogawa Model GX10/GX20/GP10/GP20 Paperless Recorder First Step Guide
Yokogawa Model GX10/GX20/GP10/GP20 Paperless Recorder First Step Guide
 
Power Specialties Process Control Line Card January 2018
Power Specialties Process Control Line Card January 2018Power Specialties Process Control Line Card January 2018
Power Specialties Process Control Line Card January 2018
 
Combustion & Fired Heater Optimization
Combustion & Fired Heater OptimizationCombustion & Fired Heater Optimization
Combustion & Fired Heater Optimization
 
Yokogawa Smartdac+ Data Acquisition & Control for Paperless Recorders Type GX...
Yokogawa Smartdac+ Data Acquisition & Control for Paperless Recorders Type GX...Yokogawa Smartdac+ Data Acquisition & Control for Paperless Recorders Type GX...
Yokogawa Smartdac+ Data Acquisition & Control for Paperless Recorders Type GX...
 
Rotary and Linear Damper Drives for Control of Combustion Air and Flue Gas
Rotary and Linear Damper Drives for Control of Combustion Air and Flue GasRotary and Linear Damper Drives for Control of Combustion Air and Flue Gas
Rotary and Linear Damper Drives for Control of Combustion Air and Flue Gas
 
Type K Rotary Drives for Industrial Applications by Power Specialties
Type K Rotary Drives for Industrial Applications by Power SpecialtiesType K Rotary Drives for Industrial Applications by Power Specialties
Type K Rotary Drives for Industrial Applications by Power Specialties
 
BLH Nobel G5 Tech Manual
BLH Nobel G5 Tech ManualBLH Nobel G5 Tech Manual
BLH Nobel G5 Tech Manual
 
Yokogawa Field Wireless Solution
Yokogawa Field Wireless SolutionYokogawa Field Wireless Solution
Yokogawa Field Wireless Solution
 
Industrial Boiler Optimization Toolkit
Industrial Boiler Optimization ToolkitIndustrial Boiler Optimization Toolkit
Industrial Boiler Optimization Toolkit
 
Evaluating Next Generation Gas Detection
Evaluating Next Generation Gas DetectionEvaluating Next Generation Gas Detection
Evaluating Next Generation Gas Detection
 
Yokogawa Variable Area Flowmeter
Yokogawa Variable Area FlowmeterYokogawa Variable Area Flowmeter
Yokogawa Variable Area Flowmeter
 
Rotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level MeasurementRotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level Measurement
 
Yokogawa EJX110A Differential Pressure Tranismitter
Yokogawa EJX110A Differential Pressure TranismitterYokogawa EJX110A Differential Pressure Tranismitter
Yokogawa EJX110A Differential Pressure Tranismitter
 
BLH Nobel G5 Process Weighing and Force Measurement Control
BLH Nobel G5 Process Weighing and Force Measurement ControlBLH Nobel G5 Process Weighing and Force Measurement Control
BLH Nobel G5 Process Weighing and Force Measurement Control
 
Excellent Airflow Measurement & Control Technical Reference: The Air Monitor ...
Excellent Airflow Measurement & Control Technical Reference: The Air Monitor ...Excellent Airflow Measurement & Control Technical Reference: The Air Monitor ...
Excellent Airflow Measurement & Control Technical Reference: The Air Monitor ...
 
A Smart Gas Transmission Pipe Using Smart Sensor Technology
A Smart Gas Transmission Pipe Using Smart Sensor TechnologyA Smart Gas Transmission Pipe Using Smart Sensor Technology
A Smart Gas Transmission Pipe Using Smart Sensor Technology
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

BLH Nobel KIS Load Cell Mounting Advice

  • 1. To achieve good weighing results, always use flexible connections to the vessel and check that no ladders or other arrangements connect the weighed vessel to surrounding foundation, walls or roof. www.blhnobel.com Mounting Advice KIS 1-2-3-8-9-11 and KIM-1 Example of LOAD MODULE orientation Document no. 35125 Publication 850 204 R4 © Vishay Nobel AB, 2010-07-28 Subject to changes without notice. POWER SPECIALTIES, INC. 9118 E. 72nd Terrace Raytown, MO 64133 Toll Free: (800) 432-6550 Phone: (816) 353-6550 Fax: (816) 353-1740 Web: www.powerspecialties.com
  • 2. Check again the measure "x" between BRACKET and YOKE, and that the lateral play between YOKE and LOAD CELL is preserved. See point 3 and 4. For installations with four LOAD MODULES or more, the LOAD CELL output signals should be checked. Add shims between vessel support and YOKE to achieve similar signal levels. Correct Recommended loading point, check measure "x". Level the LOAD MODULE within ±1° in both directions. Control that the load cell silicone protection is aligned with bracket front (KIS-1-2-3-11). Standard LOAD MODULE parts1 2 Attach YOKES under the vessel supports and position the vessel on the LOAD MODULES. Observe that the bedding should be horizontal. 3 4 Check that there is a lateral play between YOKE and LOAD CELL. 5 6 7 8 Mark the hole pattern and drill. Mount the bolts; re-position the LOAD MODULES and the vessel. Assemble LOAD CELL, BRACKET, and YOKE to one LOAD MODULE. TILT GUARD OPTION BRACKET OR PLATE LOAD CELL YOKE Important notices: IMPORTANT! WHEN DELIVERED THE MODULES ARE ONLY MOUNTED FOR TRANSPORTATION! Tighten all bolts and nuts according to engineering standards. Do not perform any welding with the LOAD MODULE in place. KIS 1-2-3 -11 KIS-8 KIM-1 KIS-9 X (mm) X (mm) X (mm) X (mm) 1 kN 35 1 kN 31 2 kN 35 2 kN 31 5 kN 35 5 kN 50 5 kN 23 10 kN 55 10 kN 50 10 kN 23 20 kN 55 20 kN 50 20 kN 23 30 kN 55 50 kN 65 50 kN 65 50 kN 33 100 kN 65 100 kN 65 100 kN 42 200 kN 65 200 kN 65 200 kN 60 300 kN 65 Adjust the measuring direction of the LOAD CELL (KIS-1-2-3-11) x x Observe loading point position relative surrounding mechanical construction. It is very important that this is strong and must be rigid enough. KIS-9 KIS-1-2-3-8-11 and KIM -1 Wrong