Page 1
Smart Grid, Smart City
National Cost Benefit Assessment
27 November, 2014 – Smart Energy Forum
Newcastle Institute for Energy and Resources
Bob Bosler, Senior Consultant, Energeia
Ranelle Cliff, Senior Project Manager, Arup
© Energeia 2014. All Rights Reserved
Page 2
• Approach to Smart Grid, Smart City National Cost Benefit Assessment
• Outlook and technology optimisation results
• Strategic Context
• SGSC Report Conclusions and Recommendations
• Transitioning to a Smart Grid Future
• Developments since SGSC and implications
Overview
© Energeia 2014. All Rights Reserved
Page 3
Energeia
© Energeia 2014. All Rights Reserved
• Founded in 2009 in Sydney, now largest specialist consultancy in Australia
• 15 full-time experts based in Sydney, with network of distinguished experts
• We seek out transformative projects which, by their nature:
• Are technically high risk
• Have high strategic value
Confidential
Page 4
Smart Grid, Smart City
Page 5
National Cost Benefit Assessment
© Energeia 2014. All Rights Reserved
What is our independent, informed assessment of
the Business Case for the deployment of an
integrated Smart Grid in a national context?
Page 6
Integrated Benefits Model
© Energeia 2014. All Rights Reserved
Network Model
Customer
Behaviour
Model
Tech Costs
Year n
(PV, CHP
Storage)
DC
Network
Price
Impact
Electricity
Price &
Tariff
Structure
Sample
NMI 19
Sample
NMI 20
……
Sample
NMI 3
Sample
NMI 2
Sample
NMI 1
Δ Load
profile 19
Δ Load
profile 20
…..
Δ Load
profile 3
Δ Load
profile 2
Δ Load
profile 1
Diversity
Model Forgone Network
Revenue
Avoided
Network
Costs
Storage
Algorithms
Age,
Utilisation,
Replacement
Period
AEMO
Forecasts
(Peak, Off
Peak
growth)
Feeder
Zone Sub
Wholesale
Price
Impact
Retail
Price
Impact
Wholesale Market Model
Tech Costs
Year n
(SFM, FDIR,
AVVC)
Page 7
Model Scope
© Energeia 2014. All Rights Reserved
• Six states
• Three scenarios (H,M,L economic growth)
• 5 time intervals (2014 to 2034)
• 1.5 weeks per model run
• 18 virtual machines (courtesy of Ausgrid)
Page 8
Smart Grid Technologies Assessed
© Energeia 2014. All Rights Reserved
Pre-Payment Plan
Critical Peak Pricing
Seasonal Time of Use
Capacity Tariff
Direct Load Control
Retailer
Solar PV
Fuel Cells (CHP)
Battery Storage
EV Smart Charging
Consumer
Active Volt VAr Control (AVVC)
Fault Detection, Isolation and Restoration (FDIR)
Substation and Feeder Monitoring (SFM)
Network
Smart Meter
Infrastructure
Page 9
Business as Usual
© Energeia 2014. All Rights Reserved
Inclining Block Tariffs
Retailer
Solar PV
Fuel Cells (CHP)
Battery Storage
EVs Unconstrained
Consumer
No change
Network
Accumulation
Meters*
* Victoria assumed SMI
Page 10
Medium Scenario
Outlook
Page 11
11
252
15,745
855
3,635
796 354 (4,981)
(164) (1,334)
(99) (2,514)
(333) (265)
15,235 27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
National Cost Benefit Assessment
© Energeia 2014. All Rights Reserved
Page 12
12
1
230
21 0 24
139
88
0
50
100
150
200
250
300
350
Seach Costs VCR Load Surveys PQ Surveys SFM Opex SFM Capex
Benefits Costs SFM Net
Benefit
Present
Value
($M
2014
Real)
Substation and Feeder Monitoring
© Energeia 2014. All Rights Reserved
Page 13
13
4
15,741 24 1,310
14,411
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
Seach Costs VCR FDIR Opex FDIR Capex
Benefits Costs FDIR Net Benefit
Present
Value
($M
2014
Real)
Fault Detection, Isolation and Restoration
© Energeia 2014. All Rights Reserved
Page 14
14
9
846 98
1 756
0
100
200
300
400
500
600
700
800
900
1,000
Avoided Line Losses Peak Benefits Capex Opex
Benefits Costs AVVC Net Benefits
Present
Value
($M
2014
Real)
Active Volt VAr Control
© Energeia 2014. All Rights Reserved
Page 15
15
252
(164)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 16
16
252
15,745
(164) (1,334)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 17
17
252
15,745
855 (164) (1,334)
(99)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 18
18
252
15,745
855
3,635
(164) (1,334)
(99) (2,514)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 19
19
252
15,745
855
3,635
796
(164) (1,334)
(99) (2,514)
(333)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 20
