SlideShare a Scribd company logo
1 of 28
Download to read offline
High Voltage Truck
Protection and Fire Prevention
Case Study
Paul Edwards
8th November 2017
Contents
1. Truck specifications
2. Electrical protection systems
3. Truck fire case study
4. Actions
5. Learning’s
Fires Reported in Queensland
During 2016 there were 305 fires reported from surface coal mines in
Queensland, with 90% of these involving fixed plant and mobile
equipment.
Of the 77 electrical fires reported there were 60 fires which involved
mobile equipment.
3
Truck Specifications
A Typical Ultra Class Truck
• Gross Weight: 600t with a 363t payload
• Engine: MTU 20V – 2,800kW
• Kato Alternator:1,450V @ 2 MW
• Electric dynamic braking: 4,500 kW
• Siemens wheel motors: 2 x 2,000 kW
• DC Bus: 2,500 V
4
Truck’s Drive System
5
Insulation Monitoring System
• The insulation monitoring device
is connected between live (DC
Bus) conductors and earth.
• The voltage UG generated by the
generator G is superimposed into
the system via the measuring
resistance Rm, the low pass filter
and the coupling resistor RA
• An insulation fault RF between
system and earth closes the
measuring circuit creating
measuring current Im
• Im causes a voltage drop Um
proportional to the insulation fault
RF at the measuring resistance
Rm
6
Insulation Monitoring System
Insulation monitor settings:
• Sensing was 3 cycles now 2 cycles
• Warning was 450 kΩ, now 2 MΩ
• Alarm was 100 kΩ, now 1 MΩ
7
Overcurrent Protection
Over current detection will
trigger a fault (and turn off
the entire drive) if
approximately 3,800 A is
detected for more than ½
second.
8
Drive System
9
2 x Water
cooled
“Power
Stacks”
per wheel
motor
drive
Case Study Truck Fire
Truck travelling to the
dump, dozer operator
reported the fire to the
truck operator.
Note: The aluminum
truck ID sign has
melted. (~530 C)
10
Case Study Truck Fire
The affected area
should look like this
11
Case Study Truck Fire
• Truck operating
normally
• No alarms,
truck data
corrupted
• No early
warning logged
via the
insulation
monitor
• Operator didn’t
know the truck
was on fire until
notified by the
dozer operator
12
Case Study Truck Fire
Close up view
of the High
Voltage
harness and
hydraulic lines
13
Case Study Truck Fire
View looking
down on the
High Voltage
harness and
hydraulic lines
14
Case Study Truck Fire
High Voltage harness
and hydraulic lines
removed and
inspected
15
Case Study Truck Fire
Identified cable arcing on
Motor 1 Phase U-2
16
Case Study Truck Fire
Identified cable
arcing on Motor 1
Phase U-2.
This position was
in mid air between
the major Stauff
support clamps.
17
Case Study Truck Fire
Identified cable arcing on Motor 1
Phase U-2
18
Case Study Truck Fire
From the evidence of the arcing
damage, there was current flow
between Motor 1 U - 2 and most
probably U -1 phase. The drive system
wouldn't protect easily for this type of
fault. Trip 3,800 A for 0.5 seconds.
Melting temperature for copper is
1,082C, Cable 535.3MCM (American).
Temperature rating is 90C 2kV rated.
Stauff clamp supported the 3,400 PSI
pressurised hydraulic park brake hose
which eventually failed from heat
accelerating the fire. Flash point of the
oil 250 – 400C.
19
Case Study Truck Fire
Audited truck fleets
and found this cable
damage
Every truck had cables
and hydraulic hosing
run to the axle box
differently. (In Australia
and the US)
There was no one
common standard.
20
Case Study Truck Fire
Stauff clamp supporting the high pressure hydraulic brake lines had moved
resulting in the cable rub failure between conductors. The movement could
have been during operation as a result of the movement of the axle box or by
human intervention or a combination of both.
Most probably cause was human intervention from a maintenance activity.
Maintenance History
08/06/2016 – Hydraulic Park line was replaced in this area
02/07/2016 – Air conditioner hydraulic pump was replaced
20/07/2016 – 3,000 hr service was completed
24/08/2016 – 500 hr service was completed
19/09/2016 – Truck Fire
21
Case Study Truck Fire
New standard
22
Case Study Truck Fire
Fire suppression system failed to fully
discharge all nozzles.
Filler lid was found loose on the Ansul
chemical bottle. The system discharged
through the fill cap on this Ansul bottle.
23
Case Study Truck Fire
Fire wire for auto activation of the
fire suppression system is located
below the cable ignition risk by > 1
metre.
No heat or ignition sources below
the “Y” ducting, only hydraulic
pumps and hoses
24
Case Study Truck Fire
Corrective Actions
• Improve cable / hose routing and standardised with the OEM
AS/NZ 4871.6 Electrical equipment for mines and quarries – Part 6 Diesel powered machinery and ancillary equipment
Section 2.2.4 Protection of cables and cable harnesses
(a) (iii) Not in direct contact with any hot surfaces, fuel lines, brake lines, pneumatic lines, hydraulic lines or the like.
NOTE: Where wiring is in close proximity, additional protection, spacing, restraint or fixing should be utilized.
• Separate high pressure fluids further, a technical request sent to OEM
• Ansul fire chemical tank, installation of mechanical security to the filler
cap
• Fire wire was repositioned to improve the activation time
• Education program and improvements with the inspection
program, interactions between trades (Mechanical / Electrical)
25
Case Study Truck Fire
Learning’s
• Educating maintainers with the risks of cable / hydraulic hose rubbing
• Sticking to the OEM installation and engaging with them for product
improvement
• Managing Mechanical / Electrical interfaces with cable and high
pressure fluid management needs an increased risk focus
• Fire risk management, don’t be a passenger, we as maintenance and
engineering leaders need to become more active with the suppliers.
Share the learning's to improve equipment for the future.
26
Case Study Truck Fire
It is not enough to do your best; you
must know what to do, and then do your
best.
William E. Deming
Thank you
27
Paul Edwards

