PDCA APPROACH TO WASTE ELIMINATION
VALUE-ADD VS. NON-VALUE ADD
1. Define value from the customer’s
perspective and provide what they
want
2. Identify the value stream or process
for each product or service and
reduce or eliminate steps that do not
add value
3. Align the value-added steps so they
flow continuously
4. Allow the level of customer demand
to pull the process, i.e., produce only
what is ordered
5. Pursue perfection through
continuous improvement
LEAN MANAGEMENT FRAMEWORK
LEAN PRINCIPLESWORK VS. WASTE
Over-production
Producing more than
what the customer
needs
Inventory
Building and storing
extra products the
customer has not
ordered
Transportation
Moving product from
one place to another
Defects
Reprocessing, or
correcting work
Over-processing
Adding excess value
when the customer does
not require it
Motion
Extra physical or mental
motion that does not add
value
Intellect
Not using employees’
full intellectual
contribution
Waiting
Employees waiting for
another process or a
machine/tool
Waste
§ Transform or shape
material or information
§ Customer wants it and
willing to pay for it
§ Done right the first time
§ No value created but
required by current
thinking
§ No value created but
required by process
limitations
§ No value created but
required by current
technology
§ No value created but
required by government/
business regulations
§ Consume resources but
creates no value for the
customer
§ Could be stopped and it
would be invisible to the
customer
Value-Added
Activities
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Value-Add
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
EIGHT TYPES OF WASTE
Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5
Stability
Just-In-Time
• Continuous flow
• Takt time
• Pull system
• Flexible workforce
Jidoka
• Separate man &
machine work
• Abnormality
Identification
• Poka yoke
• Visual Control
Goals:
highest quality,
lowest cost, shortest lead times
Involvement
1
3 4
5
Heijunka Standardized Work Kaizen2
Select the Theme
Plan the Schedule
Grasp the Present Situation
Establish the Target
Analyze the Cause & Identify Corrective Action
Implement Corrective Action
Evaluate the Result
Standardize & Follow-up
1
2
3
4
5
6
7
8
PLAN
ACT
CHECK
DO
Lean Concepts &
Principles
© Operational Excellence Consulting. All rights reserved.
PDCA APPROACH TO WASTE ELIMINATION
VALUE-ADD VS. NON-VALUE ADD
1. Define value from the customer’s
perspective and provide what they
want
2. Identify the value stream or process
for each product or service and
reduce or eliminate steps that do not
add value
3. Align the value-added steps so they
flow continuously
4. Allow the level of customer demand
to pull the process, i.e., produce only
what is ordered
5. Pursue perfection through
continuous improvement
LEAN MANAGEMENT FRAMEWORK
LEAN PRINCIPLESWORK VS. WASTE
Over-production
Producing more than
what the customer
needs
Inventory
Building and storing
extra products the
customer has not
ordered
Transportation
Moving product from
one place to another
Defects
Reprocessing, or
correcting work
Over-processing
Adding excess value
when the customer does
not require it
Motion
Extra physical or mental
motion that does not add
value
Intellect
Not using employees’
full intellectual
contribution
Waiting
Employees waiting for
another process or a
machine/tool
Waste
§ Transform or shape
material or information
§ Customer wants it and
willing to pay for it
§ Done right the first time
§ No value created but
required by current
thinking
§ No value created but
required by process
limitations
§ No value created but
required by current
technology
§ No value created but
required by government/
business regulations
§ Consume resources but
creates no value for the
customer
§ Could be stopped and it
would be invisible to the
customer
Value-Added
Activities
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Value-Add
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5
Stability
Just-In-Time
• Continuous flow
• Takt time
• Pull system
• Flexible workforce
Jidoka
• Separate man &
machine work
• Abnormality
Identification
• Poka yoke
• Visual Control
Goals:
highest quality,
lowest cost, shortest lead times
Involvement
1
3 4
5
Heijunka Standardized Work Kaizen2
EIGHT TYPES OF WASTE
Select the Theme
Plan the Schedule
Grasp the Present Situation
Establish the Target
Analyze the Cause & Identify Corrective Action
Implement Corrective Action
Evaluate the Result
Standardize & Follow-up
1
2
3
4
5
6
7
8
PLAN
ACT
CHECK
DO
© Operational Excellence Consulting. All rights reserved. 3
Operational Excellence Consulting is a management training and consulting
firm that assists organizations in improving business performance and
effectiveness. Based in Singapore, the firm’s mission is to create business
value for organizations through innovative design and operational excellence
management training and consulting solutions. For more information, please
visit www.oeconsulting.com.sg

Weitere ähnliche Inhalte

Mehr von Operational Excellence Consulting

ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterOperational Excellence Consulting
 

Mehr von Operational Excellence Consulting (20)

Digital Strategic Business Planning Methodology
Digital Strategic Business Planning MethodologyDigital Strategic Business Planning Methodology
Digital Strategic Business Planning Methodology
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
 
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
 
Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)
 
Problem Solving & Visualization Tools
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
8D Problem Solving Process & Tools
8D Problem Solving Process & Tools8D Problem Solving Process & Tools
8D Problem Solving Process & Tools
 
Digital Transformation Process Poster
Digital Transformation Process PosterDigital Transformation Process Poster
Digital Transformation Process Poster
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
 
