Processes that organize, manage and lead the project team. Project team is comprised of the
people with assigned roles and responsibilities for completing the project.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Human Resource Management Processes
Process Process Group
Plan Human Resource
Management
Planning
Acquire Project Team Executing
Develop Project Team Executing
Manage Project Team Executing
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management
Identifying and documenting project roles, responsibilities and required skills,
reporting relationships and creating a staffing management plan.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Inputs Tools and Techniques Outputs
□ Project Management
Plan
□ Activity Resource
Requirement
 Enterprise
Environmental Factors
 Organizational Process
Assets
 Organization charts and
position descriptions
 Networking
 Organizational theory
 Expert Judgment
 Meetings
□ Human Resource
Plan
pankaj sharma, 9810996356
Plan Human Resource Management
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management- Inputs
Project Management Plan provides useful information such as , how work will
be executed to accomplish the project objectives, A change management plan that
documents how changes will be monitored and controlled, how integrity of the
project baselines will be maintained . Need and method of communication among
stakeholders.
Activity Resource Requirements provides information on the preliminary resource
requirement of the project. These requirements are progressively elaborated during
the Human resource planning phase.
Enterprise Environmental Factors that can influence this process include
Organization culture and structure , Existing human resources, Personnel
administration policies and marketplace condition.
Organizational Process Assets that can influence this process include
Organizational standard processes and policies and standardized role descriptions,
Templates for organizational charts and position descriptions, and Historical
information on organizational structures that have worked in previous projects.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management -Tools and
Techniques
The objective of Organization charts and position descriptions is to ensure that
each work package has an unambiguous owner and all the team members have clear
understanding of their roles and responsibilities. Three formats that are most common
for creating this document are hierarchical, matrix, and text-oriented
Fig Reference PMBOK 4th Edition
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management -Tools and
Techniques
Sample RACI Chart
Fig Sample RACI Chart-Reference PMBOK 4th Edition
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management-Tools and
Techniques
Networking is the process of communicating with others (within Organization,
industry or professional environment). It includes luncheon meetings, informal
conversations including meetings and events, trade conferences, and symposia.
Networking within the organization helps project manager in understanding the
political and organizational force that will influence the project.
Organizational theory -Different organizational structures have different individual
response, individual performance, and personal relationship characteristics.
Organizational theory provides information regarding the way in which people, teams,
and organizational units behave. This information helps in effective planning and in
reducing the amount of time, cost and effort needed to create the plan
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Human Resource Management - Outputs
Human Resource Plan has three components roles and responsibility, organization
charts and the staffing management plan.
□ Roles and responsibility details role, authority, responsibility and competency
for the resource requirement of the project.
□ Project Organization Chart is a graphic display of project team members and
their reporting relationships. It can be formal or informal, highly detailed or
broadly framed, based on the needs of the project.
□ Staffing Management Plan details how and when the project will be staffed,
released, training needs of resources, recognition & rewards, compliance and
resource calendar. It also includes policies and procedures that protect team
members from safety hazards.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team
Confirming human resource availability and obtaining the team necessary to complete
project assignments
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team
Inputs Tools and Techniques Outputs
 Human resource
management plan
 Enterprise
environmental factors
 Organizational process
assets
 Pre-assignment
 Negotiation
 Acquisition
 Virtual Teams
 Multi- criteria decision analysis
 Project Staff
Assignments
 Resource Calendars
 Project
Management Plan
Updates
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team - Inputs
Human Resource Management Plan provides information on how project human
resource should be identified, staffed, managed, controlled and eventually released.
It also contains details on skills required , roles and responsibilities for a particular
position and the competency level that a project demands.
Enterprise Environmental Factors that can influence this process are existing
information for human resources including who are available, competency levels,
prior experience personnel administration policies, processes and procedures
Organizational Process Assets that can influence the Acquire Project Team process
include, but are not limited to, organization standard policies, processes, and
procedures.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team– Tools and Techniques
Pre-assignment refers to assigning the project team members in advance, this is
needed when specific skilled resources are required or the resources are defined in the
project charter
Negotiation with functional managers and other project managers is required if
project manager needs specific skills for the project
Acquisition is needed when specific skills are not available in the organization. This
can involve hiring individual consultants or subcontracting work to another
organization
Virtual teams can be defined as groups of people with a common goal who fulfill their
roles with little or no time spent meeting face to face. Communication is important in
such teams, the availability of electronic communication such as e-mail, audio
conferencing, web-based meetings and video conferencing has made such teams
feasible.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team– Tools and Techniques
Multi – Criteria Decision Analysis, Selection criteria are often used as a part of
acquiring the project team . By use of a multi- criteria decision analysis tool, criteria
are developed and used to rate or score potential team members. The criteria are
weighted according to the relative importance of the needs within the team. Some
examples of selection criteria that can be used to score team members are:
 Availability . Identify whether the team member is available to work on the
project within time period needed. If there are any concerns for availability during
project timeline.
 Cost. Verify if the cost of adding the team member is within the prescribed budget.
 Experience, Verify that the team member has the relevant experience that will
contribute to the project success.
 Ability, Verify that the team member has the competencies needed by the project.
 Knowledge and Skills. The team member has relevant knowledge of the
customer, similar implemented projects, nuances of the project environment and
relevant skills to use a project tool.
 Attitude that includes his ability to gel with other members of the team.
 International factors such as location of the team member, time zone and
communication capabilities
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Acquire Project Team – Outputs
Project Staff Assignments includes assignment of resource to each role defined
initially. The documentation of these assignments can include a project team directory,
memos to team members, and names inserted into other parts of the project
management plan, such as project organization charts and schedules.
Resource Calendars documents the time periods that each project team member
can work on the project. This should be created keeping in mind each person’s
schedule conflicts, involvement in other projects and his/her holiday
Project Management Plan Updates Elements of the project management plan that