20
252
15,745
855
3,635
796 354
(164) (1,334)
(99) (2,514)
(333) (265)
27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 21
21
252
15,745
855
3,635
796 354 (4,981)
(164) (1,334)
(99) (2,514)
(333) (265)
15,235 27,183
0
5,000
10,000
15,000
20,000
25,000
30,000
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SFM
FDIR
AVVC
Dynamic
Tariffs
SMI
EV
Charging
DG
&
DS
SMI Enabled SMI Enabled
Benefits Costs Total
Present
Value
($M
2014
Real)
Contribution to National Net Benefit
© Energeia 2014. All Rights Reserved
Page 22
22
Total DGDS Capacity (NEM exc large ind)
© Energeia 2014. All Rights Reserved
0
5
10
15
20
25
30
2014 2019 2024 2029 2034
BAU
Capacity
(GW)
Cumulative Solar (GW) Cumulative Battery (GW) Cumulative CHP (GW)
0
5
10
15
20
25
30
2014 2019 2024 2029 2034
SG
Capacity
(GW)
Cumulative Solar (GW) Cumulative Battery (GW) Cumulative CHP (GW)
Page 23
23
Change in Peak Demand
© Energeia 2014. All Rights Reserved
0
5
10
15
20
25
30
35
40
45
2014 2019 2024 2029 2034
Peak
Demand
(GW)
Peak demand - BaU (GW) Peak demand - SG (GW)
Page 24
24
Change in Consumption
© Energeia 2014. All Rights Reserved
0
20
40
60
80
100
120
2010 2015 2020 2025 2030 2035
Consumption
(TWh)
Consumption BAU Consumption SG
Page 25
25
0
5
10
15
20
25
30
35 12:00:00
AM
1:30:00
AM
3:00:00
AM
4:30:00
AM
6:00:00
AM
7:30:00
AM
9:00:00
AM
10:30:00
AM
12:00:00
PM
1:30:00
PM
3:00:00
PM
4:30:00
PM
6:00:00
PM
7:30:00
PM
9:00:00
PM
10:30:00
PM
12:00:00
AM
Demand
(GW)
2014 BaU 2034 SG 2034
NEM Peak Day
© Energeia 2014. All Rights Reserved
Page 26
Page 26
Strategic context
Page 27
Page 27
Strategic context
Australian Government & COAG Energy Council
• Review of RET Development of new Energy White Paper
• Aust Govt and jurisdictional policies COAG Energy Council priorities & work streams
AEMC
• Power of choice program Expanding competition in metering & services
• DNSP pricing arrangements Retail competition review …… and LOTS more
AER
• Better regulation reform program Cost allocation guidelines
• Service target performance incentive scheme (STPIS) review
AEMO
• Value of customer reliability
• Distribution network annual planning reports
Page 28
Page 28
COAG Energy Council
Strengthening Network Regulation
• Fairer network rules
• A stronger AER
• Improvements to the appeals
mechanism
Empowering Customers
• Strengthening opportunities for
consumer engagement
• Enhanced access to better consumer
data
• Opt-in TOU pricing
• Greater demand side participation
opportunities
• Enhanced consumer protection
Enhancing Competition and Innovation
• Greater retail competition and
innovation
• ‘Fair and reasonable’ return for all
microgeneration
Ensuring Balanced Network
Investment
• A national framework for reliability
standards
• Investigating demand responsiveness of
the regulatory framework
• Ensuring efficient transmission
investment
Page 29
Page 29
Stakeholder priorities
Network
impacts
Market
impacts
Consumer
impacts
Greenhouse
gas impacts
Price
impacts
Page 30
Page 30
Conclusions and
recommendations
Page 31
Page 31
High level strategic themes
Existing COAG
Energy Council
market reform
program
Cost reflective
pricing for
consumers
Jurisdictional
government
and industry
leadership
Consumer
education and
industry
training
Innovation in
technology and
product
deployment
Need for
interoperability
standards
Page 32
Page 32
Fault Detection, Isolation & Restoration FDIR
• has the potential to deliver significant economic
benefits
• heavily dependent on the value of customer
reliability (currently being reviewed by AEMO)
Page 33
Page 33
Smart Meter Infrastructure (SMI)
• Two value propositions modeled:
• Full deployment, termed stand-alone
• Customer-led, with the smart grid
case assuming uptake with
installation of DG or DS
• Enabling infrastructure
Page 34
Page 34
SMI – (stand-alone or full deployment)
• Not yet economic (with the exception of some
long-rural network topologies in some states)
• Avoided billing, metering and customer service
costs for urban and short rural network not
sufficient to offset capital costs for SMI
Page 35
Page 35
SMI + Dynamic Tariffs + Cust Feedback
