SlideShare a Scribd company logo
1 of 32
Download to read offline
Managing the P6
Schedule From An
Owner’s Perspective
April 7-10, 2013
Raquel Speers Shohet, PSP
Vice President
Hill International
Speaker Biography
Degree: BS – Civil Engineering
Years of Controls Experience: 22
EPC
Consultant
50% Public and Private Owners
50% Contractors
Built and managed 350+ schedules
Something you do not know about me: I was
goalkeeper for University of California, Irvine
Women‟s Soccer Team
Conceptual Presentation Topics
Limitations/ Capabilities of P6
Accessing Current Environment
Managing schedule progress
Incorporating varied contractor schedules
into a single enterprise system
Performing schedule review/analysis
Reporting/ Tracking critical events
Potential EV analysis
Managing owner‟s long-term goals/budget
Challenges for Enterprise Software
Rollout
Understanding the Technology
Getting past the Software Sales Pitch
Re-thinking Processes
Standardizing the Processes
Training New Processes
Executive Buy-in
Commitment
Making the Commitment
Define the Processes
 Scheduling Specification at Implementation
 Scheduling Appendix (Project Value $1M, $5-10M, $10M+)
 Schedule Department Roles and Responsibilities (SOP, “A” Team)
 IT Discovery (Hardware, License Costs, Hosting)
Design the Processes
Best Practices
System Implementation
Pilot Project
 Develop the Processes
Process Flow Charts (Baselines, Monthly Updates, Reviews)
Templates
Reporting
 Deliver the Processes
Live Environment
Training
Advanced Considerations
STANDARDIZATION IS KEY!!!!!!!!!!!!!!!!!!!!
Minimum Scheduling
Requirements
Scheduler Qualification
Requirements
Scheduling Software
Requirements
Schedule Acceptance
Critical Path Method
Work Breakdown Structure
(WBS)
Float
Calendars
Durations
Relationships
Contingency Time
Change of Contract Time
Submittal, Procurement,
Delivery Activities
Testing, Training, & Startup
Activities
Schedule Specification Considerations
State DOT Specification
1.6 Baseline Construction Schedule
C. Schedule Submission
Current BPM Considerations
Current BPM Considerations
Process Flow/
Information Management Considerations
OWNER 1 Owner 1 Master Schedule
Added Summaries:
Cost, Critical Path, Schedule Impacts, Change Order, Contingency and Start up Plans Summaries
Live Environment/
Advanced Considerations
o System Integration of Oracle Project Management/ Contract Management or
PMWeb Softwares
o QC Items
o RFIs
o Submittals
o Contractor Claims
o Web Application
o CIP Long Term Budgets/ Goals
Advanced Considerations
Each „portlet‟ can be resized or maximized based on user preference.
This PM dashboard consists of seven „portlets‟:
The Project Gantt Chart Project Statistics Project Health
Schedule Performance Index Performance Project Notebooks
Earned Value Performance
Review Presentation Topics
Limitations/ Capabilities of P6
Accessing Current Environment
Managing schedule progress
Incorporating varied contractor schedules
into a single enterprise system
Performing schedule review/analysis
Reporting/ Tracking critical events
Potential EV analysis
Managing owner‟s long-term goals/budget
Conclusion
 Understand value of an Enterprise versus Stand-alone
environment
 Identify strengths and weaknesses of current processes
 Specifications
 Data Management
 Setup Standardized Structures
 EPS, WBS, Codes, Global v Project
 Establish Key Work Flow Processes
 Maintain Consistency
 Schedule Review
 Schedule Management
 Schedule Reporting
 Utilize tools provided to optimize the schedule for your program
Questions and Answers
Hoping that you can use these implementation
and execution lessons learned outlined to
efficiently manage project schedules using
Primavera P6™
Thank you

More Related Content

What's hot

Resume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSAResume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSA
Steve Sauchelli
 
Preretrofitevaluationpresentation
PreretrofitevaluationpresentationPreretrofitevaluationpresentation
Preretrofitevaluationpresentation
Zondits
 
MDacey_Bus Exp
MDacey_Bus ExpMDacey_Bus Exp
MDacey_Bus Exp
Mike Dacey
 
Vidhya Padmanabhan_Resume_full
Vidhya Padmanabhan_Resume_fullVidhya Padmanabhan_Resume_full
Vidhya Padmanabhan_Resume_full
Vidhya Padmanabhan
 

What's hot (20)

Suely Bodart - Presentation 1
Suely Bodart - Presentation 1Suely Bodart - Presentation 1
Suely Bodart - Presentation 1
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Technology Assessment Framework
Technology Assessment FrameworkTechnology Assessment Framework
Technology Assessment Framework
 
Resume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSAResume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSA
 
IT Program Assessments
IT Program AssessmentsIT Program Assessments
IT Program Assessments
 
Preretrofitevaluationpresentation
PreretrofitevaluationpresentationPreretrofitevaluationpresentation
Preretrofitevaluationpresentation
 