may be updated include, but are not limited to the human resources plan.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team
Process of improving competencies, team interaction, and the overall team
environment to enhance project performance.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team
Inputs Tools and Techniques Outputs
 Human resource
management plan
Project staff
assignments
 Resource Calendars
□ Interpersonal Skills
□ Trainings
□ Team building activities
□ Ground rules
□ Co-location
□ Recognition and rewards
□ Personnel assessment tools
 Team Performance
assessments
 Enterprise
Environmental Factors
updates
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team - Inputs
Human Resource Management Plan provides guidance on how project human
resource should be defined , staffed , managed , controlled , and eventually released.
It identifies training strategies and plans for developing the project team. Items such
as rewards, feedback, additional training and disciplinary actions can be added to the
plan as a result of ongoing team performance assessments and other form of project
team management.
Project staff Assignments details the assignments or activities to be performed by
the Project team
Resource Calendars identify the times when the project team members can
participate in team development activities.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team – Tools and Techniques
Interpersonal Skills also referred to as soft skills are very critical for team
development. It include skills such as empathy, influence, creativity, and group
facilitation, these are valuable assets when managing the project team.
Trainings help in enhancing the competencies of the project team members.
Training can be formal or informal. Training can be formal or informal ; classroom
based ,on line, instructor-led or on the job training.
Team building activities are critical to improve interpersonal relationships,
resolving team issues and to keep the team motivated so that team members work
together effectively . They are critical for the team members who operate virtually
from remote locations . Project managers should obtain top management support,
obtain commitment of team members, introduce appropriate rewards and
recognition, create a team identity, manage conflicts effectively, promote trust and
open communication among team members, and, above all, provide good team
leadership to build effective teams.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team– Tools and Techniques
Traditionally, a team goes through five stages of development.
Forming: a group of people come together to accomplish a shared purpose.
Storming: Disagreement about mission, vision, and approaches combined with the
fact that team members are getting to know each other can cause strained
relationships and conflict.
Norming: The team has consciously or unconsciously formed working relationships
that are enabling progress on the team’s objectives.
Performing: Relationships, team processes, and the team’s effectiveness in working
on its objectives are synching to bring about a successfully functioning team.
Adjourning : In the adjourning phase, the team completes the work and moves on
from the project.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team – Tools and Techniques
Histogram is a statistical tool used in the analysis and determination of possible
solutions to quality control problem. It depicts how often the problem happens or its
frequency
Ground Rules define the acceptable behavior by the project team members. This
allows team members to discover values that are important to one another
Co-Location involves placing many or all of the most active project team members in
the same physical location to enhance their ability to perform as a team. E.g. create a
war room where all the team members work, or co-locate the project team at the
customer’s site.
Recognition and Rewards helps in keeping the team motivated and to boost their
spirits. People are motivated if they feel they are valued in the organization and this
value is demonstrated by the rewards given to them.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Abraham Maslow’s Hierarchy of Needs (1954)
(In order of priority)
Self
Actualization
Esteem
Social
Safety
Physiological Air, water, food, house, clothing
Security, stability, freedom from threat
and physical harm
Love, affection, approval, friends,
association
Accomplishment, Respect, Attention,
Appreciation
Self fulfillment, growth, learning
Recognition and Rewards – Theories of
Motivation
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
 The average worker is inherently lazy and needs supervisions
 The average worker dislikes work and avoids work whenever possible
 To induce adequate effort, the supervisor must threaten punishment and exercise careful supervision
 The average worker avoids increased responsibility and seeks to be directed
McGregor’s Theory X
Theory X relies on Strict Rules, Performance incentives, Rewards, Threats to job
security
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
 Workers are willing to do the job without continuous supervision
 The average worker wants to be active and finds the physical and mental effort on the job satisfying
 Greatest results come from willing participation which will tend to produce self-direction towards goals without coercion and
control
 The average worker seeks opportunity for personal improvement and self respect
Theory Y relies on worker participation in decisions, cordial manager-worker relationships, worker
designed job methodology, worker individualism
McGregor’s Theory Y
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
William Ouchi’s Theory Z
According to Theory Z, people who don’t fit either Theory X or Theory Y are really a combination of the two.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
Herzberg’s Motivation – Hygiene Theory
As per this theory presence of hygiene factors doesn’t motivate someone , however their
absence de-motivates. Motivation factors will motivate but they will not work without the
hygiene factors in place.
I. Motivating factors
I. Achievements
II. Recognitions
III. Work Itself
IV. Responsibility
V. Advancement
VI. Possibility for growth
Hygiene Factors are Company Policy, Paycheck, status, Relationship with co-workers
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
Expectancy Theorem of Motivation by Victor Vroom
1. You need to give people an expectation of a reward in order to motivate them
2. The rewards or awards should be achievable, if they are impossible to achieve,
they will de-motivate them
3. People are motivated by achievements
4. People “expect” to be rewarded for achievements
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
McLelland’s Achievement Theory
1. People need achievement, power and affiliation to be motivated.
2. Achievement is when someone performs well and is recognized for it
3. Power means he or she has a lot of control or influence in the company
4. Affiliation , a strong sense from being a part of a working team and having good
relationships with coworkers
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
Ouchi’s Theory
1. Formulated from Quality movement and Quality circles
2. Both Management and Workers need to be involved, and they should trust each
other
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Recognition and Rewards – Theories of Motivation
The Oldham-Hackman job characteristics model
I. Skill Variety – the number of job skills that the job holder has the opportunity
to exercise
II. Task Identity – the degree to which your work and its result are identifiable as
belonging to you
III. Task Significance – the degree to which your job has an influence on others
IV. Autonomy – the discretion you have about the way that you do the job
V. Feedback – the information that you get back about the result of your work
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Forms of Power
Below are the five Kinds of Power that can help the project managers maximize his ability
to influence and manage the team
 Formal – positional, granted by organizational/upper mgmt
 Expert – power earned through a recognized level of knowledge or skill in a
specific area
 Reward – the power to give a positive consequences, like promotions, salary rise
etc.
 Penalty – the power to provide negative consequences, like suspension,
termination, reprimands
 Referent – power gained when team members admire, and willingly follow an
individual as a role model
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Forms of Power at Work
