Quarterly Maint. Checklist – Training Machines
Machine Name –
F/CTTC/BBS/MAINT/(M/C NO)-Q
Tech. ID: M/C: (No) Quarter:01/02/03/04
M/C Name: Date:
2. DATE CHEEKPOINTS ACTIVITIES SPARE STATUS SIGN.
HYDRAULIC
TANK
CLEAN & LUBRICATE ALL THE SLIDES BY
PROPER LUB. OIL
MOTORS CHECK SMOOTH & PROPER WORKING OF
THE GEAR MECH.
LUBRICATION
TANK
CHECK FOR GEAR BOX OIL LEVEL AND
INSPECT FOR IT’S COND.
ELECTRICAL
PANEL
CHECK FOR SMOOTH MOVEMENT OF X, Y
& Z AXIS MOVE
M/C BASE FULLY CLEAN THE BASE PAN
FUNCTION
RESTORE
RESTORE ALL MACHINE FUNCTIONS
ELECTRICAL
SYSTEM
CHECK FOR PHASE, NEUTRAL & EARTH
CONNECTION (3PH-PS)
FUSE/CB CHECK PROPER RATING OF FUSE/CB AND
THEIR CONTACT
RELAYS CLEAN ALL CONTACT POINTS WITH CTC.
WIRES/CABLE CHECK PROPER RATING OF CABLE