• Clear positive economic case for immediate
deployment of dynamic tariffs in Australia
(requiring SMI)
• If dynamic tariffs are voluntary, not all
customers will adopt the offer
Page 36
Page 36
SMI Deployment Predictions
-
2
4
6
8
10
12
14
16
18
2014 2019 2024 2029 2034
Meters
(Millions)
Spinning Disc Full Deployment VIC Rollout Customer Led
Page 37
Page 37
SMI + Dynamic Tariffs + Cust Feedback (2)
• Without dynamic tariffs customers will be presented
with a strong financial incentive to install larger
distributed generation systems
• If inclining block (or flat) tariffs are maintained in
Australia it is unlikely that distributed storage will be
deployed due to a lack of financial incentives
Page 38
Page 38
Customer Research Survey Results
Key findings relating to dynamic pricing
• High satisfaction with SGSC Customer Applications network
& retail products
• Most popular trial products involved discrete peak events
• BudgetSmart also popular
• Financially vulnerable customers derived more benefit and
satisfaction from products than other households
Engagement with feedback technology vs. overall
savings
0.54
0.3
0
0.2
0.4
0.6
Daily or 2-3 times per
week
Weekly or less often
Overall
savings
Page 39
Page 39
DG + DS + SMI + Dynamic Tariffs
• Dynamic pricing drives the deployment of smaller
solar PV systems and CHP compared to BAU
• Balanced by the deployment of around 3.5 GW of
storage capacity
• Under BAU, negligible storage is likely to be
deployed
Page 40
Page 40
Electricity bill impacts (residential)
$1,712
$244 $47 $2,003
$156 $2,159 $420
$332
$1,407
0
500
1,000
1,500
2,000
2,500
3,000
SG Bill
Customer with
DG/DS
Cost of DG/DS Cross Subsidy
SG
SG Passive SG Benefits BAU Passive
Customer
Cross Subsidy
BAU
Cost oF DG/DS BAU with
DG/DS
Annual
Bill
Impact
($)
Average Bill - SG Average Bill - BaU
Page 41
Page 41
Electricity bill impacts (business)
$8,390
$1,711
$3,083 $13,184
$2,108 $15,292 $9,251
$2,620
$3,421
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
SG Bill
Customer with
DG/DS
Cost of DG/DSCross Subsidy
SG
SG Passive SG Benefits BAU Passive
Customer
Cross Subsidy
BAU
Cost oF
DG/DS
BAU with
DG/DS
Annual
Bill
Impact
($)
Average Bill - SG Average Bill - BaU
Page 42
Page 42
Transitioning to a smart grid
future
Page 43
Page 43
Transitioning industry and consumers
• Balancing:
• Risks and opportunities from new smart grid
investment
• Financial, reliability and environmental benefits
and issues
• People
• Industry and electricity consumers -
understanding, education and change
Page 44
Page 44
Maximising the benefits and opportunities
• Need for interoperability standards
• Managing greater volumes of distributed generation
and introducing distributed storage
• Examining the business case for:
• Cost reflective consumer prices
• In-grid smart grid technologies
• Consumer feedback technologies
• Key costs and risks of inaction
Page 45
Post SGSC Developments
Page 46
Post SGSC Developments (1/2)
© Energeia 2014. All Rights Reserved
• AEMC Metering Contestability Rule Change (Ongoing, Draft
Determination due March 2015)
o Likely to be retailer lead
o Minimum functional spec likely to require smart metering
o New and replacements likely to include smart meter functionality
o Where there is a business case, retailers can roll out smart meters
• AEMC Distribution Network Pricing Draft Rule Determination (Aug 2014)
o Requires tariffs to be based on LRMC
o Networks already moving to capacity based tariffs (SA Power
Networks, Energex)
Page 47
Post SGSC Developments (2/2)
© Energeia 2014. All Rights Reserved
• AEMC Distribution Reliability Measures (September 2014)
o AER to develop reliability guidelines
o MAIFI increasing from 1 minute to 3 minutes
• AEMO Value Customer Reliability (October 2014)
o Residential values have not changed substantially since 2007/08
o Commercial values notably higher
Page 48
Thank You
Arup Energeia
Level 10
201 Kent Street
Sydney NSW 2000
Level 23 Gold Fields House
1 Alfred Street
Sydney NSW 2000
P +612 9320 9647
E ranelle.cliff@arup.com
W www.arup.com
P +612 8097 0070
E bbosler@energeia.com.au
W www.energeia.com.au