Exercise : Forms of Power at Work
1. A functional manager assigns a tester to work on the project manager’s
team. This is an example of _________ power
2. The programmers always listen to the team lead because he’s really a
good software architect. This is an example of _________ power
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Forms of Power at Work
Answers to Exercise : Forms of Power at Work
1. A functional manager assigns a tester to work on the project manager’s
team. This is an example of Legitimate power
2. The programmers always listen to the team lead because he’s really a
good software architect. This is an example of Expert power
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Leadership Style
Following are the leadership style that managers can use to interact with organizational
members
 Autocratic – traditional figure of a boss who makes binding decisions
regardless of what subordinates think or desire
 Laissez-Fare – Other extreme of autocratic, the staff can pursue anything
they wish, enhances free thinking
 Democratic – participative, decisions made jointly by management and staff
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Develop Project Team– Outputs
Team Performance assessments gives insight to project manager on areas that
need improvement.
Enterprise Environmental Factors Updates The Enterprise environmental factors
that may be updated as a result of the Develop Project Team process include, but are
not limited to, personnel administration, including updates for employee training
records and skill assessments.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team
Tracking team member performance, providing feedback, resolving issues and
managing changes to optimize project performance.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team
Inputs Tools and Techniques Outputs
 Human resource
management plan
 Project staff
assignments
 Team Performance
Assessments
 Issue log
 Work performance
reports
 Organizational process
assets
□ Observation and
Conversation
□ Project performance
appraisals
□ Conflict management
□ Interpersonal skills
 Change Requests
 Project
management plan
updates
 Project document
updates
Enterprise
Environmental Factors
updates
 Organizational
process assets
updates
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team - Inputs
Human Resource Management Plan contains the human resource plan which
includes roles and responsibilities, project organization and staffing management plan
Project staff assignments provide a list of team members assigned to the project
that needs to be evaluated under the appraisal process
Team Performance Assessment is done on continuous basis formally or informally
by the project management team. This helps in issues and conflict resolution
Issue Log, Issues arise in the course of managing the project team. An issue log can
be used t document and monitor who is responsible for resolving specific issues by a
target date.
Work Performance Reports provide information on project performance vis-à-vis
project management plan. It aids in determining the future resource requirements,
recognition and rewards and updates to the staffing management plan.
Organizational process assets that can influence this process include certificates of
appreciation, newsletters, website, bonus structure, corporate apparel and
organizational perquisites
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team – Tools and Techniques
Observation and Conversation are used to stay in touch with the team member’s
work and attitudes. The project management team monitors progress toward project
deliverables, accomplishments that are a source of pride for team members, and
interpersonal issues.
Project performance appraisals helps in clarification of roles and responsibilities,
constructive feedback to team members, discovery of unknown or unresolved issues,
development of individual training plans, and the establishment of specific goals for
future time periods.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team – Tools and Techniques
Interpersonal skills use a combination of technical, human and conceptual
skills to analyze situations and interact appropriately with team members. E.g.
Leadership, Influence and effective decision making
Conflict Management results in greater productivity and positive
working relationships. When managed properly, differences of opinion can lead to
increased creativity and better decision making. Below are the source of conflicts on
the Project
More than 50% conflicts on the projects are due to disagreement over
schedules, priorities and resources)
1. Schedules
2. Project Priorities
3. Human Resources
4. Technical Opinions
5. Procedures
6. Cost
7. Personality
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team – Tools and Techniques
Conflict Resolution Methods
 Confronting/Problem Solving. Treating conflict as a problem to be solved by
examining alternatives; requires a give-and-take attitude and open dialogue.
 Withdrawing/Avoiding. Retreating from an actual or potential conflict
situation.
 Smoothing/Accommodating. Emphasizing areas of agreement rather than
areas of difference.
 Compromising. Searching for solutions that bring some degree of satisfaction to
all parties.
 Forcing. Pushing one’s viewpoint at the expense of others; offers only win-lose
solutions.
 Collaborating. Incorporating multiple viewpoints and insights from differing
perspectives; leads to consensus and commitment.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team – Outputs
Change Requests due to change in staffing. The change request should be processed
and approved through integrated change control process. Staffing changes may include
moving people to different assignments , outsourcing some of the work, and replacing
the team member who leave.
Project Management Plan Updates may include changes in the human resource
management plan
Project Documents Updates that may be updated include
 Issue Log
 Role description
 Project staff assignment
Enterprise Environmental Factors updates include input to organizational
performance appraisals and personnel skill updates
Organizational process assets updates include Historical information and lessons
learned documentation Templates, and Organizational standard processes.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Project Team – Outputs
Enterprise Environmental Factors updates include input to organizational
performance appraisals and personnel skill updates
Organizational process assets updates include Historical information and lessons
learned documentation Templates, and Organizational standard processes.
Change Requests due to change in staffing. The change request should be processed
and approved through integrated change control process
Project management plan updates include updates to staffing management plan
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Conflict Management
Exercise 2: Resolving Conflict
Figure out the conflict resolution technique that is being used in the cases
below:
1. I don’t really have time to deal with this right now. Just figure it out and
get back to me.
2. Hold on a second. Let’s sit down and figure out what the real problem is.
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Conflict Management
Exercise 2: Resolving Conflict
Figure out the conflict resolution technique that is being used in the cases
below:
1. I don’t really have time to deal with this right now. Just figure it out and
get back to me - Withdrawal
2. Hold on a second. Let’s sit down and figure out what the real problem is –
Problem Solving / Confronting
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Halo Effect
Extending the impression of a particular outstanding trait to influence the total
judgment of a person E.g. : Assuming that a person who is good in technology will be
a good project manager
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Complete the following
Exercise 3: HR Management
1. The main output of the Acquire Project Team process is
___________ assignments
2. The _________ effect causes people with technical expertise
to be put in the position for which they are unqualified
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Complete the following
Exercise 3: HR Management
1. The main output of the Acquire Project Team process is
Project Resources assignments
2. The Halo effect causes people with technical expertise to be
put in the position for which they are unqualified
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
QUIZ !
pankaj sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356