MSBProfile.doc
MSBProfile.docMSBProfile.doc
MSBProfile.doc
 
Project Challenge: A Guide to Conducting Integrated Baseline Reviews
Project Challenge: A Guide to Conducting Integrated Baseline ReviewsProject Challenge: A Guide to Conducting Integrated Baseline Reviews
Project Challenge: A Guide to Conducting Integrated Baseline Reviews
 
AJAY RESUME
AJAY RESUMEAJAY RESUME
AJAY RESUME
 
MDacey_Bus Exp
MDacey_Bus ExpMDacey_Bus Exp
MDacey_Bus Exp
 
4 the analyst as a project manager
4 the analyst as a project manager4 the analyst as a project manager
4 the analyst as a project manager
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
 
Project Management Information System (PMIS) - System Benefits Summary
Project Management Information System (PMIS) - System Benefits SummaryProject Management Information System (PMIS) - System Benefits Summary
Project Management Information System (PMIS) - System Benefits Summary
 
Project closure and audit
Project closure and auditProject closure and audit
Project closure and audit
 
Lean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation SlideLean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation Slide
 
ICIECA 2014 Paper 06
ICIECA 2014 Paper 06ICIECA 2014 Paper 06
ICIECA 2014 Paper 06
 
Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)
 
Essential Project Documents
Essential Project DocumentsEssential Project Documents
Essential Project Documents
 
Vidhya Padmanabhan_Resume_full
Vidhya Padmanabhan_Resume_fullVidhya Padmanabhan_Resume_full
Vidhya Padmanabhan_Resume_full
 

Viewers also liked

Viewers also liked (15)

Diploma certified management accountant
Diploma certified management accountantDiploma certified management accountant
Diploma certified management accountant
 
Raise Friends and Funds with Social Media
Raise Friends and Funds with Social MediaRaise Friends and Funds with Social Media
Raise Friends and Funds with Social Media
 
DRMS rising 6th & 7th grade parent orientation 15 16ppt
DRMS rising 6th & 7th grade parent orientation 15 16pptDRMS rising 6th & 7th grade parent orientation 15 16ppt
DRMS rising 6th & 7th grade parent orientation 15 16ppt
 
Storage device
Storage deviceStorage device
Storage device
 
Using Logic Models to Strengthen Fundraising
Using Logic Models to Strengthen FundraisingUsing Logic Models to Strengthen Fundraising
Using Logic Models to Strengthen Fundraising
 
Эволюция системных идей
Эволюция системных идейЭволюция системных идей
Эволюция системных идей
 
ESTIMATION OF THE CONCENTRATION OF PHOSPHATE IN LAUNDRY EFFLUENT SAMPLE BY US...
ESTIMATION OF THE CONCENTRATION OF PHOSPHATE IN LAUNDRY EFFLUENT SAMPLE BY US...ESTIMATION OF THE CONCENTRATION OF PHOSPHATE IN LAUNDRY EFFLUENT SAMPLE BY US...
ESTIMATION OF THE CONCENTRATION OF PHOSPHATE IN LAUNDRY EFFLUENT SAMPLE BY US...
 
Beckman Coulter Spectrophotometer
Beckman Coulter SpectrophotometerBeckman Coulter Spectrophotometer
Beckman Coulter Spectrophotometer
 
UJI BEDA (KOMPARASI) t - TEST (PRETEST-POSTEST)
UJI BEDA (KOMPARASI) t - TEST (PRETEST-POSTEST)UJI BEDA (KOMPARASI) t - TEST (PRETEST-POSTEST)
UJI BEDA (KOMPARASI) t - TEST (PRETEST-POSTEST)
 
FRACTALES
FRACTALESFRACTALES
FRACTALES
 
Pasta experiment
Pasta experiment Pasta experiment
Pasta experiment
 
Bab 6 uji beda
Bab 6 uji bedaBab 6 uji beda
Bab 6 uji beda
 
Mars
MarsMars
Mars
 
uji hipotesis satu rata – rata bagian 2
uji hipotesis satu rata – rata bagian 2uji hipotesis satu rata – rata bagian 2
uji hipotesis satu rata – rata bagian 2
 
DETERMINATION OF PHOSPHOROUS IN SOIL
DETERMINATION OF PHOSPHOROUS IN SOILDETERMINATION OF PHOSPHOROUS IN SOIL
DETERMINATION OF PHOSPHOROUS IN SOIL
 

Similar to 205610 managing p6 from an owners schedule

Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRM
Joyce Conrad
 
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project ManagerHarris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed, PMP
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
ngocjos
 
Richard Saporito 052715
Richard Saporito 052715Richard Saporito 052715
Richard Saporito 052715
Rich Saporito
 

Similar to 205610 managing p6 from an owners schedule (20)

iNetwork Services Deployement Overview
iNetwork Services Deployement OverviewiNetwork Services Deployement Overview
iNetwork Services Deployement Overview
 
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
 
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRM
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
 
