10 MWp Solar PV Power Project,
      Rajasthan – INDIA
       – Detailed Financial Report




        M/s XXXXX, New Delhi
10 MWp Solar PV Power Financial




               DETAILED FINANCIAL
                     REPORT
                        10 MWp SOLAR PHOTOVOLTAIC POWER PLANT,




                  PLANT LOCATION: VILLAGE: AAAAA, DISTT: BBBBB,
                             RAJASTHAN, INDIA

Project Developers

XXXXXXXX




Project Consultants
Pan Exergy Pvt Ltd
D-32, Sector-7, Noida – 201301,
INDIA.
Ph: +91-9999676750; +91-9654436886
Web: www.exergy.in Email: info@exergy.in




           2|P a g e
10 MWp Solar PV Power Financial




 1     PROJECT FINANCIALS

 1.1     Project Cost
 The cost of the power project is estimated, on the basis of the prevailing prices rates and the estimation
 is for the installation of power generation facilities described in the earlier sections of this report.


 The cost of the Solar PV power plant, presented in this section of the report covers all the costs
 associated with the construction of the plant and included civil construction cost, cost of equipment for
 power generation, cost of auxiliaries and utilities.
 Note: CER distribution: yr-1, 100% to project developer (PD); yr-2, 90% to PD; yr-3, 80% to PD; yr-4, 70% to
 PD; yr-5, 60% to PD; year 6 onwards, 50% to PD.


 1.2     Data Sheet
Site Information
Site Name                                                                          Mandali
Price of Land/Acre (Rs Lakh)                                                           0.1
Distance from the Evacuation Point(Km)                                                  17
Estimated Generation (KwH/MW)                                                      1465238
Cost of Evacuation/Km (Rs. Lakh/Km)                                                     30

Technology Information
Technology Used                                                Solar Semi (Poly Crystalline)
Cost of Solar Modules/MW (Rs. Lakh)                                                     850
Area Required (Acre/MW)                                                                    6

Cost Estimates Per MW
Item                                                                          Cost (Rs Lakh)
Solar Panel                                                                              850
Inverter (Central Inverter)                                                              150
Power Evacuation Cost (Total)                                                            510
BOS & Commissioning Cost                                                                 250
Total Technology Cost/MW                                                               1250

Financial Information
Tariff (Rs/Unit)                                                                        15.3
Debt Interest Rate (%)                                                               12.50%




           3|P a g e
10 MWp Solar PV Power Financial



 1.3      Assumptions

Sl No   Assumption Head             Sub-Head              Sub-Head (2)                                 Units          Assumptions
                                                          Installed Capacity                           MW                              10

  1        Power Generation              Capacity         CUF                                          %                        16.73%
                                                          Deration Factor                              %                         0.80%
                                                          Useful Life                                  Years                        25
                                                          Power Plant Cost                             Rs Lakh/MW                 1250
                                                          Power Evacuation Cost                        Rs Lakh                     510
  2           Project Cost           Capital Cost/MW      Land Cost                                    Rs Lakh/Acre                   0.1
                                                          Land Needed                                  Acre/MW                          6
                                                          Total Fixed cost/PW                          Rs Laks                      13016
                                                          Tariff Period                                Years                          25
                                                          Tariff                                       Rs                            15.3
                                                          Debt                                         %                             70%
                                                          Equity                                       %                             30%
                                       Debt-Equity
                                                          Total Debt Amount                            Rs Lakh                  9111.2
                                                          Total Equity Amount                          Rs Lakh                  3904.8
  3      Financial Assumptions
                                                          Loan Amount                                  Rs Lakh                  9111.2
                                                          Moratorium Period                            Years                         0
                                     Debt Component
                                                          Repayment Period (Inc Moratorium Period)     Years                        10
                                                          Interest Rate                                %                        12.50%
                                    Equity Component      Equity Amount                                Rs Lakh                  3904.8
                                                          Income Tax                                   %                        33.22%
                                    Fiscal Assumptions    MAT Rate (for 10 years)                      %                       19.931%
                                                          80 IA Benefit                                Yes/No         Yes
  4     Financial Assumptions (2)
                                                          Depreciation Rate for First 10 Years         %                               7%
                                       Depreciation       Depreciation Rate 11th year onwards          %                            1.33%
                                                          Years of 7% rate                             Years                            10
             Operations &                                 O&M                                          Lakh/MW                        9.00
  5
             Maintenance                                  Total O&M escalation                         %                            5.72%
                                                          Expected to be generated per year for next
                                    CER Produced          21 years                                     CER/MW/Year                   1500
  6          CDM Benefits
                                                          Based on Average ECX rates,( conversion
                                    CER Price             rate of 1EUR=INR65.26)                       Rs/CER                       744.7
                                         Inverter         Current Price of Inverter                    Rs Lakh/MW                     150
                                    Replacement to be
  7             Inverter
                                    done after every 10
                                           years          Replacement year                             Year                            10