More Related Content

What's hot

Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewAnand Bobade
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areasInsaf Ali Soomro PMP
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder EngagementDavidMcLachlan1
 
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...Association for Project Management
 
Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)pankajsh10
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementMohamed Loey
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication ManagementBhuWan Khadka
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Project communication management
Project communication managementProject communication management
Project communication managementPreshan Pradeepa
 
Project communication management
Project communication managementProject communication management
Project communication managementTakudzwa Chatora
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimationReetesh Gupta
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Agus Suhanto
 

What's hot (20)

Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areas
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
 
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
 
Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication Management
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project governance
Project governanceProject governance
Project governance
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6
 

Viewers also liked

Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Editionpankajsh10
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5pankajsh10
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Editionpankajsh10
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Editionpankajsh10
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Editionpankajsh10
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5pankajsh10
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5pankajsh10
 
PMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementPMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementSudhanshu Singh MBA,PMP
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalYudha Pratama, PMP
 
PMBOKで学ぶマネジメント基本のキ
PMBOKで学ぶマネジメント基本のキPMBOKで学ぶマネジメント基本のキ
PMBOKで学ぶマネジメント基本のキHiroyuki Tanaka
 
プロジェクト見える化計画 Web
プロジェクト見える化計画 Webプロジェクト見える化計画 Web
プロジェクト見える化計画 Webminamo
 
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジTrainocate Japan, Ltd.
 
Scrum始めました
Scrum始めましたScrum始めました
Scrum始めましたminamo
 
プロジェクトの構造
プロジェクトの構造プロジェクトの構造
プロジェクトの構造尚 鈴木
 
統計的品質管理の功罪
統計的品質管理の功罪統計的品質管理の功罪
統計的品質管理の功罪工 久納
 
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストJenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストHiroyuki Tanaka
 
初めての人の為のプロジェクトマネジメント入門
初めての人の為のプロジェクトマネジメント入門初めての人の為のプロジェクトマネジメント入門
初めての人の為のプロジェクトマネジメント入門尚 鈴木
 

Viewers also liked (20)

Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Edition
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 
PMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementPMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration Management
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management final
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACPPMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
 
PMBOKで学ぶマネジメント基本のキ
PMBOKで学ぶマネジメント基本のキPMBOKで学ぶマネジメント基本のキ
PMBOKで学ぶマネジメント基本のキ
 
プロジェクト見える化計画 Web
プロジェクト見える化計画 Webプロジェクト見える化計画 Web
プロジェクト見える化計画 Web
 
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
 
Scrum始めました
Scrum始めましたScrum始めました
Scrum始めました
 
プロジェクトの構造
プロジェクトの構造プロジェクトの構造
プロジェクトの構造
 
統計的品質管理の功罪
統計的品質管理の功罪統計的品質管理の功罪
統計的品質管理の功罪
 
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストJenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
 
初めての人の為のプロジェクトマネジメント入門
初めての人の為のプロジェクトマネジメント入門初めての人の為のプロジェクトマネジメント入門
初めての人の為のプロジェクトマネジメント入門
 

Similar to Project Human Resource Management - PMBOK 5

2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1reddvise
 
Analysis of recruitment and selection process
Analysis of recruitment and selection processAnalysis of recruitment and selection process
Analysis of recruitment and selection processNeethu yadav
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource ManagementAzeem Anwar
 
Nupur_Mungikar_Internship_Poster
Nupur_Mungikar_Internship_PosterNupur_Mungikar_Internship_Poster
Nupur_Mungikar_Internship_PosterNupur Mungikar
 
project human resource managment
project human resource managmentproject human resource managment
project human resource managmentAroosa Chodhary
 
Agile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPAgile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPDimitri Ponomareff
 
project human resources management
project human resources managementproject human resources management
project human resources managementMohamed , PMP
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...GlobalSkillup
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptxIkram192675
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource ManagementSanjay Rajpoot
 
