5. PROGRAMMING
Design Requirements Phase:
5. DETERMINING AREA
REQUIREMENTS
Determining the Total Net Building
Area
Calculating Total (Gross) Building
Area Required
Checking the Gross Area Estimate
13. Current Condition Analysis
INPATIENT – Blue
DIAGNOSTIC & TREATMENT – Red
OUTPATIENT & AMBULATORY – Orange
PUBLIC & ADMINISTRATIVE – Yellow
SUPPORT - Green
Sun, P.P, Programming, International Islamic University Malaysia., 2009
15. Room Diagrams are the basis for each room in a department; every room has a
diagram
Brownsheets are used to show entire department space needs and allow users to
visualize the number and size
Department
NEEDS - Program
Synthesis
Sun, P.P, Programming, International Islamic University Malaysia., 2009
16. Phase 5: NEEDS - Program Synthesis
Balance Space, Quality and Cost
Sun, P.P, Programming, International Islamic University Malaysia., 2009
17. Phase 5: NEEDS - Program Synthesis
Balance Space, Quality and Cost
Commitment and
“Sign-Off”
Sun, P.P, Programming, International Islamic University Malaysia., 2009
27. PROGRAMMING 6. ADJACENCY ANALYSIS: example
• Absolutely Required
•Immediately Adjacent
Attached A
• Important • On Same Floor Strong S
• Ordinary or • In Same Building Medium M
• Unimportant Weak W
• Not Desired • Locate as far
away as possible
Not
Related
N
Admin.
Building
New Library Radio & TV
Broadcasting
Lecture Halls Seminar
Rooms
Tutorial
Rooms
Meeting
Room
Admin.
Building
**
New Library
**
Radio & TV
Broadcasting
**
Lecture Halls
**
Seminar
Rooms
**
Tutorial
Rooms
**
Meeting
Room
**
38. SPACE RELATION QUADRANT
The zoning plan is also the integration of the Islamic
town planning and Islamic architecture. It is :
•derived from the site characteristics
•assembly and communal space as the node
•derived from the center’s needs
•supporting spaces surround the node are connected
according to the relationship of importance & zoning
Zoning
41. •curve according to site forces
•creates approachability
& welcoming façade towards
residential area
•creates frontage
•addresses residential area & main
road
•creates accessible commercial
area
Qiblat
•creates landmark
•heightens projects visibility
•provides accommodation
•residences in tower have
better view of surroundings
•the surrounding area has
better view of building
•addresses all angles
42. Segregation in critical spaces:
•Accommodation
•Sports facilities
•Mosque
•Circulation between these spaces
•Allotted facilities for Nisa’ Club
Segregation
44. Master Plan
Townhouses
Development property with strata title
Retention and recreation Ponds
Water activities and as rain water harvesting
Club House
Feel comfortable and peace in nature
Education Building
Aql Salim, To educate youth of ilm ad-dunya
wal akhirah
Training Centre
Jismi Salim, to train youth amd WAMY
members for both male and female
Mosque
The heart of WAMY Complex
The Tower
To accommodate students &family
Convention crntr for WAMY events
Horse Stable and Farm
Horse back riding activity, practical of WAMY
qurban,
Learn about permaculture and aquaculture
Chalet
Give privay and natural environment enclave
experience to users
45. Master Plan
LAND USE
Component Land Use (m²) Land Use (Acre)
Pond 1 848 0.21
Pond 2 2522 0.62
Pond 3 1596 0.39
Tower 8465 2.09
Training Centre 6417 1.59
Mosque 3627 0.90
Secretariat Building 3463 0.86
Education 3917 0.97
Townhouses + Club House 28006 6.92
Chalet 1946 0.48
Permaculture Farm 7048 1.74
Outdoor Training Area 13097 3.24
Green and Permaculture Area 27630 6.83
Total Area 108582 26.83
46. Schedule of Accommodation
Num Activities Spaces Total Area ( m²)
1 Secretariat Lobby / Front Desk
WAMY Secretariat Offices
Management Offices
Maintenance Offices
Service Offices
Counseling Room
586
(include 25% circulation
area)
2 Assembly / Communal Masjid
Convention Hall / Auditorium
Banquet Hall with kitchen
Main Entrance Hall
Lounge
Media Room
Gallery
Library
3,463
(include 25% circulation
area)
3 Training Classrooms
Seminar Rooms
Workshop
WAMY Malaysia Club
International Students Club
Nisa’ Club (with kitchen)
Inddor Sport Arena
Outdoor Sports Centre
Outdoor / Camping Equipment Storage
Swimming Pool
Gymnasium (male & female)
Sickbay / Treatment Room
2,058
(include 25% circulation
area)
4 Commercial Retail Bazaar
Convenient Store
Bookshops
Café
Boutique Busana Muslim
Sporting Goods
Restaurant
Entrepreneurial Centre & Halal Hub
613
(include 25% circulation
area)
5 Accommodation Main Lounge / Management Office / Lobby
Chalets
•Suite
•Deluxe
Service Apartment (female & male)
•2 bedrooms
•3 bedrooms
Musolla (male & female)
Main Dining Hall
10,163
(include 25% circulation
area)
6 Property Townhouses
Clubhouse
11,010
(include 25% circulation
area)
Total Built up Area 27,891
48. References:
Pena, William. Problem Seeking, An Architectural Programming Primer.
New York: John Wiley & Sons, 2001.
PLANNING AND PROGRAMMING PROCESS
William Sims and Franklin Becker
Design Brief
Phillips, Peter L. Creating the Perfect Design Brief by
Allworth Press with Design Management Institute,2004
Sustainable Construction Centre