            4|P a g e
10 MWp Solar PV Power Financial



1.4     Cash Flow

Note: Detailed Cash Flow for 25years can be provided if asked for




   Pre Tax Equity IRR                              18%
   Pre Tax Project IRR                             15%




          5|P a g e
10 MWp Solar PV Power Financial



                1.5          Profit & Loss Account

Year                               1         2             3           4            5          6              7         8            9         10       11        12        13
Profit Before         Rs
Tax                   Lakh     213.92    243.02        279.88     325.48     380.92     561.57         537.55       641.69    761.62       899.30    294.64   1769.12   1743.21
ROE (Before
Tax)                  %           5%        6%            7%          8%          10%     14%            14%          16%       20%          23%        8%       45%       45%
ROI (Before
Tax)                  %           2%        2%            2%          3%          3%          4%          4%           5%        6%           7%        2%       14%       13%
                       Rs
Tax                   Lakh        43        48            56          65           76         112        107          128        152         179        98       588       579
                       Rs
Profit after tax      Lakh     171.29    194.58        224.10     260.61     305.00     449.65         430.41       513.80    609.82       720.06    196.77   1181.46   1164.16

ROE(After Tax)        %           4%        5%            6%          7%          8%      12%            11%          13%       16%          18%        5%       30%       30%

ROI (After Tax)       %           0%        0%            0%          0%          1%          1%          1%           1%        1%           1%        1%        5%        4%




Year                               14             15             16         17           18             19            20       21            22         23         24        25
Profit Before         Rs
Tax                   Lakh     1716.88    1690.12        1662.88      1635.12       1606.81         1577.91       1548.38    18.17       1431.39    1399.68   1367.15   1333.74
ROE (Before
Tax)                  %           44%        43%                43%        42%          41%            40%           40%       0%           37%        36%       35%       34%
ROI (Before
Tax)                  %           13%        13%                13%        13%          12%            12%           12%       0%           11%        11%       11%       10%
                      Rs
Tax                   Lakh        570         561               552         543         534            524           514        6           475        465       454        443
                      Rs
Profit after tax      Lakh     1146.58    1128.70        1110.51      1091.97       1073.07         1053.77       1034.05    12.14        955.92     934.74    913.02    890.70

ROE(After Tax)        %           29%        29%                28%        28%          27%            27%           26%       0%           24%        24%       23%       23%

ROI (After Tax)       %            4%             4%            4%          4%          4%              4%            4%       0%            4%         4%        3%        3%



Average ROE (BT)                                                       26.27%
Average ROI (BT)                                                           7.88%


Average ROE (AT)                                                       18.20%
Average ROI (AT)                                                           2.42%