Information-Technology-New-Systems-Development-Case-Study
Information-Technology-New-Systems-Development-Case-StudyInformation-Technology-New-Systems-Development-Case-Study
Information-Technology-New-Systems-Development-Case-StudyEmily Cain
 
Software Project Requirement and Team Requirement Model
Software Project Requirement and  Team Requirement  Model  Software Project Requirement and  Team Requirement  Model
Software Project Requirement and Team Requirement Model SRMGPC Lucknow
 

Similar to Project Human Resource Management - PMBOK 5 (20)

2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
Analysis of recruitment and selection process
Analysis of recruitment and selection processAnalysis of recruitment and selection process
Analysis of recruitment and selection process
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Nupur_Mungikar_Internship_Poster
Nupur_Mungikar_Internship_PosterNupur_Mungikar_Internship_Poster
Nupur_Mungikar_Internship_Poster
 
MD MAHBUBR RAHMAN-HR
MD MAHBUBR RAHMAN-HRMD MAHBUBR RAHMAN-HR
MD MAHBUBR RAHMAN-HR
 
project human resource managment
project human resource managmentproject human resource managment
project human resource managment
 
Roman Osatinski Resume
Roman Osatinski ResumeRoman Osatinski Resume
Roman Osatinski Resume
 
Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
Agile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPAgile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACP
 
project human resources management
project human resources managementproject human resources management
project human resources management
 
Primavera Training
Primavera TrainingPrimavera Training
Primavera Training
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
 
W frec04
W frec04W frec04
W frec04
 
Avinash_ Resume_
Avinash_ Resume_Avinash_ Resume_
Avinash_ Resume_
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptx
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 
Charles Margeson Resume
Charles Margeson ResumeCharles Margeson Resume
Charles Margeson Resume
 
Information-Technology-New-Systems-Development-Case-Study
Information-Technology-New-Systems-Development-Case-StudyInformation-Technology-New-Systems-Development-Case-Study
Information-Technology-New-Systems-Development-Case-Study
 
Software Project Requirement and Team Requirement Model
Software Project Requirement and  Team Requirement  Model  Software Project Requirement and  Team Requirement  Model
Software Project Requirement and Team Requirement Model
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Project Human Resource Management - PMBOK 5