More Related Content

What's hot

Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
michaeljmack
 
Upgrading gen protect and grounding
Upgrading gen protect and groundingUpgrading gen protect and grounding
Upgrading gen protect and grounding
michaeljmack
 
Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...
Living Online
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
dwessin
 

What's hot (20)

Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 
Siemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentationSiemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentation
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Molded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical InformationMolded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical Information
 
5220 l11
5220 l115220 l11
5220 l11
 
Ieee pes psrc
Ieee pes psrcIeee pes psrc
Ieee pes psrc
 
Practical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansPractical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and Technicians
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Upgrading gen protect and grounding
Upgrading gen protect and groundingUpgrading gen protect and grounding
Upgrading gen protect and grounding
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...
 
havells ppt
havells ppthavells ppt
havells ppt
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliance
 
Mccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.orgMccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.org
 
Mersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
Mersen Intelligent Fuse Technology Medium Voltage Controllable FuseMersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
Mersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
 

Similar to High voltage truck protection and fire prevention Paul Edwards

Osha Wind Farms
Osha Wind FarmsOsha Wind Farms
Osha Wind Farms
vtsiri
 
Interstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement ProjectInterstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement Project
Margaret Puckette
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
Paul Soko
 

Similar to High voltage truck protection and fire prevention Paul Edwards (20)

Mike chapman-evolution-of-the-rural-network-stand-alone-power-system-pilot
Mike chapman-evolution-of-the-rural-network-stand-alone-power-system-pilotMike chapman-evolution-of-the-rural-network-stand-alone-power-system-pilot
Mike chapman-evolution-of-the-rural-network-stand-alone-power-system-pilot
 