                              6|P a g e

More Related Content

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Solar PV Financials

  • 1. 10 MWp Solar PV Power Project, Rajasthan – INDIA – Detailed Financial Report M/s XXXXX, New Delhi
  • 2. 10 MWp Solar PV Power Financial DETAILED FINANCIAL REPORT 10 MWp SOLAR PHOTOVOLTAIC POWER PLANT, PLANT LOCATION: VILLAGE: AAAAA, DISTT: BBBBB, RAJASTHAN, INDIA Project Developers XXXXXXXX Project Consultants Pan Exergy Pvt Ltd D-32, Sector-7, Noida – 201301, INDIA. Ph: +91-9999676750; +91-9654436886 Web: www.exergy.in Email: info@exergy.in 2|P a g e
  • 3. 10 MWp Solar PV Power Financial 1 PROJECT FINANCIALS 1.1 Project Cost The cost of the power project is estimated, on the basis of the prevailing prices rates and the estimation is for the installation of power generation facilities described in the earlier sections of this report. The cost of the Solar PV power plant, presented in this section of the report covers all the costs associated with the construction of the plant and included civil construction cost, cost of equipment for power generation, cost of auxiliaries and utilities. Note: CER distribution: yr-1, 100% to project developer (PD); yr-2, 90% to PD; yr-3, 80% to PD; yr-4, 70% to PD; yr-5, 60% to PD; year 6 onwards, 50% to PD. 1.2 Data Sheet Site Information Site Name Mandali Price of Land/Acre (Rs Lakh) 0.1 Distance from the Evacuation Point(Km) 17 Estimated Generation (KwH/MW) 1465238 Cost of Evacuation/Km (Rs. Lakh/Km) 30 Technology Information Technology Used Solar Semi (Poly Crystalline) Cost of Solar Modules/MW (Rs. Lakh) 850 Area Required (Acre/MW) 6 Cost Estimates Per MW Item Cost (Rs Lakh) Solar Panel 850 Inverter (Central Inverter) 150 Power Evacuation Cost (Total) 510 BOS & Commissioning Cost 250 Total Technology Cost/MW 1250 Financial Information Tariff (Rs/Unit) 15.3 Debt Interest Rate (%) 12.50% 3|P a g e
  • 4. 10 MWp Solar PV Power Financial 1.3 Assumptions Sl No Assumption Head Sub-Head Sub-Head (2) Units Assumptions Installed Capacity MW 10 1 Power Generation Capacity CUF % 16.73% Deration Factor % 0.80% Useful Life Years 25 Power Plant Cost Rs Lakh/MW 1250 Power Evacuation Cost Rs Lakh 510 2 Project Cost Capital Cost/MW Land Cost Rs Lakh/Acre 0.1 Land Needed Acre/MW 6 Total Fixed cost/PW Rs Laks 13016 Tariff Period Years 25 Tariff Rs 15.3 Debt % 70% Equity % 30% Debt-Equity Total Debt Amount Rs Lakh 9111.2 Total Equity Amount Rs Lakh 3904.8 3 Financial Assumptions Loan Amount Rs Lakh 9111.2 Moratorium Period Years 0 Debt Component Repayment Period (Inc Moratorium Period) Years 10 Interest Rate % 12.50% Equity Component Equity Amount Rs Lakh 3904.8 Income Tax % 33.22% Fiscal Assumptions MAT Rate (for 10 years) % 19.931% 80 IA Benefit Yes/No Yes 4 Financial Assumptions (2) Depreciation Rate for First 10 Years % 7% Depreciation Depreciation Rate 11th year onwards % 1.33% Years of 7% rate Years 10 Operations & O&M Lakh/MW 9.00 5 Maintenance Total O&M escalation % 5.72% Expected to be generated per year for next CER Produced 21 years CER/MW/Year 1500 6 CDM Benefits Based on Average ECX rates,( conversion CER Price rate of 1EUR=INR65.26) Rs/CER 744.7 Inverter Current Price of Inverter Rs Lakh/MW 150 Replacement to be 7 Inverter done after every 10 years Replacement year Year 10 4|P a g e
  • 5. 10 MWp Solar PV Power Financial 1.4 Cash Flow Note: Detailed Cash Flow for 25years can be provided if asked for Pre Tax Equity IRR 18% Pre Tax Project IRR 15% 5|P a g e
  • 6. 10 MWp Solar PV Power Financial 1.5 Profit & Loss Account Year 1 2 3 4 5 6 7 8 9 10 11 12 13 Profit Before Rs Tax Lakh 213.92 243.02 279.88 325.48 380.92 561.57 537.55 641.69 761.62 899.30 294.64 1769.12 1743.21 ROE (Before Tax) % 5% 6% 7% 8% 10% 14% 14% 16% 20% 23% 8% 45% 45% ROI (Before Tax) % 2% 2% 2% 3% 3% 4% 4% 5% 6% 7% 2% 14% 13% Rs Tax Lakh 43 48 56 65 76 112 107 128 152 179 98 588 579 Rs Profit after tax Lakh 171.29 194.58 224.10 260.61 305.00 449.65 430.41 513.80 609.82 720.06 196.77 1181.46 1164.16 ROE(After Tax) % 4% 5% 6% 7% 8% 12% 11% 13% 16% 18% 5% 30% 30% ROI (After Tax) % 0% 0% 0% 0% 1% 1% 1% 1% 1% 1% 1% 5% 4% Year 14 15 16 17 18 19 20 21 22 23 24 25 Profit Before Rs Tax Lakh 1716.88 1690.12 1662.88 1635.12 1606.81 1577.91 1548.38 18.17 1431.39 1399.68 1367.15 1333.74 ROE (Before Tax) % 44% 43% 43% 42% 41% 40% 40% 0% 37% 36% 35% 34% ROI (Before Tax) % 13% 13% 13% 13% 12% 12% 12% 0% 11% 11% 11% 10% Rs Tax Lakh 570 561 552 543 534 524 514 6 475 465 454 443 Rs Profit after tax Lakh 1146.58 1128.70 1110.51 1091.97 1073.07 1053.77 1034.05 12.14 955.92 934.74 913.02 890.70 ROE(After Tax) % 29% 29% 28% 28% 27% 27% 26% 0% 24% 24% 23% 23% ROI (After Tax) % 4% 4% 4% 4% 4% 4% 4% 0% 4% 4% 3% 3% Average ROE (BT) 26.27% Average ROI (BT) 7.88% Average ROE (AT) 18.20% Average ROI (AT) 2.42% 6|P a g e