  • 1. Connoisseur Solutions Project Human Resource Management pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 2. Connoisseur Solutions Project Human Resource Management Processes that organize, manage and lead the project team. Project team is comprised of the people with assigned roles and responsibilities for completing the project. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 3. Connoisseur Solutions Human Resource Management Processes Process Process Group Plan Human Resource Management Planning Acquire Project Team Executing Develop Project Team Executing Manage Project Team Executing pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 4. Connoisseur Solutions Plan Human Resource Management Identifying and documenting project roles, responsibilities and required skills, reporting relationships and creating a staffing management plan. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 5. Connoisseur Solutions Inputs Tools and Techniques Outputs □ Project Management Plan □ Activity Resource Requirement  Enterprise Environmental Factors  Organizational Process Assets  Organization charts and position descriptions  Networking  Organizational theory  Expert Judgment  Meetings □ Human Resource Plan pankaj sharma, 9810996356 Plan Human Resource Management Pankaj Sharma - Mobile No -919810996356
  • 6. Connoisseur Solutions Plan Human Resource Management- Inputs Project Management Plan provides useful information such as , how work will be executed to accomplish the project objectives, A change management plan that documents how changes will be monitored and controlled, how integrity of the project baselines will be maintained . Need and method of communication among stakeholders. Activity Resource Requirements provides information on the preliminary resource requirement of the project. These requirements are progressively elaborated during the Human resource planning phase. Enterprise Environmental Factors that can influence this process include Organization culture and structure , Existing human resources, Personnel administration policies and marketplace condition. Organizational Process Assets that can influence this process include Organizational standard processes and policies and standardized role descriptions, Templates for organizational charts and position descriptions, and Historical information on organizational structures that have worked in previous projects. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 7. Connoisseur Solutions Plan Human Resource Management -Tools and Techniques The objective of Organization charts and position descriptions is to ensure that each work package has an unambiguous owner and all the team members have clear understanding of their roles and responsibilities. Three formats that are most common for creating this document are hierarchical, matrix, and text-oriented Fig Reference PMBOK 4th Edition pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 8. Connoisseur Solutions Plan Human Resource Management -Tools and Techniques Sample RACI Chart Fig Sample RACI Chart-Reference PMBOK 4th Edition pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 9. Connoisseur Solutions Plan Human Resource Management-Tools and Techniques Networking is the process of communicating with others (within Organization, industry or professional environment). It includes luncheon meetings, informal conversations including meetings and events, trade conferences, and symposia. Networking within the organization helps project manager in understanding the political and organizational force that will influence the project. Organizational theory -Different organizational structures have different individual response, individual performance, and personal relationship characteristics. Organizational theory provides information regarding the way in which people, teams, and organizational units behave. This information helps in effective planning and in reducing the amount of time, cost and effort needed to create the plan pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 10. Connoisseur Solutions Plan Human Resource Management - Outputs Human Resource Plan has three components roles and responsibility, organization charts and the staffing management plan. □ Roles and responsibility details role, authority, responsibility and competency for the resource requirement of the project. □ Project Organization Chart is a graphic display of project team members and their reporting relationships. It can be formal or informal, highly detailed or broadly framed, based on the needs of the project. □ Staffing Management Plan details how and when the project will be staffed, released, training needs of resources, recognition & rewards, compliance and resource calendar. It also includes policies and procedures that protect team members from safety hazards. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 11. Connoisseur Solutions Acquire Project Team Confirming human resource availability and obtaining the team necessary to complete project assignments pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 12. Connoisseur Solutions Acquire Project Team Inputs Tools and Techniques Outputs  Human resource management plan  Enterprise environmental factors  Organizational process assets  Pre-assignment  Negotiation  Acquisition  Virtual Teams  Multi- criteria decision analysis  Project Staff Assignments  Resource Calendars  Project Management Plan Updates pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 13. Connoisseur Solutions Acquire Project Team - Inputs Human Resource Management Plan provides information on how project human resource should be identified, staffed, managed, controlled and eventually released. It also contains details on skills required , roles and responsibilities for a particular position and the competency level that a project demands. Enterprise Environmental Factors that can influence this process are existing information for human resources including who are available, competency levels, prior experience personnel administration policies, processes and procedures Organizational Process Assets that can influence the Acquire Project Team process include, but are not limited to, organization standard policies, processes, and procedures. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 14. Connoisseur Solutions Acquire Project Team– Tools and Techniques Pre-assignment refers to assigning the project team members in advance, this is needed when specific skilled resources are required or the resources are defined in the project charter Negotiation with functional managers and other project managers is required if project manager needs specific skills for the project Acquisition is needed when specific skills are not available in the organization. This can involve hiring individual consultants or subcontracting work to another organization Virtual teams can be defined as groups of people with a common goal who fulfill their roles with little or no time spent meeting face to face. Communication is important in such teams, the availability of electronic communication such as e-mail, audio conferencing, web-based meetings and video conferencing has made such teams feasible. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 15. Connoisseur Solutions Acquire Project Team– Tools and Techniques Multi – Criteria Decision Analysis, Selection criteria are often used as a part of acquiring the project team . By use of a multi- criteria decision analysis tool, criteria are developed and used to rate or score potential team members. The criteria are weighted according to the relative importance of the needs within the team. Some examples of selection criteria that can be used to score team members are:  Availability . Identify whether the team member is available to work on the project within time period needed. If there are any concerns for availability during project timeline.  Cost. Verify if the cost of adding the team member is within the prescribed budget.  Experience, Verify that the team member has the relevant experience that will contribute to the project success.  Ability, Verify that the team member has the competencies needed by the project.  Knowledge and Skills. The team member has relevant knowledge of the customer, similar implemented projects, nuances of the project environment and relevant skills to use a project tool.  Attitude that includes his ability to gel with other members of the team.  International factors such as location of the team member, time zone and communication capabilities pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 16. Connoisseur Solutions Acquire Project Team – Outputs Project Staff Assignments includes assignment of resource to each role defined initially. The documentation of these assignments can include a project team directory, memos to team members, and names inserted into other parts of the project management plan, such as project organization charts and schedules. Resource Calendars documents the time periods that each project team member can work on the project. This should be created keeping in mind each person’s schedule conflicts, involvement in other projects and his/her holiday Project Management Plan Updates Elements of the project management plan that may be updated include, but are not limited to the human resources plan. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 17. Connoisseur Solutions Develop Project Team Process of improving competencies, team interaction, and the overall team environment to enhance project performance. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 18. Connoisseur Solutions Develop Project Team Inputs Tools and Techniques Outputs  Human resource management plan Project staff assignments  Resource Calendars □ Interpersonal Skills □ Trainings □ Team building activities □ Ground rules □ Co-location □ Recognition and rewards □ Personnel assessment tools  Team Performance assessments  Enterprise Environmental Factors updates pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 19. Connoisseur Solutions Develop Project Team - Inputs Human Resource Management Plan provides guidance on how project human resource should be defined , staffed , managed , controlled , and eventually released. It identifies training strategies and plans for developing the project team. Items such as rewards, feedback, additional training and disciplinary actions can be added to the plan as a result of ongoing team performance assessments and other form of project team management. Project staff Assignments details the assignments or activities to be performed by the Project team Resource Calendars identify the times when the project team members can participate in team development activities. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 20. Connoisseur Solutions Develop Project Team – Tools and Techniques Interpersonal Skills also referred to as soft skills are very critical for team development. It include skills such as empathy, influence, creativity, and group facilitation, these are valuable assets when managing the project team. Trainings help in enhancing the competencies of the project team members. Training can be formal or informal. Training can be formal or informal ; classroom based ,on line, instructor-led or on the job training. Team building activities are critical to improve interpersonal relationships, resolving team issues and to keep the team motivated so that team members work together effectively . They are critical for the team members who operate virtually from remote locations . Project managers should obtain top management support, obtain commitment of team members, introduce appropriate rewards and recognition, create a team identity, manage conflicts effectively, promote trust and open communication among team members, and, above all, provide good team leadership to build effective teams. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 21. Connoisseur Solutions Develop Project Team– Tools and Techniques Traditionally, a team goes through five stages of development. Forming: a group of people come together to accomplish a shared purpose. Storming: Disagreement about mission, vision, and approaches combined with the fact that team members are getting to know each other can cause strained relationships and conflict. Norming: The team has consciously or unconsciously formed working relationships that are enabling progress on the team’s objectives. Performing: Relationships, team processes, and the team’s effectiveness in working on its objectives are synching to bring about a successfully functioning team. Adjourning : In the adjourning phase, the team completes the work and moves on from the project. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 22. Connoisseur Solutions Develop Project Team – Tools and Techniques Histogram is a statistical tool used in the analysis and determination of possible solutions to quality control problem. It depicts how often the problem happens or its frequency Ground Rules define the acceptable behavior by the project team members. This allows team members to discover values that are important to one another Co-Location involves placing many or all of the most active project team members in the same physical location to enhance their ability to perform as a team. E.g. create a war room where all the team members work, or co-locate the project team at the customer’s site. Recognition and Rewards helps in keeping the team motivated and to boost their spirits. People are motivated if they feel they are valued in the organization and this value is demonstrated by the rewards given to them. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 23. Connoisseur Solutions Abraham Maslow’s Hierarchy of Needs (1954) (In order of priority) Self Actualization Esteem Social Safety Physiological Air, water, food, house, clothing Security, stability, freedom from threat and physical harm Love, affection, approval, friends, association Accomplishment, Respect, Attention, Appreciation Self fulfillment, growth, learning Recognition and Rewards – Theories of Motivation pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 24. Connoisseur Solutions Recognition and Rewards – Theories of Motivation  The average worker is inherently lazy and needs supervisions  The average worker dislikes work and avoids work whenever possible  To induce adequate effort, the supervisor must threaten punishment and exercise careful supervision  The average worker avoids increased responsibility and seeks to be directed McGregor’s Theory X Theory X relies on Strict Rules, Performance incentives, Rewards, Threats to job security pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 25. Connoisseur Solutions Recognition and Rewards – Theories of Motivation  Workers are willing to do the job without continuous supervision  The average worker wants to be active and finds the physical and mental effort on the job satisfying  Greatest results come from willing participation which will tend to produce self-direction towards goals without coercion and control  The average worker seeks opportunity for personal improvement and self respect Theory Y relies on worker participation in decisions, cordial manager-worker relationships, worker designed job methodology, worker individualism McGregor’s Theory Y pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 26. Connoisseur Solutions Recognition and Rewards – Theories of Motivation William Ouchi’s Theory Z According to Theory Z, people who don’t fit either Theory X or Theory Y are really a combination of the two. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 27. Connoisseur Solutions Recognition and Rewards – Theories of Motivation Herzberg’s Motivation – Hygiene Theory As per this theory presence of hygiene factors doesn’t motivate someone , however their absence de-motivates. Motivation factors will motivate but they will not work without the hygiene factors in place. I. Motivating factors I. Achievements II. Recognitions III. Work Itself IV. Responsibility V. Advancement VI. Possibility for growth Hygiene Factors are Company Policy, Paycheck, status, Relationship with co-workers pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 28. Connoisseur Solutions Recognition and Rewards – Theories of Motivation Expectancy Theorem of Motivation by Victor Vroom 1. You need to give people an expectation of a reward in order to motivate them 2. The rewards or awards should be achievable, if they are impossible to achieve, they will de-motivate them 3. People are motivated by achievements 4. People “expect” to be rewarded for achievements pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 29. Connoisseur Solutions Recognition and Rewards – Theories of Motivation McLelland’s Achievement Theory 1. People need achievement, power and affiliation to be motivated. 2. Achievement is when someone performs well and is recognized for it 3. Power means he or she has a lot of control or influence in the company 4. Affiliation , a strong sense from being a part of a working team and having good relationships with coworkers pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 30. Connoisseur Solutions Recognition and Rewards – Theories of Motivation Ouchi’s Theory 1. Formulated from Quality movement and Quality circles 2. Both Management and Workers need to be involved, and they should trust each other pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 31. Connoisseur Solutions Recognition and Rewards – Theories of Motivation The Oldham-Hackman job characteristics model I. Skill Variety – the number of job skills that the job holder has the opportunity to exercise II. Task Identity – the degree to which your work and its result are identifiable as belonging to you III. Task Significance – the degree to which your job has an influence on others IV. Autonomy – the discretion you have about the way that you do the job V. Feedback – the information that you get back about the result of your work pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 32. Connoisseur Solutions Forms of Power Below are the five Kinds of Power that can help the project managers maximize his ability to influence and manage the team  Formal – positional, granted by organizational/upper mgmt  Expert – power earned through a recognized level of knowledge or skill in a specific area  Reward – the power to give a positive consequences, like promotions, salary rise etc.  