Steve Mitchell: Wireless Charge Electric Mine Vehicle
Steve Mitchell: Wireless Charge Electric Mine VehicleSteve Mitchell: Wireless Charge Electric Mine Vehicle
Steve Mitchell: Wireless Charge Electric Mine Vehicle
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
 
Wireless charge - Steven Mitchell
Wireless charge - Steven MitchellWireless charge - Steven Mitchell
Wireless charge - Steven Mitchell
 
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro TasmaniaSecuring Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
 
Osha Wind Farms
Osha Wind FarmsOsha Wind Farms
Osha Wind Farms
 
Tony Smith investigation update
Tony Smith investigation updateTony Smith investigation update
Tony Smith investigation update
 
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Electric hybrid bv rev3
Electric hybrid bv rev3Electric hybrid bv rev3
Electric hybrid bv rev3
 
ACCC conductor overview
ACCC conductor overviewACCC conductor overview
ACCC conductor overview
 
Interstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement ProjectInterstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement Project
 
EID_Unit 01_000.ppt
EID_Unit 01_000.pptEID_Unit 01_000.ppt
EID_Unit 01_000.ppt
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
Green, Sustainable Microturbines
Green, Sustainable MicroturbinesGreen, Sustainable Microturbines
Green, Sustainable Microturbines
 
Tunnels firefighting
Tunnels firefightingTunnels firefighting
Tunnels firefighting
 
Wide Area Blackouts Causes and Prevention
Wide Area Blackouts Causes and PreventionWide Area Blackouts Causes and Prevention
Wide Area Blackouts Causes and Prevention
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processes
 
Planning to Avoid Failure Storage Tanks
Planning to Avoid Failure Storage TanksPlanning to Avoid Failure Storage Tanks
Planning to Avoid Failure Storage Tanks
 

More from NSW Environment and Planning

Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
NSW Environment and Planning
 

More from NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Recently uploaded

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Recently uploaded (20)

Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 

High voltage truck protection and fire prevention Paul Edwards

  • 1. High Voltage Truck Protection and Fire Prevention Case Study Paul Edwards 8th November 2017
  • 2. Contents 1. Truck specifications 2. Electrical protection systems 3. Truck fire case study 4. Actions 5. Learning’s
  • 3. Fires Reported in Queensland During 2016 there were 305 fires reported from surface coal mines in Queensland, with 90% of these involving fixed plant and mobile equipment. Of the 77 electrical fires reported there were 60 fires which involved mobile equipment. 3
  • 4. Truck Specifications A Typical Ultra Class Truck • Gross Weight: 600t with a 363t payload • Engine: MTU 20V – 2,800kW • Kato Alternator:1,450V @ 2 MW • Electric dynamic braking: 4,500 kW • Siemens wheel motors: 2 x 2,000 kW • DC Bus: 2,500 V 4
  • 6. Insulation Monitoring System • The insulation monitoring device is connected between live (DC Bus) conductors and earth. • The voltage UG generated by the generator G is superimposed into the system via the measuring resistance Rm, the low pass filter and the coupling resistor RA • An insulation fault RF between system and earth closes the measuring circuit creating measuring current Im • Im causes a voltage drop Um proportional to the insulation fault RF at the measuring resistance Rm 6
  • 7. Insulation Monitoring System Insulation monitor settings: • Sensing was 3 cycles now 2 cycles • Warning was 450 kΩ, now 2 MΩ • Alarm was 100 kΩ, now 1 MΩ 7
  • 8. Overcurrent Protection Over current detection will trigger a fault (and turn off the entire drive) if approximately 3,800 A is detected for more than ½ second. 8
  • 9. Drive System 9 2 x Water cooled “Power Stacks” per wheel motor drive
  • 10. Case Study Truck Fire Truck travelling to the dump, dozer operator reported the fire to the truck operator. Note: The aluminum truck ID sign has melted. (~530 C) 10
  • 11. Case Study Truck Fire The affected area should look like this 11
  • 12. Case Study Truck Fire • Truck operating normally • No alarms, truck data corrupted • No early warning logged via the insulation monitor • Operator didn’t know the truck was on fire until notified by the dozer operator 12
  • 13. Case Study Truck Fire Close up view of the High Voltage harness and hydraulic lines 13
  • 14. Case Study Truck Fire View looking down on the High Voltage harness and hydraulic lines 14
  • 15. Case Study Truck Fire High Voltage harness and hydraulic lines removed and inspected 15
  • 16. Case Study Truck Fire Identified cable arcing on Motor 1 Phase U-2 16
  • 17. Case Study Truck Fire Identified cable arcing on Motor 1 Phase U-2. This position was in mid air between the major Stauff support clamps. 17
  • 18. Case Study Truck Fire Identified cable arcing on Motor 1 Phase U-2 18
  • 19. Case Study Truck Fire From the evidence of the arcing damage, there was current flow between Motor 1 U - 2 and most probably U -1 phase. The drive system wouldn't protect easily for this type of fault. Trip 3,800 A for 0.5 seconds. Melting temperature for copper is 1,082C, Cable 535.3MCM (American). Temperature rating is 90C 2kV rated. Stauff clamp supported the 3,400 PSI pressurised hydraulic park brake hose which eventually failed from heat accelerating the fire. Flash point of the oil 250 – 400C. 19
  • 20. Case Study Truck Fire Audited truck fleets and found this cable damage Every truck had cables and hydraulic hosing run to the axle box differently. (In Australia and the US) There was no one common standard. 20
  • 21. Case Study Truck Fire Stauff clamp supporting the high pressure hydraulic brake lines had moved resulting in the cable rub failure between conductors. The movement could have been during operation as a result of the movement of the axle box or by human intervention or a combination of both. Most probably cause was human intervention from a maintenance activity. Maintenance History 08/06/2016 – Hydraulic Park line was replaced in this area 02/07/2016 – Air conditioner hydraulic pump was replaced 20/07/2016 – 3,000 hr service was completed 24/08/2016 – 500 hr service was completed 19/09/2016 – Truck Fire 21
  • 22. Case Study Truck Fire New standard 22
  • 23. Case Study Truck Fire Fire suppression system failed to fully discharge all nozzles. Filler lid was found loose on the Ansul chemical bottle. The system discharged through the fill cap on this Ansul bottle. 23
  • 24. Case Study Truck Fire Fire wire for auto activation of the fire suppression system is located below the cable ignition risk by > 1 metre. No heat or ignition sources below the “Y” ducting, only hydraulic pumps and hoses 24
  • 25. Case Study Truck Fire Corrective Actions • Improve cable / hose routing and standardised with the OEM AS/NZ 4871.6 Electrical equipment for mines and quarries – Part 6 Diesel powered machinery and ancillary equipment Section 2.2.4 Protection of cables and cable harnesses (a) (iii) Not in direct contact with any hot surfaces, fuel lines, brake lines, pneumatic lines, hydraulic lines or the like. NOTE: Where wiring is in close proximity, additional protection, spacing, restraint or fixing should be utilized. • Separate high pressure fluids further, a technical request sent to OEM • Ansul fire chemical tank, installation of mechanical security to the filler cap • Fire wire was repositioned to improve the activation time • Education program and improvements with the inspection program, interactions between trades (Mechanical / Electrical) 25
  • 26. Case Study Truck Fire Learning’s • Educating maintainers with the risks of cable / hydraulic hose rubbing • Sticking to the OEM installation and engaging with them for product improvement • Managing Mechanical / Electrical interfaces with cable and high pressure fluid management needs an increased risk focus • Fire risk management, don’t be a passenger, we as maintenance and engineering leaders need to become more active with the suppliers. Share the learning's to improve equipment for the future. 26
  • 27. Case Study Truck Fire It is not enough to do your best; you must know what to do, and then do your best. William E. Deming Thank you 27