Four Steps of Jidoka Poster
Four Steps of Jidoka PosterFour Steps of Jidoka Poster
Four Steps of Jidoka Poster
 
Lean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process PosterLean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process Poster
 
AIDA Marketing Model Poster
AIDA Marketing Model PosterAIDA Marketing Model Poster
AIDA Marketing Model Poster
 
TPM: One-Point Lessons Poster
TPM: One-Point Lessons PosterTPM: One-Point Lessons Poster
TPM: One-Point Lessons Poster
 
4M Analysis Poster
4M Analysis Poster4M Analysis Poster
4M Analysis Poster
 
Hoshin Planning Poster
Hoshin Planning PosterHoshin Planning Poster
Hoshin Planning Poster
 
Customer-Centricity
Customer-CentricityCustomer-Centricity
Customer-Centricity
 
Lean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) PosterLean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) Poster
 
Business Model Canvas
Business Model CanvasBusiness Model Canvas
Business Model Canvas
 

Kürzlich hochgeladen

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalEvelina300651
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 

Kürzlich hochgeladen (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business Proposal
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 

Lean Poster

  • 1. Lean Concepts & Principles © Operational Excellence Consulting. All rights reserved. PDCA APPROACH TO WASTE ELIMINATION VALUE-ADD VS. NON-VALUE ADD 1. Define value from the customer’s perspective and provide what they want 2. Identify the value stream or process for each product or service and reduce or eliminate steps that do not add value 3. Align the value-added steps so they flow continuously 4. Allow the level of customer demand to pull the process, i.e., produce only what is ordered 5. Pursue perfection through continuous improvement LEAN MANAGEMENT FRAMEWORK LEAN PRINCIPLESWORK VS. WASTE Over-production Producing more than what the customer needs Inventory Building and storing extra products the customer has not ordered Transportation Moving product from one place to another Defects Reprocessing, or correcting work Over-processing Adding excess value when the customer does not require it Motion Extra physical or mental motion that does not add value Intellect Not using employees’ full intellectual contribution Waiting Employees waiting for another process or a machine/tool Waste § Transform or shape material or information § Customer wants it and willing to pay for it § Done right the first time § No value created but required by current thinking § No value created but required by process limitations § No value created but required by current technology § No value created but required by government/ business regulations § Consume resources but creates no value for the customer § Could be stopped and it would be invisible to the customer Value-Added Activities Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Value-Add Non-Value Add: Incidental Waste Non-Value Add: Pure Waste EIGHT TYPES OF WASTE Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5 Stability Just-In-Time • Continuous flow • Takt time • Pull system • Flexible workforce Jidoka • Separate man & machine work • Abnormality Identification • Poka yoke • Visual Control Goals: highest quality, lowest cost, shortest lead times Involvement 1 3 4 5 Heijunka Standardized Work Kaizen2 Select the Theme Plan the Schedule Grasp the Present Situation Establish the Target Analyze the Cause & Identify Corrective Action Implement Corrective Action Evaluate the Result Standardize & Follow-up 1 2 3 4 5 6 7 8 PLAN ACT CHECK DO
  • 2. Lean Concepts & Principles © Operational Excellence Consulting. All rights reserved. PDCA APPROACH TO WASTE ELIMINATION VALUE-ADD VS. NON-VALUE ADD 1. Define value from the customer’s perspective and provide what they want 2. Identify the value stream or process for each product or service and reduce or eliminate steps that do not add value 3. Align the value-added steps so they flow continuously 4. Allow the level of customer demand to pull the process, i.e., produce only what is ordered 5. Pursue perfection through continuous improvement LEAN MANAGEMENT FRAMEWORK LEAN PRINCIPLESWORK VS. WASTE Over-production Producing more than what the customer needs Inventory Building and storing extra products the customer has not ordered Transportation Moving product from one place to another Defects Reprocessing, or correcting work Over-processing Adding excess value when the customer does not require it Motion Extra physical or mental motion that does not add value Intellect Not using employees’ full intellectual contribution Waiting Employees waiting for another process or a machine/tool Waste § Transform or shape material or information § Customer wants it and willing to pay for it § Done right the first time § No value created but required by current thinking § No value created but required by process limitations § No value created but required by current technology § No value created but required by government/ business regulations § Consume resources but creates no value for the customer § Could be stopped and it would be invisible to the customer Value-Added Activities Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Value-Add Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5 Stability Just-In-Time • Continuous flow • Takt time • Pull system • Flexible workforce Jidoka • Separate man & machine work • Abnormality Identification • Poka yoke • Visual Control Goals: highest quality, lowest cost, shortest lead times Involvement 1 3 4 5 Heijunka Standardized Work Kaizen2 EIGHT TYPES OF WASTE Select the Theme Plan the Schedule Grasp the Present Situation Establish the Target Analyze the Cause & Identify Corrective Action Implement Corrective Action Evaluate the Result Standardize & Follow-up 1 2 3 4 5 6 7 8 PLAN ACT CHECK DO
  • 3. © Operational Excellence Consulting. All rights reserved. 3 Operational Excellence Consulting is a management training and consulting firm that assists organizations in improving business performance and effectiveness. Based in Singapore, the firm’s mission is to create business value for organizations through innovative design and operational excellence management training and consulting solutions. For more information, please visit www.oeconsulting.com.sg