PMO Proposal For Global Sales Operations
PMO Proposal For Global Sales OperationsPMO Proposal For Global Sales Operations
PMO Proposal For Global Sales Operations
 
Suely bodart presentation
Suely bodart   presentationSuely bodart   presentation
Suely bodart presentation
 
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project ManagerHarris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project Manager
 
C:\fakepath\ginger rey pmo office - advanced project managment part i.doc
C:\fakepath\ginger rey   pmo office - advanced project managment part i.docC:\fakepath\ginger rey   pmo office - advanced project managment part i.doc
C:\fakepath\ginger rey pmo office - advanced project managment part i.doc
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Meha_Ghadge
Meha_GhadgeMeha_Ghadge
Meha_Ghadge
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008
 
INFO 6245 Final Presentation
INFO 6245 Final PresentationINFO 6245 Final Presentation
INFO 6245 Final Presentation
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
Richard Saporito 052715
Richard Saporito 052715Richard Saporito 052715
Richard Saporito 052715
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Bradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swaBradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swa
 
WEBINAR: Face your Budgeting Fears!
WEBINAR: Face your Budgeting Fears!WEBINAR: Face your Budgeting Fears!
WEBINAR: Face your Budgeting Fears!
 
Offshore R&D Project Management
Offshore R&D Project ManagementOffshore R&D Project Management
Offshore R&D Project Management
 

More from p6academy

20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
p6academy
 

More from p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 

205610 managing p6 from an owners schedule

  • 1. Managing the P6 Schedule From An Owner’s Perspective April 7-10, 2013 Raquel Speers Shohet, PSP Vice President Hill International
  • 2. Speaker Biography Degree: BS – Civil Engineering Years of Controls Experience: 22 EPC Consultant 50% Public and Private Owners 50% Contractors Built and managed 350+ schedules Something you do not know about me: I was goalkeeper for University of California, Irvine Women‟s Soccer Team
  • 3. Conceptual Presentation Topics Limitations/ Capabilities of P6 Accessing Current Environment Managing schedule progress Incorporating varied contractor schedules into a single enterprise system Performing schedule review/analysis Reporting/ Tracking critical events Potential EV analysis Managing owner‟s long-term goals/budget
  • 4. Challenges for Enterprise Software Rollout Understanding the Technology Getting past the Software Sales Pitch Re-thinking Processes Standardizing the Processes Training New Processes Executive Buy-in Commitment
  • 5.
  • 6.
  • 7. Making the Commitment Define the Processes  Scheduling Specification at Implementation  Scheduling Appendix (Project Value $1M, $5-10M, $10M+)  Schedule Department Roles and Responsibilities (SOP, “A” Team)  IT Discovery (Hardware, License Costs, Hosting) Design the Processes Best Practices System Implementation Pilot Project  Develop the Processes Process Flow Charts (Baselines, Monthly Updates, Reviews) Templates Reporting  Deliver the Processes Live Environment Training Advanced Considerations STANDARDIZATION IS KEY!!!!!!!!!!!!!!!!!!!!
  • 8.
  • 9. Minimum Scheduling Requirements Scheduler Qualification Requirements Scheduling Software Requirements Schedule Acceptance Critical Path Method Work Breakdown Structure (WBS) Float Calendars Durations Relationships Contingency Time Change of Contract Time Submittal, Procurement, Delivery Activities Testing, Training, & Startup Activities Schedule Specification Considerations
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. State DOT Specification 1.6 Baseline Construction Schedule C. Schedule Submission Current BPM Considerations
  • 17.
  • 18. OWNER 1 Owner 1 Master Schedule
  • 19.
  • 20. Added Summaries: Cost, Critical Path, Schedule Impacts, Change Order, Contingency and Start up Plans Summaries
  • 21.
  • 22.
  • 24.
  • 25. o System Integration of Oracle Project Management/ Contract Management or PMWeb Softwares o QC Items o RFIs o Submittals o Contractor Claims o Web Application o CIP Long Term Budgets/ Goals Advanced Considerations
  • 26. Each „portlet‟ can be resized or maximized based on user preference. This PM dashboard consists of seven „portlets‟: The Project Gantt Chart Project Statistics Project Health Schedule Performance Index Performance Project Notebooks Earned Value Performance
  • 27.
  • 28.
  • 29.
  • 30. Review Presentation Topics Limitations/ Capabilities of P6 Accessing Current Environment Managing schedule progress Incorporating varied contractor schedules into a single enterprise system Performing schedule review/analysis Reporting/ Tracking critical events Potential EV analysis Managing owner‟s long-term goals/budget
  • 31. Conclusion  Understand value of an Enterprise versus Stand-alone environment  Identify strengths and weaknesses of current processes  Specifications  Data Management  Setup Standardized Structures  EPS, WBS, Codes, Global v Project  Establish Key Work Flow Processes  Maintain Consistency  Schedule Review  Schedule Management  Schedule Reporting  Utilize tools provided to optimize the schedule for your program