Penalty – the power to provide negative consequences, like suspension, termination, reprimands  Referent – power gained when team members admire, and willingly follow an individual as a role model pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 33. Connoisseur Solutions Revising Key Terms : Forms of Power at Work Exercise : Forms of Power at Work 1. A functional manager assigns a tester to work on the project manager’s team. This is an example of _________ power 2. The programmers always listen to the team lead because he’s really a good software architect. This is an example of _________ power pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 34. Connoisseur Solutions Revising Key Terms : Forms of Power at Work Answers to Exercise : Forms of Power at Work 1. A functional manager assigns a tester to work on the project manager’s team. This is an example of Legitimate power 2. The programmers always listen to the team lead because he’s really a good software architect. This is an example of Expert power pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 35. Connoisseur Solutions Leadership Style Following are the leadership style that managers can use to interact with organizational members  Autocratic – traditional figure of a boss who makes binding decisions regardless of what subordinates think or desire  Laissez-Fare – Other extreme of autocratic, the staff can pursue anything they wish, enhances free thinking  Democratic – participative, decisions made jointly by management and staff pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 36. Connoisseur Solutions Develop Project Team– Outputs Team Performance assessments gives insight to project manager on areas that need improvement. Enterprise Environmental Factors Updates The Enterprise environmental factors that may be updated as a result of the Develop Project Team process include, but are not limited to, personnel administration, including updates for employee training records and skill assessments. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 37. Connoisseur Solutions Manage Project Team Tracking team member performance, providing feedback, resolving issues and managing changes to optimize project performance. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 38. Connoisseur Solutions Manage Project Team Inputs Tools and Techniques Outputs  Human resource management plan  Project staff assignments  Team Performance Assessments  Issue log  Work performance reports  Organizational process assets □ Observation and Conversation □ Project performance appraisals □ Conflict management □ Interpersonal skills  Change Requests  Project management plan updates  Project document updates Enterprise Environmental Factors updates  Organizational process assets updates pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 39. Connoisseur Solutions Manage Project Team - Inputs Human Resource Management Plan contains the human resource plan which includes roles and responsibilities, project organization and staffing management plan Project staff assignments provide a list of team members assigned to the project that needs to be evaluated under the appraisal process Team Performance Assessment is done on continuous basis formally or informally by the project management team. This helps in issues and conflict resolution Issue Log, Issues arise in the course of managing the project team. An issue log can be used t document and monitor who is responsible for resolving specific issues by a target date. Work Performance Reports provide information on project performance vis-à-vis project management plan. It aids in determining the future resource requirements, recognition and rewards and updates to the staffing management plan. Organizational process assets that can influence this process include certificates of appreciation, newsletters, website, bonus structure, corporate apparel and organizational perquisites pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 40. Connoisseur Solutions Manage Project Team – Tools and Techniques Observation and Conversation are used to stay in touch with the team member’s work and attitudes. The project management team monitors progress toward project deliverables, accomplishments that are a source of pride for team members, and interpersonal issues. Project performance appraisals helps in clarification of roles and responsibilities, constructive feedback to team members, discovery of unknown or unresolved issues, development of individual training plans, and the establishment of specific goals for future time periods. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 41. Connoisseur Solutions Manage Project Team – Tools and Techniques Interpersonal skills use a combination of technical, human and conceptual skills to analyze situations and interact appropriately with team members. E.g. Leadership, Influence and effective decision making Conflict Management results in greater productivity and positive working relationships. When managed properly, differences of opinion can lead to increased creativity and better decision making. Below are the source of conflicts on the Project More than 50% conflicts on the projects are due to disagreement over schedules, priorities and resources) 1. Schedules 2. Project Priorities 3. Human Resources 4. Technical Opinions 5. Procedures 6. Cost 7. Personality pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 42. Connoisseur Solutions Manage Project Team – Tools and Techniques Conflict Resolution Methods  Confronting/Problem Solving. Treating conflict as a problem to be solved by examining alternatives; requires a give-and-take attitude and open dialogue.  Withdrawing/Avoiding. Retreating from an actual or potential conflict situation.  Smoothing/Accommodating. Emphasizing areas of agreement rather than areas of difference.  Compromising. Searching for solutions that bring some degree of satisfaction to all parties.  Forcing. Pushing one’s viewpoint at the expense of others; offers only win-lose solutions.  Collaborating. Incorporating multiple viewpoints and insights from differing perspectives; leads to consensus and commitment. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 43. Connoisseur Solutions Manage Project Team – Outputs Change Requests due to change in staffing. The change request should be processed and approved through integrated change control process. Staffing changes may include moving people to different assignments , outsourcing some of the work, and replacing the team member who leave. Project Management Plan Updates may include changes in the human resource management plan Project Documents Updates that may be updated include  Issue Log  Role description  Project staff assignment Enterprise Environmental Factors updates include input to organizational performance appraisals and personnel skill updates Organizational process assets updates include Historical information and lessons learned documentation Templates, and Organizational standard processes. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 44. Connoisseur Solutions Manage Project Team – Outputs Enterprise Environmental Factors updates include input to organizational performance appraisals and personnel skill updates Organizational process assets updates include Historical information and lessons learned documentation Templates, and Organizational standard processes. Change Requests due to change in staffing. The change request should be processed and approved through integrated change control process Project management plan updates include updates to staffing management plan pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 45. Connoisseur Solutions Revising Key Terms : Conflict Management Exercise 2: Resolving Conflict Figure out the conflict resolution technique that is being used in the cases below: 1. I don’t really have time to deal with this right now. Just figure it out and get back to me. 2. Hold on a second. Let’s sit down and figure out what the real problem is. pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 46. Connoisseur Solutions Revising Key Terms : Conflict Management Exercise 2: Resolving Conflict Figure out the conflict resolution technique that is being used in the cases below: 1. I don’t really have time to deal with this right now. Just figure it out and get back to me - Withdrawal 2. Hold on a second. Let’s sit down and figure out what the real problem is – Problem Solving / Confronting pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 47. Connoisseur Solutions Halo Effect Extending the impression of a particular outstanding trait to influence the total judgment of a person E.g. : Assuming that a person who is good in technology will be a good project manager pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 48. Connoisseur Solutions Revising Key Terms : Complete the following Exercise 3: HR Management 1. The main output of the Acquire Project Team process is ___________ assignments 2. The _________ effect causes people with technical expertise to be put in the position for which they are unqualified pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 49. Connoisseur Solutions Revising Key Terms : Complete the following Exercise 3: HR Management 1. The main output of the Acquire Project Team process is Project Resources assignments 2. The Halo effect causes people with technical expertise to be put in the position for which they are unqualified pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 50. Connoisseur Solutions QUIZ ! pankaj sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356