More Related Content

What's hot

Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
Yole Developpement
 
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
Eshwar Pisalkar
 
Freewire Berkeley final presentation
Freewire Berkeley final presentationFreewire Berkeley final presentation
Freewire Berkeley final presentation
Stanford University
 
The Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
The Future of Electric Vehicles in Australia - EVC Char Behyad JafariThe Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
The Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
Behyad Jafari
 

What's hot (20)

Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
Power Electronics in Electric and Hybrid Vehicles 2014 Report by Yole Develo...
 
Smart charging puts the pedal to the metal on e-mobility
Smart charging puts the pedal to the metal on e-mobilitySmart charging puts the pedal to the metal on e-mobility
Smart charging puts the pedal to the metal on e-mobility
 
141208 AER Public Forum - TransGrid Revenue Proposal
141208 AER Public Forum - TransGrid Revenue Proposal141208 AER Public Forum - TransGrid Revenue Proposal
141208 AER Public Forum - TransGrid Revenue Proposal
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 
Ev solve presentation
Ev solve presentationEv solve presentation
Ev solve presentation
 
V2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S MullenV2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S Mullen
 
V2G Cohort: The Future
V2G Cohort: The FutureV2G Cohort: The Future
V2G Cohort: The Future
 
Day2: Mr. Pr ray
Day2: Mr. Pr rayDay2: Mr. Pr ray
Day2: Mr. Pr ray
 
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
APPLICATION OF PHEVs FOR SMART GRID IN INDIAN POWER SECTOR1
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
 
Regulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the gridRegulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the grid
 
SMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSSMART V2G APPPLICATIONS
SMART V2G APPPLICATIONS
 
The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...
 
V2G State of the art technology
V2G State of the art technologyV2G State of the art technology
V2G State of the art technology
 
Sss14cheung Hitachi Europe
Sss14cheung Hitachi EuropeSss14cheung Hitachi Europe
Sss14cheung Hitachi Europe
 
Day-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSESDay-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSES
 
Freewire Berkeley final presentation
Freewire Berkeley final presentationFreewire Berkeley final presentation
Freewire Berkeley final presentation
 
The Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
The Future of Electric Vehicles in Australia - EVC Char Behyad JafariThe Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
The Future of Electric Vehicles in Australia - EVC Char Behyad Jafari
 
Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program
 
Scaling up renewable energy deployment in island regions: insights and lessons
Scaling up renewable energy deployment in island regions: insights and lessonsScaling up renewable energy deployment in island regions: insights and lessons
Scaling up renewable energy deployment in island regions: insights and lessons
 

Viewers also liked

قلم وميدان فبراير 2017
قلم وميدان فبراير 2017قلم وميدان فبراير 2017
قلم وميدان فبراير 2017
قلم وميدان
 
Springcamp api gateway prototype
Springcamp api gateway prototypeSpringcamp api gateway prototype
Springcamp api gateway prototype
Rjs Ryu
 

Viewers also liked (20)

Clean Energy Finance Corporation
Clean Energy Finance CorporationClean Energy Finance Corporation
Clean Energy Finance Corporation
 
Cooperative Drilling
Cooperative DrillingCooperative Drilling
Cooperative Drilling
 
Muscular system
Muscular systemMuscular system
Muscular system
 
قلم وميدان فبراير 2017
قلم وميدان فبراير 2017قلم وميدان فبراير 2017
قلم وميدان فبراير 2017
 
Raheel Iqbal
Raheel IqbalRaheel Iqbal
Raheel Iqbal
 
Preview radar systems david howell
Preview radar systems   david howellPreview radar systems   david howell
Preview radar systems david howell
 
Springcamp api gateway prototype
Springcamp api gateway prototypeSpringcamp api gateway prototype
Springcamp api gateway prototype
 
Biblio tic-arte 1
Biblio tic-arte 1Biblio tic-arte 1
Biblio tic-arte 1
 
E learning repro sys
E learning repro sysE learning repro sys
E learning repro sys
 
Nmdl final project express-kate schild
Nmdl final project express-kate schildNmdl final project express-kate schild
Nmdl final project express-kate schild
 
Smart Grid Analytics
Smart Grid AnalyticsSmart Grid Analytics
Smart Grid Analytics
 
Limbajultrupului(cOp)
Limbajultrupului(cOp)Limbajultrupului(cOp)
Limbajultrupului(cOp)
 
Mdg 41 review - Gary Nauer
Mdg 41 review - Gary NauerMdg 41 review - Gary Nauer
Mdg 41 review - Gary Nauer
 
Smart EMC
Smart EMCSmart EMC
Smart EMC
 
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDIILatest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
 
Mte penyertaan
Mte penyertaanMte penyertaan
Mte penyertaan
 
Mte penyertaan
Mte penyertaanMte penyertaan
Mte penyertaan
 
Artefactos digitales ei y ep
Artefactos digitales ei y epArtefactos digitales ei y ep
Artefactos digitales ei y ep
 
Perkenalan diri
Perkenalan diriPerkenalan diri
Perkenalan diri
 
Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...
 

Similar to Smart Grid, Smart City

Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016
Mark Coughlin
 
2014 Transmission Annual Planning Report - Non-network solutions
2014 Transmission Annual Planning Report - Non-network solutions2014 Transmission Annual Planning Report - Non-network solutions
2014 Transmission Annual Planning Report - Non-network solutions
TransGrid AU
 

Similar to Smart Grid, Smart City (20)

Smart Grid, Smart City: National Cost Benefit Assessment
Smart Grid, Smart City: National Cost Benefit AssessmentSmart Grid, Smart City: National Cost Benefit Assessment
Smart Grid, Smart City: National Cost Benefit Assessment
 
150819 Reliability Webinar presentation
150819 Reliability Webinar presentation150819 Reliability Webinar presentation
150819 Reliability Webinar presentation
 
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMCExperience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMC
 
IPKeysPP - WEEC Presentation 9.29.15
IPKeysPP - WEEC Presentation 9.29.15IPKeysPP - WEEC Presentation 9.29.15
IPKeysPP - WEEC Presentation 9.29.15
 
Anglian Water Trial – Cambridge
Anglian Water Trial – CambridgeAnglian Water Trial – Cambridge
Anglian Water Trial – Cambridge
 
Case study abb mission and vision
Case study abb mission and visionCase study abb mission and vision
Case study abb mission and vision
 
Transformation Tools for Utilities | Indigo Advisory Group
Transformation Tools for Utilities | Indigo Advisory GroupTransformation Tools for Utilities | Indigo Advisory Group
Transformation Tools for Utilities | Indigo Advisory Group
 
Transformation Tools for Utilities - Indigo Advisory Group
Transformation Tools for Utilities - Indigo Advisory GroupTransformation Tools for Utilities - Indigo Advisory Group
Transformation Tools for Utilities - Indigo Advisory Group
 
TransGrid consumer advisory panel
TransGrid consumer advisory panelTransGrid consumer advisory panel
TransGrid consumer advisory panel
 
How to Value Digitalization
How to Value DigitalizationHow to Value Digitalization
How to Value Digitalization
 
6.1_Adapting the Integrated Grid Economic Framework to Microgrids_Roark_EPRI/...
6.1_Adapting the Integrated Grid Economic Framework to Microgrids_Roark_EPRI/...6.1_Adapting the Integrated Grid Economic Framework to Microgrids_Roark_EPRI/...
6.1_Adapting the Integrated Grid Economic Framework to Microgrids_Roark_EPRI/...
 
Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering Sydney
 
Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
 
2014 Transmission Annual Planning Report - Non-network solutions
2014 Transmission Annual Planning Report - Non-network solutions2014 Transmission Annual Planning Report - Non-network solutions
2014 Transmission Annual Planning Report - Non-network solutions
 
Smart Grid in Korea
Smart Grid in Korea Smart Grid in Korea
Smart Grid in Korea
 
01 ltbr
01 ltbr01 ltbr
01 ltbr
 
LTBR Presentation April 2014
LTBR Presentation April 2014LTBR Presentation April 2014
LTBR Presentation April 2014
 
Engage with...Ricardo | Driving the Electric Revolution Webinar
Engage with...Ricardo | Driving the Electric Revolution WebinarEngage with...Ricardo | Driving the Electric Revolution Webinar
Engage with...Ricardo | Driving the Electric Revolution Webinar
 
Exponential Energy Keynote - TPOC 2019
Exponential Energy Keynote - TPOC 2019Exponential Energy Keynote - TPOC 2019
Exponential Energy Keynote - TPOC 2019
 

More from NSW Environment and Planning

Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
NSW Environment and Planning
 

More from NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Recently uploaded

Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Monica Sydney
 

Recently uploaded (20)

Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 

Smart Grid, Smart City

  • 1. Page 1 Smart Grid, Smart City National Cost Benefit Assessment 27 November, 2014 – Smart Energy Forum Newcastle Institute for Energy and Resources Bob Bosler, Senior Consultant, Energeia Ranelle Cliff, Senior Project Manager, Arup © Energeia 2014. All Rights Reserved
  • 2. Page 2 • Approach to Smart Grid, Smart City National Cost Benefit Assessment • Outlook and technology optimisation results • Strategic Context • SGSC Report Conclusions and Recommendations • Transitioning to a Smart Grid Future • Developments since SGSC and implications Overview © Energeia 2014. All Rights Reserved
  • 3. Page 3 Energeia © Energeia 2014. All Rights Reserved • Founded in 2009 in Sydney, now largest specialist consultancy in Australia • 15 full-time experts based in Sydney, with network of distinguished experts • We seek out transformative projects which, by their nature: • Are technically high risk • Have high strategic value Confidential
  • 4. Page 4 Smart Grid, Smart City
  • 5. Page 5 National Cost Benefit Assessment © Energeia 2014. All Rights Reserved What is our independent, informed assessment of the Business Case for the deployment of an integrated Smart Grid in a national context?
  • 6. Page 6 Integrated Benefits Model © Energeia 2014. All Rights Reserved Network Model Customer Behaviour Model Tech Costs Year n (PV, CHP Storage) DC Network Price Impact Electricity Price & Tariff Structure Sample NMI 19 Sample NMI 20 …… Sample NMI 3 Sample NMI 2 Sample NMI 1 Δ Load profile 19 Δ Load profile 20 ….. Δ Load profile 3 Δ Load profile 2 Δ Load profile 1 Diversity Model Forgone Network Revenue Avoided Network Costs Storage Algorithms Age, Utilisation, Replacement Period AEMO Forecasts (Peak, Off Peak growth) Feeder Zone Sub Wholesale Price Impact Retail Price Impact Wholesale Market Model Tech Costs Year n (SFM, FDIR, AVVC)
  • 7. Page 7 Model Scope © Energeia 2014. All Rights Reserved • Six states • Three scenarios (H,M,L economic growth) • 5 time intervals (2014 to 2034) • 1.5 weeks per model run • 18 virtual machines (courtesy of Ausgrid)
  • 8. Page 8 Smart Grid Technologies Assessed © Energeia 2014. All Rights Reserved Pre-Payment Plan Critical Peak Pricing Seasonal Time of Use Capacity Tariff Direct Load Control Retailer Solar PV Fuel Cells (CHP) Battery Storage EV Smart Charging Consumer Active Volt VAr Control (AVVC) Fault Detection, Isolation and Restoration (FDIR) Substation and Feeder Monitoring (SFM) Network Smart Meter Infrastructure
  • 9. Page 9 Business as Usual © Energeia 2014. All Rights Reserved Inclining Block Tariffs Retailer Solar PV Fuel Cells (CHP) Battery Storage EVs Unconstrained Consumer No change Network Accumulation Meters* * Victoria assumed SMI
  • 11. Page 11 11 252 15,745 855 3,635 796 354 (4,981) (164) (1,334) (99) (2,514) (333) (265) 15,235 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) National Cost Benefit Assessment © Energeia 2014. All Rights Reserved
  • 12. Page 12 12 1 230 21 0 24 139 88 0 50 100 150 200 250 300 350 Seach Costs VCR Load Surveys PQ Surveys SFM Opex SFM Capex Benefits Costs SFM Net Benefit Present Value ($M 2014 Real) Substation and Feeder Monitoring © Energeia 2014. All Rights Reserved
  • 13. Page 13 13 4 15,741 24 1,310 14,411 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 Seach Costs VCR FDIR Opex FDIR Capex Benefits Costs FDIR Net Benefit Present Value ($M 2014 Real) Fault Detection, Isolation and Restoration © Energeia 2014. All Rights Reserved
  • 14. Page 14 14 9 846 98 1 756 0 100 200 300 400 500 600 700 800 900 1,000 Avoided Line Losses Peak Benefits Capex Opex Benefits Costs AVVC Net Benefits Present Value ($M 2014 Real) Active Volt VAr Control © Energeia 2014. All Rights Reserved
  • 15. Page 15 15 252 (164) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 16. Page 16 16 252 15,745 (164) (1,334) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 17. Page 17 17 252 15,745 855 (164) (1,334) (99) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 18. Page 18 18 252 15,745 855 3,635 (164) (1,334) (99) (2,514) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 19. Page 19 19 252 15,745 855 3,635 796 (164) (1,334) (99) (2,514) (333) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 20. Page 20 20 252 15,745 855 3,635 796 354 (164) (1,334) (99) (2,514) (333) (265) 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 21. Page 21 21 252 15,745 855 3,635 796 354 (4,981) (164) (1,334) (99) (2,514) (333) (265) 15,235 27,183 0 5,000 10,000 15,000 20,000 25,000 30,000 SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SFM FDIR AVVC Dynamic Tariffs SMI EV Charging DG & DS SMI Enabled SMI Enabled Benefits Costs Total Present Value ($M 2014 Real) Contribution to National Net Benefit © Energeia 2014. All Rights Reserved
  • 22. Page 22 22 Total DGDS Capacity (NEM exc large ind) © Energeia 2014. All Rights Reserved 0 5 10 15 20 25 30 2014 2019 2024 2029 2034 BAU Capacity (GW) Cumulative Solar (GW) Cumulative Battery (GW) Cumulative CHP (GW) 0 5 10 15 20 25 30 2014 2019 2024 2029 2034 SG Capacity (GW) Cumulative Solar (GW) Cumulative Battery (GW) Cumulative CHP (GW)
  • 23. Page 23 23 Change in Peak Demand © Energeia 2014. All Rights Reserved 0 5 10 15 20 25 30 35 40 45 2014 2019 2024 2029 2034 Peak Demand (GW) Peak demand - BaU (GW) Peak demand - SG (GW)
  • 24. Page 24 24 Change in Consumption © Energeia 2014. All Rights Reserved 0 20 40 60 80 100 120 2010 2015 2020 2025 2030 2035 Consumption (TWh) Consumption BAU Consumption SG
  • 27. Page 27 Page 27 Strategic context Australian Government & COAG Energy Council • Review of RET Development of new Energy White Paper • Aust Govt and jurisdictional policies COAG Energy Council priorities & work streams AEMC • Power of choice program Expanding competition in metering & services • DNSP pricing arrangements Retail competition review …… and LOTS more AER • Better regulation reform program Cost allocation guidelines • Service target performance incentive scheme (STPIS) review AEMO • Value of customer reliability • Distribution network annual planning reports
  • 28. Page 28 Page 28 COAG Energy Council Strengthening Network Regulation • Fairer network rules • A stronger AER • Improvements to the appeals mechanism Empowering Customers • Strengthening opportunities for consumer engagement • Enhanced access to better consumer data • Opt-in TOU pricing • Greater demand side participation opportunities • Enhanced consumer protection Enhancing Competition and Innovation • Greater retail competition and innovation • ‘Fair and reasonable’ return for all microgeneration Ensuring Balanced Network Investment • A national framework for reliability standards • Investigating demand responsiveness of the regulatory framework • Ensuring efficient transmission investment
  • 29. Page 29 Page 29 Stakeholder priorities Network impacts Market impacts Consumer impacts Greenhouse gas impacts Price impacts
  • 30. Page 30 Page 30 Conclusions and recommendations
  • 31. Page 31 Page 31 High level strategic themes Existing COAG Energy Council market reform program Cost reflective pricing for consumers Jurisdictional government and industry leadership Consumer education and industry training Innovation in technology and product deployment Need for interoperability standards
  • 32. Page 32 Page 32 Fault Detection, Isolation & Restoration FDIR • has the potential to deliver significant economic benefits • heavily dependent on the value of customer reliability (currently being reviewed by AEMO)
  • 33. Page 33 Page 33 Smart Meter Infrastructure (SMI) • Two value propositions modeled: • Full deployment, termed stand-alone • Customer-led, with the smart grid case assuming uptake with installation of DG or DS • Enabling infrastructure
  • 34. Page 34 Page 34 SMI – (stand-alone or full deployment) • Not yet economic (with the exception of some long-rural network topologies in some states) • Avoided billing, metering and customer service costs for urban and short rural network not sufficient to offset capital costs for SMI
  • 35. Page 35 Page 35 SMI + Dynamic Tariffs + Cust Feedback • Clear positive economic case for immediate deployment of dynamic tariffs in Australia (requiring SMI) • If dynamic tariffs are voluntary, not all customers will adopt the offer
  • 36. Page 36 Page 36 SMI Deployment Predictions - 2 4 6 8 10 12 14 16 18 2014 2019 2024 2029 2034 Meters (Millions) Spinning Disc Full Deployment VIC Rollout Customer Led
  • 37. Page 37 Page 37 SMI + Dynamic Tariffs + Cust Feedback (2) • Without dynamic tariffs customers will be presented with a strong financial incentive to install larger distributed generation systems • If inclining block (or flat) tariffs are maintained in Australia it is unlikely that distributed storage will be deployed due to a lack of financial incentives
  • 38. Page 38 Page 38 Customer Research Survey Results Key findings relating to dynamic pricing • High satisfaction with SGSC Customer Applications network & retail products • Most popular trial products involved discrete peak events • BudgetSmart also popular • Financially vulnerable customers derived more benefit and satisfaction from products than other households Engagement with feedback technology vs. overall savings 0.54 0.3 0 0.2 0.4 0.6 Daily or 2-3 times per week Weekly or less often Overall savings
  • 39. Page 39 Page 39 DG + DS + SMI + Dynamic Tariffs • Dynamic pricing drives the deployment of smaller solar PV systems and CHP compared to BAU • Balanced by the deployment of around 3.5 GW of storage capacity • Under BAU, negligible storage is likely to be deployed
  • 40. Page 40 Page 40 Electricity bill impacts (residential) $1,712 $244 $47 $2,003 $156 $2,159 $420 $332 $1,407 0 500 1,000 1,500 2,000 2,500 3,000 SG Bill Customer with DG/DS Cost of DG/DS Cross Subsidy SG SG Passive SG Benefits BAU Passive Customer Cross Subsidy BAU Cost oF DG/DS BAU with DG/DS Annual Bill Impact ($) Average Bill - SG Average Bill - BaU
  • 41. Page 41 Page 41 Electricity bill impacts (business) $8,390 $1,711 $3,083 $13,184 $2,108 $15,292 $9,251 $2,620 $3,421 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 SG Bill Customer with DG/DS Cost of DG/DSCross Subsidy SG SG Passive SG Benefits BAU Passive Customer Cross Subsidy BAU Cost oF DG/DS BAU with DG/DS Annual Bill Impact ($) Average Bill - SG Average Bill - BaU
  • 42. Page 42 Page 42 Transitioning to a smart grid future
  • 43. Page 43 Page 43 Transitioning industry and consumers • Balancing: • Risks and opportunities from new smart grid investment • Financial, reliability and environmental benefits and issues • People • Industry and electricity consumers - understanding, education and change
  • 44. Page 44 Page 44 Maximising the benefits and opportunities • Need for interoperability standards • Managing greater volumes of distributed generation and introducing distributed storage • Examining the business case for: • Cost reflective consumer prices • In-grid smart grid technologies • Consumer feedback technologies • Key costs and risks of inaction
  • 45. Page 45 Post SGSC Developments
  • 46. Page 46 Post SGSC Developments (1/2) © Energeia 2014. All Rights Reserved • AEMC Metering Contestability Rule Change (Ongoing, Draft Determination due March 2015) o Likely to be retailer lead o Minimum functional spec likely to require smart metering o New and replacements likely to include smart meter functionality o Where there is a business case, retailers can roll out smart meters • AEMC Distribution Network Pricing Draft Rule Determination (Aug 2014) o Requires tariffs to be based on LRMC o Networks already moving to capacity based tariffs (SA Power Networks, Energex)
  • 47. Page 47 Post SGSC Developments (2/2) © Energeia 2014. All Rights Reserved • AEMC Distribution Reliability Measures (September 2014) o AER to develop reliability guidelines o MAIFI increasing from 1 minute to 3 minutes • AEMO Value Customer Reliability (October 2014) o Residential values have not changed substantially since 2007/08 o Commercial values notably higher
  • 48. Page 48 Thank You Arup Energeia Level 10 201 Kent Street Sydney NSW 2000 Level 23 Gold Fields House 1 Alfred Street Sydney NSW 2000 P +612 9320 9647 E ranelle.cliff@arup.com W www.arup.com P +612 8097 0070 E bbosler@energeia.com.au W www.energeia.com.au